Option_Year_4_-_Schedule_of_Rates.docx

DOCX document 97 KB Posted

Attached to
Stevedoring and Related Terminal Services
Solicitation number
M67004-16-R-0006
Issued by

View the file

Other files

File Type Posted
Amendment_0005_to_M67004-16-R-0006.pdf PDF
Stevedoring_Option_Year_2.xlsx XLSX spreadsheet
Stevedoring_Option_Year_4.xlsx XLSX spreadsheet
Stevedoring_Option_Year_3.xlsx XLSX spreadsheet
Stevedoring_Option_Year_1.xlsx XLSX spreadsheet
Option_Year_2_Schedule_of_Rates.docx DOCX document
Base_Year_-_Schedule_of_Rates.docx DOCX document
Option_Year_1_Schedule_of_Rates.docx DOCX document
Amendment_0004_to_M67004-16-R-0006.pdf PDF
Option_Year_3_-_Schedule_of_Rates.docx DOCX document
Amendment_0003_to_M67004-16-R-0006.pdf PDF
Stevedoring_Option_Year_1.xlsx XLSX spreadsheet
Stevedoring_Base_Year_Schedule_of_Rates.xlsx XLSX spreadsheet
Stevedoring_Option_Year_4.xlsx XLSX spreadsheet
Amendment_0002_to_M67004-16-R-0006.pdf PDF
Stevedoring_Option_Year_2.xlsx XLSX spreadsheet
Stevedoring_Option_Year_3.xlsx XLSX spreadsheet
M67004-16-R-0006_Amendment_0001.pdf PDF
M67004-16-R-0006_Solicitation.pdf PDF
Pre-Solicitation_Notice_Stevedoring_Services_FY16.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jacksonville MPS Loading Vessels Option Year 4

Commodity
Commodity Name
Unit of Measure
All Classes

Sched. 1A1

Estimated Quantity

Unit Price
Total
25
Explosives - Containers
EA
1954
$-
$-
40e
General Cargo - Preunitized
MT
12384
$-
$-
45
Containers
EA
3702
$-
$-
60
Vehicles 25001 - 50000 lbs
a.
LO/LO
EA
134
$-
$-
c.
RO/RO
EA
2438
$-
$-
d.
TO/TO
EA
238
$-
$-
61
Vehicles 1-25000 lbs
a.
LO/LO
EA
190
$-
$-
c.
RO/RO
EA
3384
$-
$-
d.
TO/TO
EA
2472
$-
$-
67
Vehicles over 50,000 lbs
a.
LO/LO
EA
30
$-
$-
c.
RO/RO
EA
1124
$-
$-
d.
TO/TO
EA
28
$-
$-

Total

GANG HOUR ESTIMATED COST LO/LO $__________

GANG HOUR ESTIMATED COST RO/RO $__________

Jacksonville MPS Loading Vessels Explosive Differential Option Year 4

Commodity
Commodity Name
Unit of Measure
All Classes

Sched. 1A1a

Estimated

Unit Price
Total
40e
General Cargo - Preunitized
MT
6194
$-
$-
45
Containers
EA
1366
$-
$-
60
Vehicles 25001 - 50000 lbs
a.
LO/LO
EA
1
$-
$-
c.
RO/RO
EA
1
$-
$-
d.
TO/TO
EA
1
$-
$-
61
Vehicles 1-25000 lbs
a.
LO/LO
EA
1
$-
$-
c.
RO/RO
EA
1
$-
$-
d.
TO/TO
EA
1
$-
$-
67
Vehicles over 50,000 lbs
a.
LO/LO
EA
1
$-
$-
c.
RO/RO
EA
1
$-
$-
d.
TO/TO
EA
1
$-
$-

Total

Jacksonville MPS Unloading Vessels Option Year 4

Commodity
Commodity Name
Unit of Measure
All Classes

Sched. 1A2

Estimated

Unit Price
Total
25
Explosives - Containers
EA
2081
$-
$-
40e
General Cargo - Preunitized
MT
14664
$-
$-
45
Containers
EA
3946
$-
$-
60
Vehicles 25001 - 50000 lbs
a.
LO/LO
EA
127
$-
$-
c.
RO/RO
EA
2059
$-
$-
d.
TO/TO
EA
316
$-
$-
61
Vehicles 1-25000 lbs
a.
LO/LO
EA
145
$-
$-
c.
RO/RO
EA
3621
$-
$-
d.
TO/TO
EA
2536
$-
$-
67
Vehicles over 50,000 lbs
a.
LO/LO
EA
49
$-
$-
c.
RO/RO
EA
973
$-
$-
d.
TO/TO
EA
56
$-
$-

Total

Jacksonville MPS Unloading Vessels Explosive Differential Option Year 4

Commodity
Commodity Name
Unit of Measure
All Classes

Sched. 1A2a

Estimated

Unit Price
Total
40e
General Cargo - Preunitized
MT
7102
$-
$-
45
Containers
EA
1435
$-
$-
60
Vehicles 25001 - 50000 lbs
a.
LO/LO
EA
12
$-
$-
c.
RO/RO
EA
317
$-
$-
d.
TO/TO
EA
9
$-
$-
61
Vehicles 1-25000 lbs
a.
LO/LO
EA
45
$-
$-
c.
RO/RO
EA
153
$-
$-
d.
TO/TO
EA
19
$-
$-
67
Vehicles over 50,000 lbs
a.
LO/LO
EA
4
$-
$-
c.
RO/RO
EA
249
$-
$-
d.
TO/TO
EA
4
$-
$-

Total

OPTION YEAR 4 - SCHEDULE OF RATES

The contractor will be paid in accordance with the commodity, man-hour, and equipment rental rates enumerated in the following schedules:

SCHEDULE IA1 - LOADING VESSELS -

Rates for loading shall be based on non-Explosive Rates for all items excluding items 20g. Explosive differentials, at Schedules IA1a, will apply to items 40 thru 66 when explosives are present, when adjacent to a vessel, or on the vessel.

Item
Description
Quantity
MT or Each
Unit Price
Total
25
EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY: GANTRY OR SHIP CRANE
1954
EA
$-
$-
40e
GENERAL CARGO PRE-UNITIZED
12384
MT
$-
$-
60
WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to

50,000 lbs PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE

OF CRADLE), ETC.

a.
LO/LO, LIFT-ON

STANDARD AND PATENTED

LASHING.

BLOCKING & BRACING

134
EA
$-
$-
c.
RO/RO, ROLL-ON

PATENTED LASHING

2438
EA
$-
$-
d.
TOW/TOW, TOW-ON PATENTED LASHING
238
EA
$-
$-
61
WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS,

TRAILER MOUNTED MACHINERY, BOATS. (EXCLUSIVE OF

CRADLE), ETC.

a.
LO/LO, LIFT-ON

STANDARD AND PATENTED LASHING.

190
EA
$-
$-
c.
RO/RO, ROLL-ON
3384
EA
$-
$-
d.
TOW/TOW, TOW-ON
2472
EA
$-
$-
67
TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.
LO/LO, LIFT-ON
30
EA
$-
$-
c.
RO/RO, ROLL-ON
1124
EA
$-
$-
d.
TOW/TOW, TOW-ON
28
EA
$-
$-
45
CARGO TRANSPORTERS

TRI-CONS, AND LEASE VANS, ALL TYPES AND SIZES, LOADED OR EMPTY.

Schedule Total

Note: (1) * The Contractor shall be responsible for the laying and removal of protective material.

(2) ** These vehicles will be driven by Government furnished drivers. Contractor responsible for lashing only. (3) Vessels in this class do not have container cell guides.

(4) Approximately 90% of all containers loaded or discharged from an BOBO vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).

(5) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.

(6) The Contractor shall stow containers in a specific pattern in order to maximize space utilization. (7) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and part of commodity rates in Section B.

OPTION YEAR 4 - SCHEDULE OF RATES

SCHEDULE IA1a - LOADING VESSELS

EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA1

Item
Description
Quantity
MT or Each
Unit Price
Total
40e
GENERAL CARGO PRE-UNITIZED
6194
MT
$-
$-
60
WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to

50,000 lbs PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE

a.
LO/LO, LIFT-ON

STANDARD AND PATENTED

LASHING.

BLOCKING & BRACING

1
EA
$-
$-
c.
RO/RO, ROLL-ON

PATENTED LASHING

1
EA
$-
$-
d.
TOW/TOW, TOW-ON PATENTED LASHING
1
EA
$-
$-
61
WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS,
a.
LO/LO, LIFT-ON

STANDARD AND PATENTED LASHING.

1
EA
$-
$-
c.
RO/RO, ROLL-ON
1
EA
$-
$-
d.
TOW/TOW, TOW-ON
1
EA
$-
$-
67
TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.
LO/LO, LIFT-ON
1
EA
$-
$-
c.
RO/RO, ROLL-ON
1
EA
$-
$-
d.
TOW/TOW, TOW-ON
1
EA
$-
$-
45
CARGO TRANSPORTERS

Schedule Total

Note: (1) * The Contractor shall be responsible for the laying and removal of protective material.

(2) ** These vehicles will be driven by Government furnished drivers. Contractor responsible for lashing only. (3) Vessels in this class do not have container cell guides.

(4) Approximately 90% of all containers loaded or discharged from an BOBO vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).

(5) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.

(6) The Contractor shall stow containers in a specific pattern in order to maximize space utilization. (7) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and

The contractor will be paid in accordance with the commodity, man-hour, and equipment rental rates enumerated in the following schedules:

SCHEDULE IA2 - DISCHARGING VESSELS

Rates for loading shall be based on non-Explosive Rates for all items excluding items 20g. Explosive differentials, at Schedules IA2a, will apply to items 40 thru 66 when explosives are present, when adjacent to a vessel, or on the vessel.

Item
Description
Quantity
MT or Each
Unit Price
Total
25
EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY:

GANTRY OR SHIP CRANE

2081
EA
$-
$-
40e
GENERAL CARGO PRE-UNITIZED
14664
MT
$-
$-
60
WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to

50,000 lbs PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE

a.
LO/LO, LIFT-ON

STANDARD AND PATENTED

LASHING.

BLOCKING & BRACING

127
EA
$-
$-
c.
RO/RO, ROLL-ON

PATENTED LASHING

2059
EA
$-
$-
d.
TOW/TOW, TOW-ON PATENTED LASHING
316
EA
$-
$-
61
WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS,
a.
LO/LO, LIFT-ON

STANDARD AND PATENTED LASHING.

145
EA
$-
$-
c.
RO/RO, ROLL-ON
3621
EA
$-
$-
d.
TOW/TOW, TOW-ON
2536
EA
$-
$-
67
TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.
LO/LO, LIFT-ON
49
EA
$-
$-
c.
RO/RO, ROLL-ON
973
EA
$-
$-
d.
TOW/TOW, TOW-ON
56
EA
$-
$-
45
CARGO TRANSPORTERS

Schedule Total

Note: (1) * The Contractor shall be responsible for the laying and removal of protective material.

(2) ** These vehicles will be driven by Government furnished drivers. Contractor responsible for lashing only. (3) Vessels in this class do not have container cell guides.

(4) Approximately 90% of all containers loaded or discharged from an BOBO vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, and the container is moved within the hold using a KALMAR (container handler).

(5) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.

(6) The Contractor shall stow containers in a specific pattern in order to maximize space utilization. (7) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and

SCHEDULE IA2a - DISCHARGING VESSELS

EXPLOSIVE DIFFERENTIAL RATES FOR SCHEDULE IA2

Item
Description
Quantity
MT or Each
Unit Price
Total
40e
GENERAL CARGO PRE-UNITIZED
7102
MT
$-
$-
60
WHEELED GOVERNMENT VEHICLES AND ROAD CONSTRUCTION EQUIPMENT, UNBOXED, 25,001 LBS to

50,000 lbs PER UNIT, SUCH AS: TRUCKS, TRACTORS, TRAILERS, VANS, MOBILE CRANES, ROAD GRADERS, ROCK CRUSHERS, BUSES, BOATS (EXCLUSIVE

a.
LO/LO, LIFT-ON

STANDARD AND PATENTED

LASHING.

BLOCKING & BRACING

12
EA
$-
$-
c.
RO/RO, ROLL-ON

PATENTED LASHING

317
EA
$-
$-
d.
TOW/TOW, TOW-ON PATENTED LASHING
9
EA
$-
$-
61
WHEELED GOVERNMENT UP TO 25,000 LBS PER UNIT UNBOXED, WHEELED OR TRACKED, SUCH AS AMBULANCES, TRACTORS, TRAILERS, VANS, CONSTRUCTION EQUIPMENT, PERSONNEL CARRIERS,
a.
LO/LO, LIFT-ON

STANDARD AND PATENTED LASHING.

45
EA
$-
$-
c.
RO/RO, ROLL-ON
153
EA
$-
$-
d.
TOW/TOW, TOW-ON
19
EA
$-
$-
67
TRACKED AND SEMI-TRACKED GOVERNMENT VEHICLES AND CONSTRUCTION EQUIPMENT, UNBOXED, SET ON TREADS, EXCEEDING A GROSS VEHICLE WEIGHT OF > 50,000 POUNDS PER UNIT.
a.
LO/LO, LIFT-ON
4
EA
$-
$-
c.
RO/RO, ROLL-ON
249
EA
$-
$-
d.
TOW/TOW, TOW-ON
4
EA
$-
$-
45
CARGO TRANSPORTERS

Schedule Total

Note: (1) * The Contractor shall be responsible for the laying and removal of protective material.

(2) ** These vehicles will be driven by Government furnished drivers. Contractor responsible for lashing only. (3) Vessels in this class do not have container cell guides.

(4) Approximately 90% of all containers loaded or discharged from an BOBO vessel are double handled. The container is placed into or removed from the ship's hold by the ship's crane or gantry crane, with the ship's crane, during the course of loading or discharge of cargo, at commodity rates.

(5) The Contractor shall be responsible for removing and replacing hatch covers and 'tween deck pontoons with the ship's crane, before and after loading or discharge of cargo, and as part of commodity rates.

(6) The Contractor shall stow containers in a specific pattern in order to maximize space utilization. (7) Lifting the KALMAR in and out of holds will be inclusive in the commodity operation, and

SCHEDULE IB1 - LOADING AND DISCHARGING RAILCARS

Item
Description
Quantity
MT or Each
Unit Price
Total
25
EXPLOSIVE CARGO AND CARGO PAYABLE AT EXPLOSIVE RATES CONTAINERS LOADED BY:

GANTRY OR SHIP CRANE

4035
EA
$-
$-

Schedule Total

MISCELLANEOUS HOURLY RATES (RATES PER HOUR)

SCHEDULE II - EXTRA LABOR - AUTOMATED RATES (STRAIGHT TIME)

ITEM
DESCRIPTION
EST QTY MT OR
EST
GANG
GANG HR
UNIT
TOTAL
EACH
NUMBER
HOURS
COST
COST
COST

PER HOUR

1
HEADER / FOREMAN
930
EA
0
0.00
$-$-$-
2
LONGSHOREMAN
4185
EA
0
0.00
$-$-$-
3
MECHANIC / DRIVER
4185
EA
0
0.00
$-$-$-
4
CHECKER / CLERK
1860
EA
0
0.00
$-$-$-
5
CRANE OP / FLG MAN
1395
EA
0
0.00
$-$-$-

Schd Total $ -

SCHEDULE IIA - EXTRA LABOR - AUTOMATED EXPLOSIVE DIFFERENTIAL

1
HEADER / FOREMAN
476
EA
0
0.00
$-$-$-
2
LONGSHOREMAN
2142
EA
0
0.00
$-$-$-
3
MECHANIC / DRIVER
2142
EA
0
0.00
$-$-$-
4
CHECKER / CLERK
952
EA
0
0.00
$-$-$-
5
CRANE OP / FLG MAN
714
EA
0
0.00
$-$-$-

Schd Total $ -

MISCELLANEOUS HOURLY RATES (RATES PER HOUR)

SCHEDULE III - DETENTION TIME - AUTOMATED (STANDBY TIME, HOURLY RATE)

ITEM
DESCRIPTION
EST QTY MT OR
EST
GANG
GANG HR
UNIT
TOTAL
EACH
NUMBER
HOURS
COST
COST
COST

PER HOUR

1
HEADER / FOREMAN
388
EA
0
0.00
$-$-$-
2
LONGSHOREMAN
1748
EA
0
0.00
$-$-$-
3
MECHANIC / DRIVER
1748
EA
0
0.00
$-$-$-
4
CHECKER / CLERK
777
EA
0
0.00
$-$-$-
5
CRANE OP / FLG MAN
582
EA
0
0.00
$-$-$-

Schd Total $ -

SCHEDULE IIIA - DETENTION TIME - AUTOMATED EXPLOSIVE DIFFERENTIAL (STANDBY TIME, HOURLY RATE)

1
HEADER / FOREMAN
179
EA
0
0.00
$-$-$-
2
LONGSHOREMAN
808
EA
0
0.00
$-$-$-
3
MECHANIC / DRIVER
808
EA
0
0.00
$-$-$-
4
CHECKER / CLERK
359
EA
0
0.00
$-$-$-
5
CRANE OP / FLG MAN
269
EA
0
0.00
$-$-$-

Schd Total $ -

SCHEDULE V - EQUIPMENT RENTAL RATES

HOURLY RATES TO BE PAID TO THE CONTRACTOR AS COMPENSATION FOR THE RENTAL OF EQUIPMENT USED IN CONNECTION WITH SERVICES PERFORMED ON A MANHOUR BASIS. CONTRACTOR SHALL FURNISH FUEL, LUBRICANT, AND MAINTENANCE.

Item
Description
Quantity
Unit of Measure / Issue
Unit Cost
Total Cost
1
TRUCKS, FORKLIFT, WITH RATE THREE (3) TONS BUT LESS THAN SEVEN AND ONE-HALF (7 1/2) TONS AT 24 INCH LOAD CENTER,

WITH LOW MAST FOR WORK IN (6) FOOT HIGH RESTRICTED AREAS.

1
HR
$-
$-
2
TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN SEVEN AND ONE-HALF (7 1/2) TON BUT

LESS THAN NINE (9) TONS AT 24 INCH LOAD CENTER.

1
HR
3
TRUCKS, FORKLIFT, WITH RATE CAPACITY GREATER THAN NINE (9) TONS BUT LESS THAN 15 TONS AT

24 INCH LOAD CENTER.

1
HR
$-
$-
4
TOP LOADER
1
HR
$-
$-
5
YARD HUSTLERS
1
HR
$-
$-
6
20 FOOT CONTAINER CHASSIS
1
HR
7
FLAT BED TRAILERS
1
HR
$-
$-

Schedule Total

SCHEDULE X - REIMBURSABLE EST QTY U / I UNIT TOTAL

Item
Description
Quantity
Unit of Measure / Issue
Unit Cost
Total Cost
1
OUT-OF-POCKET-COSTS
1
UNIT
NTE
$10,000

Schedule Total

OPTION YEAR 4 SCHEDULE TOTALS

Item
Description
Total Cost
IA1
LOAD VESSELS
$
IA1a
LOAD VESSELS –

EXPL DIFF

IA2
DISCHARGE VESSELS
$
IA2a
DISCHARGE VESSELS - EXPL DIFF
$
IB1
LOAD AND DISCH RAILCARS
$
I I
XL AUTOMATED
$
I IA
XL AUTOMATED –

EXPL DIFF

I I I
DET AUTOMATED
$
I I IA
DET AUTOMATED –

EXPL DIFF

V
EQUIPMENT RENTAL
$
X
REIMBURSABLE, OUT-OF-POCKET
$
Total of All Schedules
$

File details come from the government source that posted it. Updated .