M00681-21-Q-0019-Amendment-0001.pdf
PDF 715 KB Posted
- Attached to
- Telephone Maintenance Competitive 8(a) Federal contract opportunity
- Solicitation number
- M00681-21-Q-0019
- Issued by
- United States Marine Corps
About this file
This performance work statement outlines the requirements for telephone switch maintenance support services at Marine Corps Air Station Miramar in California. The contractor shall provide one supervisor and two technicians to maintain an Avaya Communications Manager 6 telephone switch and various third-party equipment from Monday through Friday. Services include installation, operation, maintenance, and repair of voice and data circuits. The contractor must furnish replacement parts, have trained personnel, and respond to service calls within specified timeframes. Deliverables include monthly maintenance records, personnel listings, quality control plans, and continuity of operations procedures. The contract term is for one base year with two one-year options to extend.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M00681-21-Q-0019 Amendment 0003.pdf | ||
| M00681-21-Q-0019 Amendment 0002.pdf | ||
| Att_4-List Configuration All.xlsx | XLSX spreadsheet | |
| Att_3-QPR_20210210110140.xlsx | XLSX spreadsheet | |
| D1-Att_1-Past Performance Questionnaire.docx | DOCX document | |
| D1-Att_2-Past_Performance_Worksheet.pdf | ||
| A1-DRAFT_QASP-Mir_Tel_maint.pdf | ||
| D1-M0068121Q0019-Miramar Telephone Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M0068121Q0019
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this solicitation amendment 0001 is as follow s:
1) Update Performance Work Statement. Changes are indicated in red.
2) Update 52.212-2 Addendum, Sub-Factor 3, a.
3) Answ er questions submitted in accordance w ith Addendum to FAR 52.212-1. See Continuation Page for Questions & Answ ers.
4) Extend solicitation date.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 36
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Feb-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X M0068121Q0019
X 9B. DATED (SEE ITEM 11)
03-Feb-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Feb-2021
CODE
REGIONAL CONTRACTING OFFICE-MCIWEST
P O BOX 555027
CAMP PENDLETON CA 92055-5027
M00681 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
CONTINUATION PAGE
Questions and Answers
M00681-21-Q-0019 Miramar Telephone
The following questions were submitted in response to this RFQ, the Government’s answers are provided below:
Question Section Page Paragraph Question Answer
1 PWS 3.0 Scope 5
The PWS states:... Voice services include the IOM of the
AVAYA CM6, all future CM upgrades for the telephone switch and all 3rd party equipment used to provide those services to include the installation and movement of voice and data circuits as directed by the S-6 Department
Telephone office.
As the pricing for Avaya and 3rd party OEM equipment support contracts change based on software levels and upgraded equipment, does the vendor pricing need to include support coverage for anticipated CM and 3rd party equipment upgrades throughout the life of the contract?
No, all upgrades will be processed via a different contract and are not part of this maintenance contract.
2 PWS 5.1 6
PWS 5.2 specifies the 3rd party
OEM equipment sustainment contracts that are required as part of this contract however, the PWS does not specifically specify that Avaya Support
Advantage contracts are required for this contract.
Does the Government currently have
Avaya Support Advantage contracts in place for the Avaya equipment or have they lapsed?
The Government does not currently have an Avaya
Support Advantage contract in place.
3 PWS 5.1 6
PWS 5.2 specifies the 3rd party
OEM equipment sustainment contracts that are required as part of this contract however, the PWS does not specifically specify that Avaya Support
Advantage contracts are required for this contract.
Does the Government require Avaya
Support contracts as part of this contract?
No. The Contractor shall maintain all Avaya equipment within the voice network at no additional cost to the government.
4 PWS 5.1.1 6
What are the Government’s personnel backfill requirements, if any?
There is no backfill requirement.
5 PWS 5.1.4 6
Is telephone instrument coverage/replacement required?
If so, does it need to include coverage for IP, Digital, and Analog phones?
Yes for Avaya IP and digital phones.
Is there currently a customer-owned onsite spares kit for the Avaya CM6 system?
Yes, a spare kit that covers circuit card replacement is on site.
If new OEM parts are no longer available, will it be acceptable to provide remanufactured/refurbished items?
Yes, if OEM parts are no longer available, the Contractor must provide a letter from
Avaya stating the OEM part(s) are no longer available. This letter must be sent to the COR for authorization. PWS Section
5.1.5 has been updated to reflect this requirement.
8 PWS 5.1.9.8 10
Is the Crash System replacement coverage required, or is the contractor to only Manage and Monitor the
Crash system?
Only the Crash System cable support is required. The
Contractor shall not manage or monitor the Crash System.
9 PWS 5.1.9.8 10
What is the manufacturer/model of the Crash system?
Not required. See answer to question #8 above.
10 PWS 5.1.9.8 10
What is the manufacturer/model of the existing Remote Access System?
There is a existing Remote
Access System however due to security concerns the manufacture/model number is not appropriately releasable in an open forum.
11 PWS 5.2.5 13
Is replacement of DC rectifiers and batteries required?
Yes, replacement of DC rectifiers and batteries will be required when necessary.
12 PWS 5.2.6 13
Is replacement of UPS and batteries required?
Yes, replacement of UPS and batteries will be required when necessary.
Please provide an Avaya “QPR” report and “List Config” report for the Avaya CM6 system, Sold To:
3158581.
See attached documents. Avaya
QPR report (Att 3), List Config
(Att. 4).
Section Evaluation
Factor 1, Sub-Factor 3
Quoter shall provide a written plan that describes the contractor’s strategy and procedures to perform and ensure services continue in the event of a crisis (ref PWS 4.4).
This sub-factor references PWS 4.4 however, there is no PWS 4.4 in the solicitation document. Please provide the correct PWS reference and/or contractor requirements.
52.212-2 Addendum has been updated in the solicitation to reflect the correct reference
(PWS 8.20).
52.212-5 CONTRACT
TERMS AND
CONDITIONS
REQUIRED TO
IMPLEMENT
STATUTES OR
EXECUTIVE ORDERS-
-COMMERCIAL
ITEMS (NOV 2020)
(xii) 52.222-41, Service
Contract Labor Standards (Aug
2018), (41 U.S.C. chapter 67).
Will the Government please specify the wage determination as further required by page 66?
The Department of Labor has determined the services contemplated by the PWS are exempt from the Service
Contract Labor Standards. No wage determination is being issued for this procurement.
Therefore, in accordance with
Title 29 C.F.R. Part 4, Section
4.6(d), the contractor is required to pay no less than the
Federal minimum wage.
5.1 General Tasks -
Contractor shall perform installation, operation, maintenance and repair services to include inspection, cleaning, reconfiguration, adjusting, testing, and the replacement of parts and software to ensure equipment is operational at all times according to the manufacturer’s specifications and
MCAS Miramar requirements.
5.1.5 The Contractor shall
furnish only new original equipment manufacturer (OEM) parts with the most up to date firmware and software to affect any repair or replacement. All parts installed shall become the property of the US Government.
Many items within Miramar are manufacture discontinued (i.e. G650, older servers, etc.). Is refurbished is acceptable when new is unavailable?
Yes, if OEM parts are no longer available, the Contractor must provide a letter from
Avaya stating the OEM part(s) are no longer available. This letter must be sent to the COR for authorization. PWS Section
5.1.5 has been updated to reflect this requirement.
7.0 Avaya CM6
Equipment
List/Location
Does this equipment falls under the
Cisco JELA contract?
Cisco OA&M LAN 12 port
FDO1541Y02 7210
Cisco OA&M LAN 24 port
FOC1542Y0FH 7210
Cisco OA&M LAN 12 port
FOC1542Y0F7 9681
Cisco OA&M LAN 12 port
FOC1542Y0FF 2682
Cisco OA&M LAN 12 port
FOC1542Y0F0 2130
Cisco OA&M LAN 12 port
FOC1542Y0HE 22111
Cisco OA&M LAN 12 port
FOC1607Y25A 9680
Cisco OA&M LAN 12 port
FOC1542Y0HT 7684
No.
5.2 3rd Party
Equipment: The contractor shall provide maintenance on the 3rd party equipment listed below
5.2.5 DC Power Extended
Warranty & Preventative
Maintenance
- Two scheduled preventative maintenance visit per year.
- Repairs as required.
Does the Government intent for the
Avaya Onsite maintenance team or a third party to perform the two (2) annual preventative maintenance and repair as required?
Per the contract specifications personnel working on this equipment must be trained to work on it. In the past contractor has brought in 3rd
Party personnel to do the work.
5.2 3rd Party
Equipment: The contractor shall provide maintenance on the 3rd party equipment listed below
5.2.6 AC Power Extended
Warranty & Preventative
Maintenance
- Two scheduled preventative maintenance visit per year.
- Repairs as required.
Does the Government intent for the
Avaya Onsite maintenance team or a third party to perform the two (2) annual preventative maintenance and repair as required?
Per the contract specifications personnel working on this equipment must be trained to work on it. In the past contractor has brought in 3rd
Party personnel to do the work.
Would the government be willing to extend the due date?
Solicitation has been extended.
See amendment for details.
Who is the incumbent contractor on this requirement and what is their incumbent contract number?
Incumbent and current contract information is provided in
52.212-1 Addendum, on solicitation page 45.
22 PWS 5.2
PWS 5.2 specifies the requirements for “Latest software releases” and
“24x7 Access to Customer Care hotline ensuring the fastest resolution to issues” for third party equipment.
However, PWS 5.1 or elsewhere does not specify any such requirement for the Avaya equipment. Does the
Government already have in place the necessary software assurance/agreement(s) with Avaya
(and any other first-party OEMs) for contractor technicians to accomplish the same “Latest software releases” and “24x7 Access to Customer Care hotline ensuring the fastest resolution to issues”?
PWS 5.2 covering latest software releases and 24/7 access to customer care hotline is a requirement for this contract. Software upgrades to
Avaya equipment is not covered under this contract and will be covered under a separate government contract.
24/7 access to the Avaya
Customer Care hotline would be a requirement of the contractor in order to maintain the Avaya equipment. A 3rd party access agreement would be required.
There is some ambiguity as to whether or not the
Bidders/Contractors are required to procure/hold/renew/mai ntain SLA's with the
Manufacturers listed in
PWS 5.2, and as such include such SLA costs in their price proposal.
PWS 5.2 states “The contractor shall provide maintenance on the 3rd party equipment listed below” but it is not clear if the “contractor” is also required to procure/provide OEM
SLAs, or if the Gov’t already has these OEM
SLA’s in place.
Can the Government confirm whether
SLA's (service level agreements) are in place with each Manufacturer and if such will be provided and maintained by the Government, and the contractor is required only to
“maintain” these systems utilizing the
“others” provided SLA or if
Contractors are required to price, provide, extend or maintain these
SLA's in PWS 5.2?
The government does not currently have the SLA's in place for each Manufacturer, Contractors are required to price, provide, and maintain these SLA's in PWS 5.2.
24 PWS 5.1.10
“The contractor shall provide proof that all technicians have a minimum of 10 years voice/data network experience in the installation, troubleshooting and operation of inside plant (ISP) communications infrastructure using copper and fiber optic cabling.” PWS 5.1.10.2 also lists Outside Plant (OSP). Please confirm that the cabling work involved is predominantly or exclusively ISP?
Cabling work involved is predominantly ISP cabling.
Will the Government accept an experience-certification/training tradeoff, such as OEM testing equipment training completion certificate, cable OEM training completion certificate (from major cable OEM such as Corning), or direct experience on military bases
PBX-ISP infrastructures—training certificate(s) may be substituted for 3-
5 years of experience?
No, personnel requirements shall remain in accordance with the PWS.
26 5.2 PWS
This section lists all the third party products. Is the contractor expected to have contract agreements in place with all these respective OEMs (IE, Avaya, Compunetix, Secure Logix, CAIRS, ION, various Power and battery systems). Or does the USMC have separate maintenance agreements already in place for these systems that the contractor can leverage?
The government does not have separate maintenance agreements for the third party products. This will be a requirement of the contractor.
27 7 PWS
Much of the equipment listed is no longer supported by the manufacturer, and parts may not be available. Is best effort for systems declared end of support by the OEM acceptable?
Best effort for End of Life equipment is acceptable until equipment is upgraded by the government.
28 5.2 PWS
The PWS lists Avaya as the OEM for the Ethernet Routing Switches.
Please understand Avaya has sold this product line to Extreme, does the
Government currently have a support agreement in place with Extreme for the listed Avaya Ethernet Routing
Switches?
The government does not have separate maintenance agreements with Extreme. This will be a requirement of the contractor.
29 7 PWS
In order to get a quote for the maintenance on the Avaya, Avaya requires an approved Letter of
Authorization (LOA) before they will allow another contractor to access their records. Who should we send this LOA to?
Any letter of authorization that requires approval should be submitted to jody.crespo@usmc.mil and diana.lynch-maldona@usmc.mil to be forwarded to appropriate authority for authorization.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 17-Feb-2021 07:00 AM to 24-Feb-2021 07:00 AM.
TABLE OF CONTENTS
30 5.1.1 PWS
"All technicians working on Avaya branded equipment must have been trained through an Avaya authorized training course to work on Avaya equipment. Maintenance to third party equipment below must be maintained by personnel that has been trained and qualified to work on that equipment." please confirm whether incumbent employees meet this requirement.
This question has been determined to contain proprietary information and not appropriately releasable in an open forum.
31 5.1.4 PWS
"In the event replacement parts are required to perform this service, the contractor shall be required to furnish all replacement parts at no additional cost to the U.S. Government." Please confirm whether this requirement applies ONLY to the equipment listed in PWS Paragraph 5.2, or if it includes the equipment and items listed in PWS Section 7.0. Also, please provide historical Information to clarify the magnitude of materials and hardware required for this Task, and whether there is an existing inventory of spare parts available.
All replacement parts both for
5.2 and 7.0 will be covered under this contract. During the last contract equipment covered under 7.0 has been limited to approximately 20 telephone circuit line cards, 3-5 cabinet power supplies, and 7 battery strings. 3rd Party equipment has been limited to occasional software revisions on our TMS system.
32 5.1.6.1 PWS
"the Government shall provide the
Maintenance Team Supervisor with routine work requests using the
Contractor Service Authorization
Form (hereafter known as the CSA) in order to preform regular daily tasks i.e. Adds, Moves, and Changes. -
Please clarify whether Contactor is required to provide materials/equipment to perform these
MAC's, such as cable, jacks, faceplates, conduit, etc., and whether the Contractor can charge the
Government for these items. Also, please provide Workload Estimates that describes the average, annual number of MAC's performed at this
Site.
The government will provide all the materials and equipment to perform MACs i.e. cables, jacks, faceplates, conduits, etc.
The contractor will provide the tools to perform these tasks.
On average the contractor as performed between 350 and
400 MACs a year.
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Past Performance
Questionnaire
2 30-DEC-2020
Attachment 2 Past Performance
Worksheet
2 30-DEC-2020
Attachment 3 Quote Preparation Report 1 11-FEB-2021
Attachment 4 Configuration List 1 11-FEB-2021
The following have been modified:
52.212-2 ADDENDUM
EVALUATION PROCESS:
The Government will award a contract resulting from this solicitation to the responsible quoter whose quote conforming to the solicitation will be most advantageous to the Government utilizing a tradeoff selection process, price and other factors considered. The factors and sub-factors of Technical Capability and Past Performance when combined are approximately equal to price.
The following factors shall be used to evaluate quoters:
Factor 1 - Technical Capability: Technical Capability will be evaluated based on the vendor’s response to the
PWS on how effectively and efficiently the vendor proposes technical solutions and organization experience
(Technical Approach, Management Plan).
Non-Cost/Price Evaluation –Combined Technical/Risk Rating
OUTSTANDING
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
GOOD
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
ACCEPTABLE
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
MARGINAL
Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
UNACCEPTABLE
Proposal does not meet the requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
Note: Any quoter who receives a rating of Unacceptable on any Technical factor or sub-factor cannot receive an award.
Sub-Factor 1 – Technical Plan: The vendor shall submit a Technical Plan that demonstrates:
a) The contractor shall submit a technical plan that demonstrates their ability to install, operate, maintain, and repair the voice/data services to include the all equipment listed in section 3.0 of the
PWS.
b) The contractor must demonstrate personnel requirements as set forth in section 5.0 of the PWS.
Sub-Factor 2 – Management Plan: The contractor shall submit a management plan that demonstrates their ability to manage and control all objectives set forth in the PWS to include implantation of staffing, hiring and scheduling control. The contractor shall demonstrate their ability to comply with the Acceptable Quality Levels in the
Performance Requirements Summary (PRS) Table in the Performance Work Statement. The contractor shall provide a phase-in and phase-out plan.
Sub-Factor 3 - Continuation of Mission-Essential Contractor Services Plan:
a) Quoter shall provide a written plan that describes the contractor’s strategy and procedures to perform and ensure services continue in the event of a crisis (ref PWS 8.20).
b) Quoter shall address the required criteria for the contractor written plan for continuity of essential services, as it shall be considered and evaluated in accordance with Defense Federal Acquisition
Regulation Supplement (DFARS) Clause 252.237-7023, Continuation of Essential Contractor
Services and as required by DFARS Provision 252.237-7024, Notice of Continuation of Essential
Contractor Services. (See referenced DFARS Provision for the specific items that shall be addressed in the written continuity plan. The list of items to be addressed can also be located at https://www.acq.osd.mil/dpap/dars/dfars/html/current/252237.htm#252.237-7024)
Note: Pursuant to DFARS 237.7602, the awardee’s Continuation of Mission-Essential Contractor Services Plan will be incorporated into the resultant contract.
Factor 2: Past Performance: Quoters should provide no more than three (3) recent and relevant past performance references for the prime and any subcontractor. The performance shall be of same or similar maintenance service support as provided in the Performance Work Statement provided within the last five (5) years from this solicitation date. The quoter shall provide the information using the past performance worksheet provided in Attachment 3 –
Past Performance Worksheet.
a) As part of the Past Performance evaluation, a confidence rating will be assigned that reflects consideration of information contained in the quote, past performance evaluation input provided through customer questionnaires, and other references, if any, that the Government may contact for additional past performance information.
b) The Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government.
Past Performance Relevancy Ratings
Aspects of relevance include similarity of service/support provided, complexity of effort, dollar value, contract type, and, where applicable, the degree of subcontracting/teaming. To be relevant performance data needs to be recent as described in the solicitation.
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved none of the scope and magnitude of effort and complexities this solicitation requires. No telephone switch system maintenance support.
Past Performance Confidence Assessment
Confidence in a quoter's ability to meet the Government's proposed requirements will depend on the success of a quoter in achieving various evaluation factors relating to past performance.
https://www.acq.osd.mil/dpap/dars/dfars/html/current/252237.htm#252.237-7024
Substantial Confidence Based on the quoter's recent/relevant performance record, the Government has a high expectation that the quoter will successfully perform the required effort.
Satisfactory Confidence Based on the quoter's recent/relevant performance record, the Government has a reasonable expectation that the quoter will successfully perform the required effort.
Limited Confidence Based on the quoter's recent/relevant performance record, the Government has a low expectation that the quoter will successfully perform the required effort.
No Confidence Based on the quoter's recent/relevant performance record, the Government has no expectation that the quoter will be able to successfully perform the required effort.
Unknown Confidence (Neutral) No recent/relevant performance record is
(Neutral) available or the quoter's performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
Note: In the case of a quoter without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the quoter may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a) (2) (iv)). Therefore, the quoter shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”
Factor 3: Price: The Quoter’s price quote will be evaluated to determine price reasonableness using the methods listed in FAR 13.106-3(a). If further price analysis is needed, the methods outlined in 15.404-l(b)(2) will also be considered. Price negotiation will be conducted as needed. The Government will evaluate the option to extend services (FAR 52.217-8) as part of the initial competition by multiplying the final 3-month option price by 2 (two) for the overall proposed price.
(End of provision addendum)
PERFORMANCE WORK STATEMENT
TELEPHONE SWITCH MAINTENANCE
1.0 Introduction – The S-6 Department aboard Marine Corps Air Station (MCAS)
Miramar provides voice and data communication services for all Station and tenant organizations. These services are critical to MCAS Miramar in order to perform their daily functions, maintain operational readiness, operate the airfield, and accomplish their mission.
2.0 Background – Voice services aboard MCAS Miramar are provided by a Government-owned AVAYA Communications Manager 6 (CM6) switch with multiple attached 3rd party pieces of equipment. The installation, operation and maintenance of the Avaya
Equipment will be performed by technicians as outlined in section 5.0.
3.0 Scope – The services set forth in this Performance Work Statement (PWS) will provide
MCAS Miramar with personnel to install, operate, and maintain (IOM) the voice and data services provided by the S-6 Department Telephone office. Voice services include the
IOM of the AVAYA CM6, all future CM upgrades for the telephone switch and all 3rd party equipment used to provide those services to include the installation and movement of voice and data circuits as directed by the S-6 Department Telephone office. Data services include extending Local Exchange Carrier (LEC) circuits as required to any location throughout the Air Station via existing copper or fiber optic cabling, identifying, troubleshooting circuit disruptions, tracing and repairing inside plant cabling limited outside plant cabling.
4.0 Applicable Directives – The S-6 Department Telephone office in conjunction with the
S-6 Department Cyber Security/ Information Assurance Office work together to ensure the equipment meet all Joint Interoperability Test Command (JITC) and Defense Information
Systems Agency (DISA) directives and guidelines for connection into the DISA networks.
5.0 Performance Requirements - Contractor shall perform IOM and repair services to include inspection, cleaning, reconfiguration, adjusting, testing, and the replacement of parts and software to ensure equipment is operational at all times according to the manufacturer’s specifications and MCAS Miramar requirements.
5.1 General Tasks - Contractor shall perform installation, operation, maintenance and repair services to include inspection, cleaning, reconfiguration, adjusting, testing, and the replacement of parts and software to ensure equipment is operational at all times according to the manufacturer’s specifications and MCAS Miramar requirements.
5.1.1 The contractor shall provide one (1) Telephone Switch Maintenance Supervisor and two (2) Telephone Switch Maintenance Technicians to remain on site
(telework is not authorized), Monday through Friday except identified holidays below. All technicians working on Avaya branded equipment must have been trained through an Avaya authorized training course to work on Avaya equipment.
Maintenance to third party equipment below must be maintained by personnel that have been trained and qualified to work on that equipment.
5.1.2 Contractor shall ensure that the Miramar telephone switch network is operational
24/7. The contractor shall be available after hours in the event of a service affecting outage.
5.1.3 The contractor shall thoroughly inspect all equipment parts for deterioration, excessive wear, or any other defects that affect telephone operability, and correct them in accordance with the manufacturer’s specifications. A Monthly
Maintenance Report shall be provided on all equipment that has been serviced during that month. (Deliverable 9.1)
5.1.4 In the event replacement parts are required to perform this service, the contractor shall be required to furnish all replacement parts at no additional cost to the U.S. Government.
5.1.5 The Contractor shall furnish only new original equipment manufacturer (OEM) parts with the most up to date firmware and software to affect any repair or replacement. All parts installed shall become the property of the US Government.
If OEM parts are no longer available, the Contractor must provide a letter from
Avaya stating the OEM part(s) are no longer available. This letter must be sent to the COR for authorization to provide non-OEM parts.
5.1.6 The Contractor shall furnish an accurate, current maintenance record upon the completion of each maintenance (preventative or corrective) service for each service call completed. The Government shall maintain and update a maintenance service log in regards to the telephone system for the duration of the contract.
(Deliverable 9.1)
5.1.6.1 The Government shall provide the Maintenance Team Supervisor with routine work requests using the Contractor Service Authorization
Form (hereafter known as the CSA) in order to preform regular daily tasks i.e. Adds, Moves, and Changes. CSA’s are utilized to provide specific direction to contractor personnel in the movement, installation, relocation, and reconfiguration of telephone lines and telecommunications services.
Inside plant (ISP) wiring parts required for the completion of CSA’s will be provided by the US Government. This will be developed post-award per
5.2.2.3 below.
5.1.6.2 Normal work requests involving 5 or less work tasks will be completed within 2 normal business days.
1 business day per 5 additional tasks will be allowed for each CSA.
Contractor will not be held responsible for time frames that have been documented due to a Government delay (i.e. lack of supplies, no access to facilities).
Contractor will provide copies of all completed CSAs on a weekly basis.
5.1.6.3 The Contractor response time after initial contact (via CSA or emergency notification) will be:
24 hours to respond and accept routine, non-service affecting, work.
2 hours for emergency response and acceptance when problem is service affecting and impacts mission of the Air Station. i.e. safety of life or safety of flight.
5.1.7 Personnel Requirements for the AVAYA CM suite - The contractor shall provide an experienced team of telephone maintenance personnel with applicable experience on the latest AVAYA CM suite of hardware and software and possess the requested skill sets, as detailed below, in order to ensure proper maintenance and repair are continuously achieved to further ensure uninterrupted telephone support aboard MCAS Miramar. This will consist of accomplishing all scheduled and unscheduled organizational level maintenance identified herein. The maintenance personnel will be on site daily, telework is not authorized.
5.1.8 The proposed team of telephone maintenance personnel should consist of one (1)
Maintenance Team Supervisor and two (2) Technicians. Each maintenance team member shall support the MCAS Miramar S-6 and liaison with the S-6
Telecommunications Manager in order to coordinate appropriate service completion as outlined herein. All work performed by the Contractor personnel shall be performed in accordance with the applicable manufacturer’s technical manuals and in accordance with local processes and procedures. A list of skill summaries and tasks required for the performance of this contract by the team of telephone maintenance personnel is provided below. All telephone maintenance personnel must be able to perform the following tasks provided below without direct supervision, and be capable of providing effective one-on-one instruction to
MCAS Miramar telecommunications personnel on practical maintenance applications.
5.1.9 Supervisor Skill Summary: The Maintenance Team Supervisor (hereafter referred to as “Supervisor”) shall be trained on the latest Avaya CM software and qualified to provide system administration services identified in paragraph 5.2.2.1 through
5.2.2.8. The Supervisor shall have a minimum of 5 years of experience in managing communications networks personnel.
5.1.9.1 Fault Management - The Supervisor shall work to resolve failures and fault conditions in MCAS Miramar’s supported products and initiate corrective actions to reduce faults, minimize network outages, and maximize network service availability.
Monitor Supported Products and adjuncts, respond to alarms, initiate corrective actions and provide status to the
Customer.
Notify the Customer within one (1) hour of receipt of major alarms
Provide status updates to the Customer on all outages until complete resolution is obtained.
Report circuit problems to circuit providers, when appropriate.
Coordinate activities of technicians required to resolve fault conditions including dispatch or repair personnel (subject to and limited by the terms of the customer’s maintenance agreement).
Work with the maintenance provider to run diagnostic tests upon resolution to verify Supported Products operation.
Support service to detect, isolate and resolve network problems.
Check system reports to help monitor systems, network activity, and performance.
5.1.9.2 Telecommunication System Configuration Backup -The Supervisor will execute back-ups on a periodic basis and provide these backups to the customer for storage at a remote location. The saving of data from the
Avaya telecommunication component to local media is critical for retention and disaster recovery purposes.
5.1.9.3 On-site Moves, Adds & Changes (MAC’s)
Simple MACs are defined as on-site delivery of move, add, change and delete activity for software, at the user level. The
Supervisor shall provide on-site support of MAC activity for supported products upon receipt of a correctly completed
Contractor Service Authorization (CSA) form as mutually agreed upon by customer and contractor.
The CSA will be issued by the assigned telecommunications specialist in the telephone office after they have received a request from user/customer.
Complex MACs are defined as on-site delivery of move, add, change and delete activity for network components, at system, network or application level.
The Supervisor shall provide on-site support of MAC activity for supported products upon receipt of a correctly completed
CSA as mutually agreed upon by customer and contractor.
Sample complex MAC requests include but are not limited to:
Routing features such as simple Automatic Route
Selection and Least Cost Routing changes.
Hunt groups (Universal Call Distributor, Automatic Call Distributor) creation and modification.
System intercept treatment and redirection.
Other non-engineering level software changes.
Voice mail and Automated Attendant systems.
5.1.9.4 Performance Measurement - The Supervisor shall ensure that MCAS
Miramar has adequate equipment and network resources to support their mission by providing a monthly traffic analysis report on the Avaya CM software and voice equipment to capture the following information:
Busy hour call rated processor occupancy
Port network time slot usage
Service circuits usage
Trunk group usage
Load balancing
Tone receiver usage
System capacity
5.1.9.5 Technical Consulting
The Supervisor shall offer guidance for installation, administration, features, and applications as his schedule permits during the coverage hour and period.
The Supervisor shall provide answers to questions about installation, administration, features and applications. This can include, for example, recommendations on system configuration changes, interpretations of reports, operational analysis, and explanations of complex or new features beyond what is in the system documentation.
The Supervisor shall perform voice project pre-service coordination and testing (e.g.: coordinate work functions and availability across vendors, coordinate temporary changes needed for precut testing) and provide consultative support for project teams during addition of project facilities.
The Supervisor shall support addition, move or re-arrangement of project facilities (e.g.: digital T1 spans, DID, CO, Tie Lines, Outside and Inside Plant, coordinate Dedicated Tech Activities) terminating on Avaya CM software or other part of the MCAS
Miramar voice network. The Supervisor shall:
Review project configuration to determine if additional hardware (e.g.: circuits packs, carriers, outside plant, inside plant) is required. Facilitate ordering of necessary project components and coordinate installation.
Review Designs, Project, and Implementation Plans to help MCAS Miramar Telecommunications office determine the feasibility of telecommunication projects.
Coordinate with the Customer to coordinate projects from order through cutover and testing.
During provisioning and cutover, verify working condition of routing software though call-through tests and notify customer when successful testing has been completed.
5.1.9.6 Network Carrier Support - The contractor shall communicate with network carriers to:
Access to records pertaining to equipment, network, local and non-local facilities
Access to records pertaining to cabling infrastructure
Coordination of trouble isolation, trouble referral, cooperative testing, alarm monitoring, and case management of network and local and non-local facilities troubles to resolution.
Coordination of trouble isolation, trouble referral, cooperative testing, alarm monitoring, and case management of cabling infrastructure facilities troubles to resolution.
Refer supported product alarms to the appropriate network or wiring as specified by the customer.
Manage alarms referred to network carrier or wiring and provide status updates to customer.
5.1.9.7 Technical Knowledge and Certifications - The Supervisor shall be trained on the latest Avaya CM software, qualified and familiar with the installation, operation and management of the following:
Avaya DEFINITY ® -Enterprise Communication Server / CM
Avaya EXPERT Systems SM Diagnostic Tools
Voice Messaging
Avaya INTUITY™ AUDIX® Messaging System
Crash Alarm System
CAIRS Telecommunications Management System
Latest version of Avaya Communication Manager
AVAYA AURATM
G650 MEDIA GATEWAY RHS
IPSI2 CP TN2312BP RHS
IP 320 MEDIA RESOURCE TN26
5.1.9.8 Additional Supervisor Duties - The Supervisor shall provide management of communications support services for special events and systems as identified below.
Manage, monitor the Crash Alarm System to ensure a high level of availability for this critical communication component.
Manage and maintain emergency ring down circuits (i.e. elevators, Air Traffic
Control tower, medical, fire alarms, Provost Marshal Office circuits, alarm circuits, etc.…)
Coordinate as directed with other MCAS Miramar management offices and authorized Government personnel in support of the Air Show, Presidential visits, and other special events as directed by the customer.
Manage and maintain cable records in Configuration, Accounting Information
Retrieval System (CAIRS) Telecommunications Management System (TMS) database.
Manage, monitor and maintain Music-on-Hold system.
Manage and maintain Remote Access system.
Manage the continued development and deployment of AT&T Direct Connect circuits in place of more costly off-premise extension service.
Manage, monitor, and maintain Uninterruptable Power Supply battery system at main telephone switch building, and six remote locations.
Manage, monitor, and maintain on base T1 network.
Manage, consult, design and implement Basic Rate Interface (BRI) and
Primary Rate Interface (PRI) for video teleconferencing (VTC).
Manage and monitor environmental systems (i.e. air conditioning for main telephone switch building, and six remotes, etc.).
Manage, design and deploy analog and digital station hardware, software, and technical services for telecommunication solutions.
5.1.10 Technician Skill Summary – The Maintenance Technicians (hereafter referred to as “Technicians”) shall provide installation, operation, testing, and maintenance services for the telecommunications network aboard MCAS Miramar. The contractor shall provide proof that all technicians have a minimum of 10 years voice/data network experience in the installation, troubleshooting and operation of inside plant (ISP) communications infrastructure using copper and fiber optic cabling. Tasks that the technicians shall be experienced/qualified to perform include, but are not limited to the following:
5.1.10.1 On-site Install, Moves, Adds & Changes (IMAC’s) - The
Technicians shall provide the physical labor required to install, troubleshoot and maintain voice and data network connections aboard MCAS Miramar.
IMACs are defined as day-to-day activities associated with connection of cable pathways, configuration, de-installation, relocation, and installation of hardware in support of voice and data communications.
The objectives of this service are to install equipment with a minimum disturbance of the day- to-day operation and to provide the end-users on-the-spot familiarization with the equipment. Activities concerning hardware relocation or de-installation, and changes to configurations should be performed as scheduled and to the established standards, with minimum loss of end- users’ productivity time.
Install
Providing pathways for various services from the source to the service delivery point and connecting customer provided hardware as needed. Prior to completion technicians will conduct manufacturer's standard installation tests to verify operability.
Move
The movement of an active circuit from one location to another. A move of more than ten
(10) circuits is to be considered a project. Prior to completion technicians will conduct manufacturer's standard tests to verify operability.
Add
The installation of an additional service or peripheral to an existing circuit. Prior to completion technicians will conduct manufacturer's standard tests to verify operability.
Change
Hardware - performing a modification to an existing circuit such as a hardware upgrade (to add functionality) or a downgrade (to remove functionality). Prior to completion technicians will conduct manufacturer's standard tests to verify operability.
Software - performing a modification to an existing circuit configuration to add or remove functionality. Prior to completion technicians will conduct standard tests to verify operability.
5.1.10.2 Technical Knowledge - The Technician shall be capable of the installation, configuration, testing, and troubleshooting of the following types of circuits.
Digital T1 circuits
Direct in Dial (DID) circuits
Tie Lines – (Trunks) Defense Switched Network (DSN), emergency recall systems and least cost routing.
Ring Down circuits
Central Office (CO) Trunk connections and configuration
Outside Plant (OSP)
Inside Plant (ISP)
American National Standards Institute (ANSI) Cabling Standards
Primary Rate Interface (PRI) circuits
Basic Rate Interface (BRI) circuits
Video Teleconferencing (VTC)
Digital and Analog circuits
5.1.10.3 The Technicians shall be, at a minimum, qualified as Avaya
Certified Associates (ACA).
5.1.10.4 Additional Technician Duties - The Technician shall perform communications support services for special events and systems as identified below.
Crash Alarm System to ensure a high level of availability for this critical communication component.
Emergency ring down circuits (i.e., elevators, Air Traffic
Control tower, medical, fire alarms, Provost Marshal Office circuits, alarm circuits, etc…)
Air Show, Presidential visits, and other special events as directed by the customer.
Maintain cable records in Configuration, Accounting
Information Retrieval System (CAIRS) Telecommunications
Management System (TMS) database.
AT&T Direct Connect circuits.
Monitor, and maintain Uninterruptable Power Supply battery system at main telephone switch building, and six remote locations.
Monitor, and maintain on base T1 network.
Basic Rate Interface (BRI) and Primary Rate Interface (PRI) for video teleconferencing (VTC).
Monitor environmental systems (i.e. air conditioning for main telephone switch building, and six remotes, etc.).
Analog and digital station hardware, software, and technical services for telecommunication solutions
5.2 3rd Party Equipment: The contractor shall provide maintenance on the 3rd party equipment listed below.
The contractor shall provide testing and maintenance services for the specific equipment connected to the telecommunications network aboard MCAS Miramar. All work performed by the contractor shall be performed in accordance with the applicable manufacturer’s technical manuals. Tasks that the technicians shall be experienced/qualified to perform include, but are not limited to the following:
5.2.1 Compunetix Audio Conference Maintenance
Hardware configurations and repairs
Latest software releases
24x7 Access to Customer Care hotline ensuring the fastest resolution to issues
5.2.2 SecureLogix Maintenance
Hardware configurations and repairs
5.2.3 Ion SecureCare Maintenance
Hardware configurations and repairs
5.2.4 CAIRS Telecommunications Maintenance System Maintenance
Unlimited technical support, which provides answer to questions, trouble shooting, data entry suggestions, and general support relating to the software.
Telephone training: scheduled, over the phone training for personnel during normal business hours.
Software updates and version releases.
Bug fixes made available on the web site.
Availability of all software help files.
Availability of all manual changes that may occur
5.2.5 DC Power Extended Warranty & Preventative Maintenance
Two scheduled preventative maintenance visit per year.
Repairs as required.
5.2.6 AC Power Extended Warranty & Preventative Maintenance
Two scheduled preventative maintenance visit per year.
Repairs as required.
6.0 Performance Requirements. The table below specifies the Performance Objectives and Performance Elements for the contract.
Table 1- Performance Requirements Summary (PRS)
Outcome Performance
Stakeholder
Outcome
PWS Para.
No.
Standard Acceptable Quality
Level (AQL)
Respond to Service
Calls
5.1.6 Respond to routine and
emergency service calls within the timeframes specified in paragraph 5.1.6.
95% Timely response to service calls with a 98% on-time rate for emergency calls.
Timeliness of deliverables
10.0 Provide deliverables by the
time established in paragraph 10.0.
95% of all deliverables shall be delivered on time.
7.0 AVAYA CM6 EQUIPMENT LIST/LOCATION:
Manufacturer Equipment Model / Software
Version Serial # / Sys ID
Bldg #
Avaya
Aura Communications
System
CM6
Sold to: 3158581
7210, 22111, 2130, 9680, 9681, 2682, Dell Syslog Server Dell 00168-272-717-403 7210
Avaya Ethernet Routing Switch 24 port LBNNTMMD170TMP 7210
Avaya Ethernet Routing Switch 24 port LBNNTMMD170TMW 7210
Avaya Ethernet Routing Switch 24 port LBNNTMJPR20EME 7210
Avaya Ethernet Routing Switch 24 port LGNNTMJPR20EM7 7210
Cisco OA&M LAN 12 port FDO1541Y02 7210
Cisco OA&M LAN 24 port FOC1542Y0FH 7210
Avaya Media Gateway G650 11FA03614260 7210
Avaya Media Gateway G650 11FA03614190 7210
Avaya Media Gateway G650 11FA12625471 7210
Avaya Media Gateway G650 11FA03015280 7210
Avaya Media Gateway G650 11FA03015320 7210
Avaya Media Gateway G650 11FA12626071 7210
Avaya Media Gateway G650 11FA12626191 7210
Avaya Media Gateway G650 11FA12625451 7210
Avaya Media Gateway G650 11FA12626191 7210
Avaya Media Gateway G650 11FA12029051 7210
Avaya Media Gateway G650 11FA03614050 7210
Avaya Media Gateway G650 11FA03612000 7210
Avaya Media Gateway G650 11FA03612600 7210
Avaya Media Gateway G650 11FA03813850 7210
Avaya Media Gateway G650 11FA03614100 7210
Avaya Media Gateway G650 11FA03014290 7210
Avaya Media Gateway G650 12FA03410450 7210
Avaya Media Gateway G650 11FA03302070 7210
Avaya Ethernet Routing Switch 24 port LBNNTMMD510FW3 9681
Avaya Ethernet Routing Switch 24 port LBNNTMMD510HWC 9681
Cisco OA&M LAN 12 port FOC1542Y0F7
Avaya Media Gateway G650 11FA03613020
Avaya Media Gateway G650 11FA03014880
Avaya Media Gateway G650 11FA12625301
Avaya Media Gateway G650 11FA03613040
Avaya Media Gateway G650 11FA12028561
Avaya Media Gateway G650 11FA12029041
Avaya Media Gateway G650 11FA03611830
Avaya Media Gateway G650 11FA03612210
Avaya Media Gateway G650 11FA36112980
Avaya Media Gateway G650 11FA03611950
Avaya Ethernet Routing Switch 24 port LBNNTMMD510FW
S
Avaya Ethernet Routing Switch 24 port LBNNTMMD510HW
V
Cisco OA&M LAN 12 port FOC1542Y0FF
Avaya Media Gateway G650…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .