PWS Attachment I Final Phase Network Process Document
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
October 23, 2012
Final Phase Schedule Rev 3
Legend
Develop Topical Matrix
Contract Historians/ Consultants
Research Prospective
Topics
Completed Storyline/
Matrix
Vetting w/ Plank Owners
Develop Topical
Adjacency Plan
Develop Storyboards
Final Story
Review
Identify SOL’s
Identify Children/
Family Learning
Opportunities
Identify Learning
Topics
Prioritize Learning
Outcomes Vetting
Prop List
Education Report
Mock-Up Exhibits
Procure Props
Finalize Exhibits & Include in Drawing Package
Educational Programming
Storyline Topics
Micro Artifacts
Select
COR/
ACOR/
SME
Select Potential Artifacts
Vetting
Initial Artifact
List
Required Conservation
List
Final Artifact
List
Condition Reports
Artifact Data
Sheets
Conservation Plan/SOW
Display Case
Mock- Ups
Conserve Artifacts
Display Case
Layouts
Text Develop
Interdisciplinary Teams (4)
Writing Style Guide
Draft Artifact Labels
Research Topics
Draft Gallery
Treatments
Final Artifact Labels
Draft Physical Gallery Graphic
Text Draft Image
Captions Vetting
Complete All Gallery Draft Text
Vetting Completed
Text
Dioramas
Tableaus
Cast Figures
Select
COR/
ACOR/
SME
Select
COR/
ACOR/
SME
Select
COR/
ACOR/
SME
Research Story
Develop Treatments
Draft Layout
Research Develop Stategy
Determine Fabrication
Strategy Design Package
Award Contract
Mock-Up Interactive
Develop Treatments
Draft Treatments Gather
Texture Research
Prop List
Samples
Obtain Props
Props Obtained/ Ready for
Installation
Write
SOW/
TEP
Write
SOW/
TEP
Award Contract
Adjustments as/if Needed
Vetting
Demographic Data Sheets
Concept Sketches
Vetting
Model Search
Prop List
Equipment/ Gear
Search Photo Shoot
Equipment/ Gear
Procurement
Write
SOW/
TEP
Award ContractReview
Against Diversity
Rules
Consider Model w/Story
Model Selection Primary/ Alternate
Vetting
Images Develop
Interdisciplinary Team
Research and Obtain (copyright free)
Review Against
Diversity Rules
Final Image
Research List
Completed Image List
Vetting
Contract to obtain rights
Obtain Copyright
Images
Maps
List Maps
Needed
Provide Reference
Maps
Create Rough Maps
Vetting Generate
Final Maps
Graphics
Select
COR/
ACOR/
SME
Update Style Guide
Create Templates
Assign Numbers
Graphic Schedule
Macro Artifacts
Identify Potential Artifacts
Artifact List
Select
COR/
ACOR/
SME
Vetting
Condition Reports
Engineering Studies
Curator Reports
Determine Color
Schemes/ Markings
Color Elevations
Restoration
SOW
Transportation Plan
Restore Artifacts
Print 3D Models
Restoration Report
Transport
Installation
Exhibit Lighting
Select
COR/
ACOR/
SME
Light Level
Standards
Determine Fiber Optic
Requirements
Develop Treatments
Complete Design
Package & Specs
Conceptual Lighting
Plot Vetting
Lighting Show Design (AV Media)
Complete Lighting
Plot
Complete Equipment
Spec's
Write
SOW/
TEP
Award Contract
Programming Install, Test and Adjust
AV
Media
Develop Interdisciplinary
Teams (4)
Select COR/
ACOR/SME
Determine Media Topics
Draft Media
Treatments Vetting
Complete Treatments
Create Storyboards
Write Scripts
Vetting
Completed Scripts
Write
SOW/
TEP
Contract Award
Vet Narrators
Shoot Edit Vetting Install, Test and Adjust
Exhibit Design/
Fabrication
Select
COR/
ACOR/SME
Complete Exhibit
Concept Renderings
Concept Drawing
Plan/ Elevations
List of Potential
Interactives
Immersion Draft
Treatment
Contract Drawing Package
Labor
Facility Impact Study
Produce Samples
Build Gallery Models
Mock- Ups/
Proof of Concept
Completed Design
Package
Fabricate Mounts
AV
System
Select COR/
ACOR/SME
Draft Hardware
Plan
Complete Design
Package & Specs
Write
SOW/
TEP
Off Site Test and Buy Off
Install, Test and Adjust
Facilities/ Security
Case Security
Drawings
ADA
Safety Review
Job Site Safety/ Security
Plan
Badge & Site
Access
Contracting Decide SOO vs.
SOW
Legal Review
Publish Contracting
Strategy
Award Contract
Write
SOW/
TEP
Complete Fabrication Drawings
Fabricate Install
Test and Adjust
Additional Considerations
Communications Gallery Guide Audio Tour
Stakeholders
Develop Stakeholder
List (Internal
&External)
Vetting/ Select
Meet Stakeholders
Research Existing Media
MCHF
Construction Begins June
MCHF
Construction
Ends June
Install, Test and Adjust
Obtain Images
Install, Test and Adjust
Simulator
Leatherneck Gallery Changes
Install, Test and Adjust
MOH
Theater
Install, Test and Adjust
2nd Deck Exhibit Hallway
Install, Test and Adjust
Art Gallery Install, Test and Adjust
Legacy Walk
Install, Test and Adjust
Education/ Childrens Area
Install, Test and Adjust
Sports Hall of Fame
Install, Test and Adjust
Gallery 9 Install, Test and Adjust
Changing Gallery
Install, Test and Adjust
FY 2013 FY 2014 FY 2015
Start
Process
Deliverable/ Document
Vetting
End
Vetting Production
Rough Concept Sketches
Graphic File
Production
Fabricate
Fabricate
Install, Test and Adjust
Install, Test and Adjust
End FY
End FY
End
FY
End
FY
End
FY
End
FY
End
FY
Final Phase Schedule
10/23/2012
| Final Phase Schedule Rev4.vsd |
| Page-1 |
| Page-2 |