D1_Attachment 8 -Schedule of Rates.xlsx
XLSX spreadsheet 50 KB Posted
- Solicitation number
- M6700425R0002
- Issued by
-
United States Marine Corps
About this file
This is a pricing schedule template for a stevedoring and terminal services contract at Blount Island Command for the United States Marine Corps, covering four ordering periods. The schedule details rates for loading and discharging vessels, including both non-explosive and explosive cargo handling across multiple categories: general cargo, cargo transporters, wheeled vehicles, tracked vehicles, and construction equipment. Each ordering period contains detailed line items for specific cargo types with different handling methods (LO/LO, RO/RO, TOW/TOW).
The schedule includes hourly rates for extra labor (automated rates for straight time), detention time, and equipment rental rates for various types of material handling equipment such as forklifts, top loaders, yard hustlers, and chassis. The contractor is responsible for protective material, hatch cover handling, and container stowage according to government plans. Special provisions note that 90% of containers on BOBO class vessels require double handling, and any order started during an ordering period maintains the same pricing throughout performance even if crossing ordering periods. Questions related to this solicitation are due by December 23, 2024 at 12:00 EST.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| D1_Attachment 8 -Schedule of Rates.xlsx | XLSX spreadsheet | |
| D1_M6700425R0002 Conform Through Amendment 0001.pdf | ||
| D1_Attachment 7.1 - Collective Bargaining Agreement Amendment.pdf | ||
| F2_Questions and Answers.docx | DOCX document | |
| D1_M6700425R0002 Amendment 0001.pdf | ||
| D1_Attachment 7 - Collective Bargaining Agreement.pdf | ||
| D1_Attachment 5 - Past Performance Evaluation Form.docx | DOCX document | |
| D1_Attachment 4- Contractor Performance Data Sheet.docx | DOCX document | |
| D1_Attachment 1 - Environmental Service Agreement.docx | DOCX document | |
| D1_Attachment 3 - GFP Listing.xlsx | XLSX spreadsheet | |
| D1_Attachment 6 - Past Performance Questionnaire.docx | DOCX document | |
| D1_M6700425R0002.pdf | ||
| D1_Attachment 2 - DD 626 Fillable Motor Vehicle Transportation HAZMAT.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ordering Period 1
| Ordering Period 1 - SCHEDULE OF RATES |
| Any order started during an ordering period will retain the same pricing of that ordering period throughout the performance of the offload/backload even if the performance crosses ordering periods. |
| The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules: |
| SCHEDULE IA1 - LOADING VESSELS - |
| Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA1a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel. |
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 40e | GENERAL CARGO PRE-UNITIZED | 3484.09 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS, TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | 783 | EA | $ - | ERROR:#VALUE! |
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING | 26 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON, PATENTED LASHING | 226 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 34 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, | ||||
| TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF | |||||
| CRADLE), ETC. | |||||
| a. | LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING. | 5 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 665 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 461 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS | ||||
| VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | |||||
| a. | LO/LO, LIFT-ON | 10 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 180 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 3 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates. | |||||
| Ordering Period 1 - SCHEDULE OF RATES | |||||
| SCHEDULE IA1a - LOADING VESSELS - | |||||
| EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA1 | |||||
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 25 | EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: GANTRY OR SHIP CRANE | 355 | EA | $ - | ERROR:#VALUE! |
| 40e | GENERAL CARGO PRE-UNITIZED | 164.32 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS | 250 | EA | $ - | ERROR:#VALUE! |
| TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | |||||
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING, BLOCKING & BRACING | 3 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 97 | EA | $ - | ERROR:#VALUE! |
| PATENTED LASHING | |||||
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 5 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 33 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 15 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | ||||
| a. | LO/LO, LIFT-ON | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 56 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 3 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates | |||||
| Ordering Period 1 - SCHEDULE OF RATES | |||||
| The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules: | |||||
| SCHEDULE IA2 - DISCHARGING VESSELS | |||||
| Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA2a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel. | |||||
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 40e | GENERAL CARGO PRE-UNITIZED | 486.62 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS | 783 | EA | $ - | ERROR:#VALUE! |
| TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | |||||
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. BLOCKING & BRACING | 28 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 451 | EA | $ - | ERROR:#VALUE! |
| PATENTED LASHING | |||||
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 20 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON | 8 | EA | $ - | ERROR:#VALUE! |
| STANDARD AND PATENTED LASHING. | |||||
| c. | RO/RO, ROLL-ON | 759 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 568 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | ||||
| a. | LO/LO, LIFT-ON | 14 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 222 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 2 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates | |||||
| Ordering Period 1 - SCHEDULE OF RATES |
| SCHEDULE IA2a - DISCHARGING VESSELS |
| EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA2 |
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 25 | EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: | 504 | EA | $ - | ERROR:#VALUE! |
| GANTRY OR SHIP CRANE | |||||
| 40e | GENERAL CARGO PRE-UNITIZED | 168.77 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS | 491 | EA | $ - | ERROR:#VALUE! |
| TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | |||||
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON PATENTED LASHING | 32 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 1 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC. |
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 7 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 2 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | ||||
| a. | LO/LO, LIFT-ON | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 12 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 1 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates | |||||
| Ordering Period 1 - SCHEDULE OF RATES | |||||
| SCHEDULE IB1 - LOADING AND DISCHARGING RAILCARS | |||||
| Item | Description | Quantity | MT or Each | ||
| Unit Price | Total | ||||
| 25 | EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: | 995 | EA | $ - | ERROR:#VALUE! |
| GANTRY OR SHIP CRANE | |||||
| Schedule Total | ERROR:#VALUE! | ||||
| Ordering Period 1 - SCHEDULE OF RATES | |||||
| MISCELLANEOUS HOURLY RATES (RATES PER HOUR) | |||||
| SCHEDULE II - EXTRA LABOR - AUTOMATED RATES (STRAIGHT TIME) | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | HEADER / FOREMAN | 186 | EA | $ | ERROR:#VALUE! |
| 2 | LONGSHOREMAN | 837 | EA | $ | ERROR:#VALUE! |
| 3 | MECHANIC / DRIVER | 837 | EA | $ | ERROR:#VALUE! |
| 4 | CHECKER / CLERK | 372 | EA | $ | ERROR:#VALUE! |
| 5 | CRANE OP / FLG MAN | 279 | EA | $ | ERROR:#VALUE! |
| Sub Total | ERROR:#VALUE! | ||||
| SCHEDULE IIA - EXTRA LABOR - AUTOMATED EXPLOSIVE DIFFERENTIAL | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | HEADER / FOREMAN | 95 | EA | $ | ERROR:#VALUE! |
| 2 | LONGSHOREMAN | 427 | EA | $ | ERROR:#VALUE! |
| 3 | MECHANIC / DRIVER | 427 | EA | $ | ERROR:#VALUE! |
| 4 | CHECKER / CLERK | 191 | EA | $ | ERROR:#VALUE! |
| 5 | CRANE OP / FLG MAN | 143 | EA | $ | ERROR:#VALUE! |
| Sub Total | ERROR:#VALUE! | ||||
| MISCELLANEOUS HOURLY RATES (RATES PER HOUR) | |||||
| SCHEDULE III - DETENTION TIME - AUTOMATED (STANDBY TIME, HOURLY RATE) | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | HEADER / FOREMAN | 78 | EA | $ | ERROR:#VALUE! |
| 2 | LONGSHOREMAN | 350 | EA | $ | ERROR:#VALUE! |
| 3 | MECHANIC / DRIVER | 350 | EA | $ | ERROR:#VALUE! |
| 4 | CHECKER / CLERK | 156 | EA | $ | ERROR:#VALUE! |
| 5 | CRANE OP / FLG MAN | 117 | EA | $ | ERROR:#VALUE! |
| Sub Total | ERROR:#VALUE! | ||||
| SCHEDULE IIIA - DETENTION TIME - AUTOMATED EXPLOSIVE DIFFERENTIAL (STANDBY TIME, HOURLY RATE) | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | HEADER / FOREMAN | 36 | EA | $ | ERROR:#VALUE! |
| 2 | LONGSHOREMAN | 162 | EA | $ | ERROR:#VALUE! |
| 3 | MECHANIC / DRIVER | 162 | EA | $ | ERROR:#VALUE! |
| 4 | CHECKER / CLERK | 82 | EA | $ | ERROR:#VALUE! |
| 5 | CRANE OP / FLG MAN | 54 | EA | $ | ERROR:#VALUE! |
| Sub Total | ERROR:#VALUE! |
| SCHEDULE V - EQUIPMENT RENTAL RATES | |||||
| HOURLY RATES TO BE PAID TO THE CONTRACTOR AS COMPENSATION FOR THE RENTAL OF EQUIPMENT USED IN CONNECTION WITH SERVICES PERFORMED ON A EXTRA LABOR BASIS. CONTRACTOR SHALL FURNISH FUEL, LUBRICANT, AND MAINTENANCE. | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | TRUCKS, FORKLIFT, WITH RATE THREE (3) TONS BUT LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS AT 24 INCH LOAD CENTER, WITH LOW MAST FOR WORK IN (6) FOOT HIGH RESTRICTED AREAS. | 1 | HR | $ | ERROR:#VALUE! |
| 2 | TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN SEVEN AND ONE-HALF (7 1/2) TON BUT LESS THAN NINE (9) TONS AT 24 INCH LOAD CENTER. | 1 | HR | $ | ERROR:#VALUE! |
| 3 | TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN NINE (9) TONS BUT LESS THAN 15 TONS AT 24 INCH LOAD CENTER. | 1 | HR | $ | ERROR:#VALUE! |
| 4 | TOP LOADER | 1 | HR | $ | ERROR:#VALUE! |
| 5 | YARD HUSTLERS | 1 | HR | $ | ERROR:#VALUE! |
| 6 | 20 FOOT CONTAINER CHASSIS | 1 | HR | $ | ERROR:#VALUE! |
| 7 | FLAT BED TRAILERS | 1 | HR | $ | ERROR:#VALUE! |
| Schedule Total | Sub Total | ERROR:#VALUE! |
| Ordering Period 1 - SCHEDULE OF RATES | ||
| Item | Description | Total Cost |
| IA1 | LOAD VESSELS | ERROR:#VALUE! |
| IA1a | LOAD VESSELS – | ERROR:#VALUE! |
| EXPL DIFF | ||
| IA2 | DISCHARGE VESSELS | ERROR:#VALUE! |
| IA2a | DISCHARGE VESSELS - EXPL DIFF | ERROR:#VALUE! |
| IB1 | LOAD AND DISCH RAILCARS | ERROR:#VALUE! |
| I I | XL AUTOMATED | ERROR:#VALUE! |
| I IA | XL AUTOMATED – | ERROR:#VALUE! |
| EXPL DIFF | ||
| I I I | DET AUTOMATED | ERROR:#VALUE! |
| I I IA | DET AUTOMATED – | ERROR:#VALUE! |
| EXPL DIFF | ||
| V | Equipment Rental Rates | ERROR:#VALUE! |
| Total of All Schedules | ERROR:#VALUE! |
Ordering Period 2
| Ordering Period 2 - SCHEDULE OF RATES |
| Any order started during an ordering period will retain the same pricing of that ordering period throughout the performance of the offload/backload even if the performance crosses ordering periods. |
| The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules: |
| SCHEDULE IA1 - LOADING VESSELS - |
| Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA1a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel. |
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 40e | GENERAL CARGO PRE-UNITIZED | 638.23 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS, TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | 581 | EA | $ - | ERROR:#VALUE! |
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING | 13 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON, PATENTED LASHING | 479 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 13 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, | ||||
| TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF | |||||
| CRADLE), ETC. | |||||
| a. | LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING. | 3 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 757 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 448 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS | ||||
| VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | |||||
| a. | LO/LO, LIFT-ON | 12 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 142 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 1 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates. | |||||
| Ordering Period 2 - SCHEDULE OF RATES | |||||
| SCHEDULE IA1a - LOADING VESSELS - | |||||
| EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA1 | |||||
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 25 | EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: GANTRY OR SHIP CRANE | 329 | EA | $ - | ERROR:#VALUE! |
| 40e | GENERAL CARGO PRE-UNITIZED | 40.82 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | 180 | EA | $ - | ERROR:#VALUE! |
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING, BLOCKING & BRACING PATENTED LASHING | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 50 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 8 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 16 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 6 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | ||||
| a. | LO/LO, LIFT-ON | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 58 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 1 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates | |||||
| Ordering Period 2 - SCHEDULE OF RATES | |||||
| The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules: | |||||
| SCHEDULE IA2 - DISCHARGING VESSELS | |||||
| Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA2a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel. | |||||
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 40e | GENERAL CARGO PRE-UNITIZED | 1 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS | 223 | EA | $ - | ERROR:#VALUE! |
| TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | |||||
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. BLOCKING & BRACING | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 1 | EA | $ - | ERROR:#VALUE! |
| PATENTED LASHING | |||||
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 1 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON | 1 | EA | $ - | $ - |
| STANDARD AND PATENTED LASHING. | |||||
| c. | RO/RO, ROLL-ON | 1 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 1 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | ||||
| a. | LO/LO, LIFT-ON | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 1 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 1 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates | |||||
| Ordering Period 2 - SCHEDULE OF RATES |
| SCHEDULE IA2a - DISCHARGING VESSELS |
| EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA2 |
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 25 | EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: GANTRY OR SHIP CRANE | 3531 | EA | $ - | ERROR:#VALUE! |
| 40e | GENERAL CARGO PRE-UNITIZED | 1 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS | 223 | EA | $ - | ERROR:#VALUE! |
| TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | |||||
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON PATENTED LASHING | 1 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 1 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 1 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 1 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | ||||
| a. | LO/LO, LIFT-ON | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 13 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 1 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates | |||||
| Ordering Period 2 - SCHEDULE OF RATES | |||||
| SCHEDULE IB1 - LOADING AND DISCHARGING RAILCARS | |||||
| Item | Description | Quantity | MT or Each | ||
| Unit Price | Total | ||||
| 25 | EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: | 660 | EA | $ - | ERROR:#VALUE! |
| GANTRY OR SHIP CRANE | |||||
| Schedule Total | ERROR:#VALUE! | ||||
| Ordering Period 2 - SCHEDULE OF RATES | |||||
| MISCELLANEOUS HOURLY RATES (RATES PER HOUR) | |||||
| SCHEDULE II - EXTRA LABOR - AUTOMATED RATES (STRAIGHT TIME) | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | HEADER / FOREMAN | 186 | EA | $ | ERROR:#VALUE! |
| 2 | LONGSHOREMAN | 837 | EA | $ | ERROR:#VALUE! |
| 3 | MECHANIC / DRIVER | 837 | EA | $ | ERROR:#VALUE! |
| 4 | CHECKER / CLERK | 372 | EA | $ | ERROR:#VALUE! |
| 5 | CRANE OP / FLG MAN | 279 | EA | $ | ERROR:#VALUE! |
| Sub Total | ERROR:#VALUE! | ||||
| SCHEDULE IIA - EXTRA LABOR - AUTOMATED EXPLOSIVE DIFFERENTIAL | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | HEADER / FOREMAN | 95 | EA | $ | ERROR:#VALUE! |
| 2 | LONGSHOREMAN | 427 | EA | $ | ERROR:#VALUE! |
| 3 | MECHANIC / DRIVER | 427 | EA | $ | ERROR:#VALUE! |
| 4 | CHECKER / CLERK | 191 | EA | $ | ERROR:#VALUE! |
| 5 | CRANE OP / FLG MAN | 143 | EA | $ | ERROR:#VALUE! |
| Sub Total | ERROR:#VALUE! | ||||
| MISCELLANEOUS HOURLY RATES (RATES PER HOUR) | |||||
| SCHEDULE III - DETENTION TIME - AUTOMATED (STANDBY TIME, HOURLY RATE) | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | HEADER / FOREMAN | 78 | EA | $ | ERROR:#VALUE! |
| 2 | LONGSHOREMAN | 350 | EA | $ | ERROR:#VALUE! |
| 3 | MECHANIC / DRIVER | 350 | EA | $ | ERROR:#VALUE! |
| 4 | CHECKER / CLERK | 156 | EA | $ | ERROR:#VALUE! |
| 5 | CRANE OP / FLG MAN | 117 | EA | $ | ERROR:#VALUE! |
| Sub Total | ERROR:#VALUE! | ||||
| SCHEDULE IIIA - DETENTION TIME - AUTOMATED EXPLOSIVE DIFFERENTIAL (STANDBY TIME, HOURLY RATE) | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | HEADER / FOREMAN | 36 | EA | $ | ERROR:#VALUE! |
| 2 | LONGSHOREMAN | 162 | EA | $ | ERROR:#VALUE! |
| 3 | MECHANIC / DRIVER | 162 | EA | $ | ERROR:#VALUE! |
| 4 | CHECKER / CLERK | 82 | EA | $ | ERROR:#VALUE! |
| 5 | CRANE OP / FLG MAN | 54 | EA | $ | ERROR:#VALUE! |
| Sub Total | ERROR:#VALUE! | ||||
| SCHEDULE V - EQUIPMENT RENTAL RATES | |||||
| HOURLY RATES TO BE PAID TO THE CONTRACTOR AS COMPENSATION FOR THE RENTAL OF EQUIPMENT USED IN CONNECTION WITH SERVICES PERFORMED ON A EXTRA LABOR BASIS. CONTRACTOR SHALL FURNISH FUEL, LUBRICANT, AND MAINTENANCE. | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | TRUCKS, FORKLIFT, WITH RATE THREE (3) TONS BUT LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS AT 24 INCH LOAD CENTER, WITH LOW MAST FOR WORK IN (6) FOOT HIGH RESTRICTED AREAS. | 1 | HR | $ | ERROR:#VALUE! |
| 2 | TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN SEVEN AND ONE-HALF (7 1/2) TON BUT LESS THAN NINE (9) TONS AT 24 INCH LOAD CENTER. | 1 | HR | $ | ERROR:#VALUE! |
| 3 | TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN NINE (9) TONS BUT LESS THAN 15 TONS AT 24 INCH LOAD CENTER. | 1 | HR | $ | ERROR:#VALUE! |
| 4 | TOP LOADER | 1 | HR | $ | ERROR:#VALUE! |
| 5 | YARD HUSTLERS | 1 | HR | $ | ERROR:#VALUE! |
| 6 | 20 FOOT CONTAINER CHASSIS | 1 | HR | $ | ERROR:#VALUE! |
| 7 | FLAT BED TRAILERS | 1 | HR | $ | ERROR:#VALUE! |
| Schedule Total | Sub Total | ERROR:#VALUE! |
Ordering Period 2 - SCHEDULE OF RATES
| Item | Description | Total Cost |
| IA1 | LOAD VESSELS | ERROR:#VALUE! |
| IA1a | LOAD VESSELS – | ERROR:#VALUE! |
| EXPL DIFF | ||
| IA2 | DISCHARGE VESSELS | ERROR:#VALUE! |
| IA2a | DISCHARGE VESSELS - EXPL DIFF | ERROR:#VALUE! |
| IB1 | LOAD AND DISCH RAILCARS | ERROR:#VALUE! |
| I I | XL AUTOMATED | ERROR:#VALUE! |
| I IA | XL AUTOMATED – | ERROR:#VALUE! |
| EXPL DIFF | ||
| I I I | DET AUTOMATED | ERROR:#VALUE! |
| I I IA | DET AUTOMATED – | ERROR:#VALUE! |
| EXPL DIFF | ||
| V | Equipment Rental Rates | ERROR:#VALUE! |
| Total of All Schedules | ERROR:#VALUE! |
Ordering Period 3
| Ordering Period 3 - SCHEDULE OF RATES |
| Any order started during an ordering period will retain the same pricing of that ordering period throughout the performance of the offload/backload even if the performance crosses ordering periods. |
| The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules: |
| SCHEDULE IA1 - LOADING VESSELS - |
| Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA1a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel. |
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 40e | GENERAL CARGO PRE-UNITIZED | 4011.74 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS, TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | 970 | EA | $ - | ERROR:#VALUE! |
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING | 34 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON, PATENTED LASHING | 270 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 1 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, | ||||
| TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF | |||||
| CRADLE), ETC. | |||||
| a. | LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING. | 8 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 777 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 539 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS | ||||
| VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | |||||
| a. | LO/LO, LIFT-ON | 3 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 183 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 5 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates. | |||||
| Ordering Period 3 - SCHEDULE OF RATES | |||||
| SCHEDULE IA1a - LOADING VESSELS - | |||||
| EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA1 | |||||
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 25 | EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: GANTRY OR SHIP CRANE | 525 | EA | $ - | ERROR:#VALUE! |
| 40e | GENERAL CARGO PRE-UNITIZED | 345.84 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS | 632 | EA | $ - | ERROR:#VALUE! |
| TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | |||||
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING, BLOCKING & BRACING | 14 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 143 | EA | $ - | ERROR:#VALUE! |
| PATENTED LASHING | |||||
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 7 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 66 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 74 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | ||||
| a. | LO/LO, LIFT-ON | 3 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 93 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 3 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates | |||||
| Ordering Period 3 - SCHEDULE OF RATES | |||||
| The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules: | |||||
| SCHEDULE IA2 - DISCHARGING VESSELS | |||||
| Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA2a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel. | |||||
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 40e | GENERAL CARGO PRE-UNITIZED | 3558.66 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS | 694 | EA | $ - | ERROR:#VALUE! |
| TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | |||||
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. BLOCKING & BRACING | 7 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 209 | EA | $ - | ERROR:#VALUE! |
| PATENTED LASHING | |||||
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 12 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON | 5 | EA | $ - | ERROR:#VALUE! |
| STANDARD AND PATENTED LASHING. | |||||
| c. | RO/RO, ROLL-ON | 592 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 434 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | ||||
| a. | LO/LO, LIFT-ON | 5 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 177 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 8 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates | |||||
| Ordering Period 3 - SCHEDULE OF RATES |
| SCHEDULE IA2a - DISCHARGING VESSELS |
| EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA2 |
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 25 | EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: | 388 | EA | $ - | ERROR:#VALUE! |
| GANTRY OR SHIP CRANE | |||||
| 40e | GENERAL CARGO PRE-UNITIZED | 29.36 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS | 271 | EA | $ - | ERROR:#VALUE! |
| TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | |||||
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON PATENTED LASHING | 37 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 1 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC. |
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 72 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 1 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | ||||
| a. | LO/LO, LIFT-ON | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 37 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 4 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates | |||||
| Ordering Period 3 - SCHEDULE OF RATES | |||||
| SCHEDULE IB1 - LOADING AND DISCHARGING RAILCARS | |||||
| Item | Description | Quantity | MT or Each | ||
| Unit Price | Total | ||||
| 25 | EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: | 913 | EA | $ - | ERROR:#VALUE! |
| GANTRY OR SHIP CRANE | |||||
| Schedule Total | ERROR:#VALUE! | ||||
| Ordering Period 3 - SCHEDULE OF RATES | |||||
| MISCELLANEOUS HOURLY RATES (RATES PER HOUR) | |||||
| SCHEDULE II - EXTRA LABOR - AUTOMATED RATES (STRAIGHT TIME) | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | HEADER / FOREMAN | 186 | EA | $ | ERROR:#VALUE! |
| 2 | LONGSHOREMAN | 837 | EA | $ | ERROR:#VALUE! |
| 3 | MECHANIC / DRIVER | 837 | EA | $ | ERROR:#VALUE! |
| 4 | CHECKER / CLERK | 372 | EA | $ | ERROR:#VALUE! |
| 5 | CRANE OP / FLG MAN | 279 | EA | $ | ERROR:#VALUE! |
| Sub Total | ERROR:#VALUE! | ||||
| SCHEDULE IIA - EXTRA LABOR - AUTOMATED EXPLOSIVE DIFFERENTIAL | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | HEADER / FOREMAN | 95 | EA | $ | ERROR:#VALUE! |
| 2 | LONGSHOREMAN | 427 | EA | $ | ERROR:#VALUE! |
| 3 | MECHANIC / DRIVER | 427 | EA | $ | ERROR:#VALUE! |
| 4 | CHECKER / CLERK | 191 | EA | $ | ERROR:#VALUE! |
| 5 | CRANE OP / FLG MAN | 143 | EA | $ | ERROR:#VALUE! |
| Sub Total | ERROR:#VALUE! | ||||
| MISCELLANEOUS HOURLY RATES (RATES PER HOUR) | |||||
| SCHEDULE III - DETENTION TIME - AUTOMATED (STANDBY TIME, HOURLY RATE) | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | HEADER / FOREMAN | 78 | EA | $ | ERROR:#VALUE! |
| 2 | LONGSHOREMAN | 350 | EA | $ | ERROR:#VALUE! |
| 3 | MECHANIC / DRIVER | 350 | EA | $ | ERROR:#VALUE! |
| 4 | CHECKER / CLERK | 156 | EA | $ | ERROR:#VALUE! |
| 5 | CRANE OP / FLG MAN | 117 | EA | $ | ERROR:#VALUE! |
| Sub Total | ERROR:#VALUE! | ||||
| SCHEDULE IIIA - DETENTION TIME - AUTOMATED EXPLOSIVE DIFFERENTIAL (STANDBY TIME, HOURLY RATE) | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | HEADER / FOREMAN | 36 | EA | $ | ERROR:#VALUE! |
| 2 | LONGSHOREMAN | 162 | EA | $ | ERROR:#VALUE! |
| 3 | MECHANIC / DRIVER | 162 | EA | $ | ERROR:#VALUE! |
| 4 | CHECKER / CLERK | 82 | EA | $ | ERROR:#VALUE! |
| 5 | CRANE OP / FLG MAN | 54 | EA | $ | ERROR:#VALUE! |
| Sub Total | ERROR:#VALUE! | ||||
| SCHEDULE V - EQUIPMENT RENTAL RATES | |||||
| HOURLY RATES TO BE PAID TO THE CONTRACTOR AS COMPENSATION FOR THE RENTAL OF EQUIPMENT USED IN CONNECTION WITH SERVICES PERFORMED ON A EXTRA LABOR BASIS. CONTRACTOR SHALL FURNISH FUEL, LUBRICANT, AND MAINTENANCE. | |||||
| ITEM | DESCRIPTION | EST QTY | MT OR EACH | UNIT COST | TOTAL COST |
| 1 | TRUCKS, FORKLIFT, WITH RATE THREE (3) TONS BUT LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS AT 24 INCH LOAD CENTER, WITH LOW MAST FOR WORK IN (6) FOOT HIGH RESTRICTED AREAS. | 1 | HR | $ | ERROR:#VALUE! |
| 2 | TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN SEVEN AND ONE-HALF (7 1/2) TON BUT LESS THAN NINE (9) TONS AT 24 INCH LOAD CENTER. | 1 | HR | $ | ERROR:#VALUE! |
| 3 | TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN NINE (9) TONS BUT LESS THAN 15 TONS AT 24 INCH LOAD CENTER. | 1 | HR | $ | ERROR:#VALUE! |
| 4 | TOP LOADER | 1 | HR | $ | ERROR:#VALUE! |
| 5 | YARD HUSTLERS | 1 | HR | $ | ERROR:#VALUE! |
| 6 | 20 FOOT CONTAINER CHASSIS | 1 | HR | $ | ERROR:#VALUE! |
| 7 | FLAT BED TRAILERS | 1 | HR | $ | ERROR:#VALUE! |
| Schedule Total | Sub Total | ERROR:#VALUE! |
Ordering Period 3 - SCHEDULE OF RATES
| Item | Description | Total Cost |
| IA1 | LOAD VESSELS | ERROR:#VALUE! |
| IA1a | LOAD VESSELS – | ERROR:#VALUE! |
| EXPL DIFF | ||
| IA2 | DISCHARGE VESSELS | ERROR:#VALUE! |
| IA2a | DISCHARGE VESSELS - EXPL DIFF | ERROR:#VALUE! |
| IB1 | LOAD AND DISCH RAILCARS | ERROR:#VALUE! |
| I I | XL AUTOMATED | ERROR:#VALUE! |
| I IA | XL AUTOMATED – | ERROR:#VALUE! |
| EXPL DIFF | ||
| I I I | DET AUTOMATED | ERROR:#VALUE! |
| I I IA | DET AUTOMATED – | ERROR:#VALUE! |
| EXPL DIFF | ||
| V | Equipment Rental Rates | ERROR:#VALUE! |
| Total of All Schedules | ERROR:#VALUE! |
Ordering Period 4
| Ordering Period 4 - SCHEDULE OF RATES |
| Any order started during an ordering period will retain the same pricing of that ordering period throughout the performance of the offload/backload even if the performance crosses ordering periods. |
| The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules: |
| SCHEDULE IA1 - LOADING VESSELS - |
| Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA1a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel. |
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 40e | GENERAL CARGO PRE-UNITIZED | 3484.09 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS, TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | 644 | EA | $ - | ERROR:#VALUE! |
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING, BLOCKING & BRACING | 26 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON, PATENTED LASHING | 226 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 34 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, | ||||
| TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF | |||||
| CRADLE), ETC. | |||||
| a. | LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING. | 5 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 665 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 461 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS | ||||
| VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | |||||
| a. | LO/LO, LIFT-ON | 10 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 180 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 3 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates. | |||||
| Ordering Period 4 - SCHEDULE OF RATES | |||||
| SCHEDULE IA1a - LOADING VESSELS - | |||||
| EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA1 | |||||
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 25 | EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: GANTRY OR SHIP CRANE | 355 | EA | $ - | ERROR:#VALUE! |
| 40e | GENERAL CARGO PRE-UNITIZED | 164.32 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS | 371 | EA | $ - | ERROR:#VALUE! |
| TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | |||||
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON, STANDARD AND PATENTED LASHING, BLOCKING & BRACING | 3 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 97 | EA | $ - | ERROR:#VALUE! |
| PATENTED LASHING | |||||
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 5 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 33 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 15 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | ||||
| a. | LO/LO, LIFT-ON | 1 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 56 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 3 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates | |||||
| Ordering Period 4 - SCHEDULE OF RATES | |||||
| The contractor will be paid in accordance with the commodity and man-hour rates enumerated in the following schedules: | |||||
| SCHEDULE IA2 - DISCHARGING VESSELS | |||||
| Rates for loading shall be based on non-Explosive Rates. Explosive differentials, in Schedules IA2a, will apply to items 40 thru 67 when explosives are present, when adjacent to a vessel, or on the vessel. | |||||
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 40e | GENERAL CARGO PRE-UNITIZED | 486.62 | MT | $ - | ERROR:#VALUE! |
| 45 | CARGO TRANSPORTERS | 783 | EA | $ - | ERROR:#VALUE! |
| TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY. | |||||
| 60 | WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to 50,000 lbs. PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON STANDARD AND PATENTED LASHING. BLOCKING & BRACING | 28 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 451 | EA | $ - | ERROR:#VALUE! |
| PATENTED LASHING | |||||
| d. | TOW/TOW, TOW-ON PATENTED LASHING | 471 | EA | $ - | ERROR:#VALUE! |
| 61 | WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS, TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF CRADLE), ETC. | ||||
| a. | LO/LO, LIFT-ON | 8 | EA | $ - | ERROR:#VALUE! |
| STANDARD AND PATENTED LASHING. | |||||
| c. | RO/RO, ROLL-ON | 759 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 568 | EA | $ - | ERROR:#VALUE! |
| 67 | TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT. | ||||
| a. | LO/LO, LIFT-ON | 14 | EA | $ - | ERROR:#VALUE! |
| c. | RO/RO, ROLL-ON | 222 | EA | $ - | ERROR:#VALUE! |
| d. | TOW/TOW, TOW-ON | 2 | EA | $ - | ERROR:#VALUE! |
| Schedule Total | ERROR:#VALUE! | ||||
| (1) The Contractor shall be responsible for the laying and removal of protective material. | |||||
| (2) Vessels in this class do not have container cell guides. | |||||
| (3) Approximately 90% of all containers loaded or discharged from a BOBO class vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler). | |||||
| (4) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. | |||||
| (5) The Contractor shall stow containers in accordance with government provided stow plan.. | |||||
| (6) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates | |||||
| Ordering Period 4 - SCHEDULE OF RATES |
| SCHEDULE IA2a - DISCHARGING VESSELS |
| EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA2 |
| Item | Description | Quantity | MT or Each | Unit Price | Total |
| 25 | EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: | 504 | EA | $ - | ERROR:#VALUE! |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .