Attachment_H_SOW_PS_Matrix.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- M67854-13-R-5024
- Issued by
-
United States Marine Corps
About this file
Attachment H SOW PS Matrix
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Supportability Factors (SOW)
LIGHT CAPABILITY ROUGH TERRAIN FORKLIFT (LCRTF)
Vendor:
| SOW Reference | Requirement | Proposal Reference | State whether proposal meets or exceeds requirement | If exceeds, provide a brief summary explaining how the proposal exceeds the requirement |
| 3.1.1 | Program Management | |||
| 3.1.2 | Subcontractor Management | |||
| 3.1.3 | Data Management | |||
| 3.1.4 | Technical Proposal | |||
| 3.2.1 | Contractor Responsibilities | |||
| 3.2.2 | Post Award Conference | |||
| 3.2.3 | In-process review | |||
| 3.3.1 | Systems Engineering Program | |||
| 3.3.2 | Technical reviews | |||
| 3.3.2.1 | Critical Design Review | |||
| 3.3.2.2 | Test Readiness Review | |||
| 3.3.2.3 | System Verification Review | |||
| 3.3.2.4 | Production Readiness Review | |||
| 3.3.2.5 | Physical Configuration Audit | |||
| 3.3.3 | Requirements Traceability Matrix | |||
| 3.3.4 | System Impact Assessment | |||
| 3.3.5 | Corrosion Prevention and Control | |||
| 3.3.6.1 | Reliabiity and Maintainabiilty Program | |||
| 3.3.6.2 | Procedures and Controls | |||
| 3.3.6.3 | Failure reporting Analysis and Corrective Action System | |||
| 3.4.1 | Quality Management System | |||
| 3.5 | Producibility | |||
| 3.6.1 | System Safety | |||
| 3.6.1.1 | Safety Assessment | |||
| 3.6.2 | Material Safety data Sheets | |||
| 3.7.1 | TDP Contents | |||
| 3.7.2 | TDP General Requirements | |||
| 3.7.3.1 | Required Options | |||
| 3.7.3.2 | Application data | |||
| 3.7.3.3 | Drawing Detail | |||
| 3.7.3.4 | Drawing Management | |||
| 3.7.3.5 | Part Identification | |||
| 3.7.3.6 | Material List | |||
| 3.7.3.7 | Standard Items | |||
| 3.7.3.8 | Top level Assembly Drawing | |||
| 3.7.3.9 | Assembly & Subassembly Drawings | |||
| 3.7.3.10 | Detail Drawings | |||
| 3.7.3.11 | Electrical Drawings | |||
| 3.7.4 | Vendor Drawings | |||
| 3.7.5 | Source Control | |||
| 3.8.1 | Configuration management Process | |||
| 3.8.2 | Configuration Identification CI) | |||
| 3.8.3 | Configuration Status Accounting | |||
| 3.8.3.1 | Serialized tracking | |||
| 3.8.3.2 | Modification tracking | |||
| 3.8.3.3 | Baseline Tracking | |||
| 3.8.4 | Configuration Management meetings/Audits | |||
| 3.8.5 | Parts Management Program | |||
| 3.8.6 | Product Baseline Management | |||
| 3.8.7 | Configuration Control | |||
| 3.8.7.1 | Engineering Release System | |||
| 3.8.7.2 | Engineering Change Proposals | |||
| 3.8.7.3 | Requests for Deviation | |||
| 3.8.7.4 | Notice of revision | |||
| 3.9 | Item Unique Identification | |||
| 3.9.1 | Parent End Item Data Plate Information | |||
| 3.9.2 | Sub Assembly data Plate information | |||
| 3.10.1 | Contractor Certification | |||
| 3.10.2 | Contractor Support to Government Testing | |||
| 3.10.3 | Nonconformance of First Article | |||
| 3.10.4 | First Article Refurbishment | |||
| 3.10.5 | Refurbishment and Retrofit of Units | |||
| 3.10.6 | Transportability | |||
| 4.1.1 | Warranty Support Management | |||
| 4.1.2 | Reporting of Warranty data | |||
| 4.1.3 | Execution | |||
| 4.2 | Maintenance Planning | |||
| 4.2.1 | Organizational Level Maintenance | |||
| 4.2.2 | Intermediate Level Maintenance | |||
| 4.2.3 | Depot Level Maintenance | |||
| 4.2.4 | Support Equipment | |||
| 4.3.2 | Provisioning Guidance Conference | |||
| 4.3.3 | Provisioning Conference | |||
| 4.3.4 | Provisioning Plan | |||
| 4.4 | Provisioning and other Pre-procurement Screening Data | |||
| 4.4.1 | Provisioning technical Documentation | |||
| 4.4.2 | Provisioining Parts List | |||
| 4.4.3 | Special Tools Clarification | |||
| 4.4.4 | Special Tools and Test Equipment (STTE) list | |||
| 4.4.5 | Long Lead Time Items List | |||
| 4.4.6 | Common and Bulk Items List (CBIL) | |||
| 4.5 | Supplemental Data for Provisioning (SDFP) | |||
| 4.5.1 | SDFP submission | |||
| 4.6 | Parts Support | |||
| 4.6.1 | Direct Vendor Delivery |
| 4.6.2 | Electronic Data Interchange |
| 4.6.3 | ANSI X12 Transaction Data sets |
| 4.6.4 | Defense Automatic Addressing Service Center (DAASC) |
| 4.6.5 | Conductivity Test |
| 4.6.6 | Delivery Schedule |
| 4.6.7 | Bar-code labeling of individual shipments |
| 4.6.8 | Marking |
| 4.7 | Military Standard Requisitioning & issue Procedures (MILSTRIP) |
| 4.7.1 | Bar Coding |
| 4.7.2 | DD Form 1387 Coding |
| 5.1 | Technical Manuals requirements |
| 5.1.1 | Standardized terminology |
| 5.1.2 | Draft Technical Manual (DTM) |
| 5.1.3 | Final Reproducible Copy (FRC) |
| 5.1.4 | Manuals |
| 5.1.5 | Changes |
| 5.1.6 | Quality Assurance/Quality control |
| 5.1.7 | Validation |
| 5.1.8 | TM Validation Plan |
| 5.2 | Verification |
| 5.2.1 | Final Acceptance |
| 5.2.2 | Final Deliverables |
| 5.3 | Course Development |
| 5.3.1 | Management of Training Development |
| 5.3.2 | Training coruses |
| 5.3.3 | Armor/Crew Protection Kit (CPK) installation Training |
| 5.3.4 | Training Material Development |
| 5.3.5 | Instructional Performance Requirements Documentation (training task data) |
| 5.3.6 | Training program structure documentation (curriculum Outline of Instruction) development |
| 5.3.7 | Training Conduct Support Document (Lesson Plan data Requirements) development |
| 5.3.8 | Conduct Support Document (Trainee Guide Data Requirements) Development |
| 5.3.9 | Instructional Media Package (courseware data files) development |
| 5.3.9.1 | Training Test Package Development |
| 5.3.9.2 | Course Conduct Information Package (Trainee and Training Course Completion Data) |
| 5.4 | Training Requirements |
| 5.4.1 | Product Qualification Test (PQT) training |
| 5.4.2 | Limited User Evaluation (LUE) training |
| 5.4.3 | Instructor and Key Personnel Training (I&KPT) |
| 5.4.4 | New Equipment Training Development |
| 5.4.5 | Conduct of New Equipment Training (NET) |
| 6.1 | Access to Classified Information |
| 6.2 | Secret Faciilty Clearance Requirement |
| 6.3 | For Official Use Only |
| 7.1.1 | Parent End Item Data Plate Informatin |
| 7.1.2 | Sub Assembly data Plate information |
| 7.1.3 | Item unique Identification |
| 7.1.4 | Packaging |
| 7.2 | Marking |
Operational Effectiveness (PS)
| LIGHT CAPABILITY ROUGH TERRAIN FORKLIFT (LCRTF) CPK | ||||
| PD Reference | Requirement | Proposal Reference | State whether proposal meets or exceeds requirement | If exceeds, provide a brief summary explaining how the proposal exceeds the requirement |
| 3.2.1 | Functional capabilities | |||
| 3.3.2.1 | Load Handling | |||
| 3.2.2.2 | Travel | |||
| 3.2.2.3 | Decontamination | |||
| 3.2.2.4 | Basic Issue Items (BII) | |||
| 3.2.3.1 | Drive and Transmission | |||
| 3.2.3.2 | Ignition | |||
| 3.2.4.1 | Crew Protection | |||
| 3.2.4.2 | Installation and Removal | |||
| 3.2.4.3 | Armored Cab | |||
| 3.2.4.4 | Storage and Transport | |||
| 3.2.4.5 | Roll Over Protective Structure (ROPS)/Fall Over Protective Structure (FOPS) | |||
| 3.2.4.6 | Access | |||
| 3.2.4.7 | Seat and Seatbelt | |||
| 3.2.4.8 | Controls and Displays | |||
| 3.2.4.9 | Load Chart | |||
| 3.2.4.10 | Load Moment Indicator Alarm | |||
| 3.2.4.11 | Anti-Overload Device | |||
| 3.2.4.12 | Weapons Bracket | |||
| 3.2.4.13 | Protective Equpment Stowage | |||
| 3.2.4.14 | Heating, Ventilation, and Air Conditioning (HVAC) | |||
| 3.2.4.15 | Defroster | |||
| 3.2.4.16 | Window Wipers and Washer | |||
| 3.2.4.17 | Publications Stowage | |||
| 3.2.4.18 | Cab Illuminatino | |||
| 3.2.5.1 | Horn and Backup Alarm | |||
| 3.2.5.2 | Lights | |||
| 3.2.5.3 | Electricial System | |||
| 3.2.5.4 | Diagnostics | |||
| 3.2.6.1 | Identification Plate | |||
| 3.2.6.2 | Shipping Data Plate | |||
| 3.2.6.3 | Safety Signs | |||
| 3.2.7.1 | Component and Material Quality | |||
| 3.2.7.2 | Hazardous Materials | |||
| 3.2.7.3 | Corrosion | |||
| 3.2.7.4 | Pain and Treatment | |||
| 3.3.1 | Noise | |||
| 3.3.2 | Visibiilty | |||
| 3.3.3 | System Safety | |||
| 3.3.4 | Occupational Safety and Health | |||
| 3.4.1 | Overall External Dimensions | |||
| 3.4.2 | Ground Clearance | |||
| 3.4.3 | Weight | |||
| 3.4.4 | Weight Distribution | |||
| 3.5.1 | Steering | |||
| 3.5.2 | Braking | |||
| 3.5.3 | Angle of Approach and Departure | |||
| 3.6.1 | External Radio Frequency (RF) Electromagnetic Environments (EME) | |||
| 3.6.2 | Electromagnetic Interference (EMI) | |||
| 3.6.3 | Electrostatic Charge Control | |||
| 3.7.1 | High Temperature | |||
| 3.7.2 | Low Temperature | |||
| 3.7.3 | Rain | |||
| 3.7.4 | Sand and Dust | |||
| 3.7.5 | Fording | |||
| 3.8 | Human Factors Engineering | |||
| 3.9.1 | Reliability | |||
| 3.9.2 | Availability | |||
| 3.9.3 | Preventive Maintenance | |||
| 3.9.4 | Corrective Maintenance | |||
| 3.9.5 | Durability | |||
| 3.10.1 | Highway transport | |||
| 3.10.2 | Rail Transport | |||
| 3.10.3 | Marine Transport | |||
| 3.10.4 | Fixed-Wing Air Transport | |||
| 3.10.5 | Rotary-Wing Air Transprot | |||
| 3.10.6 | Lifting and Tiedown Provisions |
File details come from the government source that posted it. Updated .