MSGL_CDRL_9 APRIL 09_Attachment 6.doc

DOC document 2 MB Posted

Attached to
Indefinite Delivery Indefinite Quantity Contract Award for Multi-Shot Grenade Launcher Weapon Systems
Solicitation number
M6785409R1002
Issued by

About this file

MSGL Contract Data Requirements List

View the file

Other files

File Type Posted
AMENDMENT 0001 MSGL.doc DOC document
RFP MSGL.doc DOC document
Attachment 1_PD-MSGL-001 Rev A 9 APRIL 09 FINAL.doc DOC document
Attachment 4_Spares Tools and Gages Pricing Matrix.xls XLS spreadsheet
Attachment 3_Pricing Matrix.xls XLS spreadsheet
MULTI SHOT GRENADE LAUNCHER M67854-09-R1002.xps XPS file
Attachment9_Production Capability Questionairre.doc DOC document
Attachment 8_Safety Assessment.doc DOC document
Attachment7_MC Stocklist_E7900.pdf PDF
Attachment 5_Past Performance.xls XLS spreadsheet
Attachment2_TMCR.doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

M67854-09-R-1002

F. CONTRACTOR

1. DATA ITEM NO.

A0001

2. TITLE OF DATA ITEM

CONTRACTOR'S PROGRESS, STATUS AND MANAGEMENT REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80227

5. CONTRACT REFERENCE

SOW para 3.2.1

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

MTHLY

12. DATE OF 1ST SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 – Report shall be in MS Office format.

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 11 - The reporting period is from the first to last business day of each month.

BLK 12/13 - Submit report within 10 calendar days of the end of the reporting period.

MCSC:

PMM-132

15. TOTAL ---------(

G. PREPARED BY

Major Jody White

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page _1_ of _29_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0002

2. TITLE OF DATA ITEM

GOVERNMENT FURNISHED INFORMATION DEFICIENCY REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80596

5. CONTRACT REFERENCE

SOW para 3.3.2

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

ASREQ

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION ASREQ

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

MCSC:

PMM-132
1
15. TOTAL ---------(
1

G. PREPARED BY

Major Jody White

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 3 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0003

2. TITLE OF DATA ITEM

CONFERENCE AGENDA

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81249A

5. CONTRACT REFERENCE

SOW para 3.4.1

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12/13 - Submit 10 calendar days prior to each conference, meeting, audit, or review. The Government requires 3 calendar days to review. The contractor shall submit final 21 calendar days after receipt of Government comments.

MCSC:

PMM-132
1
1
15. TOTAL ---------(
1
1

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 4 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0004

2. TITLE OF DATA ITEM

CONFERENCE MINUTES

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250A

5. CONTRACT REFERENCE

SOW para 3.4.1

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12/13 - Submit 4 calendar days after each conference, meeting, audit or review. The Government requires 5 calendar days to review. The contractor shall submit final 21 calendar days after receipt of Government comments.

BLK 15 - Distribution 1 plus one copy to each attendee.

MCSC:

(PM)
1
1

Copy to each attendee

15. TOTAL ---------(
1
2

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 5 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0005

2. TITLE OF DATA ITEM

FAILURE SUMMARY AND ANALYSIS REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-RELI-80255

5. CONTRACT REFERENCE

SOW para 3.5.1

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 11 - The reporting period is from the first to last business day of each quarter.

BLK 12/13 - Submit report within 10 calendar days or request.

BLK 14 - Copies shall be delivered electronically in MS Office 2000 format.

MCSC:

PMM-132

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 6 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

M SGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0006

2. TITLE OF DATA ITEM

SYSTEM SAFETY HAZARD ANALYSIS (SSHA) REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80101B

5. CONTRACT REFERENCE

SOW para 3.6.2

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

A

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 - Section 10.2.3, para. (b)10: assessment of hazard risk shall be done in accorance with MIL-STD-882D, para. 4.3.

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - Submit within 30 calendar days of contract award. The Government requires 30 calendar days for review. The contractor shall submit final 30 days after receipt of Government comments.

BLK 13 - Submit updated SSHAs within 30 calendar days of any significant changes to the MSGL design.

BLK 14 - Draft and regular copies shall be delivered electronically in MS Office 2000 format.

MCSC:

PMM-132
1
1

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 7 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0007

2. TITLE OF DATA ITEM

SAFETY ASSESSMENT REPORT (SAR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80102B

5. CONTRACT REFERENCE

SOW para 3.6.3

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - Submit within 30 calendar days of contract award. The Government requires 30 calendar days for review. The contractor shall submit final 30 days after receipt of Government comments.

BLK 13 - Submit updated SARs within 30 calendar days of any significant changes to the MSGL design.

MCSC:

PMM-132
1
1

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0008

2. TITLE OF DATA ITEM

CRITICAL SAFETY ITEM, CHARACTERISTIC AND CRITICAL DEFECT REPORT

3. SUBTITLE

SAFETY ITEMS/CHARACTERISTICS REPORT

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80970A(SICR)

5. CONTRACT REFERENCE

SOW para 3.6.4

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ONE

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - Submit report within 60 calendar days of contract award. The Government requires 45 calendar days to review. The contractor shall incorporate any required changes based on Government comments and resubmit 14 calendar days after receipt of comments.

MCSC:

PMM-132
1
1
15. TOTAL ---------(
1
1

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 9_ of _29_ Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0009

2. TITLE OF DATA ITEM

CRITICAL SAFETY ITEM, CHARACTERISTIC AND CRITICAL DEFECT REPORT

3. SUBTITLE

REPORT OF HARDWARE CONTAINING CRITICAL DEFECT

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80970A(RHCCD)

5. CONTRACT REFERENCE

SOW para 3.6.4

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12/13 - Submit within 7 days of the identification of a critical non-conformance during production.

MCSC:

PMM-132

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 10 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0010

2. TITLE OF DATA ITEM

CONFIGURATION MANAGEMENT PLAN

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80858B

5. CONTRACT REFERENCE

SOW para 3.7

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ONE

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - Submit within 60 calendar days of contract award.

MCSC:

PMM-132

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 11 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0011

2. TITLE OF DATA ITEM

ENGINEERING CHANGE PROPOSAL (ECP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80639C

5. CONTRACT REFERENCE

SOW para 3.7.2

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 14 - Copies shall be delivered electronically in MS Office 2000 format or Portable Document Format (PDF).

MCSC:

PMM-132

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 12 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0012

2. TITLE OF DATA ITEM

NOTICE OF REVISION (NOR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80642C

5. CONTRACT REFERENCE

SOW para 3.7.2

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 14 - Copies shall be delivered electronically in MS Office 2000 format or Portable Document Format (PDF).

MCSC:

PMM-132

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 13 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0013

2. TITLE OF DATA ITEM

REQUEST FOR DEVIATION (RFD)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80640C

5. CONTRACT REFERENCE

SOW para 3.7.2

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 14 - Copies shall be delivered electronically in MS Office 2000 format or Portable Document Format (PDF).

MCSC:

PMM-132

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 14 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0014

2. TITLE OF DATA ITEM

ENGINEERING RELEASE RECORD (ERR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-CMAN-80463C

5. CONTRACT REFERENCE

SOW para 3.7.2.1

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - Submit an Engineering Release Record upon approval of each ECP.

BLK 14 - Copies shall be delivered electronically in Portable Document Format (PDF).

MCSC:

PMM-132

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 15 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _X_ TM _ _ OTHER __ __

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0015

2. TITLE OF DATA ITEM

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81003C

5. CONTRACT REFERENCE

SOW para 3.8.1

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ONE

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government Agencies and their contractors. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - Submit drawings within 60 calendar days of contract award. The Government requires 30 calendar days to review. The contractor shall incorporate any required changes based on Government comments and resubmit 14 calendar days after receipt of comments.

MCSC:

PMM-132
1
1
15. TOTAL ---------(
2
3
1

G. PREPARED BY

Major Jody White

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 16 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _X_ TM _ _ OTHER __ __

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0016

2. TITLE OF DATA ITEM

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS

3. SUBTITLE

SOLID MODELS

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81003C(SM)

5. CONTRACT REFERENCE

SOW para 3.8.2

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

DD

9. DIST

STATEMENT

C

10. FREQUENCY

ONE

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 - Provide solid models for all components and assemblies of the MSGL system. Provide solid models in the following format: STEP AP203, Conformance Class 6 (Advanced Boundary Representation Solids).

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government Agencies and their contractors. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - Submit on a Compact Disc within 45 days of exercise of contract option.

MCSC:

PMM-132

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 17 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _X_ TM _ _ OTHER __ __

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0017

2. TITLE OF DATA ITEM

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS

3. SUBTITLE

GAGE ENGINEERING DRAWINGS

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81003C

5. CONTRACT REFERENCE

SOW para 3.8.3

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

C

10. FREQUENCY

ONE

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government Agencies and their contractors. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - Submit drawings within 60 calendar days of contract award. The Government requires 45 calendar days to review. The contractor shall incorporate any required changes based on Government comments and resubmit 14 calendar days after receipt of comments.

MCSC:

PMM-132

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, JUN 90 (EG)
Previous editions are obsolete
Page 18 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0018

2. TITLE OF DATA ITEM

SOURCE DATA FOR FORECASTING DMSMS

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81656

5. CONTRACT REFERENCE

SOW para 3.10

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ONE

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 2 - DMSMS stands for Diminishing Manufacturing Sources and Material Shortages.

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - The DMSMS source data shall be submitted 30 calendar days after approval of the Production Readiness Review (PRR).

BLK 13 - The contractor shall provide updates as necessary during the contract period to incorporate any changes to configuration/parts.

MCSC:

PMM-132

15. TOTAL ---------(
1
1

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 19 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0019

2. TITLE OF DATA ITEM

TEST/INSPECTION REPORT

3. SUBTITLE

PRODUCTION ACCEPTANCE TEST

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-80809B(PAT)

5. CONTRACT REFERENCE

SOW para 3.11.1

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - Submit within 14 calendar days of completion of the Production Acceptance Test.

MCSC:

PMM-132

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 20 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A-0019

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0020

2. TITLE OF DATA ITEM

FAILURE ANALYSIS AND CORRECTIVE ACTION REPORT

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81315A

5. CONTRACT REFERENCE

SOW para 3.11.1

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

LT

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION

Draft
Final
Reg
Repro

16. REMARKS

BLK 4 - Only submit the Final Report, as described in DI-SESS-81315A.

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - Submit report within 14 calendar days of failed Production Acceptance Testing.

MCSC:

PMM-132

15. TOTAL ---------(

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 21 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0021

2. TITLE OF DATA ITEM

LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCT

3. SUBTITLE

PROVISIONING PLAN

4. AUTHORITY (Data Acquisition Document No.)

DI-ALSS-81529(PP)

5. CONTRACT REFERENCE

SOW para 3.14.1

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

DD

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

30DAC

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION ASREQ

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - The Government requires 60 calendar days to review and the contractor has 90 calendar days to submit final.

MCSC:

PMM-132
1
1
15. TOTAL ---------(
2
2

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 22 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0022

2. TITLE OF DATA ITEM

LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCT

3. SUBTITLE

PROVISIONING TECHNICAL DOCUMENTATION

4. AUTHORITY (Data Acquisition Document No.)

DI-ALSS-81529(PTD)

5. CONTRACT REFERENCE

SOW para 3.14.2

6. REQUIRING OFFICE

MARCORSYSCOM (PM)

7. DD 250 REQ

DD

9. DIST

STATEMENT

B

10. FREQUENCY

ASREQ

12. DATE OF 1ST SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE
b. COPIES

8. APP CODE

11. AS OF DATE

13. DATE OF SUBSEQUENT SUBMISSION SEE BLK 16

Draft
Final
Reg
Repro

16. REMARKS

BLK 9 - Include the following distribution statement on each deliverable: DISTRIBUTION STATEMENT B: Distribution authorized to U.S. Government Agencies only to protect proprietary information. Other requests for this document shall be referred to PMM-132 Infantry Weapons, MARCORSYSCOM.

BLK 12 - Report due 15 calendar days prior to each scheduled IPR. Government will review and provide comments at the IPR. The contractor shall incorporate comments and resubmit within 15 calendar days of each IPR which follows. This review/resubmission process shall be iterative.

BLK 13 - Final submission of data due 30 calendar days prior to the last IPT. Government will provide final comments at IPR. Contractor shall incorporate comments and submit final delivery within 15 calendar days of completion of final IPR. Government will accept / reject data within 15 calendar days.

MCSC:

PMM-132
1
1
15. TOTAL ---------(
2
2

G. PREPARED BY

H. DATE

9 April 09

I. APPROVED BY

Major Matthew Howes

J. DATE

9 April 09

DD Form 1423-1, FEB 2001
PREVIOUS EDITION MAY BE USED
Page 23 of 29 Pages

CONTRACT DATA REQUIREMENTS LIST

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP _ _ TM _ _ OTHER __X__

D. SYSTEM/ITEM

MSGL

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A0023

2. TITLE OF DATA ITEM

LOGISTICS MANAGEMENT INFORMATION (LMI) DATA PRODUCT

3. SUBTITLE

PROVISIONING PARTS LIST

4. AUTHORITY (Data Acquisition…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .