FAR 52.212-2 Addendum Rev.pdf
PDF 230 KB Posted
- Solicitation number
- M0026427R0001
- Issued by
-
United States Marine Corps
About this file
FAR 52.212-2 Evaluation Criteria for Commercial Products and Services
This document establishes the evaluation methodology for a single Indefinite Delivery, Indefinite Quantity (IDIQ) contract award for EDCOM Information Technology Support Services (ITSS). The Government will apply a Best Value Tradeoff process following FAR 15 and Department of Defense Source Selection Procedures dated August 20, 2022. Award will be made to the responsible offeror whose proposal represents the best value considering both price and non-price factors. Proposals will be evaluated without discussions unless the Contracting Officer determines discussions necessary, and the competitive range may be limited to the most highly rated proposals if efficiency requires.
The evaluation consists of three factors in descending order of importance: Factor 1 (Technical Approach), Factor 2 (Past Performance), and Factor 3 (Price), with combined non-price factors significantly more important than price. Technical Approach evaluation assesses feasibility, innovation, and reliability across four task areas: Task 1 (Network and System Support with structured cabling and preventative maintenance), Task 2 (Cybersecurity and Information Security Support including RMF and Zero Trust implementation), Task 3 (Technical Support with multi-tiered helpdesk and Break/Fix execution), and Task 4 (AV/VTC systems support). The evaluation includes assessment of labor category qualifications, labor mix, staffing plan narrative addressing recruitment and retention strategies, teaming approach compliance with FAR 52.219-14 subcontracting limitations, and Mission-Essential Contractor Services Plan requirements. Past Performance evaluation examines recency and relevancy of contract references using DoD Source Selection Procedures methodology, considering CPARS, FAPIIS, eSRS databases, and Supplier Performance Risk System ratings. Price evaluation uses Total Evaluated Price (TEP) methodology covering Years 1-5 for CLINs 0001-0004 plus Government-provided travel and OCONUS Other Direct Costs for CLINs 0005-0006, with estimated spending allocations: Task 1 Network Support (54%), Task 2 Cybersecurity (20%), Task 3 Technical Support (17%), Task 4 AV/VTC (7%), Travel (1%), and ODC (1%).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised Initial and Sample Task Order Req.pdf | ||
| EDCOM ITSS PWS Rev.pdf | ||
| Attach 3- Pricing Template REVISED -Insert Offeror Name.xlsx | XLSX spreadsheet | |
| FAR 52.212-1 Addendum Rev.pdf | ||
| Attach 5 - Past Performance Questionnaire Rev.docx | DOCX document | |
| M0026427R0001 Amendment 2.pdf | ||
| EDCOM ITSS Q and A.pdf | ||
| Attach 4 - DD-254 REV Static Version.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FAR 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
(Deviation 2026-O0038)
1.0 Basis For Contract Award
1.1 The Government intends to award a single Indefinite Delivery, Indefinite Quantity (IDIQ) contract resulting from this solicitation to the responsible Offeror whose proposal represents the Best Value to the
Government, price and non-price factors considered.
The Government will execute the evaluation using the Best Value Tradeoff process, using FAR 15-
Contracting by Negotiations, adhering to the criteria set forth in the Department of Defense Source
Selection Procedures, dated 20 August 2022.
1.2 Evaluation Factors
The Government will evaluate proposals based on the following three evaluation factors:
Factor 1: Technical Approach
Factor 2: Past Performance
Factor 3: Price
The non-price factors (Factors 1-2) are listed in descending order of importance. All non-price factors when combined are significantly more important than Factor 3 - Price.
Prospective Offerors are forewarned that a proposal meeting the solicitation requirements with the lowest evaluated price may not be selected for award if a higher rated evaluated priced proposal is determined to be more advantageous to the Government. Additionally, proposals that have the highest rating may not be selected for award if the price is too high to justify paying the premium for the superior aspects of the proposal.
The Government intends to evaluate proposals and award a contract without discussions with Offerors.
However, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
2.0 Evaluation Methodology
2.1 Volume 1- Compliance Documentation:
The Government will conduct a verification of the proposal as it relates to adherence to FAR 52.212-1
Instruction to Offerors Addendum. This verification will be done to determine the completeness of the proposal as it relates to the solicitation instructions. Volume 1- Compliance Documents will be reviewed to determine proposal responsiveness.
2.2 Volume 2- Factor 1 – Technical Approach Evaluation:
The Technical Approach factor will include evaluation of the Offeror’s proposed Approach Description and Staffing Plan. This factor will be rated in accordance with the DoD Source Selection Procedures
Combined Technical/Risk Rating Method criteria.
The Government will conduct a verification of the proposal as it relates to adherence to FAR 52.212-1
Instruction to Offerors Addendum. This verification will be done to determine the completeness of the proposal as it relates to the solicitation instructions for this factor.
Evaluation criteria are as follows:
Approach Description:
The Government will assess the feasibility, innovation, and reliability of the Offeror’s technical approach to executing the following specific requirements of the EDCOM ITSS PWS Section 5:
• Task 1 Network and System Support:
• Capability to execute information systems network configuration, safeguarding, and maintenance to ensure uninterrupted operability.
• Approach to execute structured cabling.
• Approach to execute network preventative maintenance per PWS schedule.
• Task 2 Cybersecurity and Information Security Support:
• Approach to execute RMF, eMASS package authorization, Zero Trust implementation, and security incident response.
• Task 3 Technical Support:
• Approach to execute helpdesk support at multi-tiered levels, including response and resolution time adherence per PWS timelines.
• Approach to perform Break/Fix execution, to include repair completion timelines.
• Task 4 (AV/VTC Support):
• Approach to execute AV/VTC systems support to include system operations and troubleshooting during live academic and military events.
• Approach to execute preventative maintenance schedule considered for system operability
Evaluation will include assessing the Offeror’s described core complexities, execution strategies, processes/workflows, and risk mitigation plans that make up their proposed solution to executing these PWS tasks.
Staffing Plan:
The staffing plan evaluation will consist of an assessment of the proposed labor category qualifications, labor mix, strategy to recruit, retain and replace personnel, teaming approach and mission essential plan.
• Labor Category Qualifications: The Government will assess the qualifications proposed to execute the applicable PWS tasks. This includes ensuring the required security clearance and required DCWF certifications are proposed, as well as assessing the proposed education, experience, certifications and any other qualifications proposed for their suitability to perform the required PWS tasks.
• Labor mix (labor categories and hours): The Government will assess the suitability of the proposed labor mix (to include labor categories and proposed hours/FTEs) to execute the initial and sample task orders.
• Staffing Plan Narrative: The Government will assess the offeror’s strategy to recruit, retain and replace personnel per PWS section 4.15. This includes an assessment of the Offeror’s capability to obtain staff for task order execution, their plan to establish teaming arrangements/partnerships with subcontractors, how effective their approach to resource task orders under a non-recurring setting as an IDIQ, and their proposed timeline to staff contracts considering the security clearance requirements.
• Teaming Approach: An assessment of the offeror’s compliance with FAR 52.219-14 Limitation on Subcontracting criteria, considering the 1st tier subcontracting limitation applicable to this requirement.
• Mission Essential Plan: An assessment of the offeror’s Mission-Essential Contractor Services
Plan to ensure it meets all required elements prescribed in DFARS 252.237-7024.
2.3 Volume 3: Factor 2 – Past Performance Evaluation
Factor 2 will consist of an evaluation of the contractor’s past performance including an assessment of recency and relevancy of past performance contract references as it relates to this effort. The Government will conduct a structured past performance evaluation that examines each offeror’s demonstrated record of recent past performance on similar contracts to determine its relevance to the Government’s current needs, the quality of that performance, and the degree of confidence the Government places in each offeror’s ability to meet the solicitation requirements. The evaluation will be conducted based on the information provided by the offeror in RFP Attachment 2 Past Performance Relevancy Matrix. This includes the Offeror’s historical compliance with FAR 52.219-8 (utilization of small business concerns).
If a reference is determined to be ‘not recent’, it will not be evaluated for relevancy or quality. If a reference is found to be ‘not relevant’ it will not be evaluated for quality.
The Past Performance Relevancy Rating Method and Performance Confidence Assessments Rating
Method defined in the DoD Source Selection Procedures will be utilized in this evaluation. The evaluation will also consider the Offeror’s Supplier’s Risk Rating obtained from the Supplier
Performance Risk System under the Procurement Integrated Enterprise Environment (PIEE) web page.
Points of contact other than those identified by the Offeror may be contacted by the Government, and the information received from those other references may be used in the past performance evaluation. Past performance information may be obtained from any sources available to the Government, including, but not be limited to, the CPARS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; and interviews with Program
Managers, Contracting Officers, Contracting Officer’s Representatives, and the Defense Contract
Management Agency (DCMA). More recent and relevant performance may have a greater impact on
Performance Confidence Assessment than a less recent or relevant effort. The Government will give greater consideration to the contracts or efforts which the Government determines are most relevant.
The evaluation may consider past performance information regarding predecessor companies, or subcontractors that will perform major or critical aspects of the requirement when such information is relevant to the performance of requirements and services detailed in the PWS. The offeror must explain and detail the major or critical aspects of the requirement that the predecessor company or subcontractor is proposed to perform. Further, the Government will not evaluate the past performance of a subcontractor, predecessor company, or any other affiliated company unless the offeror includes in its Past
Performance volume documentation that such subcontractor, predecessor company, or other affiliated company is obligated to perform should a contract be awarded to the offeror. Such documentation must be in the form of documented affiliation, a copy of a teaming agreement, a copy of a joint venture agreement, or other documentation of a similarly binding nature demonstrating the other entity’s commitment.
If subcontractor past performance is provided as part of the most relevant contracts or efforts, the subcontractor experience will be given weight relative to the scope, magnitude, and complexity of the aspects of the work under the solicitation that the subcontractor is proposed to perform.
An offeror determined to have no record of relevant past performance (or in an instance where no information on the offeror’s past performance is available), will not be evaluated favorably or unfavorably for the Past Performance factor. In this case, the offeror’s past performance is unknown and assigned a performance confidence rating of “Neutral”.
The government will consider the quality of the records deemed recent and at least somewhat relevant past performance in the overall confidence rating determination.
The Government will conduct a verification of the proposal as it relates to adherence to FAR 52.212-1
Instruction to Offerors Addendum. This verification will be done to determine the completeness of the
2.4 Volume 4- Factor 3 – Price Evaluation:
The price analysis techniques set forth in FAR 15.4 will be used to determine whether the price offered is fair and reasonable. A proposed price is reasonable when it is fair to the buyer, seller, and reasonable considering the market conditions, available alternatives, and price-related factors as determined through one or more of the price analysis techniques. The Government will utilize the Total Evaluated Price (TEP) for best value and price reasonableness determination. The Government will also perform a review of unbalanced pricing.
The TEP is the sum of the initial and sample total proposed prices for Year 1 through 5 for CLINs 0001 through 0004 and the Government-provided travel and OCONUS Other Direct Cost amounts for CLINs
0005 and 0006.
The Government will conduct a verification of the proposal as it relates to adherence to FAR 52.212-1
Instruction to Offerors Addendum. This verification will be done to determine the completeness of the
2.5 OTHER INFORMATION TO CONSIDER:
The following percentage allocation of estimated spending by task is provided to the contractor for consideration in their proposal preparation. The Government reserves the right to consider or not consider the use of this information in the evaluation of any factors and best value determination of this solicitation.
This historical information is provided for information purposes only and no adjustment to the contract price shall be made if conditions are different in execution of this contract.
CLIN Task
Estimated
Spending
Allocation by Task
0001 Task 1- Network System Support 54%
0002 Task 2- Cybersecurity and Information Security Support 20%
0003 Task 3- Technical Support 17%
0004 Task 4- Audiovisual and Video teleconference Support 7%
0005 Travel 1%
0006 ODC 1%
Total 100%
(End of Provision Addendum)
| 1.0 Basis For Contract Award |
| 1.1 The Government intends to award a single Indefinite Delivery, Indefinite Quantity (IDIQ) contract resulting from this solicitation to the responsible Offeror whose proposal represents the Best Value to the Government, price and non-price factors c... |
| 1.2 Evaluation Factors |
| 2.0 Evaluation Methodology |
| 2.1 Volume 1- Compliance Documentation: |
| 2.2 Volume 2- Factor 1 – Technical Approach Evaluation: |
| 2.3 Volume 3: Factor 2 – Past Performance Evaluation |
| 2.4 Volume 4- Factor 3 – Price Evaluation: |
File details come from the government source that posted it. Updated .