Attachment 7 Solicitation Q and A.pdf

PDF 108 KB Posted

Attached to
Southwest Region Fleet Transportation (SWRFT) Non-Tactical Vehicle Equipment Maintenance Services and Minor Repair
Solicitation number
M0068121Q0051
Issued by

View the file

Other files

File Type Posted
Amendment 0001.pdf PDF
Attachment 6 SWRFT NTV Inventory.xlsx XLSX spreadsheet
Attachment 1 PWS Final.pdf PDF
Attachment 4 WD 2015-5671.pdf PDF
Attachment 2 WD 2015-5629.pdf PDF
Attachment 5 WD 2015-5475.pdf PDF
M0068121Q0051 Solicitation.pdf PDF
Attachment 3 WD 2015-5635.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. M00681-21-Q-0051 QUESTIONS AND ANSWERS

Solicitation Section

Solicitation Page

Paragraph Question Government Answer n/a n/a n/a Is this a new solicitation or a recompete of an existing contract?

New solicitation.

n/a n/a n/a If this is a recompete of an existing contract, can your office release the name of the incumbent Contractor, the contract number, the period of performance and the dollar value of the existing contract?

N/A

Performance Work

Statement

2 4.1 PPE—Is any specialty PPE beyond basic PPE items like steel toed work boots, hearing protection, helmets, work gloves, ear plugs or other hearing protection required for the work under this contract? If yes, can you specify the name/type of the specialty

PPE?

The contractor shall provide PPE as stated in PWS para.

14.3 (i.e. safety glasses, safety shoes, hard hats, work gloves, and ear plugs). If any specialized or additional PPE is required, the Government will provide the appropriate PPE.

Performance Work

Statement

2 4.1.1 This section states: “The Contractor shall provide qualified personnel within three (3) calendar days from the date of the Government’s written request.” Does this mean that DBIDS/Base Security appointments are available at the base pass and security office 7 days per week, including holidays, such that this 3-day timeline can be met? Or does it mean that a pre-approved roster of personnel will already exist (with all DBIDS and Security appointments already completed), and personnel must be available within 3 calendar days of being placed onto the pre-approved roster?

DBIDS/Base Security appointments are not available 7 days a week. The Government will provide temporary pre-approved access or will temporarily escort contractor personnel to the workplace until the contractor can complete the DBIDS process.

Solicitation Page

Paragraph Question Government Answer

Performance Work

Statement

2 4.1.5 Does a Technical Library of Original Equipment Manufacturer (OEM) manuals exist, and is this library accessible to Contractor personnel, or will personnel in uniform provide Contractor personnel with copies of relevant OEM checklists from the Technical Library?

The Government will provide any necessary OEM manuals and guides for contractor personnel to utilize.

Performance Work

Statement

2 4.1.8 Does any of the activity in section 4.1.8 require Contractor personnel to obtain Common Access Cards (CAC) for network access?

Contractor personnel will not be required to obtain a CAC for network access. The automated systems are stand-alone systems that are not connected to the secure network, and therefore do not require a CAC.

Performance Work

Statement

8 15.1 The PWS states “The Quality Control Plan (QCP) will be delivered with the contractor’s quote.” Where in proposal File 1, 2 or 3 should the Quality Control Plan be inserted, and does this change the page limitations of the File?

Include the QCP with the technical quote. The technical quote page limitation is increased from 35 to 40.

Solicitation

(SF 1449)

29 52.212-1

ADDENDUM

Whereas the contract seems to be structured as a base year + 2 option years + 6 months at maximum, this sentence in this section seems to indicate a longer period of performance;

please clarify: “The period of performance shall be a one-year base period with four (4) possible one-year option periods and the option to extend services up to six months in accordance with

(IAW) 52.217-8.”

Addendum 52.212-1 has been corrected.

The period of performance is a base year + 2 possible option years + up to 6 month extension of services.

Solicitation

(SF 1449)

31 FILE 1:

Technical

May the Cover Page of File 1 use the bidder’s logo image and Times New Roman text above size 12 pt?

This is acceptable.

Solicitation Page

Paragraph Question Government Answer

Solicitation

(SF 1449)

31 FILE 2: Past Performance

May bidders add a Cover Page onto File 2: Past Performance that follows the same rules as the Cover Page for File 1?

This is acceptable.

Solicitation

(SF 1449)

31 FILE 2: Past Performance

Should each past performance contract/citation also describe the size, scale, scope, complexity, period of performance and description of the work, or no?

This paragraph has been updated to require that quoters include a description of contract scope for each past performance contract submitted.

Solicitation

(SF 1449)

31 FILE 2: Past Performance

Is there a page limitation for FILE 2: Past Performance?

No.

Solicitation

(SF 1449)

31 FILE 3: Price In File 3: PRICE, should copies of signed amendments be inserted before the full copy of the SF 1449, or after the full copy of the SF 1449?

Before is preferred, but either is acceptable.