M0026422Q0165 QASP (Attachment 1).docx

DOCX document 23 KB Posted

Attached to
TBS Wi-Fi
Solicitation number
M0026422Q0165
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) for solicitation number M0026422Q0165 from the United States Marine Corps for Wi-Fi equipment lease and services at The Basic School. The QASP establishes the methodology by which the contractor's performance will be monitored and assessed to ensure compliance with performance objectives outlined in the Performance Work Statement. Key performance characteristics to be evaluated include quality of work performed at 65% weighting, responsiveness and planning at 20% weighting, and management and administration at 15% weighting. Ratings will be generated monthly for each weighted performance area and aggregated using a moving average. Performance will be monitored through methods such as demonstrations, inspections using random or stratified sampling, and periodic or judgmental inspections. The QASP defines performance requirements and associated adjectival ratings of exceptional, very good, satisfactory, and unacceptable.

View the file

Other files

File Type Posted
M0026422Q0165 Amendment 0001.pdf PDF
M0026422Q0165.pdf PDF
M0026422Q0165 PPQ (Attachment S-1).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

1. Objective. This Quality Assurance Surveillance Plan (QASP) serves as the principal basis for assessing overall performance quality associated with the The Basic School (TBS) for Wi-fi equipment lease and services. This document will be used by the Government to assess the effectiveness of the Contractor’s quality with respect to management and technical services provided. This QASP provides the methodology by which the Contractor's performance will be monitored to determine compliance with established performance objectives and to establish performance benchmarks that ensure a quantifiable basis for measuring effectiveness. The plan is designed so that surveillance is limited to that which is necessary to verify the Contractor is performing management and technical services satisfactorily and relates directly to performance objectives of the performance objectives delineated in the PWS.

2. Government Surveillance. The COR will serve as the administering authority for this task, and her/his authority will be limited to administering specific technical aspects of the task order as set forth at Inspection and Acceptance. The COR will not provide direction that is outside the scope of responsibilities delineated under this task order and will defer any conditional interpretations to the Contracting Officer. The COR will:

· Maintain a detailed knowledge of the technical requirements of the contract;

· Document Contractor performance in accordance with the QASP;

· Identify and immediately forward notifications of deficient, or non-compliant performance to the Contracting Officer;

· Approve priorities of support, resources, and associated schedules.

3. Surveillance Methods. Surveillance of Contractor performance is the method used by the Government to determine whether the contractor is effectively and efficiently complying with all terms and conditions of the task order. In addition to statistical analysis, the functional expertise of the Technical Representative plays a critical role in adequately evaluating contractor performance. The below listed methods of surveillance shall be used in the administration of this QASP and the standards are delineated by WBS element in the Performance Requirements Survey (PRS) table:

Demonstration - A qualification method that is carried out by operation and relies on observable functional operation. It does not require the use of instrumentation or special test equipment;

Inspections: A qualitative inspections can be accomplished through one of the following techniques:

· Random or Stratified Sampling: With random sampling, services are sampled to determine if the level of performance is acceptable. Random sampling works best when the number of instances of the services being performed is very large and a statistically valid sample can be obtained. Stratified sampling focuses on selected parts of total contractor output for sampling. Computer programs may be available to assist in establishing sampling procedures.

· Periodic Inspection, Judgmental Inspection or Planned Sampling: This method, sometimes called "planned sampling, " consists of the evaluation of tasks selected on other than a 100% or random basis.

4. Performance Requirements. The performance requirements set forth in this section correspond to the material content cited in the PWS and the evaluation factors at FAR 52.212-2 ADDENDUM. Corresponding ratings will be generated for each of the weighted performance areas and aggregated monthly. The COR will track performance using a moving average and reconcile performance with the Contractors Program Mgr. This information will also be shared with the Contracting Officer and included in CPARs reports and any past performance assistance requests:

Performance Characteristic / Wt.
RFQ Relationship
Evaluation Rating[footnoteRef:1] [1: ]
Quality of Work Performed: .65
Technical Approach
Exceptional-100%

Very Good- 97% Satisfactory- 95% Unacceptable: < 95%

Responsiveness / Planning: .20
Technical Appraoch
Exceptional-100%

Very Good- 97% Satisfactory- 95% Unacceptable: < 95%

Management & Administration: .15
Technical Approach

Exceptional-100% Very Good- 97% Satisfactory- 95% Unacceptable: < 95%

Numerical values for the adjectival ratings are: >.95 – Excellent – Exceeds standard compliance; .85 - .94 standard compliance – Acceptable; and <.85 – unacceptable.

The criteria that will used to accomplish the evaluation ratings is derived from the RFQ and from the elements of performance determined to be most influential to performance.

PERFORMANCE REQUIREMENTS SURVEY (PRS)

Task
Performance Standards
Acceptable Quality Level (AQL)
Incentive/Remedy
Equipment Lease & Operability
Contractor provides equipment meeting the requirements established in the PWS.
· 100% compliance with DISA equipment list

· Resolve any equipment malfunctioning within 48 hours from notification

· Delivery of equipment list for review prior installation.

· Completion of equipment installation and configuration within the established delivery date

· 100% compliance with minimum Wi-Fi requirements per location

Exceptional-100% Very Good- 97%

Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer.

Network Security Requirements
Contractor provides services meeting the requirements established in the PWS.
· 100% firewall and information access control

· 95% successful content filtering

· 100% Wi-Fi signal encryption

· 100% Wireless Intrusion Prevention (WIP)s and Wireless Intrusions Detection (WID)s on all WAPs

· 100% TBS S-6 network access

· Access to portal or splash page solution for TBS to grant users and their devices access

· 100% compliance with Cyber Security Workforce (CSWF) qualifications under DOD 8570 and/or 8140 Exceptional-100% Very Good- 97%

Trends of less than acceptable performance could result in reductions in payments at the discretion of the Contracting Officer.