Price Summary Template
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN
ITEM Task Classification Description Associated Deliverable Qty Price
| 001 | WRI Solution Design - MCAGCC Twentynine Palms | |||
| 001-1 | WRI Solution Design | WRI Site Survey and "as is" E-LMR System Base-lining | A001, A002, A007 | 1 |
| 001-2 | WRI System Architecture | A001, A002, A007 | 1 | |
| 001-3 | Critical Design Review | A001, A002, A003, A004, A005, A006, A007, A008, A018, A022, A023, A024, A025, A029, A032, A034, A035, A037, A038, A039, A040 | 1 | |
| TOTAL ITEM 001 |
| 002 | WRI Fielding - MCAGCC Twentynine Palms | |||
| 002-1 | WRI Fielding | Radio Frequency Substation | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 |
| 002-2 | 10 channel RF Repeater Suite (Bearmat Hill) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 002-3 | 6 channel RF Repeater Suite (Argos) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 002-4 | 6 channel RF Repeater Suite (Bullion) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 002-5 | 6 channel RF Repeater Suite (Noble Pass) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 002-6 | Network Management System server/client | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 002-7 | Key Management Facility server/client/loader | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 002-8 | P25 OTAR via infrastructure | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 002-9 | OTAP (IAW final TIA-102 standards) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 002-10 | Network Logging Recorder | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 002-11 | Inter RF Subsystem Interface (IAW final TIA-102 standards) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 002-12 | Baseband Audio bridge (24 resources) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 002-13 | Subscriber Unit Programming | A032 | 1 | |
| 002-14 | Factory Acceptance Test, Functional Configuration Audit, IA Self-Assessment | A002, A014, A019, A025, A026, A027, A028, A030, A031, A035, A036, A037, A039, A040 | 1 | |
| 002-15 | IA Independent Verification & Validation, Physical Configuration Audit, Site Acceptance Test | A002, A015, A016, A017, A020, A030, A031, A032, A033 | 1 | |
| 002-16 | Installation of 6 channel RF repeater suite (Location TBD) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 3 | |
| 002-17 | Installation of 12 channel RF repeater suite (Location TBD) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 3 | |
| 002-18 | Radio Dispatch Console | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 4 | |
| 002-19 | Workstation Furniture | A026 | 4 | |
| 002-20 | Warranty | Initial (3) Three Year Warranty | A018, A038, A039, A040 | 1 |
| 002-21 | (1) One Year Warranty- Year 4 | A018, A038, A039, A040 | 1 | |
| 002-22 | (1) One Year Warranty- Year 5 | A018, A038, A039, A040 | 1 | |
| 002-23 | Sustainment Services | 24x7 Remote Network Monitoring & Diagnostics- Initial (3) Three Years | A018, A038, A039, A040 | 1 |
| 002-24 | 24x7 Remote Network Monitoring & Diagnostics- (1) One Year- Year 4 | A018, A038, A039, A040 | 1 | |
| 002-25 | 24x7 Remote Network Monitoring & Diagnostics- (1) One Year- Year 5 | A018, A038, A039, A040 | 1 | |
| 002-26 | Toll-Free Telephone Help Desk- Initial (3) Three Years | A018, A038, A039, A040 | 1 | |
| 002-27 | Toll-Free Telephone Help Desk- (1) One Year- Year 4 | A018, A038, A039, A040 | 1 | |
| 002-28 | Toll-Free Telephone Help Desk- (1) One Year- Year 5 | A018, A038, A039, A040 | 1 | |
| 002-29 | Dispatched On-Site Fixed Equipment Response & Repair- Initial (3) Three Years | A018, A038, A039, A040 | 1 | |
| 002-30 | Dispatched On-Site Fixed Equipment Response & Repair- (1) One Year- Year 4 | A018, A038, A039, A040 | 1 | |
| 002-31 | Dispatched On-Site Fixed Equipment Response & Repair- (1) One Year- Year 5 | A018, A038, A039, A040 | 1 | |
| 002-32 | Preventive Maintenance Service- Initial (3) Three Years | A018, A038, A039, A040 | 1 | |
| 002-33 | Preventive Maintenance Service- (1) One Year- Year 4 | A018, A038, A039, A040 | 1 | |
| 002-34 | Preventive Maintenance Service- (1) One Year- Year 5 | A018, A038, A039, A040 | 1 | |
| 002-35 | Information Assurance | DoD Information Assurance Certification & Accreditation Process Support | A002, A015, A016, A017, A026, A027, A028, A030, A031 | 1 |
| 002-36 | Information Assurance Vulnerability Scanning & Mitigation | A002, A015, A016, A017, A026, A027, A028, A030, A031 | 1 | |
| 002-37 | Configuration Management Support | A002, A015, A016, A017, A021, A022, A23, A024, A025, A026, A027, A037 | 1 | |
| TOTAL ITEM 002 |
| 003 | WRI Solution Design - MCMWTC Bridgeport | |||
| 003-1 | WRI Solution Design | WRI Site Survey and "as is" E-LMR System Base-lining | A001, A002, A007 | 1 |
| 003-2 | WRI System Architecture | A001, A002, A007 | 1 | |
| 003-3 | Critical Design Review | A001, A002, A003, A004, A005, A006, A007, A008, A018, A022, A023, A024, A025, A029, A032, A034, A035, A037, A038, A039, A040 | 1 | |
| TOTAL ITEM 003 |
| 004 | WRI Fielding - MCMWTC Bridgeport | |||
| 004-1 | WRI Fielding | 6 channel RF Repeater Suite (Sweetwater) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 |
| 004-2 | 6 channel RF Repeater Suite (Mean Peak) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 004-3 | 6 channel RF Repeater Suite (Coleville) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 004-4 | 6 channel RF Repeater Suite (Base Camp) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 004-5 | 6 channel RF Repeater Suite (Little Wolf) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 004-6 | Network Management System server/client | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 004-7 | Key Management Facility server/client/loader | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 004-8 | P25 OTAR via infrastructure | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 004-9 | OTAP (IAW final TIA-102 standards) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 004-10 | Network Logging Recorder | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 004-11 | Baseband Audio bridge (24 resources) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 004-12 | Subscriber Unit Programming | A032 | 1 | |
| 004-13 | Factory Acceptance Test, Functional Configuration Audit, IA Self-Assessment | A002, A014, A019, A025, A026, A027, A028, A030, A031, A035, A036, A037, A039, A040 | 1 | |
| 004-14 | IA Independent Verification & Validation, Physical Configuration Audit, Site Acceptance Test | A002, A015, A016, A017, A020, A030, A031, A032, A033 | 1 | |
| 004-15 | Installation of 6 channel RF repeater suite (Location TBD) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 004-16 | Installation of 12 channel RF repeater suite (Location TBD) | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 1 | |
| 004-17 | Radio Dispatch Console | A026, A027, A028, A030, A031, A032, A033, A034, A035, A036, A037 | 4 | |
| 004-18 | Workstation Furniture | A026 | 4 | |
| 004-19 | Warranty | Initial (3) Three Year Warranty | A018, A038, A039, A040 | 1 |
| 004-20 | (1) One Year Warranty- Option Year 1 | A018, A038, A039, A040 | 1 | |
| 004-21 | (1) One Year Warranty- Option Year 2 | A018, A038, A039, A040 | 1 | |
| 004-22 | Sustainment Services | 24x7 Remote Network Monitoring & Diagnostics- Initial (3) Three Years | A018, A038, A039, A040 | 1 |
| 004-23 | 24x7 Remote Network Monitoring & Diagnostics- (1) One Year- Year 4 | A018, A038, A039, A040 | 1 | |
| 004-24 | 24x7 Remote Network Monitoring & Diagnostics- (1) One Year- Year 5 | A018, A038, A039, A040 | 1 | |
| 004-25 | Toll-Free Telephone Help Desk- Initial (3) Three Years | A018, A038, A039, A040 | 1 | |
| 004-26 | Toll-Free Telephone Help Desk- (1) One Year- Year 4 | A018, A038, A039, A040 | 1 | |
| 004-27 | Toll-Free Telephone Help Desk- (1) One Year- Year 5 | A018, A038, A039, A040 | 1 | |
| 004-28 | Dispatched On-Site Fixed Equipment Response & Repair- Initial (3) Three Years | A018, A038, A039, A040 | 1 | |
| 004-29 | Dispatched On-Site Fixed Equipment Response & Repair- (1) One Year- Year 4 | A018, A038, A039, A040 | 1 | |
| 004-30 | Dispatched On-Site Fixed Equipment Response & Repair- (1) One Year- Year 5 | A018, A038, A039, A040 | 1 | |
| 004-31 | Preventive Maintenance Service- Initial (3) Three Years | A018, A038, A039, A040 | 1 | |
| 004-32 | Preventive Maintenance Service- (1) One Year- Year 4 | A018, A038, A039, A040 | 1 | |
| 004-33 | Preventive Maintenance Service- (1) One Year- Year 5 | A018, A038, A039, A040 | 1 | |
| 004-34 | Information Assurance | DoD Information Assurance Certification & Accreditation Process Support | A002, A015, A016, A017, A026, A027, A028, A030, A031 | 1 |
| 004-35 | Information Assurance Vulnerability Scanning & Mitigation | A002, A015, A016, A017, A026, A027, A028, A030, A031 | 1 | |
| 004-36 | Configuration Management Support | A002, A015, A016, A017, A021, A022, A23, A024, A025, A026, A027, A037 | 1 | |
| TOTAL ITEM 004 |
Deliverable
| Deliverable Number | Item Description/Title | PWS Section | Delivery Due | CLIN |
| A001 | Progress, Status and Management Report | 3.3.1, 3.3.2.1.1 | Quarterly | |
| A002 | Report, Record of Meeting/Minutes | 3.4.3, 3.4.3.1, 3.4.3.2 | As Required | |
| A003 | Systems Engineering Management Plan | 3.4 | 7 days prior to PAC | |
| A004 | System/Subsystem Design Description | 3.4.1 | 14 days prior to CDR | |
| A005 | Interface Design Description | 3.4.1 | 14 days prior to CDR | |
| A006 | Software Design Description | 3.4.1 | 14 days prior to CDR | |
| A007 | Database Design Description | 3.4.1 | 14 days prior to CDR | |
| A008 | Telecommunications System Engineering Plan | 3.4.1 | 14 days prior to CDR | |
| A009 | Spectrum Supportability Risk Assessment | 3.4.1.1.2 | 14 days prior to CDR | |
| A010 | System Safety Program Plan | 3.4.1.2 | 14 days prior to CDR | |
| A011 | Safety Assessment Report | 3.4.1.2 | 14 days prior to CDR | |
| A012 | Battery Selection Program Report | 3.4.1.2 | 14 days prior to CDR | |
| A013 | Frequency Allocation Data | 3.4.1.3 | 14 days prior to CDR | |
| A014 | Design Review Information Package | 3.4.3, 3.4.3.1, 3.4.3.2 | 14 days prior to CDR, FCA, TRR, PCA | |
| A015 | Information Assurance Design Review Information Package | 3.4.4.1, 3.4.3.1 | 14 days prior to IA Self Assessment and IV&V | |
| A016 | Information Assurance Test Plan | 3.4.4.1 | 14 days prior to appropriate IA event | |
| A017 | Information Assurance Test Report | 3.4.4.1 | 5 days after appropriate IA event | |
| A018 | Contractor's Configuration Management Plan | 3.4.5 | 14 days prior to CDR | |
| A019 | Functional Configuration Audit (FCA) Plan | 3.4.5.2 | 30 days prior to FAT | |
| A020 | Configuration Audit Summary Report | 3.4.5.2, 3.4.5.3 | 5 days after completion of event | |
| A021 | Engineering Change Proposal | 3.4.5.4 | 7 days after receipt of Government comment | |
| A022 | Contract Change Proposal | 3.4.5.4 | As required within 15 days of notification from Contracting Officer | |
| A023 | Request for Waiver | 3.4.5.5 | As required 15 days of identification of design change that requires a waiver | |
| A024 | Notice of Revision | 3.4.5.6 | As required 15 days of identification of design change that requires a waiver | |
| A025 | Configuration Status Accounting Information | 3.4.5.7 | Within 15 days of approved changes | |
| A026 | Product Drawings/Models and Associated Lists | 3.4.5.9 | 14 days prior to FAT; 30 days for subsequent submissions when required | |
| A027 | Software Version Description | 3.4.5.10 | 14 days prior to FAT; 30 days for subsequent submissions when required | |
| A028 | Telecommunications System Installation Plan | 3.4.6 | 14 days prior to CDR; 30 days for subsequent submissions when required | |
| A029 | Site Survey Report | 3.4.6 | 14 days prior to CDR; 30 days for subsequent submissions when required | |
| A030 | Test Plan, each test event | 3.4.3.2, 3.5.1, 3.5.2 | 30 days prior to FAT; 30 days for subsequent submissions when required | |
| A031 | Test Report, each test event | 3.4.3.2, 3.5.1, 3.5.2 | 15 days after Test event | |
| A032 | Installation/Acceptance Test plan | 3.6.4 | 60 days prior to TRR; 30 days for subsequent submissions when required | |
| A033 | Technical Report–Study/Services (Cutover Plan) | 3.6.4 | 60 days prior to TRR; 30 days for subsequent submissions when required | |
| A034 | Training Data Products | 3.7 | 60 days prior to TRR; 30 days for subsequent submissions when required | |
| A035 | COTS Manual and Associated Supplemental Data | 3.8 | 60 days prior to TRR; 30 days for subsequent submissions when required | |
| A036 | Software User Manual | 3.8 | 60 days prior to TRR; 30 days for subsequent submissions when required | |
| A037 | IUID Marking Activity and Verification Report | 3.8.2 | 15 days prior to Site Acceptance Test; 30 days for subsequent submissions when required | |
| A038 | Warranty Performance Report | 3.9.1 | As required; within 30 days of warranty repair/return | |
| A039 | Sustainment Plan | 3.9.2 | 14 days prior to CDR; 30 days for subsequent submissions when required | |
| A040 | Sustainment Engineering and Logistics Report | 3.9.3 | Initial report within 60 days after Contract Award; Annually; within 60 day of Contract closeout |