Revised Initial and Sample Task Order Req.pdf
PDF 170 KB Posted
- Solicitation number
- M0026427R0001
- Issued by
-
United States Marine Corps
About this file
This document outlines the Initial and Sample Task Order requirements for a federal information technology support contract supporting the Education Command (EDCOM) network across multiple military installations.
The contractor shall provide comprehensive IT infrastructure support across eight geographic locations with 28 total available desks: Quantico, VA (23 desks); Camp Lejeune/Camp Johnson, NC (1 desk); Camp Pendleton, CA (1 desk); Hawaii (1 desk); Twenty-nine Palms, CA (1 desk); and Okinawa, Japan (1 desk). Support for MCAS Miramar, CA and Joint Reserve Fort Worth, TX (0 desks available) must be provided remotely or via contractor travel from other government sites. The Initial Task Order runs 12 months from March 20, 2027 to March 19, 2028, with the government intending to award this initial task order with the base IDIQ contract. The Sample Task Order covers years 2–5 (March 20, 2028 through March 19, 2032) for evaluation purposes only and will not be awarded as an actual task order.
The contractor must manage approximately 1,100 network users, 60 servers, and 1,100 end-user devices, handling an estimated 2,400 helpdesk tickets annually with steady-state volumes of 150–200 tickets monthly and surge periods of 300–600 tickets monthly. Services include NIPR and SIPR support limited to SARs, imaging, and ESD tickets; tier-1/tier-2 end-user support (account/permission requests, workstation repair, network/VLAN access, classroom AV setup); cybersecurity support across eight active ATO packages in eMASS including POA&M management, weekly ACAS vulnerability scanning of approximately 388 assets, and STIG compliance; AV/VTC event support averaging 10–15 weekly events; cable installations and equipment moves averaging 20–30 monthly; and after-hours technical refresh support averaging 1–2 monthly events. The Okinawa position is structured as permanent, full-time on-site work providing hands-on hardware break/fix, desktop troubleshooting, and AV/VTC support during local business hours, with coordination available from CONUS-based contractor subject matter experts for advanced support. If a rotational staffing model is proposed, all associated travel, lodging, and per diem costs must be included in the firm-fixed price and comply with SOFA and country-clearance requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR 52.212-2 Addendum Rev.pdf | ||
| EDCOM ITSS PWS Rev.pdf | ||
| Attach 3- Pricing Template REVISED -Insert Offeror Name.xlsx | XLSX spreadsheet | |
| FAR 52.212-1 Addendum Rev.pdf | ||
| Attach 5 - Past Performance Questionnaire Rev.docx | DOCX document | |
| M0026427R0001 Amendment 2.pdf | ||
| EDCOM ITSS Q and A.pdf | ||
| Attach 4 - DD-254 REV Static Version.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISTRIBUTION: DoW COMMUNITY ONLY
Initial and Sample Task Order Requirements:
The contractor shall provide a solution to cover all 4 tasks of the PWS based on the following office space constraints since place of performance is at government site:
Location Number of Desks Available
Quantico, VA 23 Desks
Camp Lejeune N.C (Incl Camp Johnson, N.C.) 1 Desk
Camp Pendleton, CA 1 Desk
Hawaii 1 Desk
MCAGCC Twenty-nine Palms, CA 1 Desk
Okinawa, Japan 1 Desk
MCAS Miramar, CA 0 Desks **
Joint Reserve Forth Worth (FTW), TX 0 Desks **
Total office space available for Initial and Sample TO: 28 Desks
** Since there is no desk space available at these two locations, and all work under this contract has to be at a Government site, support for these two locations shall be provided by contractor personnel at other Government site locations. This may be accomplished either remotely (from another government location) or via contractor travel to the site.
Contractor shall develop its FTE allocation based on these circumstances.
Period of Performance:
The 'Initial Task Order' is for a period of 12 months; the Government intends to award this initial task order with the base IDIQ contract.
The 'Sample Task Order' covers years 2-5 and is provided solely for evaluation purposes; it will not be awarded as an actual task order.
The Period of Performance shall be based as follows:
Year 1 (Initial TO): 20 March 2027 to 19 March 2028
Year 2 (Sample TO): 20 March 2028 to 19 March 2029
Year 3 (Sample TO): 20 March 2029 to 19 March 2030
Year 4 (Sample TO): 20 March 2030 to 19 March 2031
Year 5 (Sample TO): 20 March 2031 to 19 March 2032
Requirements:
1. NIPR & SIPR support limited to SAARs, imaging, ESD tickets.
2. EDCOM has approximately 1,100 users accessing the network.
3. Manage an estimated 60 servers, 1,100 end user devices.
4. Handle an estimated 2,400 helpdesk tickets annually. Estimated Monthly Ticket Volume.
Steady-State Months: Approximately 150-200 tickets/service requests per month across all supported sites.
• Peak Academic / Event Months: Approximately 300–600 tickets/service requests per month.
• Ticket Distribution by Location (Estimated):
o Main Campus / Primary HQ: 75% o Geographically Dispersed California Sites: 10% o Camp Lejeune/Camp Johnson: 5% o Hawaii: 5% o Okinawa On-Site Facility: 5%
5. Categories & SLAs: The vast majority of tickets consist of tier-1/tier-2 end-user support (account/permission requests, peripheral/workstation break/fix, basic network/VLAN access, and classroom AV setups). Offerors are responsible for proposing a flexible staffing and triage methodology capable of meeting the performance standards (response and resolution times) outlined in the PWS Performance Work Statement / Service Level Agreements across both steady-state and surge periods.
6. Approximate inventories by location for users, endpoints, servers, network devices, cloud resources, AV/VTC systems, and telecommunications rooms:
• Network Devices o Quantico, VA
Quantico – 273 Museum Support Facility - 6 o Camp Johnson - 17 o Camp Lejeune - 2 o California
29 Palms - 13 Camp Pendleton - 37 MCRD San Diego - 1 Miramar - 3 o Hawaii - 20 o Japan - 16
• End Points o 29 Palms
User Accounts in AD: 8 Computer: 10 Number of Servers: 0 o Camp Pendleton User Accounts in AD: 39 Computer: 107 Number of Servers: 13 o Quantico User Accounts in AD: 2364 Computer: 1200 Number of Servers: 33 o Camp Lejeune User Accounts in AD: 8 Computer: 84 Number of Servers: 8 o Hawaii User Accounts in AD: 12 Computer: 28 Number of Servers: 8 o Okinawa User Accounts in AD: 6 Computer: 10 Number of Servers: 8
• AV systems:
o Quantico, VA
Warner Hall
• 1 Auditorium
• 3 Lecture halls
• 3 Large Conference rooms
• 25 Classrooms
Simmons Hall
• 1 Conference room
• Breckinridge Hall
• 1 Cisco SVTC suite
• 1 Auditorium
• 4 Conference rooms
Gray Research Center/ Library
• 1 Auditorium
• 3 Large Conference rooms
• 4 Large classrooms o Camp Lejeune, NC Camp Johnson, NC
• 1 Auditorium
• 1 Computer lab
• 2 Conference rooms
• 8 Large Classrooms
• 40 Classrooms o Camp Pendleton, CA Camp Pendleton, CA
• 3 Large Classrooms
• 1 Conference room
29 Palms, CA
• 1 Lecture Hall
• 1 Large Conference room
• 1 Classroom
Miramar, CA
• 1 Lecture Hall
• 1 Large Conference room
• 1 Small Conference room
San Diego, CA
• 1 Large Conference room
• 1 Classroom
K-Bay, HI – 4 Classrooms Okinawa, Japan – 1 Conference room & 12 Classrooms
7. eMASS/ATO packages, open POA&Ms, ACAS vulnerabilities, STIG findings, and upcoming authorization deadlines required to be supported. Final authorization authority and the ISSM role remain inherently governmental functions. However, the contractor is responsible for cybersecurity support services across eight (8) active ATO packages registered in eMASS for EDCOM. To assist offerors in estimating technical effort, historical metrics over a typical 12-month period reflect:
• Active POA&Ms: Approximately 10-20 open items across all systems at any given time.
• ACAS Vulnerability Scans / STIG Checks: Routine scanning occurs on a weekly cadence across approximately 388 assets, with vulnerability remediation prioritized in accordance with USCYBERCOM/DoD timelines.
• Authorization Deadlines: Reauthorization occurs on a standard three-year cycle;
approximately 8 packages are scheduled for full re-accreditation or major review during the base period of performance.
8. Anticipated workload for after-hours support, AV/VTC events, cable installations, equipment moves, break/fix services, and technical-refresh activities:
• Workload across these task areas is managed primarily during standard duty hours (core operational hours). Historical volume and operational expectations are outlined below:
• After-Hours & Technical Refresh Support: Technical refreshes and planned maintenance typically occur outside standard operational hours. The Government utilizes flexible scheduling (e.g., schedule adjustments within the standard 40-hour workweek) to maintain steady-state hours without generating routine overtime. After-hours events average approximately 1-2 events per month.
• AV/VTC Support: AV/VTC setup and monitoring average approximately 10-15 scheduled events per week, predominantly during duty hours.
• Cable Installations & Equipment Moves: Inside-plant moves, adds, and changes (MACs) are driven by customer relocations and project milestones, historically averaging 20-30 moves/drops per month.
• Break/Fix Services: Handled during core hours via standard ticketing queues, averaging 150–250 tickets per month across the supported command. Emergency after-hours callouts (e.g., critical network outages) are rare, occurring fewer than 2–3 times per quarter.
9. OCONUS Support:
For the one on-site Okinawa support, primary function involves providing hands-on touch labor, hardware break/fix, desktop troubleshooting, and on-site AV/VTC event support during local business hours. The Okinawa-based contractor personnel may coordinate with and leverage CONUS-based contractor SMEs for advanced tier-3 support, system engineering guidance, or escalation, provided standard local response times are maintained.
This requirement is structured as a permanent, full-time on-site position in Okinawa. The Government does not require or anticipate a TDY rotational model. If an offeror elects to propose a rotational staffing strategy, all associated travel, lodging, and per diem costs must be fully factored into their firm-fixed price and comply with applicable SOFA (Status of Forces Agreement) and country-clearance requirements.
File details come from the government source that posted it. Updated .