The file's text, extracted by GovTribe without its formatting.
Loading
| OPTION YEAR 1 - SCHEDULE OF RATES | | | | | |
| The contractor will be paid in accordance with the commodity, man-hour, and | | | | | |
| equipment rental rates enumerated in the following schedules: | | | | | |
| SCHEDULE IA1 - LOADING VESSELS - | | | | | |
| Rates for loading shall be based on non-Explosive Rates for all items excluding items 20g. | | | | |
| Explosive differentials, at Schedules IA1a, will apply to items 40 thru 66 when explosives are | | | | |
| present, when adjacent to a vessel, or on the vessel. | | | | |
| ITEM | DESCRIPTION | EST QTY | MT OR | UNIT | TOTAL |
| | | EACH | COST | COST |
| 25 | EXPLOSIVE CARGO AND CARGO | | | | |
| PAYABLE AT EXPLOSIVE RATES | | | | |
| CONTAINERS LOADED BY: | | | | |
| GANTRY OR SHIP CRANE | 1954 | EA | $ - 0 | $ - 0 |
| 40 | GENERAL CARGO | | | | |
| e | PRE-UNITIZED | 12384 | MT | $ - 0 | $ - 0 |
| 60 | WHEELED GOVERNMENT |
| VEHICLES AND ROAD |
| CONSTRUCTION EQUIPMENT, |
| UNBOXED, 25,001 LBS to |
| 50,000 lbs PER UNIT, SUCH AS: |
| TRUCKS, TRACTORS, TRAILERS, |
| VANS, MOBILE CRANES, ROAD |
| GRADERS, ROCK CRUSHERS, |
| BUSES, BOATS (EXCLUSIVE |
| OF CRADLE), ETC. |
| A | LO/LO, LIFT-ON | 134 | EA | $ - 0 | $ - 0 |
| STANDARD AND PATENTED | | | | |
| LASHING. | | | | |
| BLOCKING & BRACING | | | | |
| C | RO/RO, ROLL-ON | 2438 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| D | TOW/TOW, TOW-ON | 238 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| 61 | WHEELED GOVERNMENT |
| UP TO 25,000 LBS PER UNIT |
| UNBOXED, WHEELED OR |
| TRACKED, SUCH AS |
| AMBULANCES, TRACTORS, |
| TRAILERS, VANS, |
| CONSTRUCTION EQUIPMENT, |
| PERSONNEL CARRIERS, |
| TRAILER MOUNTED MACHINERY, |
| BOATS. (EXCLUSIVE OF |
| CRADLE), ETC. |
| A | LO/LO, LIFT-ON | 190 | EA | $ - 0 | $ - 0 |
| STANDARD AND PATENTED LASHING. | | | | |
| C | RO/RO, ROLL-ON | 3384 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| D | TOW/TOW, TOW-ON | 2472 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| 67 | TRACKED AND SEMI-TRACKED |
| GOVERNMENT VEHICLES AND |
| CONSTRUCTION EQUIPMENT, |
| UNBOXED, SET ON TREADS, |
| EXCEEDING A GROSS VEHICLE |
| WEIGHT OF > 50,000 POUNDS |
| PER UNIT. |
| A | LO/LO, LIFT-ON | 30 | EA | $ - 0 | $ - 0 |
| STANDARD AND PATENTED LASHING. | | | | |
| C | RO/RO, ROLL-ON | 1124 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| D | TOW/TOW, TOW-ON | 28 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| 45 | CARGO TRANSPORTERS | 3702 | EA | $ - 0 | $ - 0 |
| INCLUDES SEAVANS, MILVANS, | | | | |
| TRI-CONS, AND LEASE VANS, | | | | |
| ALL TYPES AND SIZES, | | | | |
| LOADED OR EMPTY. | | | | |
Schd Total $ - 0
| Note: | (1) * The Contractor shall be responsible for the laying and removal of protective material. |
| (2) ** These vehicles will be driven by Government furnished drivers. Contractor responsible for lashing only. |
| (3) Vessels in this class do not have container cell guides. |
| (4) Approximately 90% of all containers loaded or discharged from an BOBO vessel are double handled. |
| The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, |
| and the container is moved within the hold using a KALMAR (container handler). |
| (5) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons |
| with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. |
| (6) The Contractor shall stow containers in a specific pattern in order to maximize space utilization. |
| (7) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and |
| part of commodity rates in Section B. |
| SCHEDULE IA1a - LOADING VESSELS |
| EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA1 |
| ITEM | DESCRIPTION | EST QTY | MT OR | UNIT | TOTAL |
| | | EACH | COST | COST |
| 40 | GENERAL CARGO | | | | |
| e | PRE-UNITIZED | 6194 | MT | $ - 0 | $ - 0 |
| 60 | WHEELED GOVERNMENT |
| VEHICLES AND ROAD |
| CONSTRUCTION EQUIPMENT, |
| UNBOXED, 25,001 LBS to |
| 50,000 lbs PER UNIT, SUCH AS: |
| TRUCKS, TRACTORS, TRAILERS, |
| VANS, MOBILE CRANES, ROAD |
| GRADERS, ROCK CRUSHERS, |
| BUSES, BOATS (EXCLUSIVE |
| OF CRADLE), ETC. |
| A | LO/LO, LIFT-ON | 1 | EA | $ - 0 | $ - 0 |
| STANDARD AND PATENTED | | | | |
| LASHING. | | | | |
| C | RO/RO, ROLL-ON | 1 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| D | TOW/TOW, TOW-ON | 1 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| 61 | WHEELED GOVERNMENT |
| UP TO 25,000 LBS PER UNIT |
| UNBOXED, WHEELED OR |
| TRACKED, SUCH AS |
| AMBULANCES, TRACTORS, |
| TRAILERS, VANS, |
| CONSTRUCTION EQUIPMENT, |
| PERSONNEL CARRIERS, |
| TRAILER MOUNTED MACHINERY, |
| BOATS. (EXCLUSIVE OF |
| CRADLE), ETC. |
| A | LO/LO, LIFT-ON | 1 | EA | $ - 0 | $ - 0 |
| STANDARD AND PATENTED LASHING. | | | | |
| C | RO/RO, ROLL-ON | 1 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| D | TOW/TOW, TOW-ON | 1 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| 67 | TRACKED AND SEMI-TRACKED |
| GOVERNMENT VEHICLES AND |
| CONSTRUCTION EQUIPMENT, |
| UNBOXED, SET ON TREADS, |
| EXCEEDING A GROSS VEHICLE |
| WEIGHT OF > 50,000 POUNDS |
| PER UNIT. |
| A | LO/LO, LIFT-ON | 1 | EA | $ - 0 | $ - 0 |
| STANDARD AND PATENTED LASHING. | | | | |
| C | RO/RO, ROLL-ON | 1 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| D | TOW/TOW, TOW-ON | 1 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| 45 | CARGO TRANSPORTERS | 1366 | EA | $ - 0 | $ - 0 |
| INCLUDES SEAVANS, MILVANS, | | | | |
| TRI-CONS, AND LEASE VANS, | | | | |
| ALL TYPES AND SIZES, | | | | |
| LOADED OR EMPTY. | | | | |
Schd Total $ - 0
| Note: | (1) * The Contractor shall be responsible for the laying and removal of protective material. |
| (2) ** These vehicles will be driven by Government furnished drivers. Contractor responsible for lashing only. |
| (3) Vessels in this class do not have container cell guides. |
| (4) Approximately 90% of all containers loaded or discharged from an BOBO vessel are double handled. |
| The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, |
| and the container is moved within the hold using a KALMAR (container handler). |
| (5) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons |
| with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. |
| (6) The Contractor shall stow containers in a specific pattern in order to maximize space utilization. |
| (7) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and |
| part of commodity rates in Section B. |
Offloading
| OPTION YEAR 1 - SCHEDULE OF RATES | |
| The contractor will be paid in accordance with the commodity, man-hour, and | |
| equipment rental rates enumerated in the following schedules: | |
| SCHEDULE IA2 - DISCHARGING VESSELS | |
| Rates for loading shall be based on non-Explosive Rates for all items excluding items 20g. |
| Explosive differentials, at Schedules IA2a, will apply to items 40 thru 66 when explosives are |
| present, when adjacent to a vessel, or on the vessel. |
| ITEM | DESCRIPTION | EST QTY | MT OR | UNIT | TOTAL |
| | | EACH | COST | COST |
| 25 | EXPLOSIVE CARGO AND CARGO | | | | |
| PAYABLE AT EXPLOSIVE RATES | | | | |
| CONTAINERS LOADED BY: | | | | |
| GANTRY OR SHIP CRANE | 2081 | EA | $ - 0 | $ - 0 |
| 40 | GENERAL CARGO | | | | |
| e | PRE-UNITIZED | 14664 | MT | $ - 0 | $ - 0 |
| 60 | WHEELED GOVERNMENT |
| VEHICLES AND ROAD |
| UNBOXED, 25,001 LBS to |
| 50,000 lbs PER UNIT, SUCH AS: |
| MORE PER UNIT, SUCH AS: |
| TRUCKS, TRACTORS, TRAILERS, |
| VANS, MOBILE CRANES, ROAD |
| GRADERS, ROCK CRUSHERS, |
| BUSES, BOATS (EXCLUSIVE |
| OF CRADLE), ETC. |
| A | LO/LO, LIFT-OFF | 127 | EA | $ - 0 | $ - 0 |
| STANDARD AND PATENTED | | | | |
| LASHING. | | | | |
| BLOCKING & BRACING | | | | |
| C | RO/RO, ROLL-OFF | 2059 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| D | TOW/TOW, TOW-OFF | 316 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| 61 | WHEELED GOVERNMENT |
| UP TO 25,000 LBS PER UNIT |
| UNBOXED, WHEELED OR |
| TRACKED, SUCH AS |
| AMBULANCES, TRACTORS, |
| TRAILERS, VANS, |
| CONSTRUCTION EQUIPMENT, |
| PERSONNEL CARRIERS, |
| TRAILER MOUNTED MACHINERY, |
| BOATS. (EXCLUSIVE OF |
| CRADLE), ETC. |
| A | LO/LO, LIFT-OFF | 145 | EA | $ - 0 | $ - 0 |
| STANDARD AND PATENTED LASHING. | | | | |
| C | RO/RO, ROLL-OFF | 3621 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| D | TOW/TOW, TOW-OFF | 2536 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| 67 | TRACKED AND SEMI-TRACKED |
| GOVERNMENT VEHICLES AND |
| CONSTRUCTION EQUIPMENT, |
| UNBOXED, SET ON TREADS, |
| EXCEEDING A GROSS VEHICLE |
| WEIGHT OF > 50,000 POUNDS |
| PER UNIT. |
| A | LO/LO, LIFT-OFF | 49 | EA | $ - 0 | $ - 0 |
| STANDARD AND PATENTED LASHING. | | | | |
| C | RO/RO, ROLL-ON | 973 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| D | TOW/TOW, TOW-ON | 56 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| 45 | CARGO TRANSPORTERS | 3946 | EA | $ - 0 | $ - 0 |
| INCLUDES SEAVANS, MILVANS, | | | | |
| TRI-CONS, AND LEASE VANS, | | | | |
| ALL TYPES AND SIZES, | | | | |
| LOADED OR EMPTY. | | | | |
Schd Total $ - 0
| Note: | (1) * The Contractor shall be responsible for the laying and removal of protective material. |
| (2) ** These vehicles will be driven by Government furnished drivers. Contractor responsible for lashing only. |
| (3) Vessels in this class do not have container cell guides. |
| (4) Approximately 90% of all containers loaded or discharged from an BOBO vessel are double handled. |
| The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, |
| and the container is moved within the hold using a KALMAR (container handler). |
| (5) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons |
| with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. |
| (6) The Contractor shall stow containers in a specific pattern in order to maximize space utilization. |
| (7) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and |
| part of commodity rates in Section B. |
| SCHEDULE IA2a - DISCHARGING VESSELS |
| EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA2 |
| ITEM | DESCRIPTION | EST QTY | MT OR | UNIT | TOTAL |
| | | EACH | COST | COST |
| 40 | GENERAL CARGO | | | | |
| e | PRE-UNITIZED | 7102 | MT | $ - 0 | $ - 0 |
| 60 | WHEELED GOVERNMENT |
| VEHICLES AND ROAD |
| CONSTRUCTION EQUIPMENT, |
| UNBOXED, 25,001 LBS to |
| 50,000 lbs PER UNIT, SUCH AS: |
| TRUCKS, TRACTORS, TRAILERS, |
| VANS, MOBILE CRANES, ROAD |
| GRADERS, ROCK CRUSHERS, |
| BUSES, BOATS (EXCLUSIVE |
| OF CRADLE), ETC. |
| A | LO/LO, LIFT-ON | 12 | EA | $ - 0 | $ - 0 |
| STANDARD AND PATENTED | | | | |
| LASHING. | | | | |
| BLOCKING & BRACING | | | | |
| C | RO/RO, ROLL-ON | 317 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| D | TOW/TOW, TOW-ON | 9 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| 61 | WHEELED GOVERNMENT |
| UP TO 25,000 LBS PER UNIT |
| UNBOXED, WHEELED OR |
| TRACKED, SUCH AS |
| AMBULANCES, TRACTORS, |
| TRAILERS, VANS, |
| CONSTRUCTION EQUIPMENT, |
| PERSONNEL CARRIERS, |
| TRAILER MOUNTED MACHINERY, |
| BOATS. (EXCLUSIVE OF |
| CRADLE), ETC. |
| A | LO/LO, LIFT-ON | 45 | EA | $ - 0 | $ - 0 |
| STANDARD AND PATENTED LASHING. | | | | |
| C | RO/RO, ROLL-ON | 153 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| D | TOW/TOW, TOW-ON | 19 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| 67 | TRACKED AND SEMI-TRACKED |
| GOVERNMENT VEHICLES AND |
| CONSTRUCTION EQUIPMENT, |
| UNBOXED, SET ON TREADS, |
| EXCEEDING A GROSS VEHICLE |
| WEIGHT OF > 50,000 POUNDS |
| PER UNIT. |
| A | LO/LO, LIFT-ON | 4 | EA | $ - 0 | $ - 0 |
| STANDARD AND PATENTED LASHING. | | | | |
| C | RO/RO, ROLL-ON | 249 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| D | TOW/TOW, TOW-ON | 4 | EA | $ - 0 | $ - 0 |
| PATENTED LASHING | | | | |
| 45 | CARGO TRANSPORTERS | 1435 | EA | $ - 0 | $ - 0 |
| INCLUDES SEAVANS, MILVANS, | | | | |
| TRI-CONS, AND LEASE VANS, | | | | |
| ALL TYPES AND SIZES, | | | | |
Schd Total $ - 0
| Note: | (1) * The Contractor shall be responsible for the laying and removal of protective material. |
| (2) ** These vehicles will be driven by Government furnished drivers. Contractor responsible for lashing only. |
| (3) Vessels in this class do not have container cell guides. |
| (4) Approximately 90% of all containers loaded or discharged from an BOBO vessel are double handled. |
| The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, |
| with the ship's crane, during the course of loading or discharge of cargo, at commodity rates. |
| (5) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons |
| with the ship's crane, before and after loading or discharge of cargo, and as part of commodity rates. |
| (6) The Contractor shall stow containers in a specific pattern in order to maximize space utilization. |
| (7) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and |
| part of commodity rates in Section B. |
Rail Loading-Offloading
| OPTION YEAR 1 - SCHEDULE OF RATES |
| The contractor will be paid in accordance with the commodity, man-hour, and |
| equipment rental rates enumerated in the following schedules: |
SCHEDULE IB1 - LOADING AND DISCHARGING RAILCARS
| ITEM | DESCRIPTION | EST QTY | MT OR | UNIT | TOTAL |
| | | EACH | COST | COST |
| 25 | EXPLOSIVE CARGO AND CARGO | | | | |
| PAYABLE AT EXPLOSIVE RATES | | | | |
| CONTAINERS | 4035 | EA | $ - 0 | $ - 0 |
Schd Total $ - 0
Extra Labor-Delay
| OPTION YEAR 1 - SCHEDULE OF RATES |
| The contractor will be paid in accordance with the commodity, man-hour, and |
| equipment rental rates enumerated in the following schedules: |
| MISCELLANEOUS HOURLY RATES (RATES PER HOUR) |
SCHEDULE II - EXTRA LABOR - AUTOMATED RATES (STRAIGHT TIME)
| ITEM | DESCRIPTION | EST QTY | MT OR | EST | GANG | GANG HR | UNIT | TOTAL |
| | | EACH | NUMBER | HOURS | COST | COST | COST |
| | | | PER HOUR | | | | |
| 1 | HEADER / FOREMAN | 930 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 2 | LONGSHOREMAN | 4185 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 3 | MECHANIC / DRIVER | 4185 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 4 | CHECKER / CLERK | 1860 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 5 | CRANE OP / FLG MAN | 1395 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
Schd Total $ - 0
SCHEDULE IIA - EXTRA LABOR - AUTOMATED EXPLOSIVE DIFFERENTIAL
| 1 | HEADER / FOREMAN | 476 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 2 | LONGSHOREMAN | 2142 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 3 | MECHANIC / DRIVER | 2142 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 4 | CHECKER / CLERK | 952 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 5 | CRANE OP / FLG MAN | 714 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
Schd Total $ - 0
MISCELLANEOUS HOURLY RATES (RATES PER HOUR)
SCHEDULE III - DETENTION TIME - AUTOMATED (STANDBY TIME, HOURLY RATE)
| ITEM | DESCRIPTION | EST QTY | MT OR | EST | GANG | GANG HR | UNIT | TOTAL |
| | | EACH | NUMBER | HOURS | COST | COST | COST |
| | | | PER HOUR | | | | |
| 1 | HEADER / FOREMAN | 388 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 2 | LONGSHOREMAN | 1748 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 3 | MECHANIC / DRIVER | 1748 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 4 | CHECKER / CLERK | 777 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 5 | CRANE OP / FLG MAN | 582 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
Schd Total $ - 0
SCHEDULE IIIA - DETENTION TIME - AUTOMATED EXPLOSIVE DIFFERENTIAL (STANDBY TIME, HOURLY RATE)
| 1 | HEADER / FOREMAN | 179 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 2 | LONGSHOREMAN | 808 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 3 | MECHANIC / DRIVER | 808 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 4 | CHECKER / CLERK | 359 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
| 5 | CRANE OP / FLG MAN | 269 | EA | 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 |
Schd Total $ - 0
Equipment Rental
| OPTION YEAR 1 - SCHEDULE OF RATES |
| The contractor will be paid in accordance with the commodity, man-hour, and |
| equipment rental rates enumerated in the following schedules: |
| SCHEDULE V - EQUIPMENT RENTAL RATES |
| HOURLY RATES TO BE PAID TO THE CONTRACTOR AS COMPENSATION FOR THE RENTAL OF EQUIPMENT USED IN |
| CONNECTION WITH SERVICES PERFORMED ON A MANHOUR BASIS. CONTRACTOR SHALL FURNISH FUEL, |
| LUBRICANT, AND MAINTENANCE. |
| ITEM | DESCRIPTION | EST QTY | U / I | UNIT | TOTAL |
| | | | COST | COST |
| 1 | TRUCKS, FORKLIFT, WITH RATED | 1 | HR | $ - 0 | $ - 0 |
| CAPACITY GREATER THAN | | | | |
| THREE (3) TONS BUT LESS THAN | | | | |
| SEVEN AND ONE-HALF (7 1/2) | | | | |
| TONS AT 24 INCH LOAD CENTER, | | | | |
| WITH LOW MAST FOR WORK IN | | | | |
| (6) FOOT HIGH RESTRICTED | | | | |
| AREAS. | | | | |
| 2 | TRUCKS, FORKLIFT, WITH RATED | 1 | HR | $ - 0 | $ - 0 |
| CAPACITY GREATER THAN | | | | |
| SEVEN AND ONE-HALF (7 1/2) | | | | |
| TON BUT LESS THAN NINE (9) | | | | |
| TONS AT 24 INCH LOAD CENTER. | | | | |
| 3 | TRUCKS, FORKLIFT, WITH RATED | 1 | HR | $ - 0 | $ - 0 |
| CAPACITY GREATER THAN NINE | | | | |
| (9) TONS BUT LESS THAN 15 | | | | |
| TONS AT 24 INCH LOAD CENTER. | | | | |
4 TOP LOADER 1 HR $ - 0 $ - 0
5 YARD HUSTLERS 1 HR $ - 0 $ - 0
6 20 FOOT CONTAINER CHASSIS 1 HR $ - 0 $ - 0
7 FLAT BED TRAILERS 1 HR $ - 0 $ - 0
Schd Total $ - 0
| SCHEDULE X - REIMBURSABLE | EST QTY | U / I | UNIT | TOTAL |
| | | COST | COST |
OUT-OF-POCKET COSTS 1 UNIT NTE $10,000.00 - -
Schd Total $ - 0
JAX MPS COMMODITY
Jacksonville MPS
Loading Vessels
Commodity Commodity Name Unit of Measure All Classes
| | | Sched. 1A1 | | |
| | | Quantity | Unit Price | Total |
| 25 | Explosives - Containers | EA | 1954 | $ - 0 | $ - 0 |
| 40e | General Cargo - Preunitized | MT | 12384 | $ - 0 | $ - 0 |
| 45 | Containers | EA | 3702 | $ - 0 | $ - 0 |
| 60 | Vehicles 25001 - 50000 lbs | | | | |
| a. | LO/LO | EA | 134 | $ - 0 | $ - 0 |
| c. | RO/RO | EA | 2438 | $ - 0 | $ - 0 |
| d. | TO/TO | EA | 238 | $ - 0 | $ - 0 |
| 61 | Vehicles 1-25000 lbs | | | | |
| a. | LO/LO | EA | 190 | $ - 0 | $ - 0 |
| c. | RO/RO | EA | 3384 | $ - 0 | $ - 0 |
| d. | TO/TO | EA | 2472 | $ - 0 | $ - 0 |
| 67 | Vehicles over 50,000 lbs | | | | |
| a. | LO/LO | EA | 30 | $ - 0 | $ - 0 |
| c. | RO/RO | EA | 1124 | $ - 0 | $ - 0 |
| d. | TO/TO | EA | 28 | $ - 0 | $ - 0 |
| Total | | | | | $ - 0 |
Jacksonville MPS
Unloading Vessels
Commodity Commodity Name Unit of Measure All Classes
| | | Sched. 1A2 | | |
| | | Quantity | Unit Price | Total |
| 25 | Explosives - Containers | EA | 2081 | $ - 0 | $ - 0 |
| 40e | General Cargo - Preunitized | MT | 14664 | $ - 0 | $ - 0 |
| 45 | Containers | EA | 3946 | $ - 0 | $ - 0 |
| 60 | Vehicles 25001 - 50000 lbs | | | | |
| a. | LO/LO | EA | 127 | $ - 0 | $ - 0 |
| c. | RO/RO | EA | 2059 | $ - 0 | $ - 0 |
| d. | TO/TO | EA | 316 | $ - 0 | $ - 0 |
| 61 | Vehicles 1-25000 lbs | | | | |
| a. | LO/LO | EA | 145 | $ - 0 | $ - 0 |
| c. | RO/RO | EA | 3621 | $ - 0 | $ - 0 |
| d. | TO/TO | EA | 2536 | $ - 0 | $ - 0 |
| 67 | Vehicles over 50,000 lbs | | | | |
| a. | LO/LO | EA | 49 | $ - 0 | $ - 0 |
| c. | RO/RO | EA | 973 | $ - 0 | $ - 0 |
| d. | TO/TO | EA | 56 | $ - 0 | $ - 0 |
| Total | | | | | $ - 0 |
| Jacksonville MPS | | | | | |
| Loading Vessels |
| Explosive Differential |
Commodity Commodity Name Unit of Measure All Classes
| | | Sched. 1A1a | | |
| | | Quantity | Unit Price | Total |
| 40e | General Cargo - Preunitized | MT | 6194 | $ - 0 | $ - 0 |
| 45 | Containers | EA | 1366 | $ - 0 | $ - 0 |
| 60 | Vehicles 25001 - 50000 lbs | | | | |
| a. | LO/LO | EA | 1 | $ - 0 | $ - 0 |
| c. | RO/RO | EA | 1 | $ - 0 | $ - 0 |
| d. | TO/TO | EA | 1 | $ - 0 | $ - 0 |
| 61 | Vehicles 1-25000 lbs | | | | |
| a. | LO/LO | EA | 1 | $ - 0 | $ - 0 |
| c. | RO/RO | EA | 1 | $ - 0 | $ - 0 |
| d. | TO/TO | EA | 1 | $ - 0 | $ - 0 |
| 67 | Vehicles over 50,000 lbs | | | | |
| a. | LO/LO | EA | 1 | $ - 0 | $ - 0 |
| c. | RO/RO | EA | 1 | $ - 0 | $ - 0 |
| d. | TO/TO | EA | 1 | $ - 0 | $ - 0 |
| Total | | | | | $ - 0 |
| Jacksonville MPS | | | | | |
| Unloading Vessels |
| Explosive Differential |
Commodity Commodity Name Unit of Measure All Classes
| | | Sched. 1A2a | | |
| | | Quantity | Unit Price | Total |
| 40e | General Cargo - Preunitized | MT | 7102 | $ - 0 | $ - 0 |
| 45 | Containers | EA | 1435 | $ - 0 | $ - 0 |
| 60 | Vehicles 25001 - 50000 lbs | | | | |
| a. | LO/LO | EA | 12 | $ - 0 | $ - 0 |
| c. | RO/RO | EA | 317 | $ - 0 | $ - 0 |
| d. | TO/TO | EA | 9 | $ - 0 | $ - 0 |
| 61 | Vehicles 1-25000 lbs | | | | |
| a. | LO/LO | EA | 45 | $ - 0 | $ - 0 |
| c. | RO/RO | EA | 153 | $ - 0 | $ - 0 |
| d. | TO/TO | EA | 19 | $ - 0 | $ - 0 |
| 67 | Vehicles over 50,000 lbs | | | | |
| a. | LO/LO | EA | 4 | $ - 0 | $ - 0 |
| c. | RO/RO | EA | 249 | $ - 0 | $ - 0 |
| d. | TO/TO | EA | 4 | $ - 0 | $ - 0 |
| Total | | | | | $ - 0 |
Totals
OPTION YEAR 1 SCHEDULE TOTALS
IA1 LOAD VESSELS $ - 0
IA1a LOAD VESSELS - EXPL DIFF $ - 0
IA2 DISCHARGE VESSELS $ - 0
IA2a DISCHARGE VESSELS - EXPL DIFF $ - 0
IB1 LOAD AND DISCH RAILCARS $ - 0
I I XL AUTOMATED $ - 0
I IA XL AUTOMATED - EXPL DIFF $ - 0
I I I DET AUTOMATED $ - 0
I I IA DET AUTOMATED - EXPL DIFF $ - 0
V EQUIPMENT RENTAL $ - 0
X REIMBURSABLE, OUT-OF-POCKET $ - 0
TOTAL ALL SCHEDULES $ - 0