M6740019Q0091_Amendment_0001.pdf
PDF 185 KB Posted
- Attached to
- Conveyor maintenance service
- Solicitation number
- M6740019Q0091
- Issued by
-
United States Marine Corps
About this file
M6740019Q0091_Amendment_0001.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| M6740019Q0091_Amendment_0002.pdf | ||
| M6740019Q0091_M67400-19-Q-0091.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M2023019SU1LZUF
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is as follow s
1. Change qty for CLIN0001,1001,2001 from 4job to 2job
2. Add CLIN 0003,1003,2003 for on call support
3. Update Statement Of Work
4. Extend RFQ close date from 12Jul2019 to 17Jul2019
1. CONTRACT ID CODE PAGE OF PAGES
Y 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M6740019Q0091
X 9B. DATED (SEE ITEM 11)
26-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Jul-2019
CODE
MARINE CORPS REGIONAL CONTRACTING OFFICE
MARINE CORPS BASE
CAMP S.D. BUTLER
PSC 557 BOX 2000
FPO AP CA 96379-2000
M67400 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
M6740019Q0091
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 12-Jul-2019 12:00 AM to 17-Jul-
2019 12:00 AM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN description has changed from Quarterly Maintenance of Conveyor Belt to Biannual
Maintenance of Conveyor Belt.
The CLIN extended description has changed from:
The contractor shall provide preventative maintenance service in accordance with the manufacturer’s specifications.
(See Statement of Work for details).This CLIN shall cover Camp Foster, Kinser, Hansen.POP:
01Aug2019~31Jul2020
To:
The contractor shall provide preventative maintenance service in accordance with the manufacturer’s specifications.
(See Statement of Work for details).This CLIN shall cover Camp Foster, Kinser, Hansen.POP:
01Aug2019~31Jul2020
The pricing detail quantity has decreased by 2.00 from 4.00 to 2.00.
CLIN 1001
CLIN 2001
CLIN 0003 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 12 Months On-call support
FFP
This on call response will provide the opportunity to survey, troubleshoot, and identify or provide initial assessment of component, equipment, or part failure including their associated Conveyor belt system for the listed equipment in the
Statement of Work (SOW).
The Contractor shall perform on-call (on-site) support and repair services in accordance with the Statement of Work (SOW).
The contractor shall perform corrective maintenance on the equipment listed on an on call basis at no additional cost to the Government. Invoicing will be on a monthly basis at the established firm fixed price. Labor and all other costs associated with performance shall be included in this firm fixed price. Total Government estimated hours for maintenance per year: 120 hours.
Government estimates a 15% increase of maintenance hours during the peak usage times in Jun and December.
POP: 01Aug2019~31Jul2020
FOB: Destination
NET AMT
CLIN 1003 is added as follows:
1003 12 Months OPTION On-call support
FFP
This on call response will provide the opportunity to survey, troubleshoot, and identify or provide initial assessment of component, equipment, or part failure including their associated Conveyor belt system for the listed equipment in the
Statement of Work (SOW).
The Contractor shall perform on-call (on-site) support and repair services in accordance with the Statement of Work (SOW).
The contractor shall perform corrective maintenance on the equipment listed on an on call basis at no additional cost to the Government. Invoicing will be on a monthly basis at the established firm fixed price. Labor and all other costs associated with performance shall be included in this firm fixed price. Total Government estimated hours for maintenance per year: 120 hours.
POP: 01Aug2020~31Jul2021
CLIN 2003 is added as follows:
OPTION On-call support
FFP
This on call response will provide the opportunity to survey, troubleshoot, and identify or provide initial assessment of component, equipment, or part failure including their associated Conveyor belt system for the listed equipment in the
Statement of Work (SOW).
The Contractor shall perform on-call (on-site) support and repair services in accordance with the Statement of Work (SOW).
The contractor shall perform corrective maintenance on the equipment listed on an on call basis at no additional cost to the Government. Invoicing will be on a monthly basis at the established firm fixed price. Labor and all other costs associated with performance shall be included in this firm fixed price. Total Government estimated hours for maintenance per year: 120 hours.
POP: 01Aug2021~31Jul2022
DELIVERIES AND PERFORMANCE
The following Delivery Schedule Item has been deleted from CLIN 0001:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
4 N/A
The following Delivery Schedule item has been added to CLIN 0001:
POP 01-AUG-2019 TO
31-JUL-2020
N/A M20230
GOVERNMENT REP
SEE SCHEDULE
FPO AP 00000
M20230
The following Delivery Schedule for CLIN 0002 has been added:
N/A N/A
The following Delivery Schedule for CLIN 0003 has been added:
The following Delivery Schedule for CLIN 1001 has been added:
POP 01-AUG-2020 TO
31-JUL-2021
The following Delivery Schedule for CLIN 1002 has been added:
The following Delivery Schedule for CLIN 1003 has been added:
The following Delivery Schedule for CLIN 2001 has been added:
POP 01-AUG-2021 TO
31-JUL-2022
The following Delivery Schedule for CLIN 2002 has been added:
The following Delivery Schedule for CLIN 2003 has been added:
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0003:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following Acceptance/Inspection Schedule was added for CLIN 1003:
The following Acceptance/Inspection Schedule was added for CLIN 2003:
The following have been modified:
STATEMENT OF WORK
STATEMENT OF WORK
PREVENTATIVE MAINTENANCE AND REPAIR OF POSTAL EQUIPMENT
1. SPECIFIC TASKS:
1.1 Scope of Work: The contractor shall provide all qualified personnel, supervision, supplies, materials, parts, components, equipment, tools, and transportation to perform preventative maintenance and repair services for government owned Conveyor Belt Systems at those locations listed in this Statement of Work. Maintenance will be performed on quarterly basis. Contractor shall provide quarterly maintenance schedule to the Postal Supply
Chief/637-2468 or 637-1191, Camp Kinser, Bldg 820, for prior approval.
1.2 Applicable Documents: It shall be the contractor’s sole responsibility to perform all work under the contract in compliance with the most current edition/revision of the Japanese Environmental Governing Standards (JEGS).
Contractor shall strictly adhere to all JEGS requirements regarding maintenance services.
1.3 General Tasks: Contractor shall perform preventative maintenance and repair services to include inspection, cleaning, lubricating, adjusting, testing, and the replacement of parts to ensure equipment is operational according to the manufacturer’s specifications and is operational at all times.
1.3.1 The contractor shall thoroughly inspect all equipment parts for deterioration, excessive wear, misalignment, loose joints, improper adjustments, or any other defects that affect machine operability, and correct them in accordance with the manufacturer’s specifications.
1.3.2 Contractor shall be reimbursed for conveyor belts, belt connections and conveyor replacement parts that are defective, damaged, or beyond economical repair. However, the contractor shall obtain approval from the Postal
Supply Chief, prior to replacement. The contractor shall procure the items on a competitive basis. Discounts and rebates on items provided to the contractor shall be credited to the government. The Postal Supply Chief reserves the right to specify quality, size, efficiency, and aesthetic requirements for all items.
1.3.2.1 Contractor shall invoice for parts at quarterly and shall provide original delivery tickets, sales slips, or other documents identifying items purchased, to be included with the invoice. Contractor will not be reimbursed without the supporting documentation.
2. EQUIPMENT LIST/LOCATION:
CONVEYOR BELT SYSTEMS
Consolidated Postal System Operations (16 conveyor belts)
Manufacture Name Serial Number Location Building No.
Fuji Electric Company 08114254-03-1 Camp Kinser 820
Fuji Electric Company 08114254-03-2 Camp Kinser 820
Fuji Electric Company 0811425401-03 Camp Kinser 820
Fuji Electric Company 0811425401-05 Camp Kinser 820
Fuji Electric Company 0840890301-02 Camp Kinser 820
Fuji Electric Company 0811425401-01 Camp Kinser 820
Fuji Electric Company 0811425401-04 Camp Kinser 820 Fuji Electric Company 0811425401-02 Camp Kinser 820
Fuji Electric Company 0811425401-06 Camp Kinser 820
Fuji Electric Company 0841650801 Camp Kinser 820
Fuji Electric Company 0841650805 Camp Kinser 820
Fuji Electric Company 0811425402-01 Camp Kinser 820
Fuji Electric Company 0811425402-02 Camp Kinser 820
Fuji Electric Company 0841650803 Camp Kinser 820
Stewart-Glapat Corp. 0013842-2 Camp Kinser 820
Stewart-Glapat Corp. 0013842-1 Camp Kinser 820
Camp Foster Post Office (3 conveyor belts)
Stewart-Glapat Corp. 0013410 Camp Foster 1006
Fuji Electric Company 0812623401 Camp Foster 1006
Fuji Electric Company 50018 Camp Foster 1006
Camp Hansen (3 conveyor belts)
Maruyasu Kikai Company 0862211401 Camp Hansen 2385
Maruyasu Kikai Company 0862211401 Camp Hansen 2385
Fuji Electric Company 765732001 Camp Hansen 2385
3. GENERAL INFORMATION:
3.1 Hours of Operation: Contractor shall perform required services during the following hours: 7:30 a.m. through 4:30 p.m., Monday through Friday.
3.2 Recognized Holidays: The contractor is not required to provide services on the following US holidays:
New Year’s Day 1 January*
Martin Luther King’s Birthday Third Monday in January
President’s Day Third Monday in February
Memorial Day Last Monday in May
Independence Day 4 July*
Labor Day First Monday in September
Columbus Day Second Monday in October
Veteran’s Day 11 November* Thanksgiving Day Fourth Thursday in November
Christmas Day 25 December*
*Note: If a holiday falls on a Saturday, it will be observed on the preceding Friday. If the holiday falls on a Sunday, it will be observed on the following Monday.
3.3 Contract Manager: The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate, who shall act on behalf of the contractor when the manager is absent, shall be designated in writing to the Contracting Officer.
3.3.1 The contract manager shall have full authority to act on behalf of the contractor on all contract matters relating to the daily operation of this contract.
3.3.2 The contract manager, or alternate shall be available during normal duty hours, within one workday, to meet on with government personnel to discuss problem areas.
3.2.4 The contract manager and alternate or alternates shall be able to read, write, speak and understand English.
Contractor Personnel: Contractor personnel shall present a clean, neat appearance and be easily recognized. This may be accomplished by wearing distinctive clothing bearing the name of the company and/or by wearing appropriate badges which contain the company name and the employee’s name.
Clothing or badges shall be provided by the contractor.
3.5 Identification and Base Passes: The contractor shall obtain identification cards and base passes for all employees and vehicles. An Application shall be coordinated through the Regional Contracting Office. At time of application, the Marine Corps Base, Camp Butler Provost Marshall’s Office (PMO) may conduct a background check on employees. Upon termination of employment, the contractor shall return identification cards and base passes to PMO within 24 hours.
(End Statement of Work)
(End of Summary of Changes)
File details come from the government source that posted it.