Item Number

Section Questions Answers

1 1. Item #0001 Concept Design

1.1. FFP, We are worried that any FFP offered outside the

limited technical details currently provided would be a high-risk guess. As a potential solution, may we offer NTE amount or would we be considered non-responsive?

1.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

Yes. Please refer to updated Instructions to Offerors (52.212-1) in responding to pricing on both the IDIQ (Section SF1499) and

Attachment A: Delivery Order 0001 and Sample Delivery Order

0002. The final package will be determined at the Delivery order level and after completion of the Concept Design Phase. At this time, not all treatments are available but the government determined that sufficient information was provided in order to propose to this solicitation.

2 1.2. Concept Design All Galleries 1.2.1 What is NMMC's vision and/or expectations for retrofitting the existing galleries?

The end state goal is to bring existing galleries to today's level of technology and standardize across all galleries. Added to PWS

2.1 2nd para

3 1.2. Concept Design All Galleries 1.2.2.Solicitation is missing Media/AV treatment packages for a majority of the elements. How would the NMMC like to see our responses for the areas with inadequate information?

At this time, not all treatments are available but the government determined that sufficient information was provided in order to propose to this solicitation. The Media/AV treatments were for informational purposes and to familiarize the vendors with the different types of media that may be produced and/or played on this hardware exhibits requirement.

4 2. Item #0002 Drawing

2.1. FFP, We are worried that any FFP offered outside the

limited technical details currently provided would be a high-risk guess. As a potential solution, could we offer NTE amount or would we be considered non-responsive?

If the answer to the above is YES, will the NMMC provide a detailed description or media treatment package? See response to Item Number 1.

5 2.2. Drawings All Galleries

2.2.1 What is NMMC's vision and/or expectations for

retrofitting the existing galleries? See response to Item Number 2.

6 2.2. Drawings All Galleries

2.2.2.Solicitation is missing Media/AV treatment packages for a majority of the elements. How would the NMMC like to see our responses for the areas with inadequate information?

See response to Item Number 3.

7 3.Item #0003 Prototypes

3.1. FFP, We are worried that any FFP offered outside the

limited technical details currently provided would be a high-risk guess. As a potential solution, could we offer NTE amount or would we be considered non-responsive?

3.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

8 3.2. Prototypes All Galleries 3.2.1. What are NMMC's vision and/or expectations for retrofitting the existing galleries? See response to Item Number 2.

9 3.2. Prototypes All Galleries 3.2.2.Does the NMMC anticipate prototyping every element in every Gallery?

No. Only those highly complex elements using unfamiliar technology will require prototyping.

10 3.2. Prototypes All Galleries

3.2.3. May NMMC provide an estimate of the number of

Prototype elements?

The number of prototypes will be proposed at the concept design phase by the contractor.

3.2 Prototypes All Galleries

3.2.4. Solicitation is missing Media/AV treatment packages for a majority of the elements. How would the NMMC like to see our responses for the areas with inadequate information? See response to Item Number 3.

12 4. Item #0004 Hardware

4.1. FFP, We are worried that any FFP offered outside the

limited technical details currently provided would be a high-risk guess.4.1.1 For this and the remaining CLIN’s it seems contradictory to list them as FFP, when the Solicitation clearly states there will be Individual Delivery Orders for each Gallery based on the results of the Design phases, which is currently under development. How do these work together? See response to Item Number 1.

13 4. Item #0004 Hardware`

4.1.2. Section 2.1 states the following in the last paragraph “It is also the responsibility of the Contractor, and their sub-contractors, to understand and adhere to the requirements of this contract and its delivery orders. It shall be understood that, for the sake of simplicity and to reduce redundancy, details listed herein are not always repeated on drawings. This is not meant to release the Contractor from meeting these requirements.” Considering the solution has not been design it is not possible to meet this level of detail, can you please clarify how the Contractor will be held to everything shown and not shown?

The contractor is responsible for meeting the requirements in concert with the IDIQ Contract and requisite delivery orders.

14 4. Item #0004 Hardware

4.1.3. Section 3.2 Concept Design informs the Contractor

“Concept design will include selection of hardware and production of concept drawings produced with enough detail to demonstrate how the audio, video and control hardware will work to present all media. 4.1.3.1. The associated hardware

CLIN’s request FFP line items pricing including Manufacture, part number and pricing contradict this section, how can we as bidders provide something from a phase that has not been completed yet?

See response to Item Number 1.

4.2 Hardware (\All Galleries) / 4.2.1 General

Hardware Questions

4.2.1.1. Does the NMMC want projection screens and

projection screen coatings included? Yes

4.2 Hardware (\All Galleries) / 4.2.1 General

Hardware Questions

4.2.1.1.1. If so can the NMMC provide estimated dimensions

of the surfaces? See Attachment D, Drawings for estimated dimensions.

4.2 Hardware (\All Galleries) / 4.2.1 General

Hardware Questions 4.2.2.What does NMMC consider Hardware?

Hardware is all physical components that comprise the completed system.

M00264-17-R-0018 Digital Exhibit -Amendment 0004 Attachment : Vendor Questions and Government Responses

4.2 Hardware (\All Galleries) / 4.2.1 General

Hardware Questions

4.2.2.1. Does the NMMC require every bracket and field device along with smaller integration and installation parts? Yes

4.2 Hardware (\All Galleries) / 4.2.1 General

Hardware Questions

4.2.3.What are NMMC's vision and/or expectations for retrofitting the existing galleries?

See response to Item Number 2.

4.2 Hardware (\All Galleries) / 4.2.1 General

Hardware Questions

4.2.4.Solicitation is missing Media/AV treatment packages for a majority of the elements. How would the NMMC like to see our responses for the areas with inadequate information?

See response to Item Number 3.

22 5. Item #0004, 5, 6, 7, 8AA, Gallery

#1 Leatherneck Gallery (Existing)/

5.1 Hardware

5.1.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive? 5.1.1.1 If the answer to the above is YES, will the

NMMC provide a detailed description or media treatment package?

See response to Item Number 1.

5. Item #0004, 5, 6, 7, 8AA, Gallery

#1 Leatherneck Gallery (Existing)/

5.1 Hardware 5.1.2 What are NMMC's vision and/or expectations for retrofitting?

See response to Item Number 2.

5. Item #0004, 5, 6, 7, 8AA, Gallery

#1 Leatherneck Gallery (Existing)/

5.2 Integration

5.2.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?/5.2.1.1. If the answer to the above is YES, will the

NMMC provide a detailed description or media treatment package?

See response to Item Number 1.

5. Item #0004, 5, 6, 7, 8AA, Gallery

#1 Leatherneck Gallery (Existing)/

5.3 Installation

5.3.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

5.3.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

5. Item #0004, 5, 6, 7, 8AA, Gallery

#1 Leatherneck Gallery (Existing)/

5.4. Programming/Test and

Adjust/Closeout

5.4.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

5.4.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

5. Item #0004, 5, 6, 7, 8AA, Gallery

#1 Leatherneck Gallery (Existing)/

5.5. Maintenance

5.5.1. FFP, it is unclear to us how we can provide per Gallery maintenance costs, if this is excluded from our response to the

Solicitation will it be considered non-responsive?

5.5.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

5. Item #0004, 5, 6, 7, 8AA, Gallery

#1 Leatherneck Gallery (Existing)/

5.5. Maintenance 5.5.1.2. Please confirm if Davis Bacon wage rates apply? No, this requirement does not involve any construction.

29 6. Item #0004, 5, 6, 7, 8AB, Gallery

#2 Gallery #2 Overlook/6.1.

Hardware (4)/6.1.1. AV201 Ground

Vehicle Interactive

6.1.1.1. There is no description or media treatment; if this is excluded from our response to the Solicitation will it be considered non-responsive? 6.1.1.2. If the answer to the above is YES, will the NMMC provide a detailed description or media treatment package?

See response to Item Number 3.

6. Item #0004, 5, 6, 7, 8AB, Gallery

#2 Gallery #2 Overlook/6.1.

Hardware (4)/6.1.2. AV202 Decision

Forcing Cases Operations Sea Angle

6.1.2.1. There is no description or media treatment; if this is excluded from our response to the Solicitation will it be considered non-responsive? 6.1.2.2. If the answer to the above is YES, will the NMMC provide a detailed description or media treatment package?

See response to Item Number 3.

6. Item #0004, 5, 6, 7, 8AB, Gallery

#2 Gallery #2 Overlook/6.1.

Hardware (4)/6.1.3. AV203 AAVP

Augmented Reality

6.1.3.1. There is no description or media treatment; if this is excluded from our response to the Solicitation will it be considered non-responsive? 6.1.3.2. If the answer to the above is YES, will the NMMC provide a detailed description or media treatment package?

See response to Item Number 3.

6. Item #0004, 5, 6, 7, 8AB, Gallery

#2 Gallery #2 Overlook/6.1.

Hardware (4)/6.1.4. AV204 Decision

Forcing Cases Operation Eastern

Front

6.14.1. There is no description or media treatment; if this is excluded from our response to the Solicitation will it be considered non-responsive? 6.1.4.2. If the answer to the above is YES, will the NMMC provide a detailed description or media treatment package?

See response to Item Number 3.

6. Item #0004, 5, 6, 7, 8AB, Gallery

#2 Gallery #2 Overlook/6.1.

Hardware (4)/6.1.5. AV205 Air

Vehicle Interactive

6.1.5.1. There is no description or media treatment; if this is excluded from our response to the Solicitation will it be considered non-responsive? 6.1.5.2. If the answer to the above is YES, will the NMMC provide a detailed description or media treatment package?

See response to Item Number 3.

M00264-17-R-0018 Digital Exhibit -Amendment 0004 Attachment : Vendor Questions and Government Responses

6. Item #0004, 5, 6, 7, 8AB, Gallery

#2 Gallery #2 Overlook/6.1.

Hardware (4)/6.1.6. AV206 Decision

Forcing Cases Knock on the Door

6.1.6.1. There is no description or media treatment; if this is excluded from our response to the Solicitation will it be considered non-responsive? 6.1.6.2. If the answer to the above is YES, will the NMMC provide a detailed description or media treatment package?

See response to Item Number 3.

6. Item #0004, 5, 6, 7, 8AB, Gallery

#2 Gallery #2 Overlook/6.1.

Hardware (4)/6.1.7. AV207 Intel

Interactive

6.1.7.1. There is no description or media treatment; if this is excluded from our response to the Solicitation will it be considered non-responsive? 6.1.7.2. If the answer to the above is YES, will the NMMC provide a detailed description or media treatment package?

See response to Item Number 3.

6. Item #0004, 5, 6, 7, 8AB, Gallery

#2 Gallery #2 Overlook/6.1.

Hardware (4)/6.1.8. AV208 Intel

Interactive

6.1.8.1. There is no description or media treatment; if this is excluded from our response to the Solicitation will it be considered non-responsive? 6.1.8.2. If the answer to the above is YES, will the NMMC provide a detailed description or media treatment package?

See response to Item Number 3.

6. Item #0004, 5, 6, 7, 8AB, Gallery

#2 Gallery #2 Overlook/6.2.

Integration

6.2.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

6.2.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

6. Item #0004, 5, 6, 7, 8AB, Gallery

#2 Gallery #2 Overlook/6.3.

Installation

6.3.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

6.3.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

6. Item #0004, 5, 6, 7, 8AB, Gallery

#2 Gallery #2 Overlook/6.4.

Programming/Test and

Adjust/Closeout

6.4.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

6.4.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

6. Item #0004, 5, 6, 7, 8AB, Gallery

#2 Gallery #2 Overlook/6.5.

Maintenance

6.5.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

6.5.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

7. Item #0004, 5, 6, 7, 8AC, Gallery

#3 Scuttlebutt Theater / 7.1 Hardware 7.1.1. FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

7.1.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

7. Item #0004, 5, 6, 7, 8AC, Gallery

#3 Scuttlebutt Theater / 7.2

Integration

7.2.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

7.2.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

7. Item #0004, 5, 6, 7, 8AC, Gallery

#3 Scuttlebutt Theater / 7.3

Installation

7.3.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

7.3.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

7. Item #0004, 5, 6, 7, 8AC, Gallery

#3 Scuttlebutt Theater / 7.4

Programming/Test and

Adjust/Closeout

7.4.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

7.4.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

7. Item #0004, 5, 6, 7, 8AC, Gallery

#3 Scuttlebutt Theater / 7.5

Maintenance

7.5.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

7.5.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

7. Item #0004, 5, 6, 7, 8AC, Gallery

#3 Scuttlebutt Theater / 7.5

Maintenance

7.5.1.2. Please confirm if Davis Bacon wage rates apply? See response to Item Number 28.

M00264-17-R-0018 Digital Exhibit -Amendment 0004 Attachment : Vendor Questions and Government Responses

8.Item #0004, 5, 6, 7, 8AD Gallery

#4 Making Marines 8.1. FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

8.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

8.Item #0004, 5, 6, 7, 8AD Gallery

#4 Making Marines/8.2 Integration 8.2.1. FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

8.2.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

8.Item #0004, 5, 6, 7, 8AD Gallery

#4 Making Marines/8.3 Installation 8.3.1. FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

8.3.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

8.Item #0004, 5, 6, 7, 8AD Gallery

#4 Making Marines/8.4

Programming/Test and Adjust

Closeout

8.4.1. FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

8.4.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

Item #0004, 5, 6, 7, 8AD Gallery #4

Making Marines/8.5 Maintenance (8) 8.5.1. FFP, it is unclear to us how we can provide per Gallery maintenance costs, if this is excluded from our response to the

Solicitation will it be considered non-responsive?

8.5.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

52 Item #0004, 5, 6, 7, 8AD Gallery #4

Making Marines/Maintenance (8) 8.1.1.1. Please confirm if Davis Bacon wage rates apply? See response to Item Number 28.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk 9.1. FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

9.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.2 AV501

Transformation Narrative 9.2.1.Is a Media Treatment available for this element?

See response to Item Number 3.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.3 AV502

Decision Forcing Cases Intro 9.3.1.Is a Media Treatment available for this element?

See response to Item Number 3.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.3 AV502

Decision Forcing Cases Intro

9.3.2. There is no detail drawing available in the package for this, can one be made available?

See Attachment D, Drawings for estimated dimensions. The detail drawing will be finalized within the concept design phase.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.4 AV503

9.4.1. The Media Narrative identifies this as (No better friend)

The Drawing package identifies this as (Marine Security

Guard), which is correct?

No Better Friend is the Exhibit Scene, and Marine Security

Guards is one element of the Exhibit Scene

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.4 AV503

9.4.2. The media treatment described in the media treatments

do not match the intent presented in the drawings, please provide clarification?

Drawings describe physical space, media treatments describe the intent and detail of the AV pieces.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.5 AV504

9.5.1. The Media Narrative identifies this as (No better friend)

The Drawing package identifies this as (Non Combat

Missions), which is correct?

No Better Friend is the Exhibit Scene, and Non Combat

Missions is one element of the Exhibit Scene.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.5 AV504

9.5.2. The media treatment described in the media treatments

do not match the intent presented in the drawings, please provide clarification?

Media treatments describe the intent and detail of the AV pieces and are accurate for purposes of this solicitation.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.6 AV505 A

Grateful Nation

9.6.1. The media treatment described in the media treatments

do not match the intent presented in the drawings, please provide clarification? See response to Item Number 60.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.7 AV506

Families Information Storm

9.7.1 No media treatment provided See Attachment D, Drawings for complexity of exhibit.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.7 AV506

Families Information Storm 9.7.2 What is the proposed screen surface? Is this to be included in the costs?

This will be determined by the contractor at the Concept Design

Phase and finalized at the Delivery Order level.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.8 AV507 Marine

Families Interactive

9.8.1. The media treatment described in the media treatments

do not match the intent presented in the drawings, please provide clarification? Media treatment AV507 was not provided in Attachment C.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.9 AV508 Marine

Families Interactive

9.9.1. The media treatment described in the media treatments

do not match the intent presented in the drawings, please provide clarification? Media treatment AV508 was not provided in Attachment C.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.10 AV509

Marine Families Interactive

9.10.1. The media treatment described in the media treatments do not match the intent presented in the drawings, please provide clarification? Media treatment AV509 was not provided in Attachment C.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.11 AV510

9.11.1. The media treatment described in the media treatments do not match the intent presented in the drawings, please provide clarification? Media treatment AV510 was not provided in Attachment C.

M00264-17-R-0018 Digital Exhibit -Amendment 0004 Attachment : Vendor Questions and Government Responses

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.11 AV510

9.11.2. There are two names for this element in the package, which is correct?

9.11.2.1. Drawing iX00-08 Identifies AV0510 as (Marines

Are) Drawing iX05-27 Identifies this as Enduring Mission, which is correct?

Enduring Mission is correct.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.12 Integration 9.12.1. FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

9.12.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.13 Installation 9.13.1. FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

9.13.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.14 Installation 9.14.1. FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

9.14.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

9. Item #0004, 5, 6, 7, 8AE Gallery

#5 Legacy Walk / 9.15 Maintenance 9.15.1. FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

9.15.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

10. Item #0004, 5, 6, 7, 8AF Gallery

#6 The New Republic / 10.1 10.1. FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

10.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

10. Item #0004, 5, 6, 7, 8AF Gallery

#6 The New Republic / 10.2

Installation

10.2.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

10.2.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

10. Item #0004, 5, 6, 7, 8AF Gallery

#6 The New Republic / 10.3

Programming/Test and

Adjust/Closeout

10.3.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

10.3.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

10. Item #0004, 5, 6, 7, 8AF Gallery

#6 The New Republic / 10.4

Maintenance 10.4.1. FFP, it is unclear to us how we can provide per Gallery maintenance costs, if this is excluded from our response to the

Solicitation will it be considered non-responsive?

10.4.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

11. Item #0004, 5, 6, 7, 8AG Gallery

#7 Global Expansion / 11.1 11.1.1 FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

11.1.2.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

11. Item #0004, 5, 6, 7, 8AG Gallery

#7 Global Expansion / 11.2

Integration

11.2.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

11.2.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

11. Item #0004, 5, 6, 7, 8AG Gallery

#7 Global Expansion / 11.3

Installation

11.3.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

11.3.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

M00264-17-R-0018 Digital Exhibit -Amendment 0004 Attachment : Vendor Questions and Government Responses

11. Item #0004, 5, 6, 7, 8AG Gallery

#7 Global Expansion / 11.4

Programming/Test and

Adjust/Closeout

11.4.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

11.4.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

11. Item #0004, 5, 6, 7, 8AG Gallery

#7 Global Expansion / 11.5

Maintenance 11.5.1. FFP, it is unclear to us how we can provide per Gallery maintenance costs, if this is excluded from our response to the

Solicitation will it be considered non-responsive?

11.5.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

11. Item #0004, 5, 6, 7, 8AG Gallery

#7 Global Expansion / 11.5

Maintenance

11.5.1.2. Please confirm if Davis Bacon wage rates apply? See response to Item Number 28.

12. Item #0004, 5, 6, 7, 8AH Gallery

#8 WW1 / 12.1 12.1 FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

12.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

12. Item #0004, 5, 6, 7, 8AH Gallery

#8 WW1 / 12.2 Integration (5) 12.2.1 FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

12.2.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

12. Item #0004, 5, 6, 7, 8AH Gallery

#8 WW1 / 12.3 Installation (6) 12.3.1 FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

12.3.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

12. Item #0004, 5, 6, 7, 8AH Gallery

#8 WW1 / 12.4 Programming/Test and Adjust/Closeout (7)

12.4.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

12.4.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

12. Item #0004, 5, 6, 7, 8AH Gallery

#8 WW1 / 12.5 Maintenance (8)

12.5.1. FFP, it is unclear to us how we can provide per Gallery maintenance costs, if this is excluded from our response to the

Solicitation will it be considered non-responsive?

12.5.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

12. Item #0004, 5, 6, 7, 8AH Gallery

#8 WW1 / 12.5 Maintenance (8)

12.5.1.2. Please confirm if Davis Bacon wage rates apply? See response to Item Number 28.

13. Item #0004, 5, 6, 7, 8AJ Gallery

#9 The Interwar Years / 13.1 13.1 FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

13.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

13. Item #0004, 5, 6, 7, 8AJ Gallery

#9 The Interwar Years / 13.2

Integration (5)

13.2.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

13.2.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

13. Item #0004, 5, 6, 7, 8AJ Gallery

#9 The Interwar Years / 13.3

Installation (6)

13.3.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

13.3.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

13. Item #0004, 5, 6, 7, 8AJ Gallery

#9 The Interwar Years / 13.4

Programming/Test and

Adjust/Closeout (7)

13.4.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

13.4.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

M00264-17-R-0018 Digital Exhibit -Amendment 0004 Attachment : Vendor Questions and Government Responses

13. Item #0004, 5, 6, 7, 8AJ Gallery

#9 The Interwar Years / 13.5

Maintenance (8) 13.5.1. FFP, it is unclear to us how we can provide per Gallery maintenance costs, if this is excluded from our response to the

Solicitation will it be considered non-responsive?

13.5.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

13. Item #0004, 5, 6, 7, 8AJ Gallery

#9 The Interwar Years / 13.5

Maintenance (8) 13.5.1.2. Please confirm if Davis Bacon wage rates apply? See response to Item Number 28.

14. Item #0004, 5, 6, 7, 8AK Gallery

#10 WWII / 14.1 14.1 FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

14.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

14. Item #0004, 5, 6, 7, 8AK Gallery

#10 WWII / 14.2 Integration (5) 14.2.1 FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

14.2.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

14. Item #0004, 5, 6, 7, 8AK Gallery

#10 WWII / 14.3 Installation (6) 14.3.1 FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

14.3.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

14. Item #0004, 5, 6, 7, 8AK Gallery

#10 WWII / 14.4 Programming/Test and Adjust/Closeout (7)

14.4.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

14.4.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

14. Item #0004, 5, 6, 7, 8AK Gallery

#10 WWII / 14.5 Maintenance (8)

14.5.1. FFP, it is unclear to us how we can provide per Gallery maintenance costs, if this is excluded from our response to the

Solicitation will it be considered non-responsive?

14.5.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

14. Item #0004, 5, 6, 7, 8AK Gallery

#10 WWII / 14.5 Maintenance (8)

14.5.1.2. Please confirm if Davis Bacon wage rates apply? See response to Item Number 28.

15. Item #0004, 5, 6, 7, 8AL Gallery

#10 Korean War / 15.1 15.1 FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

15.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

15. Item #0004, 5, 6, 7, 8AL Gallery

#10 Korean War / 15.2 Integration

(5)

15.2.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

15.2.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

15. Item #0004, 5, 6, 7, 8AL Gallery

#10 Korean War / 15.3 Installation

(6)

15.3.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

15.3.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

15. Item #0004, 5, 6, 7, 8AL Gallery

#10 Korean War / 15.4

Programming/Test and

Adjust/Closeout (7)

15.4.1 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

15.4.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

15. Item #0004, 5, 6, 7, 8AL Gallery

#10 Korean War / 15.5 Maintenance

(8) 15.5.1. FFP, it is unclear to us how we can provide per Gallery maintenance costs, if this is excluded from our response to the

Solicitation will it be considered non-responsive?

15.5.1.1. If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package?

See response to Item Number 1.

15. Item #0004, 5, 6, 7, 8AL Gallery

#10 Korean War / 15.5 Maintenance

(8) 15.5.1.2. Please confirm if Davis Bacon wage rates apply? See response to Item Number 28.

M00264-17-R-0018 Digital Exhibit -Amendment 0004 Attachment : Vendor Questions and Government Responses

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.1 17.1 FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

17.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.2

17.2. AV1302 Forward Deployed Advance Organizer 17.2..1

No questions

No Response needed.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.3 17.3. AV1302 Forward Deployed Exit 17.3.1 The drawing detail for this element on drawing iX13-08 has black

(unreadable) flags on the drawing, can this please be corrected and reissued? 17.3.1 This is a problem on many of the drawings, can the entire drawing package be reprinted making sure all information flaags are readable? Please check your technical settings as the government verified by downloading via Fedbizopps.gov and this is not blocked out.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.4

AV1303 Decision Forcing Cases-

Grenada

17.4.1 Drawig iX13-10 details are blacked out please reprint?

17.4.2 Drawig iX13-12 details are blacked out please reprint?

17.4.3 Drawig iX13-13 details are blacked out please reprint?

See response to Item Number 110.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.5

AV1304 Gulf War Stories &

Environment 17.5.1 No questions See response to Item Number 108.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.6

AV1305 My Life Oral istory- Gulf

War

17.6.1 Drawig iX13-13 details are blacked out please reprint? See response to Item Number 110.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.7

AV1306 AAVP Story

17.7.1 No immdediate questions, can you please provide

reprinted drawings with flags unreadable? See response to Item Number 110.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.8

AV1307 Interactive Maps- #1

17.8.1 There are no details on what makes this an Interactive

Element? Can you please provide further specifications and details?

Visitors will interface with this exhibit via touch screen. This will be determined by the contractor at the Concept Design

Phase and finalized at the Delivery Order level.

115 17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.9

AV1308 Interactive Maps- #2

17.9.1 There are no details on what makes this an Interactive

Element? Can you please provide further specifications and details? See response to Item Number 114.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.10

AV1309 Interactive Maps- #3 17.10.1 There are no details on what makes this an Interactive

Element? Can you please provide furhter specifications and details? See response to Item Number 114.

117 17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.11

AV1311 Interactive Maps- #4

17.11.1 There are no details on what makes this an Interactive

Element? Can you please provide furhter specifications and details? See response to Item Number 114.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.12

AV1309 Interactive Maps- #5

17.12.1 There are no details on what makes this an Interactive

Element? Can you please provide furhter specifications and details? See response to Item Number 114.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.13

AV1312 Life Aboard Ship

17.13.1 No questions No Response needed.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.14

Integration

17.14 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

17.14.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.15

Installation

17.15 FFP, there is insufficient details provided in the

solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

17.15.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.16

Programming/Test and

Adjust/Closeout 17.16.1 FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive?

17.16.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

See response to Item Number 1.

M00264-17-R-0018 Digital Exhibit -Amendment 0004 Attachment : Vendor Questions and Government Responses

17. Item #0004, 5, 6, 7, 8AN Gallery

#13 Forward Deployment 17.17

Maintenance

17.17.1 FFP, it is unclear to us how we can provide per Gallery maintenance costs, if this is excluded from our response to the solicitation will it be considered non-responsive?

17.17.1.1 If the answer to the above is YES, will the NMMC

provide a detailed description or media treatment package

17.17.1.2 Please confirm if Davis Bacon wage rates apply?

See response to Item Number 1.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan

18.1.FFP, there is insufficient details provided in the solicitation to provide an FFP price. This would typically be detailed during the design phase; if this is excluded from our response to the Solicitation will it be considered non-responsive? 18.1.1. If the answer to the above is YES, will the

NMMC provide a detailed description or media treatment package? See response to Item Number 1.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.2.

AV1401 COC Advanced Organizer

18.2.2. No Questions No Response needed.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.3.

AV1402 My Life Oral History – OEF

18.3.1. Please provide a Media Treatment for this Element?

Additional details on NMMC’s vision and expectations will help us provide FFP for this element. See response to Item Number 3.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.4. 18.4.

AV1403 Interactive Map – OEF 1

18.4.1. Please provide a Media Treatment for this Element?

Additional details on NMMC’s vision and expectations will help us provide FFP for this element. See response to Item Number 3.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.5.

AV1404 Combat Footage

18.1.1. Please provide a Media Treatment for this Element?

Additional details on NMMC’s vision and expectations will help us provide FFP for this element. See response to Item Number 3.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.6.

AV1405 My Life Oral History – OEF

18.6.1. Please provide a Media Treatment for this Element? Additional details on

NMMC’s vision and expectations will help us provide FFP for this element. See response to Item Number 3.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.7.

AV1406 My Life Oral History – OEF

18.7.1. Please provide a Media Treatment for this Element? Additional details on

NMMC’s vision and expectations will help us provide FFP for this element. See response to Item Number 3.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.8.

AV1407 Marine Life – Camel Spider

Effect

18.8.1. Please provide a Media Treatment for this Element? Additional details on

NMMC’s vision and expectations will help us provide FFP for this element. See response to Item Number 3.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.9.

AV1408 Not Used

18.9 AV1408 Not Used See response to Item Number 3.

M00264-17-R-0018 Digital Exhibit -Amendment 0004 Attachment : Vendor Questions and Government Responses

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.10.

AV1409 Fly Storm

18.10.1. Please provide a Media Treatment for this Element?

Additional details on NMMC’s vision and expectations will help us provide FFP for this element. See response to Item Number 3.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.11.

AV1410 Interactive Map – OEF

18.11.1. Please provide a Media Treatment for this Element?

Additional details on NMMC’s vision and expectations will help us provide FFP for this element. See response to Item Number 3.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.12.

AV1411 Decision-Forcing Cases –

March to Baghdad

18.12.1. Please provide a Media Treatment for this Element?

Additional details on NMMC’s vision and expectations will help us provide FFP for this element. See response to Item Number 3.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.13

AV1412 Decision-Forcing Cases –

Sandstorm

18.13.1. Please provide a Media Treatment for this Element?

Additional details on NMMC’s vision and expectations will help us provide FFP for this element. See response to Item Number 3.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.14

AV1413 My Life Oral History – OEF

18.14.1. Please provide a Media Treatment for this Element?

Additional details on NMMC’s vision and expectations will help us provide FFP for this element. See response to Item Number 3.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.15.

AV1414 FARP Environment

18.15.1. No Questions No Response needed.

18.Item #0004, 5, 6, 7, 8AP Gallery

#14 Iraq and Afghanistan 18.16.

AV1415 FARP Pepper’s Ghost Effect

18.16.1.

This is the start of the file's text. The full file is on GovTribe.