About this file

This document is a set of bidding plans and details for a road repair and resurfacing project at Mackinac Island State Park in Mackinac Island, Michigan. The project is being managed by the Michigan Department of Technology, Management & Budget on behalf of the Mackinac Island State Park Commission. The scope of work involves a 1.5-inch hot mix asphalt (HMA) overlay on all roads within the project limits, except for Fort Street which will be milled 1.5 inches and replaced with new 1.5-inch HMA. The contractor will also be required to perform HMA patching and replacement as indicated on the plans. Construction is to be completed by May 24, 2024. The contractor will utilize British Landing for equipment and material delivery, with the Mackinac Island State Park Commission escorting them to and from the project sites. The equipment staging area will be located at the Mackinac Island State Park Commission service area behind Fort Mackinac.

The contract documents provide detailed quantities for HMA patching, removal and replacement, and placement. Pricing will be per the HMA application table included in the details. The Mackinac Island State Park Commission will be responsible for all shoulder and slope restoration including topsoil, seeding, and mulch. Contractors are required to provide a traffic control plan for approval prior to the pre-construction meeting.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MACKINAC ISLAND STATE PARK COMMISSION

FILE NO.: 751/23242.ABG

ROAD REPAIRS

MACKINAC ISLAND, MI

CONTACT LIST:

DTMB PROJECT DIRECTOR

ALAN GOSCHKA

MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT & BUDGET

MACKINAC ISLAND STATE PARK COMMISSION

STEVE BRISSON

DIRECTOR, MICHIGAN STATE HISTORIC PARKS

MYRON JOHNSON

(906) 250-0792

PROFESSIONAL SERVICE CONTRACTOR

JEREMY GAGNON

PROJECT MANAGER

U.P. ENGINEERS & ARCHITECTS, INC

707 ASHMUN STREET

SAULT STE. MARIE, MICHIGAN 49783

(906) 635-0511

JGAGNON@UPEA.COM

GENERAL NOTES

1. CONTRACTOR SHALL COORDINATE PROJECT

SCHEDULING WITH MISPC VIA PRE-CONSTRUCTION

SCHEDULE MEETING.

2. CONTRACTOR SHALL FIELD VERIFY ALL QUANTITIES.

3. MISPC WILL PERFORM ALL SHOULDER AND SLOPE

RESTORATION INCLUDING TOPSOIL, SEEDING AND

MULCH.

4. CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL

PLAN WITH APPROVAL FROM THE MISPC AT THE

PRECONSTRUCTION MEETING. SEE SPECIFICATION

SECTION 01100 PROJECT PROCEDURES (3) BARRIER

& ENCLOSURES ITEM (C) STREET BARRICADES.

5. CONSTRUCT BUTT JOINT AT ALL ASPHALT

INTERSECTIONS.

6. CONTRACTOR TO CLEAN ROAD PRIOR TO PAVING

WITH POWER SWEEPER AS NECESSARY TO REMOVE

ALL DIRT, DEBRIS AND HORSE FECES.

7. SAWCUT AND PROVIDE BUTT JOINTS AT ALL

INTERSECTIONS.

8. CONSTRUCTION TO BE COMPLETED BY MAY 24, 2024.

9. CONTRACTOR TO UTILIZE BRITISH LANDING FOR

EQUIPMENT AND MATERIAL DELIVERY. MISPC TO

ESCORT CONTRACTOR TO AND FROM PROJECT SITES

ALONG DNR DESIGNATED ROUTE. EQUIPMENT

STAGING AREA TO BE LOCATED AT THE MISPC

SERVICE AREA BEHIND FORT MACKINAC.

10. SCOPE OF WORK: ALL ROADS (EXCEPT FORT

STREET) TO RECEIVE 1.5" HMA OVERLAY FROM

PROJECT LIMIT TO PROJECT LIMIT. CONTRACTOR TO

REMOVE AND REPLACE AND/OR PATCH AS SHOWN ON

THE PLANS. FORT STREET TO BE MILLED (1.5") AND

REPLACED WITH 1.5" HMA.

STATE OF MICHIGAN

MACKINAC

ISLAND

CARRIAGE ROAD [C102]

CARRIAGE ROAD [C102]

CEMETERY ROAD (SOUTH) [C103]

FORT STREET [C101]

CEMETERY ROAD (SOUTH) [C103]

GARRISON ROAD [C104]

CEMETERY ROAD (NORTH) [C102]

HURON ROAD (EAST) [C100]

CUPID'S PATHWAY [C105]

HURON ROAD (WEST) [C101]

SPRING STREET [C106]

CUPID'S PATHWAY [C105]

MACKINAC ISLAND VICINITY MAP DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

STATE OF MICHIGAN

ADAM P. LACH, RA, DIRECTOR

FACILITIES AND BUSINESS SERVICES ADMINISTRATION

DESIGN AND CONSTRUCTION DIVISION

FILE NO.: 751/23242.ABG

HURON ROAD (EAST) PLAN

INDEX OF SHEETS

C100

C103

NUMBER SHEET NAME

CEMETERY ROAD (SOUTH) PLAN

C104 GARRISON ROAD PLAN

PROJECT TITLE SHEETG100

C102 CARRIAGE ROAD, CUPID'S PATHWAY & CEMETERY ROAD (NORTH) PLAN

HURON ROAD (WEST) & FORT STREET PLANC101

C501 DETAILS

C105 CUPID'S PATHWAY PLAN

C106 SPRING STREET PLAN

CUPID'S PATHWAY [C102]

PATCH 30'x12' [G100]

PATCH 50'x12' [G100]

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

M

A C

K

IN

A C

IS

LA

N D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

BI

D

D

IN

G

/1 5/

M

-0

JG SP JG JG

PROJECT

TITLE SHEET

G001

M A

C K

IN

A

C

IS

LA

N

D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

M A

C K

IN

A

C

IS

LA

N

D , M

IC

H

IG

A

N

9/ 8/

:0

PM

P:

\M

-0

D

TM

B- M

AC

KI

N

AC

IS

LA

N D

R O

AD

P

AV

IN

G

4\

D W

G S\

C O

VE

R

.D W

G

R O

A D

R

EP

A

IR

S R

O A

D R

EP

A

IR

S

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

BP: 0+00.00

PI: 3+29.05

PC: 4+20.53

PT

: 5

+5 8.9

PC

: 7

+2 8.9

PT

: 8

+0 2.9

PI

: 8 +1

7.0

9+00

9+00

10+00

11+00

12+00

EP

: 1

2+

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

M

A C

K

IN

A C

IS

LA

N D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

BI

D

D

IN

G

/1 5/

M

-0

JG SP JG JG

HURON

ROAD (EAST)

PLAN

C100

M A

C K

IN

A

C

IS

LA

N

D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

M A

C K

IN

A

C

IS

LA

N

D , M

IC

H

IG

A

N

8/ 1/

:1

PM

P:

\M

-0

D

TM

B- M

AC

KI

N

AC

IS

LA

N D

R O

AD

P

AV

IN

G

4\

D W

G S\

B

AS

E.

D

W G

R O

A D

R

EP

A

IR

S R

O A

D R

EP

A

IR

S

EXISTING

GRAVEL

PATHWAY

EXISTING

GRAVEL

PATHWAY

EX. MANHOLE

POB STA. 0+65

POE STA. 12+90

12'

20'

12'

12'

20'

LEGEND

HMA SURFACE, REM AND REPLACE

HMA PATCHING

HMA PLACEMENT

ARCH

ROCK

ROAD

HURON ROAD

PROJECT LIMITS

PROJECT LIMITS

MATCH LINE

MATCH LINE

FORT MACKINAC

PARADE GROUND

FORT MACKINAC

HURON ROAD

HURON ROAD QUANTITIES

(FOR INFORMATION ONLY)

1,399 Sft HMA Patching 7,068 Sft HMA Remove and Replace

HMA PATCHING

STA. 3+56 TO STA. 4+20

STA. 8+90 TO STA. 9+08

REMOVE AND REPLACE

STA. 2+00 TO STA. 3+00

STA. 4+20 TO STA. 4+73

STA. 6+00 TO STA. 6+30

STA. 6+74 TO STA. 8+00

STA. 12+15 TO STA. 12+90

GARRISON ROAD

HURON ROAD

PROPOSED HURON ROAD (EAST) PLAN

EX. CONCRETE

PATHWAY

HURON

ROAD

HURONROAD

HURON

ROAD

MATCH LINE

MATCH LINE

PROJECT LIMITS

PROJECT LIMITS

HURON

ROAD

GENERAL NOTES

1. CONTRACTOR SHALL COORDINATE PROJECT SCHEDULING WITH MISPC VIA

PRE-CONSTRUCTION SCHEDULE MEETING.

2. CONTRACTOR SHALL FIELD VERIFY ALL QUANTITIES.

3. MISPC WILL PERFORM ALL SHOULDER AND SLOPE RESTORATION INCLUDING

TOPSOIL, SEEDING AND MULCH.

4. CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN WITH APPROVAL

FROM THE MISPC AT THE PRECONSTRUCTION MEETING. SEE SPECIFICATION

SECTION 01100 PROJECT PROCEDURES (3) BARRIER & ENCLOSURES ITEM (C)

STREET BARRICADES.

5. CONSTRUCT BUTT JOINT AT ALL ASPHALT INTERSECTIONS.

GENERAL NOTES (CONTINUED)

6. CONTRACTOR TO CLEAN ROAD PRIOR TO PAVING WITH POWER SWEEPER AS

NECESSARY TO REMOVE ALL DIRT, DEBRIS AND HORSE FECES.

7. SAWCUT AND PROVIDE BUTT JOINTS AT ALL INTERSECTIONS.

8. CONSTRUCTION TO BE COMPLETED BY MAY 24, 2024.

9. CONTRACTOR TO UTILIZE BRITISH LANDING FOR EQUIPMENT AND MATERIAL

DELIVERY. MISPC TO ESCORT CONTRACTOR TO AND FROM PROJECT SITES

ALONG DNR DESIGNATED ROUTE. EQUIPMENT STAGING AREA TO BE LOCATED

AT THE MISPC SERVICE AREA BEHIND FORT MACKINAC.

10. SCOPE OF WORK: ALL ROADS (EXCEPT FORT STREET) TO RECEIVE 1.5" HMA

OVERLAY FROM PROJECT LIMIT TO PROJECT LIMIT. CONTRACTOR TO REMOVE

AND REPLACE AND/OR PATCH AS SHOWN ON THE PLANS. FORT STREET TO BE

MILLED (1.5") AND REPLACED WITH 1.5" HMA.

2+00

3+00

7+00

8+00

9+00

BP: 0+00

EP: 9+07

0+00

4+00

5+00

6+00

1+00

2+00

3+00

BP: 0+00

EP: 3+89

0+00

LEGEND

HMA SURFACE, REM AND REPLACE

HMA PATCHING

HMA PLACEMENT

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

M

A C

K

IN

A C

IS

LA

N D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

BI

D

D

IN

G

/1 5/

M

-0

JG SP JG JG

HURON ROAD

(WEST) & FORT

STREET PLAN

C101

M A

C K

IN

A

C

IS

LA

N

D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

M A

C K

IN

A

C

IS

LA

N

D , M

IC

H

IG

A

N

9/ 8/

:0

PM

P:

\M

-0

D

TM

B- M

AC

KI

N

AC

IS

LA

N D

R O

AD

P

AV

IN

G

4\

D W

G S\

B

AS

E.

D

W G

R O

A D

R

EP

A

IR

S R

O A

D R

EP

A

IR

S

PROPOSED HURON

ROAD (WEST) PLAN

HURON

ROAD

CE

M

ET

ER

Y

RO

AD

M

AR

KE

T

ST

RE

ET

FORTSTREET

SPRING

STREET

M -1

M-18

FORT STREET

PROPOSED FORT STREET PLAN

HURON ROAD

HURON

ROAD

FORT

STREET

20'

20'

POB STA. 0+00

PROJECT LIMITS

PROJECT LIMITS

POB STA. 0+00

PROJECT LIMITS

PROJECT LIMITS

EX. WATER VALVE.

PRESERVE AND

PROTECT AS REQUIRED.

EX. MANHOLE

POE STA. 3+89

PROJECT LIMITS

PROJECT LIMITS

POE STA. 9+07

PROJECT LIMITS

PROJECT LIMITS

SAWCUT

EXISTING

CONCRETE

WALK & CURB

23'

20'

HURON ROAD QUANTITIES

(FOR INFORMATION ONLY)

1,002 Sft HMA Patching

HMA PATCHING

STA. 0+70 TO STA. 0+86

STA. 4+81 TO STA. 5+25

STA. 5+60 TO STA. 5+63

STA. 5+83 TO STA. 6+07

STA. 8+02 TO STA. 8+21

EXISTING

CONCRETE

WALK & CURB

EX. MANHOLE

EXISTING CONCRETE

EXISTING CONCRETE

HURON ROAD

GENERAL NOTES

1. CONTRACTOR SHALL COORDINATE PROJECT SCHEDULING WITH MISPC VIA

PRE-CONSTRUCTION SCHEDULE MEETING.

2. CONTRACTOR SHALL FIELD VERIFY ALL QUANTITIES.

3. MISPC WILL PERFORM ALL SHOULDER AND SLOPE RESTORATION INCLUDING

TOPSOIL, SEEDING AND MULCH.

4. CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN WITH APPROVAL

FROM THE MISPC AT THE PRECONSTRUCTION MEETING. SEE SPECIFICATION

SECTION 01100 PROJECT PROCEDURES (3) BARRIER & ENCLOSURES ITEM (C)

STREET BARRICADES.

5. CONSTRUCT BUTT JOINT AT ALL ASPHALT INTERSECTIONS.

GENERAL NOTES (CONTINUED)

6. CONTRACTOR TO CLEAN ROAD PRIOR TO PAVING WITH POWER SWEEPER AS

NECESSARY TO REMOVE ALL DIRT, DEBRIS AND HORSE FECES.

7. SAWCUT AND PROVIDE BUTT JOINTS AT ALL INTERSECTIONS.

8. CONSTRUCTION TO BE COMPLETED BY MAY 24, 2024.

9. CONTRACTOR TO UTILIZE BRITISH LANDING FOR EQUIPMENT AND MATERIAL

DELIVERY. MISPC TO ESCORT CONTRACTOR TO AND FROM PROJECT SITES

ALONG DNR DESIGNATED ROUTE. EQUIPMENT STAGING AREA TO BE LOCATED

AT THE MISPC SERVICE AREA BEHIND FORT MACKINAC.

10. SCOPE OF WORK: ALL ROADS (EXCEPT FORT STREET) TO RECEIVE 1.5" HMA

OVERLAY FROM PROJECT LIMIT TO PROJECT LIMIT. CONTRACTOR TO REMOVE

AND REPLACE AND/OR PATCH AS SHOWN ON THE PLANS. FORT STREET TO BE

BP: 0+00.00

PC: 0+36.56

PT: 0+66.25

PC: 2+72.02

PT: 2+94.69

PC: 4+24.49

PT: 4+76.85

PC: 6+18.98

PT: 7+04.61

PC: 9+28.09

PT: 9+80.70

PC: 10+14.24

0+00

1+00 2+00 3+00

4+00 5+00

6+00 7+00

8+00

9+00

10+00

2+00

1+00

0+00

PC: 9+28.09 PT: 9+80.70 PC: 10+14.24

PT: 10+54.14

PC: 11+68.98

PT: 12+10.10

PC: 12+60.07

PT: 13+34.31

PC: 13+87.41

PT: 14+44.08

9+00

10+00 11+00

12+00 13+00

14+00

15+00

0+00

PC: 13+87.41

PT: 14+44.08

PI: 15+92.86

PI: 17+88.56

EP: 20+00

14+00

15+00 16+00 17+00 18+00 19+00 20+00

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

M

A C

K

IN

A C

IS

LA

N D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

BI

D

D

IN

G

/1 5/

M

-0

JG SP JG JG

C102

M A

C K

IN

A

C

IS

LA

N

D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

M A

C K

IN

A

C

IS

LA

N

D , M

IC

H

IG

A

N

7/

/2

7:

A

M

P:

\M

-0

D

TM

B- M

AC

KI

N

AC

IS

LA

N D

R O

AD

P

AV

IN

G

4\

D W

G S\

B

AS

E.

D

W G

R O

A D

R

EP

A

IR

S R

O A

D R

EP

A

IR

S

POB STA. 0+00

POE STA. 20+00

13'

13'

13'

13'

11'

15'

15'

20'

14'

15'

PROVIDE NEW

ASPHALT BASE AND

HMA PER DETAIL 2

ON SHEET C501

LEGEND

HMA SURFACE, REM AND REPLACE

HMA PATCHING

HMA PLACEMENT

WINGS OF

MACKINAC

GRAND

HOTEL

STABLES

C

U

PID

'S

PA

TH

W

A Y

CARRIAGE ROAD

CARRIAGE

ROAD

CUPID'SPATHWAY

CARRIAG

E RO

AD /

CUPID'S PATHW

AY

CARRIAGE ROAD

GARRISON

ROAD

CEMETERY

ROAD

GARRISON

ROAD

MATCH LINE B1

MATCH LINE B1

REMOVE AND REPLACE

STA. 4+36 TO STA. 6+11

STA. 6+31 TO STA. 6+36

STA. 6+74 TO STA. 6+79

STA. 8+00 TO STA. 8+30

STA. 9+08 TO STA. 9+40

STA. 11+55 TO STA. 12+10

STA. 14+3 TO STA 14+8

STA. 14+42 TO STA. 14+68

STA. 17+74 TO STA. 18+10

STA. 18+80 TO STA. 19+60

PROJECT LIMITS

PROJECT LIMITS

MATCH LINE B1

MATCH LINE B1

MATCH LINE A

MATCH LINE A

MATCH LINE A1

MATCH LINE A1 PROJECT LIMITS

PROJECT LIMITS

CEMETERY

ROAD

CARRIAGEROAD

CARRIAGE

ROAD

CARRIAGEROAD

CEMETERY

ROAD

PROPOSED CARRIAGE ROAD, CUPID'S

PATHWAY & CEMETERY ROAD (NORTH) PLAN

CEMETERY ROAD

CARRIAGE RD,

CUPID'S PATH

& CEMETERY

RD (NORTH)

FORT MACKINAC

POST CEMETERY

CARRIAGE ROAD, CUPID'S PATHWAY

AND FORT SERVICE ROAD QUANTITIES

(FOR INFORMATION ONLY)

502 Sft HMA Patching 171 Sft HMA Placement 6,086 Sft HMA Remove and Replace

HMA PATCHING

STA. 11+21 TO STA. 11+25

STA. 15+85 TO STTA. 16+15

HMA PLACEMENT

STA. 9+57 TO STA. 9+81

EXISTING PATHWAY

EXISTING PATHWAY

EXISTING PATHWAY

EXISTING PATHWAY

GENERAL NOTES

1. CONTRACTOR SHALL COORDINATE PROJECT SCHEDULING WITH MISPC VIA

PRE-CONSTRUCTION SCHEDULE MEETING.

2. CONTRACTOR SHALL FIELD VERIFY ALL QUANTITIES.

3. MISPC WILL PERFORM ALL SHOULDER AND SLOPE RESTORATION INCLUDING

TOPSOIL, SEEDING AND MULCH.

4. CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN WITH APPROVAL

FROM THE MISPC AT THE PRECONSTRUCTION MEETING. SEE SPECIFICATION

SECTION 01100 PROJECT PROCEDURES (3) BARRIER & ENCLOSURES ITEM (C)

STREET BARRICADES.

5. CONSTRUCT BUTT JOINT AT ALL ASPHALT INTERSECTIONS.

GENERAL NOTES (CONTINUED)

6. CONTRACTOR TO CLEAN ROAD PRIOR TO PAVING WITH POWER SWEEPER AS

NECESSARY TO REMOVE ALL DIRT, DEBRIS AND HORSE FECES.

7. SAWCUT AND PROVIDE BUTT JOINTS AT ALL INTERSECTIONS.

8. CONSTRUCTION TO BE COMPLETED BY MAY 24, 2024.

9. CONTRACTOR TO UTILIZE BRITISH LANDING FOR EQUIPMENT AND MATERIAL

DELIVERY. MISPC TO ESCORT CONTRACTOR TO AND FROM PROJECT SITES

ALONG DNR DESIGNATED ROUTE. EQUIPMENT STAGING AREA TO BE LOCATED

AT THE MISPC SERVICE AREA BEHIND FORT MACKINAC.

10. SCOPE OF WORK: ALL ROADS (EXCEPT FORT STREET) TO RECEIVE 1.5" HMA

OVERLAY FROM PROJECT LIMIT TO PROJECT LIMIT. CONTRACTOR TO REMOVE

AND REPLACE AND/OR PATCH AS SHOWN ON THE PLANS. FORT STREET TO BE

MILLED (1.5") AND REPLACED WITH 1.5" HMA.

PROJECT LIMITS

PROJECT LIMITS

EXISTING PATHWAY QUANTITIES

(FOR INFORMATION ONLY)

1,950 Sft HMA Remove and Replace

REMOVE AND REPLACE

STA. 1+00 TO STA. 2+50

13'

PROJECT LIMITS

PROJECT LIMITS

EXISTING PATHWAY

POE STA. 2+60

POB STA. 0+00

2+00

3+00

4+00

5+00 6+00 7+00

BP: 0+00

3+00

7+00 8+00 9+00 10+00

11+00

12+00

12+00

13+00

14+00 15+00 16+00 17+00

18+00

EP: 18+00

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

M

A C

K

IN

A C

IS

LA

N D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

BI

D

D

IN

G

/1 5/

M

-0

JG SP JG JG

CEMETERY

ROAD (SOUTH)

C103

M A

C K

IN

A

C

IS

LA

N

D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

M A

C K

IN

A

C

IS

LA

N

D , M

IC

H

IG

A

N

9/ 8/

:0

PM

P:

\M

-0

D

TM

B- M

AC

KI

N

AC

IS

LA

N D

R O

AD

P

AV

IN

G

4\

D W

G S\

B

AS

E.

D

W G

R O

A D

R

EP

A

IR

S R

O A

D R

EP

A

IR

S

LEGEND

HMA SURFACE, REM AND REPLACE

HMA PATCHING

HMA PLACEMENT

MATCH LINE B2

MATCH LINE B2

CUPID'S

PATHWAY

CEMETERY ROAD

MATCH LINE B2

MATCH LINE B2

MATCH LINE A1

MATCH LINE A1

MATCH LINE A1

MATCH LINE A1

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

FO

RT

SE

RVI

CE

ROAD

CARRIAGEROAD

CEMETERY

ROAD

PROPOSED CEMETERY ROAD (SOUTH) PLAN

CEMETERY

ROAD

CEMETERY

ROAD

CEMETERY

ROAD

CEMETERY

ROAD

HU

RO

N

RO

AD

HURON

ROAD

CEMETERY ROAD

POE STA. 18+00

POB STA. 0+00

12'

12'

12'

12'

12'

12'

CEMETERY ROAD

CEMETERY ROAD

GENERAL NOTES

1. CONTRACTOR SHALL COORDINATE PROJECT SCHEDULING WITH MISPC VIA

PRE-CONSTRUCTION SCHEDULE MEETING.

2. CONTRACTOR SHALL FIELD VERIFY ALL QUANTITIES.

3. MISPC WILL PERFORM ALL SHOULDER AND SLOPE RESTORATION INCLUDING

TOPSOIL, SEEDING AND MULCH.

4. CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN WITH APPROVAL

FROM THE MISPC AT THE PRECONSTRUCTION MEETING. SEE SPECIFICATION

SECTION 01100 PROJECT PROCEDURES (3) BARRIER & ENCLOSURES ITEM (C)

STREET BARRICADES.

5. CONSTRUCT BUTT JOINT AT ALL ASPHALT INTERSECTIONS.

GENERAL NOTES (CONTINUED)

6. CONTRACTOR TO CLEAN ROAD PRIOR TO PAVING WITH POWER SWEEPER AS

NECESSARY TO REMOVE ALL DIRT, DEBRIS AND HORSE FECES.

7. SAWCUT AND PROVIDE BUTT JOINTS AT ALL INTERSECTIONS.

8. CONSTRUCTION TO BE COMPLETED BY MAY 24, 2024.

9. CONTRACTOR TO UTILIZE BRITISH LANDING FOR EQUIPMENT AND MATERIAL

DELIVERY. MISPC TO ESCORT CONTRACTOR TO AND FROM PROJECT SITES

ALONG DNR DESIGNATED ROUTE. EQUIPMENT STAGING AREA TO BE LOCATED

AT THE MISPC SERVICE AREA BEHIND FORT MACKINAC.

10. SCOPE OF WORK: ALL ROADS (EXCEPT FORT STREET) TO RECEIVE 1.5" HMA

OVERLAY FROM PROJECT LIMIT TO PROJECT LIMIT. CONTRACTOR TO REMOVE

AND REPLACE AND/OR PATCH AS SHOWN ON THE PLANS. FORT STREET TO BE

MILLED (1.5") AND REPLACED WITH 1.5" HMA.

CEMETERY ROAD QUANTITIES

(FOR INFORMATION ONLY)

690 Sft HMA Remove and Replace

REMOVE AND REPLACE

STA. 11+25 TO STA. 11+45

STA. 12+75 TO STA. 13+50

0+00 1+00 2+00 3+00 4+00 5+00 6+00

BP

: 0

+0 0.

PI

: 3

+7 3.

PC

: 5

+1 4.

6+00

7+00

8+00

9+00

10+00

11+00

PT

: 6

+5 7.

PC

: 7

+7 0.

PT

: 7

+9 2.

PC

: 9

+9 3.

PT

: 1

0+

.7

PT

: 1

1+

.08

PC

: 1

0+

.2

EP

: 1

1+

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

M

A C

K

IN

A C

IS

LA

N D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

BI

D

D

IN

G

/1 5/

M

-0

JG SP JG JG

GARRISON

ROAD PLAN

C104

M A

C K

IN

A

C

IS

LA

N

D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

M A

C K

IN

A

C

IS

LA

N

D , M

IC

H

IG

A

N

9/ 8/

:0

PM

P:

\M

-0

D

TM

B- M

AC

KI

N

AC

IS

LA

N D

R O

AD

P

AV

IN

G

4\

D W

G S\

B

AS

E.

D

W G

R O

A D

R

EP

A

IR

S R

O A

D R

EP

A

IR

S

CEMETERY WALL

CEMETERY WALL

EXISTING ACCESS ROAD

POE STA. 11+50

EXISTING

GRAVEL

PATHWAY

13'

13'

13'

13'

13'

LEGEND

HMA SURFACE, REM AND REPLACE

HMA PATCHING

HMA PLACEMENT

GARRISON ROAD QUANTITIES (FOR INFORMATION ONLY)

11,270 Sft HMA Patching 76 Sft HMA Remove and Replace

HMA PATCHING

STA. 3+00 TO STA. 11+50

REMOVE AND REPLACE

STA. 8+12 TO STA. 8+25

STA. 11+20 TO STA. 11+26

PROJECT LIMITS

PROJECT LIMITS

MATCH LINE

MATCH LINE

MATCH LINE

MATCH LINE

PROJECT LIMITS

PROJECT LIMITS

GARRISONROAD

FORT MACKINAC

POST CEMETERY

FORT MACKINAC

POST CEMETERY

CEMETERY

ROAD

SKULL

CAVE

GARRISON ROAD

GARRISON ROAD

GARRISON

ROAD

RIFLE

RANGE

ROAD

GARRISONROAD

PROPOSED GARRISON ROAD PLAN

GARRISON

ROAD

GENERAL NOTES

1. CONTRACTOR SHALL COORDINATE PROJECT SCHEDULING WITH MISPC VIA

PRE-CONSTRUCTION SCHEDULE MEETING.

2. CONTRACTOR SHALL FIELD VERIFY ALL QUANTITIES.

3. MISPC WILL PERFORM ALL SHOULDER AND SLOPE RESTORATION INCLUDING

TOPSOIL, SEEDING AND MULCH.

4. CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN WITH APPROVAL

FROM THE MISPC AT THE PRECONSTRUCTION MEETING. SEE SPECIFICATION

SECTION 01100 PROJECT PROCEDURES (3) BARRIER & ENCLOSURES ITEM (C)

STREET BARRICADES.

5. CONSTRUCT BUTT JOINT AT ALL ASPHALT INTERSECTIONS.

GENERAL NOTES (CONTINUED)

6. CONTRACTOR TO CLEAN ROAD PRIOR TO PAVING WITH POWER SWEEPER AS

NECESSARY TO REMOVE ALL DIRT, DEBRIS AND HORSE FECES.

7. SAWCUT AND PROVIDE BUTT JOINTS AT ALL INTERSECTIONS.

8. CONSTRUCTION TO BE COMPLETED BY MAY 24, 2024.

9. CONTRACTOR TO UTILIZE BRITISH LANDING FOR EQUIPMENT AND MATERIAL

DELIVERY. MISPC TO ESCORT CONTRACTOR TO AND FROM PROJECT SITES

ALONG DNR DESIGNATED ROUTE. EQUIPMENT STAGING AREA TO BE LOCATED

AT THE MISPC SERVICE AREA BEHIND FORT MACKINAC.

10. SCOPE OF WORK: ALL ROADS (EXCEPT FORT STREET) TO RECEIVE 1.5" HMA

OVERLAY FROM PROJECT LIMIT TO PROJECT LIMIT. CONTRACTOR TO REMOVE

AND REPLACE AND/OR PATCH AS SHOWN ON THE PLANS. FORT STREET TO BE

POB STA. 0+00

6+30

1+00 2+00 3+00

4+00

5+00 6+00

7+00 6+00 5+00 4+00 3+00 2+00 0+001+00

LEGEND

HMA SURFACE, REM AND REPLACE

HMA PATCHING

HMA PLACEMENT

PROPOSED CUPID'S PATHWAY PLAN

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

M

A C

K

IN

A C

IS

LA

N D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

BI

D

D

IN

G

/1 5/

M

-0

JG SP JG JG

CUPID'S

PATHWAY

PLAN

C105

M A

C K

IN

A

C

IS

LA

N

D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

M A

C K

IN

A

C

IS

LA

N

D , M

IC

H

IG

A

N

7/

/2

7:

A

M

P:

\M

-0

D

TM

B- M

AC

KI

N

AC

IS

LA

N D

R O

AD

P

AV

IN

G

4\

D W

G S\

B

AS

E.

D

W G

R O

A D

R

EP

A

IR

S R

O A

D R

EP

A

IR

S

CUPID'S PATHWAY

CEMETERYROAD

CEMETERY

ROAD

FORT

SERVICE

ROAD

CUPID'S

PATHWAY

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

GENERAL NOTES

1. CONTRACTOR SHALL COORDINATE PROJECT SCHEDULING WITH MISPC VIA

PRE-CONSTRUCTION SCHEDULE MEETING.

2. CONTRACTOR SHALL FIELD VERIFY ALL QUANTITIES.

3. MISPC WILL PERFORM ALL SHOULDER AND SLOPE RESTORATION INCLUDING

TOPSOIL, SEEDING AND MULCH.

4. CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN WITH APPROVAL

FROM THE MISPC AT THE PRECONSTRUCTION MEETING. SEE SPECIFICATION

SECTION 01100 PROJECT PROCEDURES (3) BARRIER & ENCLOSURES ITEM (C)

STREET BARRICADES.

5. CONSTRUCT BUTT JOINT AT ALL ASPHALT INTERSECTIONS.

GENERAL NOTES (CONTINUED)

6. CONTRACTOR TO CLEAN ROAD PRIOR TO PAVING WITH POWER SWEEPER AS

NECESSARY TO REMOVE ALL DIRT, DEBRIS AND HORSE FECES.

7. SAWCUT AND PROVIDE BUTT JOINTS AT ALL INTERSECTIONS.

8. CONSTRUCTION TO BE COMPLETED BY MAY 24, 2024.

9. CONTRACTOR TO UTILIZE BRITISH LANDING FOR EQUIPMENT AND MATERIAL

DELIVERY. MISPC TO ESCORT CONTRACTOR TO AND FROM PROJECT SITES

ALONG DNR DESIGNATED ROUTE. EQUIPMENT STAGING AREA TO BE LOCATED

AT THE MISPC SERVICE AREA BEHIND FORT MACKINAC.

10. SCOPE OF WORK: ALL ROADS (EXCEPT FORT STREET) TO RECEIVE 1.5" HMA

OVERLAY FROM PROJECT LIMIT TO PROJECT LIMIT. CONTRACTOR TO REMOVE

AND REPLACE AND/OR PATCH AS SHOWN ON THE PLANS. FORT STREET TO BE

MILLED (1.5") AND REPLACED WITH 1.5" HMA.

CUPID'S

PATHWAY

CUPID'S PATHWAY

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

PROJECT LIMITS

CUPID'S

PATHWAY

10'

CU

PI

D' S

PA

TH

W

AY

10'

CU

PI

D'

S

PA

TH

W

AY

13'

13'

POE STA. 6+30

POB STA. 0+00

POE STA. 7+25

POB STA. 0+00

CUPID'S PATHWAY QUANTITIES

(FOR INFORMATION ONLY)

325 Sft HMA Remove and Replace

REMOVE AND REPLACE

STA. 4+00 TO STA. 4+50

HMA CURB PLACEMENT

STA. 2+00 TO STA. 4+50

PLACE 100 LFT OF

HMA CURB. REFER

TO DETAIL 1 ON

SHEET C501.

6+00

7+00

8+00

9+00

10+00

11+00

11+40

0+00

1+00 2+00

3+00

4+00

5+00

6+00

LEGEND

HMA SURFACE, REM AND REPLACE

HMA PATCHING

HMA PLACEMENT

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

M

A C

K

IN

A C

IS

LA

N D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

BI

D

D

IN

G

/1 5/

M

-0

JG SP JG JG

SPRING

STREET

PLAN

C106

M A

C K

IN

A

C

IS

LA

N

D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

M A

C K

IN

A

C

IS

LA

N

D , M

IC

H

IG

A

N

9/ 8/

:0

PM

P:

\M

-0

D

TM

B- M

AC

KI

N

AC

IS

LA

N D

R O

AD

P

AV

IN

G

4\

D W

G S\

B

AS

E.

D

W G

R O

A D

R

EP

A

IR

S R

O A

D R

EP

A

IR

S

PROPOSED SPRING STREET PLAN

SPRING STREET QUANTITIES

(FOR INFORMATION ONLY)

650 Sft HMA Remove and Replace 600 Lft HMA Edge Curb Placement

REMOVE AND REPLACE

STA. 6+25 TO STA. 6+75

HMA CURB PLACEMENT

STA. 2+00 TO STA. 4+50

STA. 2+00 TO STA. 5+50

SPRING STREET

SPRING STREET

HURONROAD

HURONROAD

FORT

STREET

FORT

STREET

MATCH LINE

MATCH LINE

MATCH LINE

MATCH LINE

PROJECT LIMITS

PROJECT LIMITS

PROJE

CT L

IM

ITS

PROJE

CT L

IM

ITS

GENERAL NOTES

1. CONTRACTOR SHALL COORDINATE PROJECT SCHEDULING WITH MISPC VIA

PRE-CONSTRUCTION SCHEDULE MEETING.

2. CONTRACTOR SHALL FIELD VERIFY ALL QUANTITIES.

3. MISPC WILL PERFORM ALL SHOULDER AND SLOPE RESTORATION INCLUDING

TOPSOIL, SEEDING AND MULCH.

4. CONTRACTOR SHALL PROVIDE A TRAFFIC CONTROL PLAN WITH APPROVAL

FROM THE MISPC AT THE PRECONSTRUCTION MEETING. SEE SPECIFICATION

SECTION 01100 PROJECT PROCEDURES (3) BARRIER & ENCLOSURES ITEM (C)

STREET BARRICADES.

5. CONSTRUCT BUTT JOINT AT ALL ASPHALT INTERSECTIONS.

GENERAL NOTES (CONTINUED)

6. CONTRACTOR TO CLEAN ROAD PRIOR TO PAVING WITH POWER SWEEPER AS

NECESSARY TO REMOVE ALL DIRT, DEBRIS AND HORSE FECES.

7. SAWCUT AND PROVIDE BUTT JOINTS AT ALL INTERSECTIONS.

8. CONSTRUCTION TO BE COMPLETED BY MAY 24, 2024.

9. CONTRACTOR TO UTILIZE BRITISH LANDING FOR EQUIPMENT AND MATERIAL

DELIVERY. MISPC TO ESCORT CONTRACTOR TO AND FROM PROJECT SITES

ALONG DNR DESIGNATED ROUTE. EQUIPMENT STAGING AREA TO BE LOCATED

AT THE MISPC SERVICE AREA BEHIND FORT MACKINAC.

10. SCOPE OF WORK: ALL ROADS (EXCEPT FORT STREET) TO RECEIVE 1.5" HMA

OVERLAY FROM PROJECT LIMIT TO PROJECT LIMIT. CONTRACTOR TO REMOVE

AND REPLACE AND/OR PATCH AS SHOWN ON THE PLANS. FORT STREET TO BE

MILLED (1.5") AND REPLACED WITH 1.5" HMA.

EX. DRIVEWAY

EX. DRIVEWAY

EX. DRIVEWAY EX. CONCRETE

EX. DRAINAGE

STRUCTURE TO

REMAIN

14'

16'

18'

11'

PLACE 250 LFT OF HMA

CURB. REFER TO DETAIL 1

ON SHEET C501.

PLACE 350 LFT OF HMA

CURB. REFER TO DETAIL 1

ON SHEET C501.

13'

POB STA. 0+00

POE STA. 11+40

ADJUST MANHOLE

AS NECESSARY

MATCH EXISTING SLOPE

EXISTING AGGREGATE BASE

EXISTING HMA SURFACE TO REMAIN

EXISTING AGGREGATE BASEREMOVE AND REPLACE EXISTING HMA SURFACE.

MATCH EXISTING HMA THICKNESS AND SLOPE AND

COMPACT EXISTING AGGREGATE BASE AS NECESSARY

EXISTING AGGREGATE BASEEXISTING HMA SURFACE TO

REMAIN (APPROX. 3" DEPTH)

PROPOSED SLOPE

RESTORATION, TYP.

(BY MISPC)

PLACE HMA WEDGE OVER EXISTING

PATCHING/ DEPRESSION AREAS PER

PLAN AND AS DIRECTED BY ENGINEER.

MATCH EXISTING SLOPE

MATCH EXISTING SLOPE

MATCH EXISTING SLOPE

PROPOSED 8" AGGREGATE BASE. SLOPE

FOR POSITIVE DRAINAGE AS NECESSARY.

2PLACE PROPOSED HMA SURFACE

MILL 1.5" AND PLACE 1.5" HMA SURFACE

EXISTING

CONCRETE

TO REMAIN

EXISTING CONCRETE

CURB TO REMAIN

EXISTING HMA SURFACE TO REMAIN

NEW 1.5" HMA SURFACE

PROPOSED SLOPE

RESTORATION, TYP.

(BY MISPC)

PROPOSED SLOPE

RESTORATION, TYP.

(BY MISPC)

HMA CURB, TYP.

EXISTING AGGREGATE BASE

EXISTING DRIVE LANE (WIDTH PER PLAN)

EXISTING DRIVE LANE (WIDTH PER PLAN)

EXISTING DRIVE LANE (WIDTH PER PLAN)

EXISTING DRIVE LANE (WIDTH PER PLAN)

EXISTING DRIVE LANE (WIDTH PER PLAN)

1' 0.25'

0.75'

1 HMA CURB DETAIL

2 CARRIAGE ROAD DETAIL (STA. 9+65)

3 FORT STREET DETAIL

4 REMOVE AND REPLACE HMA DETAIL

5 HMA PATCHING DETAIL

REMARKS

(AWI=NONE)58-28

PERFORMANCE GRADERATE/SYD

165 #

ITEMI.D.

HMA BOND COAT FOR INFORMATION ONLY-0.05-0.15 GAL

HMA, LVSP

58-2845-165 #2 HMA, LVSP (AWI=NONE)

PR

OJ

EC

T N

O:

DR

AW

N

BY

CH

EC

KE

D:

AP

PR

OV

ED

1 2 3 4 5

1 2 3 4 5

D

C

B

A

D

C

B

A

© U.P. Engineers & Architects, Inc.

DE

SI

GN

ED

B Y:

w w w .u pe a.

co m

IS

SU

ED

F

O R

D

A

TE

M

A C

K

IN

A C

IS

LA

N D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

BI

D

D

IN

G

/1 5/

M

-0

JG SP JG JG

DETAILS

C501

M A

C K

IN

A

C

IS

LA

N

D

M A

C K

IN

A

C

IS

LA

N

D S

TA

TE

P A

R K

C O

M M

IS

SI

O N

M A

C K

IN

A

C

IS

LA

N

D , M

IC

H

IG

A

N

9/ 8/

:0

PM

P:

\M

-0

D

TM

B- M

AC

KI

N

AC

IS

LA

N D

R O

AD

P

AV

IN

G

4\

D W

G S\

B

AS

E.

D

W G

R O

A D

R

EP

A

IR

S R

O A

D R

EP

A

IR

S

25' AT P.O.B. AND P.O.E.,

TO R.O.W AT INTERSECTIONS,

8' AT DRIVES

PROPOSED

HMA SURFACE

COLD MILLED AREAS TO BE PAID

FOR AS: HMA SURFACE, REM. ON

DRIVES AND INTERSECTIONS.

EXISTING

PAVEMENT

7 BUTT JOINT DETAIL

USE REBAR OR STEEL

ROD FOR REMOVAL

FOR INLETS WITH CAST CURB BOX

USE WOOD 2X4, EXTEND BEYOND

GRATE WIDTH ON BOTH SIDES.

LENGTH VARIES. SECURE TO GRATE

WITH WIRE OR PLASTIC TIES.

4" TO 6" OVAL HOLE SHALL BE HEAT

CUT INTO ALL FOUR SIDE PANELSMINIMUM DOUBLE

STITCHED SEAMS

ALL AROUND SIDE

PANELS AND ON FLAP

POCKETS

NOTE: DETAIL BASED ON MDOT

STANDARD DETAIL R-96-E.

ALL PANELS AND

FLAP POCKETS TO BE

MADE FROM A

SINGLE PIECE OF

NON-WOVEN

GEOTEXTILE FABRIC

12"

12"

4"

8"

8 INLET PROTECTION DETAIL

6 HMA APPLICATION TABLE

File details come from the government source that posted it. Updated .