EDCOM ITSS Q and A.pdf
PDF 394 KB Posted
- Solicitation number
- M0026427R0001
- Issued by
-
United States Marine Corps
About this file
This is a Questions and Answers document for federal contract M00264-27-R-0001, condensing 1,166 industry questions into 116 responses organized under 12 thematic categories addressing clarifications to a Request for Proposal.
The solicitation concerns an indefinite delivery indefinite quantity (IDIQ) contract for IT support services at the Education Command (EDCOM), a Marine Corps educational institution. The contract is a 100% Women-Owned Small Business (WOSB) set-aside under NAICS 541512 with a $45 million ceiling, covering a five-year ordering period from March 20, 2027 through March 19, 2032. The contract requires support for approximately 1,100 users, 1,400 end-user devices, and 70 servers across multiple locations including Camp Pendleton, Quantico, Okinawa, Miramar, and Fort Worth. Services include helpdesk support (2,400 annual tickets at 150–200 steady-state monthly or 300–600 peak), break/fix support (150–250 monthly tickets), cybersecurity management of eight active Authority to Operate packages, network and systems administration, AV/VTC support, and IT infrastructure maintenance. All contractor personnel working on-site must maintain active Secret security clearances; the Government is not sponsoring clearances. Core operating hours are 0730–1700 local time Monday through Friday, with after-hours support not exceeding 5% of effort. Response times for standard help desk tickets are 24 hours; urgent tickets require response within 1 hour and resolution within 24–36 hours. The contract includes fixed-price labor rates for defined labor categories, travel reimbursement, and other direct costs. Break/fix materials and components will be procured separately via task orders. First-tier subcontracting only is permitted, and all DD Form 254 requirements must be completed prior to work commencement. No site visits will be conducted, and proposal submission is via PIEE in Microsoft Office 365 or Adobe Acrobat format with a 45-page limit for the technical volume.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR 52.212-2 Addendum Rev.pdf | ||
| Revised Initial and Sample Task Order Req.pdf | ||
| EDCOM ITSS PWS Rev.pdf | ||
| Attach 3- Pricing Template REVISED -Insert Offeror Name.xlsx | XLSX spreadsheet | |
| FAR 52.212-1 Addendum Rev.pdf | ||
| Attach 5 - Past Performance Questionnaire Rev.docx | DOCX document | |
| M0026427R0001 Amendment 2.pdf | ||
| Attach 4 - DD-254 REV Static Version.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M00264-27-R-0001 Questions and Answers
There were 1,166 questions received from industry. The Government organized questions in a manageable format, without redundancies under 12 thematic categories. The 1,166 questions were condensed to 116 questions under the 12 thematic categories. The Government is providing responses to these 116 questions as follows:
Thematic Category 1. Pricing Template, Formulas, and Plugs (Attachment 3)
Question No. Question / Inquired Topic
Solicitation Reference Government Response
1 Attachment 3 Year 2 Formula Errors: Cells H8:H13, H16:H21, H24:H29, and H32:H37 in the Initial & Sample TO Pricing tab reference Column J (Year 4) of the Labor Rates tab instead of Column H (Year 2). May offerors correct these formulas, or will a revised workbook be issued?
Attachment 3, Initial & Sample TO Pricing tab & Labor Rates tab
Issue has been corrected in amendment 2. Please use the revised attachment 3 included in the RFP amendment.
2 Whole-Dollar Pricing vs.
Fractional Plug Amounts:
FAR 52.212-1 Addendum §2.8.1 states pricing shall be in whole dollars only, but Attachment 3 tab Travel_and_ODC contains fractional-cent values (e.g., $63,739.2187). How should offerors enter and round these amounts?
FAR 52.212-1
Addendum §2.8.1, §2.8.2; Attachment (Travel_and_ODC)
Issue has been corrected in amendment 2. Please use the revised attachment 3 included in the RFP amendment.
3 Escalation Across Labor Categories: Does the template require a single escalation rate per year, or may offerors propose different escalation
Attachment 3, Labor Rates tab;
FAR 52.212-1
Addendum §2.8.1
It is up to the offerors to determine the proposed escalation for a given ordering period year.
percentages by labor category or location?
4 Break/Fix Pricing in Attachment 3: How should contractor-furnished break/fix components under PWS §5.3.2 be reflected in Attachment 3?
PWS §5.3.2;
Attachment 3
For pricing under attachment 3, just account for the labor cost. All materials/equipment/parts will be procured and settled at the task order level as FFP. The task orders will be based on the labor established in the indefinite delivery indefinite quantity base contract (agreed labor rate X hours) plus any materials/ equipment/parts cost. Total amount will be procured as FFP.
5 Section B Continuation Sheet (SF 1449 p. 3) Estimated Quantities: Do the numbers in the Estimated Quantity column represent labor hours or dollars?
RFP SF 1449
Continuation, p. 3
No, the numbers in the Estimated Quantity column represent neither labor hours nor dollars. This is a system limitation which requires quantities to be added. This is an IDIQ contract, not a Definitive Quantity, Indefinite Delivery. IDIQ ceiling value is set at the $45M dollar amount, not quantities.
6 "FAR 52.216-22(d) allows completion of orders beyond the ordering period... Which rates govern an order’s performance after Year 5?"
Pricing performance beyond Year 5
Any orders issued under a given ordering period will abide to the pricing of that period. For example, if a task order is issued at the end on ordering period 5 and period of performance will be beyond the IDIQ ordering period, such order will be expedited with ordering period 5 rates since it was issued while the IDIQ ordering was active.
7 "Please clarify/describe whether the Government will pay payment requests based on partial invoices."
Invoice payment rules
Payment will be made per CLIN structure unit of issue.
For example, if the task order sets quantity of 12 each/month, the contractor will be able to invoice for 12 instances per terms and agreed unit prices.
8 "With this being a single award IDIQ, would the Government accept additional unpriced LCATS in Attachment 3 to enable greater flexibility during the period of performance?"
Request to submit unpriced LCATs
No unpriced labor categories are permitted. RFP Attachment 3 requires fully loaded hourly rates for all proposed LCATs, which will become part of the contract and be used to expedite task orders.
9 "Please confirm whether offerors may apply G&A or other indirect burdens to the Travel (CLIN 0005) and ODC (CLIN 0006) CLINs."
Indirect burdening of plug CLINs
Contractor is responsible for ensuring compliance with their accounting practices. Indirect cost handling applicable to cost CLINs on federal contracts will be subject to RFO FAR 31. Fee is strictly prohibited.
Thematic Category 2. Period of Performance, Ordering Period, and Transition
Question No.
Question / Inquired Topic
Solicitation Reference Government Response
10 Period of Performance Date Discrepancy: SF 1449 and FAR 52.216-18 specify 20 March 2027
RFP SF 1449 p. 5;
FAR 52.216-18 p.
17; Initial &
Ordering period is from 20 March 2027 through 19 March 2032. Initial and Sample TO requirement through 19 March 2032, whereas the Initial and Sample Task Order Requirements specify 15 March 2027 through 14 March 2032 (Year 1: 15 Mar 2027 – 14 Mar 2028). Which dates govern?
Sample TO Requirements p. 1 information has been corrected in the RFP amendment.
11 Transition Period Timing and Reimbursement:
Does the 30-day transition occur prior to or concurrently with the Initial Task Order start date?
PWS §4.20 The Government expects to award new contract at least 30 days prior to the current contract expiration date to allow for orderly transition. PWS §4.20 states: "There will be up to a 30-day transition period, starting the day after award... Transition in will not be separately reimbursed under a task order; it is an expectation of the base IDIQ contract management."
12 Incumbent Transition Support & Handover:
Will the predecessor contractor be required to support knowledge transfer and turn over existing diagrams and SOPs during transition?
PWS §4.20 PWS §4.20 requires the contractor to facilitate the transfer of work control and ensure a smooth transition of services. All data generated in this and previous requirements is subject to the data rights clauses, which include diagrams and SOPs.
13 "Does the Government anticipate that oncoming direct labor staff will be seated and working before the start of the first T/O performance period... will the Government consider a priced 30-day transition period?"
Seated direct labor during transition;
request for priced transition CLIN
The Government expects to award new contract at least 30 days prior to the current contract expiration date to allow for orderly transition.
PWS §4.20 explicitly states transition-in will not be separately reimbursed.
14 "Are task orders on the IDIQ expected to be sequential 12-month task orders?"
Task order issuance pattern
PWS §4 states orders are placed when needs arise and funding is available.
The initial task order requirement reflects the preponderance of the services intended. For this one, the expectation is to issue an annual task order comprising a 12-month period of performance for these services.
The Government may issue task orders at any time in any amounts authorized under the IDIQ.
15 "What operational-readiness milestone is required for the tracking method during the approved transition period?"
Transition operational readiness gates
The main Acceptance Gate is contractor personnel onboard with approved security clearances and system access.See PWS section 4.15 for vacancy replacement timelines.
Thematic Category 3. Past Performance (Volume 3, Factor 2)
No.
Question / Inquired Topic
Solicitation Reference
Government Response
16 Number of Past Performance Records (3
vs. 4): FAR 52.212-1 Addendum §2.7.1 and Attachment 2 allow up to four (4) records, while FAR 52.212-2 Addendum §2.3 references "the three most relevant contracts or efforts." Which controls?
FAR 52.212-1
Addendum
§2.7.1; FAR
52.212-2 Addendum §2.3;
Attachment 2
A maximum of four (4) past performance records are allowed. FAR 52.212-2 Addendum §2.3 has been corrected via RFP amendment 2.
17 Submission of Standalone Narrative
FAR 52.212-1
Addendum
No separate narrative required for past performance. Offerors shall complete
vs. Attachment 2: Is a separate past performance narrative required in addition to Attachment 2?
§2.7.1;
Attachment 2
Attachment 2 Past Performance Relevancy Matrix and provide the supporting documentation for each of the records submitted. The supporting documentation does include copy of contract records, POCs, contract cover pages, CLIN pricing, SOWs/PWSs. If the record is for a cost-plus contract including narratives for incentive/award-fee, then, such information shall be included.
18 PPQ Submission Method & Routing:
Attachment 5 instructs assessors to email PPQs directly to the Government, while §2.7.1 states PPQs shall be provided as attachments to Volume 3. Which procedure applies?
FAR 52.212-1
Addendum
§2.7.1; RFP
Attachment 5
The direct delivery of CPARS is required per RFP instructions. As for PPQs, the RFP instructions said that if CPARS data is not available for a contract, Offerors shall provide Past Performance Questionnaire (PPQ) per the RFP. The PPQ is included as Attachment 5 of the solicitation. The PPQ shall be provided before the closing date of this solicitation. PPQ shall be provided in accordance with the delivery instructions set forth in RFP Attachment 5.
Attachment 5 requires the PPQ Assessor to provide it to the Government. Instructions are in Attachment 5.
19 Subcontractor Experience & Teaming Documentation: Is a separate commitment letter required if a fully executed teaming agreement is submitted?
May a prime contractor
FAR 52.212-1
Addendum §2.7.1
Commitment letters are part of the fully executed teaming agreement.
RFP instructions Section 2.7.1 states:
"The Offeror shall ensure a copy of teaming agreements for all participants in this effort are included... a commitment signed by Offeror and subcontractor certifying that if a contract is awarded resulting from the proposal, the parties commit
PM complete a PPQ for a subcontractor?
to joint performance as proposed shall be included."
A prime contractor may complete a PPQ for a company that performed as a subcontractor under the reference contract. Attachment 5 has been updated to reference “Assessor” in lieu of “Government official”
20 Recency Period Threshold: Will the Government consider projects with 5 to 6 months of performance, or expand recency to 5 years?
FAR 52.212-1
Addendum §2.7.1;
Attachment 2
No.
21 "Would the Government permit offerors to submit a Blanket Purchase Agreement (BPA) as a single past performance record, aggregating orders against that BPA?"
BPA order aggregation
Yes, as long as the offeror includes issued and funded calls for the Blanket Purchase Agreement (BPA) being used as a past performance record. A BPA itself with no call provided to demonstrate performance will not suffice. Call may be incorporated as 1 record under the BPA reference.
22 "When claiming a Multiple Award IDIQ collectively, must offerors submit CPARS/SOWs for all task orders or only relevant task orders?"
MAC IDIQ scope submissions
It depends on the offeror’s decision and the CPARS structure of the IDIQ.
The Offeror is responsible for determining the IDIQ and task orders used to claim experience. If CPARS is done solely at the IDIQ level, then that record will suffice. If CPARS is done at the task order level, then the CPARS of each task order will suffice.
23 "Will the Government accept a PPQ completed by a former Government
PPQ assessor qualifications
Current KO or COR input is preferred.
The use of a retired government official for PPQs is not permitted contracting officer, COR, or technical lead who has since retired/reorganized?"
because it cannot be contacted by evaluators to confirm the assessment since it is no longer a government representative.
24 "If SOW language is broad, will the Government accept contemporaneous CDRLs, monthly status reports, or COR direction as supplemental evidence of technologies delivered?"
Secondary relevancy mapping sources
Yes, the offeror may incorporate supplemental information to depict outcomes and relevancy of a given past performance record as long as copy of the SOW/SOO/PWS is provided. Submission of solely supplemental documentation generated by the offeror is not acceptable.
25 "If SOW did not specifically state geographically dispersed locations, but support was global, can the Offeror state that in a narrative?"
Attachment 2 Column P geographic mapping
The past performance record should include place of performance. The Offeror may incorporate any evidence (e.g., email) from the cognizant government official (KO or COR) to demonstrate place of performance if the record itself is silent.
26 "Request the Government delete Column V (FAR 52.219-8 compliance) from the relevancy matrix as it is not relevant to small businesses."
Request to remove matrix requirement
Attachment 2 Column V remains a mandatory field in the issued matrix.
If the prime of the contract record is a small business, just make an assertion in the column.
27 "Can the Government confirm if section VII exists in Attachment 5, and confirm assessors only complete sections V and VI?"
Attachment 5 form sections
Attachment 5 “VII” typo has been corrected in RFP amendment.
Assessor completes PPQ sections V and VI.
Thematic Category 4. Staffing, Facilities, and Personnel Qualifications
No.
Question / Inquired Topic
Solicitation Reference
Government Response
28 28-Desk Limitation vs.
FTE Count: Is 28 the maximum allowable FTE count, or an office space constraint? May offerors propose fewer or more FTEs?
Initial & Sample
TO
Requirements, p.
Yes, 28 office spaces is the maximum space alloted for contractor persomnnel assigned to support task order 1 requirement. Offerors are free to provide a labor mix to execute their proposed technical approach. The office desk information is for space constraint and FTE cap. Contractors are encouraged to consider this FTE cap as part of their approach.
29 Submission of Names and Resumes: Are resumes, names, or letters of commitment required with the proposal?
Attachment 1;
FAR 52.212-1
Addendum §2.6
No. FAR 52.212-1 Addendum §2.6 and Attachment 1 explicitly state:
"Submission of individual candidate resumes, 'resume-like' profiles, or names of specific individuals is strictly prohibited in all sections of this volume."
Qualifications are proposed at the labor category level.
30 Key Personnel Designations: Are any positions designated as Key Personnel?
EDCOM ITSS
PWS; FAR
52.212-1 Addendum
No key personnel apply. The solicitation package does not identify or designate any Key Personnel.
31 Standard Productive Work Hours: Does the Government prescribe a standard number of productive work hours per FTE?
Attachment 1, Initial_& Sample Task_ Orders tab
Attachment 1 provides an entry field for "Productive Work Hours per FTE:" to be defined by the offeror. No mandatory standard figure is specified by the Government.
32 DCWF Qualifications and Pathways (PWS §4.18): Are non-
EDCOM ITSS
PWS §4.18
PWS §4.18 lists DCWF Work Role Codes and proficiency levels (e.g., 451, 441, 628, 431, 442, 521, 722) and states:
certification qualification pathways under DoD 8140 recognized? What are the qualifications for AV/VTC Support?
"No waivers or exceptions will be considered." For AV/VTC Support, the table explicitly designates DCWF Code and Level as "N/A."
33 Cross-Functional Personnel & Remote Support: May one employee cover multiple tasks, and can CONUS staff support remote sites?
PWS §4.8, §5.0;
Initial & Sample TO Requirements §9
The solicitation allows offerors to propose their own labor mix. The Government is ok for allowing limited (less than 30 days) remote support to cover down on local requirements to ensure operability. However, the requirement is for onsite local support.
Initial & Sample TO Requirements §9 states: "The Okinawa-based contractor personnel may coordinate with and leverage CONUS-based contractor SMEs for advanced tier-3 support, system engineering guidance, or escalation, provided standard local response times are maintained."
PWS section 4.15 has been updated to incorporate the following: Upon coordination and approval from the Contracting Officer Representative, while contractor personnel is being replaced, remote work is allowed to cover down on local requirements to ensure operability.
34 "Please confirm that offerors may enter the O*NET-SOC Code in the DOL Occupation Code column."
Occupational taxonomy mapping
Confirmed
35 "What minimum notice does the Government anticipate providing between issuance of a future task order and
Task order ramp-up notice
The initial task order will be used to satisfy the minimum amount guaranteed of the IDIQ. The scope of work of the initial task order is the preponderance of work this contract entails. The required start of performance?"
expectation is to issue an annual task order for this requirement.
36 "What does the Government mean by 'non-recurring setting' in the Staffing Plan Narrative instructions?"
Narrative drafting guidance
Non-recurring setting refers to the nature of the IDIQ. Services are subject to task order issuance, not options. The intent is for the offeror to consider how to support task orders as they arise.
37 "Can the Government provide historical/EDCOM experience ranges for Junior, Mid, Senior, and SME levels (e.g., 1–2 yrs
vs. 2–3 yrs)?"
Experience definitions by tier
This information is confidential to the incumbent. This solicitation requirement is performance-based, and Offerors are responsible for defining the minimum qualifications for each labor category and the labor mix for the task order scenarios based on the requirements of the solicitation.
38 "Does the PWS 4.21 proposal-incorporation clause apply to individual personnel qualifications so that an overqualified person sets a binding replacement benchmark?"
Replacement staffing standard interpretation
This PWS section holds the contractor accountable to deliver services based on the agreed terms, which includes qualification criteria of labor categories.
It is about labor category qualifications, not about individuals.
Thematic Category 5. Security Clearances, Facility Clearance (FCL), and DD Form 254
No.
Question / Inquired Topic
Solicitation Reference
Government Response
39 FCL Timing and Clearance Sponsorship:
Must the prime hold an active Secret FCL at proposal submission?
Will the Government sponsor uncleared offerors or accept in-process FCLs?
FAR 52.212-1
Addendum §2.5.4
FAR 52.212-1 Addendum §2.5.4 explicitly states: "The Offeror must have an active SECRET Facility Clearance (FCL) at the proposal submission date.
The Government is NOT sponsoring clearances." For Joint Ventures, either the JV itself or BOTH JV members must possess a Secret FCL at proposal submission.
No interim contractor’s FCL clearances are accepted.
The Government is NOT sponsoring clearances.
40 Subcontractor FCL Requirements: Must first-tier subcontractors hold an active Secret FCL at proposal submission?
FAR 52.212-1
Addendum §2.5.4;
PWS §4.14.2
Subcontractors with eligible secret clearance capabilities may receive sponsorship from the prime via the DD- 254.
FAR 52.212-1 Addendum §2.5.4 states the Offeror shall provide a DD Form 254 filled out in blocks 7.a–7.c for any subcontractors. PWS §4.14.2 states: "All DD Form 254 requirements must be completed and approved prior to commencing any work under this contract."
41 Personnel Clearance Level & Interim Clearances: Does all on-site staff require a Secret clearance, and are interim clearances accepted?
PWS §4.14.8 The Contractor is responsible for providing a suitable individual to execute the job at the required security clearance level. PWS §4.14.8 explicitly mandates: "For this requirement, all contractor staff working at government premises shall have a secret security clearance. The Government is not sponsoring clearances." Contractor personnel interim clearances are accepted. If the full clearance is not granted the access will be rescinded and the FTE will need to be replaced.
42 Classified Safeguarding at Contractor Facilities:
Is contractor-facility safeguarding required?
FAR 52.212-1
Addendum §2.5.4;
PWS §4.14.1
No, PWS §4.14.1 states work is performed at EDCOM facilities. DD Form 254 specific block interpretations are governed by Attachment 4, but performance is designated at Government premises.
43 "If an Offeror holds a SECRET FCL that is SUSPENDED or INACTIVE, will the Government consider the requirement met if reinstated by submission date, or sponsor reinstatement?"
Suspended/Inactive FCL status
Section 2.5.4 requires an active Secret FCL at proposal submission date. The Government is not sponsoring clearances. No interim contractor’s FCL clearances are accepted.
44 "Which contract personnel must have a SCI clearance? Can the Government confirm there is no TS requirement?"
TS/SCI clearance applicability
The solicitation documents do not identify any Top Secret or TS/SCI requirements; all stated requirements specify Secret.
45 "Will the Government provide a flattened/static version of Attachment 4 DD Form 254 that opens outside Adobe Reader?"
Technical issue opening dynamic
XFA PDF
Offeror may download a fillable DD- 254 form if needed. A copy of a flattened/static version of Attachment 4 DD Form 254 is included in the RFP amendment.
Thematic Category 6. Cybersecurity, CMMC, RMF, and Zero Trust
No.
Question / Inquired Topic
Solicitation Reference Government Response
CMMC Level Specification: What CMMC level applies under DFARS 252.204- 7021 and 252.204-7025?
RFP pp. 20, 30
The CMMC level applicable to this effort is Level 1. The fill-in blanks under DFARS 252.204-7021(d)(1)(i) and DFARS 252.204-7025(b)(1) were left unpopulated in the solicitation document because they will be completed at award.
47 eMASS / ATO Packages Workload:
How many ATO packages and reviews are required during Year 1?
Initial & Sample TO Requirements §7
Item 7 states: "the contractor is responsible for cybersecurity support services across eight (8) active ATO packages registered in eMASS for EDCOM... Reauthorization occurs on a standard three-year cycle;
approximately 8 packages are scheduled for full re-accreditation or major review during the base period of performance." A package-by-package schedule is not provided.
48 Zero Trust Baseline and Roadmap: What is the current Zero Trust implementation baseline and roadmap for
EDCOM?
PWS §5.2.1.5;
FAR 52.212-2
Addendum §2.2
PWS §5.2.1.5 requires the contractor to "Support the implementation of the Department of War’s (DOW’s) Zero Trust Strategy on all EDCOM networks and systems." Current baseline maturity documentation or roadmaps are not provided in the solicitation.
49 eMASS and RMF Training Timeline Discrepancy: Does PWS §5.2.2.5 (30 days) or PRS p. 36 (60 days)
PWS §5.2.2.5;
PWS §8.1 (PRS p.
36)
PWS §5.2.2.5 states personnel must complete training "within 30 days of contract award or hire date,". The PRS table on page 36 has been corrected to say, "within 30 days of onboarding."
govern for training completion?
50 "Will the Cyber-Security Specialist have access to input into the Risk Management Framework (RMS/eMASS)?"
System read/write permissions
PWS §5.2.2.5 has been updated to include the following “Cybersecurity roles will be granted RMS/eMASS access after completion of required training and based on the assigned role.
51 "Is there a local Authorizing Official that can endorse Local Only Authorities to Connect (ATC) if required?"
Local AO availability
No, EDCOM does not possess a local Authorizing Official (AO) for independent Local Only Authorities to Connect (ATC); all ATCs and system accreditations are governed strictly under the authoritative, enterprise Marine Corps RMF and connection approval processes.
52 "Will the Government amend the solicitation to make CMMC Level 2 (C3PAO-assessed) a go/no-go requirement at proposal submission?"
Request to mandate C3PAO CMMC at submission
CMMC level 1 applies to this requirement.
53 "Is EDCOM targeting DoD Zero Trust Target Level or Advanced Level, and is there an existing implementation roadmap?"
Target Zero Trust maturity tier and roadmap
EDCOM is aligned with the Department of the Navy (DON) and DoD CIO mandate to achieve Zero Trust Target Level. The Zero Trust implementation roadmap is Government-led, and the contractor is not responsible for engineering the overarching Zero Trust architecture.
https://goto.google.com/no-go
Thematic Category 7. Small Business Program and Limitations on Subcontracting
No.
Question / Inquired Topic
Solicitation Reference
Government Response
54 Applicable Set-Aside Type: Is this procurement a 100% WOSB set-aside or a total small business set-aside?
RFP SF 1449
Block 10; RFP p.
7; FAR 52.212-1
Addendum §2.5.3
SF 1449 Block 10 marks the procurement as 100% set-aside for Women-Owned Small Business (WOSB) under NAICS 541512 ($34M size standard). FAR 52.219-30 is incorporated on page 7.
55 FAR 52.219-14
Limitation on Subcontracting Period:
Which compliance period governs under FAR 52.219-14(f)(1)?
RFP p. 11 (FAR 52.219-14)
On page 11, the checkbox for "By the end of the base term of the contract and then by the end of each subsequent option period" is checked with a checkmark in the RFP text.
56 Similarly Situated Entities: How are first-tier subcontractors treated under FAR 52.219-14?
FAR 52.219-14(b) Please review 52.219-14, including but not limited to subsection (b), and all applicable small business regulations and laws concerning subcontractors.
57 1st Tier Subcontracting Limitation: Does PWS §4.14.2 prohibit second-tier subcontracting?
PWS §4.14.2 Yes. PWS §4.14.2 explicitly states:
"This requirement is limited to 1st tier subcontracting."
58 "If a subcontractor fails to perform, may the prime contractor reassign work to its own staff to maintain continuity without a formal contract modification?"
Post-award workshare reallocation
The prime is responsible for overall contract execution, which includes overseeing its subcontractors.
Changes in personnel are subject to the requirements in the contract.
59 "Will the Government require evidence that a
JV eligibility documentation
Yes. Language added under Volume 1 instructions and evaluation criteria.
Joint Venture meets 13 CFR 127.506 submitted with Volume 1?"
RFP 52.212-1 Addendum Volume 1 section 2.5.3 has been updated to include the following:
Any offeror that is a joint venture must submit a copy of its joint venture agreement and must also submit evidence that the joint venture meets 13 CFR 127.506.
Thematic Category 8. Workload Baseline, Inventories, and Break/Fix Materials
No.
Question / Inquired Topic
Solicitation Reference Government Response
60 Inventory Discrepancy (Summary vs. Site Breakdown): Summary states 1,100 users, 1,100 devices, and 60 servers;
location inventories total 2,437 AD accounts, 1,439 computers, and 70 servers. Which numbers govern?
Initial & Sample TO Requirements §§2, 3, 6
Both sets of figures are provided in the Initial and Sample Task Order Requirements document. The solicitation does not state whether one set supersedes the other.
EDCOM operates in a hybrid environment with some on-premises servers but mostly cloud based services. EDCOM average user base is 1,100 users. Some users require two systems (EDU/MCEN) therefore the end-user devices are higher at approximately 1,400 systems. This fluctuates depending on time of year and student enrollment. Same with the servers, there are 13 on-prem and then there are typically 50 virtual servers maintained in our cloud environment. The virtual server number can fluctuate based on requirements.
61 Ticket Volume Overlap: Are the 150– 250 monthly break/fix tickets included in the 2,400 annual helpdesk tickets? How many peak months exist?
Initial & Sample TO Requirements §§4, 8
Item 4 estimates 2,400 helpdesk tickets annually (150–200 steady-state/month; 300–600 peak/month).
Item 8 separately cites 150–250 break/fix tickets per month. The solicitation does not clarify whether break/fix tickets are counted within the 2,400 total or how many months are peak.
62 Historical Spend for Contractor-Furnished Parts: Can the Government provide historical quantities or spend for break/fix components under PWS §5.3.2?
PWS §5.3.2 PWS §5.3.2 requires the contractor to provide minor break/fix components under FFP task orders. Historical spending, annual component volumes, and specific cost thresholds are not available. However, break/fix components will be procured via separate task order(s). The contractor will then be able to provide a quote to the Government to settle price.
63 Support Scope for Miramar and JRB Fort Worth: What is the workload and support model for locations with 0 desks?
Initial & Sample TO Requirements
p. 1; PWS §4.8
PWS §4.8 and Initial & Sample TO Requirements state support for MCAS Miramar and JRB Fort Worth shall be provided by contractor personnel from other Government site locations, either remotely or via travel. Miramar has minimal support requirements that are typically supported by the Pendleton FTE. Fort Worth does not currently have onsite requirements and only has 1 to 2 assets which are supported from Quantico.
64 NIPR/SIPR Scope Limitation: Does the Initial TO limit
Initial & Sample TO Requirements
Item 1 of the Initial & Sample TO Requirements states: "NIPR & SIPR support limited to SAARs, imaging, NIPR/SIPR support to SAARs, imaging, and ESD tickets, excluding SharePoint development and Trusted Agent duties?
§1; PWS §5.1.5.1,
§5.2.1.10
ESD tickets." PWS §5.1.5.1 and §5.2.1.10 describe broader SharePoint and Trusted Agent duties.
As the contract is to support EDCOM’s IL2 EDU network, MCEN NIPR/SIPR support is limited to supporting SAAR submissions, coordinating Imaging and MCEN ESD tickets for users. There are trusted agent duties for PKI token management and limited MCEN content management duties for EDCOM resources.
65 "What is the expected workload, asset count, or ticket volume for Joint Reserve Base Fort Worth, TX?"
JRB Fort Worth baseline
Fort Worth does not currently have onsite requirements and only has 1 to 2 assets which are supported from Quantico.
66 "Do the Active Directory user accounts include students, faculty, distance-education users, or inactive accounts?"
AD account composition
Information about Active Directory (AD) user accounts encompass all active students, faculty staff, and authorized distance-education users.
Inactive or scale accounts are managed and disabled/purged according to standard DoD lifecycle policies.
67 "Does the 388 weekly scanned asset figure include servers and workstations, or only network devices?"
ACAS scanning boundary
Network devices (388) are just the network layer scans (Routers, Switches, Servers). This does not include the End User Devices.
68 "Can the Government provide the breakdown of peak academic months vs. steady-state
Academic calendar / peak months schedule
The student on boarding happens in August and January. Those are peak months. Steady state months are months throughout the calendar year?"
September through December and February through June.
69 "Can the Government confirm that end users are instructors and HQ staff, and not students?"
Supported user demographics
End users include EDCOM Staff, faculty, and students.
Thematic Category 9. Operating Hours, SLAs, and Deliverables
No.
Question / Inquired Topic
Solicitation Reference
Government Response
70 Core Operating Hours & 5% After-Hours Support: How is the 5% after-hours support limit measured, and are overtime/standby hours separate?
PWS §4.10; Initial & Sample TO Requirements §8
PWS §4.10 defines core hours as 0730–1700 Local, Monday through Friday, and states weekend/after-hours support will not exceed 5% and must be factored into FFP pricing.
Initial & Sample TO Requirements §8 notes the Government uses flexible scheduling within the 40-hour workweek.
71 Trouble Ticket Clock Measurement: Are response/resolution times measured in business hours or calendar hours? Do clocks pause for external delays?
PWS §5.3.1.16,
§5.3.1.17; PWS
§8.1
PWS §5.3.1.16 requires standard ticket response within 24 hours and resolution within 48–72 hours.
Section 5.3.1.17 requires urgent/VIP response within 1 hour and resolution within 24–36 hours.
Response/resolution times are measured in business hours and clocks do pause for external delays such as Commercial ISP circuit issues that are outside of the contractor’s control.
72 AAR Submission Deadlines: Does PWS Table 6.2 (24–48 hours) or PRS (24 hours) govern After-Action Report delivery?
PWS Table 6.2 (p.
32); PWS §8.1
(pp. 34, 36)
Standard is 24 to 48 hours. The PRS has been updated.
73 PWS Typographical and Numbering Errors: Remote VMware is numbered 5.2.2.5; PRS ticket rows cite 5.3.1.17/18 instead of 5.3.1.16/17; Helpdesk metrics cite 5.3.1.19.
PWS §5.1.2,
§5.2.2, §5.3.1;
PWS Table 6.2;
PWS §8.1
Numbering corrections made in the
PWS.
"What specific event starts the SLA clock (user request, ticket creation, ticket issuance, or assignment), and does an automated email qualify as an initial response?"
SLA start trigger and response definition
The SLA clock initiates upon ticket creation in the ITSM platform/SPO list. Automated system-generated confirmation emails do not satisfy the contractual initial response requirement; substantive human engagement is required. PWS has been updated with this information.
"What specific event starts the SLA clock (user request, ticket creation, ticket issuance, or assignment), and does an automated email qualify as an initial response?"
SLA start trigger and response definition
The SLA clock initiates upon ticket creation in the ITSM platform/SPO list. Automated system-generated confirmation emails do not satisfy the contractual initial response requirement; substantive human engagement is required. PWS has been updated with this information.
76 "Does a response recorded at exactly 24 hours or exactly 1 hour satisfy the '< 24 hours'
Mathematical interpretation of PRS boundary
A response recorded at exactly 1 hour (60 minutes) or exactly 24 hours (1,440 minutes) is calculated and '< 1 hour' PRS target?"
as inclusive of the threshold and satisfies the respective metric.
Technical Standard: Any timestamp exceeding these exact limits (e.g., 61 minutes or 24 hours and 1 minute) will be flagged as a non-compliant event.
Bidders should design their operational workflows and automated alerting alerts to target response times well before these maximum thresholds.
77 "Does the PRS requirement to resolve or mitigate AV/VTC event issues within 5–10 minutes apply at remote sites with 0 desks?"
Remote AV mitigation standards
No. The 5–10-minute AV/VTC resolution standard applies strictly to local, on-site personnel troubleshooting. Remote sites without resident ITSS staff are governed by remote-triage and dispatch SLAs.
78 "What inspection frequencies, maintenance checklists, and pre-event procedures apply to AV/VTC auditoriums?"
AV preventive maintenance schedules
The contractor is responsible for conducting routine, preventative maintenance inspections and pre-event verifications on all Government-furnished auditorium AV/VTC systems to ensure mission readiness.
Standard Government-furnished equipment (GFE) checklists and vendor-specific diagnostic guides will be provided to the awardee during the transition phase-in period. Bidders must detail their proposed preventative maintenance methodology within their Technical Proposal.
Thematic Category 10. Proposal Preparation, Page Limits, and Formatting
No.
Question / Inquired Topic
Solicitation Reference
Government Response
79 Volume 2 Page Limit Exclusions: Do Attachment 1, the teaming table, the Mission-Essential Plan, cover page, and TOC count toward the 45-page limit?
FAR 52.212-1
Addendum §2.1(d), §2.2
Volume 2 is limited to 45 pages.
Section 2.1(d) states: "The Contractor is encouraged to incorporate graphics, figures, and exhibits as attachments to the volume. Attachments will not impact the page count limitations."
The Mission Essential Plan is NOT an attachment and WILL count towards the volume page count.
Per PWS section 4.14, all contractor staff working at government premises are considered Mission Essential per DFARS 252.237-7023 and 7024.
80 Document File Formats and Submission Files:
May offerors submit separate PDF files per volume and Excel files via PIEE?
FAR 52.212-1
Addendum §2.0, §2.2
Section 2.0 states proposals shall be submitted via PIEE (max file size 1.9 GB per file, with no limit on the number of files) in Microsoft Office 365 or Adobe Acrobat format.
Spreadsheets must be in Excel format.
81 CUI Header/Footer Markings: Which marking applies to proposal documents:
CUI//SP-SCTC or
CUI//PROCURE?
FAR 52.212-1
Addendum §2.1(g)
FAR 52.212-1 Addendum §2.1(g) specifies: "Headers/footers must ensure the company name and RFP number are included on each page and marked as CUI//SP-SCTC or CUI//PROCURE as appropriate."
82 "Would the Government consider the use of Arial or Arial Narrow 10pt font, or Times New Roman 9pt font for graphics, tables, and exhibits?"
Request for font exceptions
No. RFP Section 2.1(d) strictly mandates Times New Roman minimum 10-point font.
83 "Will the Government allow an 11x17 foldout page for the staffing plan to count as 2 pages?"
Request for 11x17 foldouts
No. RFP Section 2.1(a) specifies standard 8.5 x 11-inch paper size;
foldouts are not addressed.
84 "Will the Government allow an Executive Summary that is outside the page count?"
Request for non-counting Executive Summary
No. Section 2.2 defines the volumes and page limits; an uncounted Executive Summary is not authorized.
"What automated evaluation tools will the Government use, and will they assign ratings or perform compliance screening only?"
Automated evaluation tool identity and scope
Only Government approved automation tools will be used, in the source selection team’s discretion, only in a supporting capacity to support review and analysis. Ratings on a given factor will be done by evaluators, not from an automated system.
86 "The PIEE notice requires an MSDS attachment under FAR 52.223-3. Is an MSDS required for this IT services offer?"
Safety Data Sheet upload in PIEE
No. This is a service contract that includes acquiring ancillary consumables under the break/fix PWS section. As such, FAR 52.223-3 is not incorporated in the RFP.
87 Predecessor Contract Details: What is the incumbent contract
Solicitation Package M00264-22-F-0039 awarded to Epsilon, Inc.
number and contractor?
88 Site Visits & Pre- Proposal Conferences: Will the Government conduct a site visit under FAR 52.237-1?
RFP p. 26 (FAR 52.237-1)
No site visits will be held.
Thematic Category 11: Current-State Infrastructure, Environment Details & Incumbent Information
Question No. Question / Inquired
Topic
Topic / Inquired Detail
Government Response
89 "Is there an incumbent contract number, contract type, current period of performance, and incumbent contractor name?"
Incumbent contract identification
Current contract number is M00264- 22-F-0039 awarded to Epsilon, Inc.
90 "What is the current contractor staffing level (FTEs and hours) by labor category, task area, and site under the incumbent contract?"
Incumbent staffing baseline
This is contractor’s proprietary information and is not shared.
91 "Are there any current vacancies on the incumbent contract, and how long have they been open?"
Incumbent vacancy status
No vacancies concerns. Contract performance concerns are privity to incumbent and government officials.
92 "Is the current Project Manager a full-time
Dedicated Project Manager billet
Dedicated management labor categories are not mandated in the resource, and is a dedicated PM required by the Government?"
PWS. A primary point of contact from the contractor is expected to be provided to expedite effective communications and coordination with COR and KO.
93 "What is the total number of ESXi hosts, clusters, vCenter instances, and virtual servers currently managed?"
VMware infrastructure inventory
Current inventory includes 13 ESXi hosts located across 5 campuses.
Maintenance of 50 virtual servers regularly with additional virtual servers stood up as necessary.
94 "What is the current software version for the VDI environment, and what are the golden image networks?"
VDI software release versions
Not all information regarding VDI software versions and internal IP network baselines for golden images can be disclosed in the RFP due to OPSEC-sensitive matters.
System Standards: Bidders should assume the unclassified IL2 VDI environment utilizes standard, modern Microsoft Azure Virtual Desktop (AVD) and Windows Enterprise 10/11 operating system baselines.
Golden Image Maintenance: The contractor is responsible for building, patching, and maintaining operating system and application layers (golden images) using standard Government-provided tools and pre-approved baseline policies.
Detailed Handoff: Specific software catalogs, network paths, and access credentials will be provided to the awardee under formal non-disclosure agreement (NDA) parameters during the transition phase-in period.
95 "What are the Azure IL2 subscription counts, VM sizes, storage allocations, databases, and monthly consumption costs?"
Cloud asset and billing baseline
Specific subscription and billing metrics information cannot be disclosed in the RFP due to OPSEC-sensitive matters.
96 "Which network management tool is in production: Cisco DNA Center or Prime Infrastructure?"
Centralized network monitoring tool
PWS §5.1.3.2 lists both. The Government utilizes standard, commercially available Cisco enterprise network management suites to monitor and maintain local EDU Net hardware.
97 "What systems are in use for backups (e.g., Veeam), network monitoring (e.g., SolarWinds), and rack alarms?"
Commercial toolchain identity
Specific brand names, platform software, and physical facility security mechanisms (such as rack alarms) are OPSEC-sensitive and will not be disclosed.
98 "What is the authoritative ITSM / ticketing system currently in use across .edu, NIPR, and
SIPR?"
Ticketing system of record
The unclassified ITSM software platform is IL2 EDU Net and the enterprise MCEN (NIPR/SIPR) utilize separate, distinct ticketing systems. Brand names of the current and emerging platforms will not be
"What is the inventory of AV/VTC control systems (Crestron, Extron, Cisco CMS) and total endpoint counts?"
AV equipment makes and models
Room counts are provided in PWS
pp. 3-4. The Government utilizes standard, commercially available AV/VTC control systems and endpoints to support its educational spaces. Specific hardware brands, model numbers, and exact device counts are considered proprietary operational details and will not be
100 "Does EDCOM maintain its own Cisco Meeting Server (CMS) or Edge Border Controllers?"
VTC core architecture
The specific presence, hosting, and configuration of Cisco Meeting Servers (CMS) or Edge Border Controllers on the EDU Net are OPSEC-sensitive and will not be disclosed; all boundary defense and video bridging capabilities are fully Government-Furnished Services
(GFS).
101 "Does Breckinridge Hall SVTC suite connect to SIPRNet, and what COMSEC devices are managed?"
SVTC encryption boundaries
PWS §4.14.4 notes COMSEC equipment exists; specific models and circuit links are not disclosed due to security reasons.
Specific classified network drops, SIPRNet routing pathways, and serial numbers/types of active COMSEC equipment are strictly classified/controlled information and will not be disclosed; all COMSEC hardware and encryption management are retained entirely by the Government.
102 "Does Cable Management include Outside Plant (OSP) infrastructure (underground conduit, manholes) or only Inside Plant (ISP)?"
OSP vs. ISP cable scope
Only ISP.
103 "How many SharePoint sites, AFPIMS pages, Power BI reports, Power Apps, and Power
Knowledge management asset inventory
Quantity counts for web pages and automation flows are not provided in PWS §5.1.5. The exact counts of active SharePoint sites, AFPIMS pages, Power BI reports, Power Apps, Automate flows currently exist?"
and Power Automate flows fluctuate dynamically and will not be provided.
Offerors should assume standard, routine M365 content and page maintenance workloads for a regional academic organization.
104 "Does the contract include LMS administration or courseware development for professional military education?"
LMS and curriculum development scope
Not included in PWS §5 scope because it is handled through the College of Distance Education and Training.
Thematic Category 12: Specific Operational, Policy & Legal Considerations
No.
Question / Inquired Topic
Topic / Inquired Detail
Government Response
105 "Will the Government sponsor SOFA status (Article XIV), country clearance, and base privileges (APO, commissary, exchange, housing) for Okinawa?"
SOFA logistics and sponsorship
No, the Government will not sponsor Status of Forces Agreement (SOFA) status, country clearances, or base privileges (APO, commissary, exchange, housing) for contractor personnel; all local and international logistical support, housing, and legal compliance are the sole responsibility of the contractor.
106 "Are Defense Base Act (DBA) insurance, LQA, post allowances, and relocation reimbursable under CLIN 0006 or included in FFP labor?"
Okinawa ODC vs.
FFP labor cost treatment
DBA, hazard and hardship is covered as part of the cost for the OCONUS performance portion of the contract.
Living Quarters Allowances and relocation reimbursement are NOT sponsored by the Government and shall be accounted for in the price for services.
107 "Is a locally hired Japanese national or SOFA-eligible person acceptable for the Okinawa position?"
Host nation / local hiring eligibility
Please see PWS §4.14.8, which requires a Secret clearance for all on-site personnel. Please review requirements of a Secret clearance.
108 "Does the Service Contract Labor Standards (FAR 52.222-
41) apply, and will wage determinations be provided?"
Service Contract Act applicability
This contract is NOT subject to the Service Contract Labor Standard Act.
FAR 52.222-41 and Department of Labor wage determinations are not included in the solicitation package.
109 "Will the Government furnish specialized cable test equipment (Fluke, OTDR), fiber splicers, and Ekahau survey tools as GFP?"
GFP diagnostic tool coverage
PWS §4.17 states GFP includes desk, laptop, monitor, and phone. The Government will not provide a dedicated inventory of specialized cable testers, fiber splicers, or wireless survey tools as dedicated contractor GFP; any on-site Government-owned equipment may only be utilized by the contractor on a temporary, shared, as-available basis.
110 "Is Attachment 6 (GFP Checklist) required with proposal submission or completed after award?"
Attachment 6 submission timing
No, the GFP is provided because it will be part of the contract but is NOT required to be submitted with the proposal. FAR 52.212-1 Addendum List of Attachments states Attachment 6 is "to be filled out at the task order level."
111 "Are offerors expected to procure commercial software licenses under
Contractor software purchasing scope
The contractor is NOT expected to procure commercial software licenses. PWS section 4.19.2 applies
PWS §4.19.2, and how are they funded?"
to the extent the contractor’s work involves contractor and/or 3rd Party Software Licenses.
112 "How does the 50-mile local travel exclusion apply between Camp Pendleton and MCAS Miramar / MCRD San Diego?"
Camp Pendleton to Miramar travel reimbursement
PWS §4.11.1 excludes travel within a 50-mile radius of the assigned place of performance; specific mileage determinations are made per task order.
113 "Are COVID-19 vaccinations mandatory for contractor personnel?"
Vaccination policy There are no mandatory vaccination requirements. PWS §4.6 requires contractors to adhere to Government public health guidance; specific current vaccination mandates are not stated.
114 "Does EDCOM encourage contractor-proposed AI/RPA solutions under the DoD AI Strategy?"
Artificial Intelligence / RPA approach
PWS §5 does not include specific AI requirements because EDCOM is not seeking, and will not provide evaluation credit for, contractor-proposed AI or RPA solutions.
Offerors must propose strictly against the core IT service support requirements specified in the PWS.
115 "Would the Government consider establishing a Bidder's Library for technical documentation?"
Request for Bidder's Library
Bidder's Library is not and will not be established for this solicitation.
116 "Would the Government consider extending the proposal due date (e.g., by one week, or to 16 November 2026)?"
Proposal due date extension request
Proposal due date has been extended.
See RFP amendment 1.