08-T-9023 RSC Amend 01.doc

DOC document 38 KB Posted

Attached to
Upgrade of Rotary Screw Compressor (RSC)
Solicitation number
M00146-08-T-9023
Issued by

About this file

Amendment 0001

View the file

Other files

File Type Posted
08-T-9023 Amend 0002 Canx.doc DOC document
08-T-9023 Amended SOW - 9-05-08.doc DOC document
08-T-9023 Client Auth Ltr.doc DOC document
08-T-9023 Past Performance Questionnaire.doc DOC document
08-T-9023 Solicitation.doc DOC document
DSC_1028.JPG JPG image
DSC_1027.JPG JPG image
DSC_1034.JPG JPG image
DSC_1032.JPG JPG image
DSC_1037.JPG JPG image
DSC_1030.JPG JPG image
DSC_1029.JPG JPG image
DSC_1033.JPG JPG image
DSC_1031.JPG JPG image
DSC_1026.JPG JPG image
DSC_1035.JPG JPG image
DSC_1036.JPG JPG image
DSC_1025.JPG JPG image
08-T-9023 Site Visit Instructions.doc DOC document
Equipment Calibration Procedure DI-R-7065.pdf PDF
Lockout tagout procedure -- Attachment12.pdf PDF
NAVAIRDEPOT 5090 1B -Chapt 3-5090 1_CH1.pdf PDF
Updated Draft SPEC-WFD-Rotary Screw Compressor.doc DOC document
MSS SP-69 -- pipe hangers and supports.pdf PDF
16402N Interior Distribution System.pdf PDF
Test Procedure DI-NDTI-80603.pdf PDF
Site Preparation Requirements and Installation Plan DI-MGMT-80033.pdf PDF
Design Review Data Package DI-E-5423.pdf PDF
PE20440M_1-1 Drawing.pdf PDF
08-T-9023 Site Visit Instructions.doc DOC document
Maintenance Test and Support Equipment Requirements List DI-ILSS-80294A.pdf PDF
Recommended Spare Parts List for Spares DI-ILSS-80293B.pdf PDF
Test Report DI-NDTI-80604.pdf PDF
Acceptance Test Plan DI-QCIC-80553.pdf PDF
Manuals Technical Modified Commercial DI-M-2071.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

CORRECTIONS TO SOW

As a result of technical questions to clarify the Government’s Statement of Work (SOW), the following paragraphs in the SOW are being amended.

a) Paragraph 2.1. Government documents. The Government has amended the SOW to add the General Building Requirements, UFC 1-200-1.

b) Paragraph 2.2.1. Non-Government Documents. The SOW is being amended to delete a duplicate reference for the National Electrical Code NFPA 70.

c) Paragraph 2.2.1. Non-Government Documents. The SOW is being amended to add the reference for the Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA)

d) Under Paragraph 3.2.1. Equipment Installation. Paragraph 3.2.1.b.(13) has been amended and clarifies the Government’s requirement in the SOW for weatherproofing of the existing shed.

e) Paragraph 3.2.2. Contractor’s License has been amended in the SOW and clarifies the Government’s requirement for licensing of general contractors.

f) Paragraph 3.3.1.2. Capacity has been amended in the SOW to clarify the Government’s requirement for “motor controlled by a variable frequency drive.”

g) Paragraph 3.3.1.8. Air Dryer Instrumentation and Controls has been amended to clarify the intent of the connection to the existing Johnson METASYS system.

h) Paragraph 3.3.4.2.13 Air Dryer Instrumentation and Controls has been amended to clarify the intent of the connection to the existing Johnson METASYS system.

i) Paragraph 3.3.5.4. Electrical System has been amended to clarify what must be furnished by the contractor and the Government.

j) Paragraph 3.4.1.1. Compressed Air Piping has been amended to clarify the Government’s intent for the site test.

k) Paragraph 3.6.5.1. Contractor work scheduling considerations has been amended to clarify the Government’s requirement to have existing 50HP and 25HP compressors and dryer to remain in operation during the entire fourteen (14) day installation period.

l) Paragraph 3.6.5.1.1. Optional portable units to supplement production needs, is a new paragraph.

m) Paragraph 5.1. Publication Sources has been amended to add the contact information and phone number for the Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA)

INSTRUCTIONS TO OFFERORS

Paragraph 2)a.i.1 of the Instructions to Offerors on Page 54 of the solicitation is corrected to read as follows:

The proposal shall provide a general description of how the OEM will meet and/or exceed the government’s requirement. This acquisition is conducted pursuant to FAR Subpart 13.5, and will utilize the streamlined evaluation procedures set forth in FAR Part 13. As such, the Government does not desire the submission of detailed quotes addressing each aspect of the specification in response to this solicitation. Rather, the Government seeks quotes that acknowledge compliance with the requirements set forth in the Statement of Work and highlight any portions of the proposal that offer innovative solutions or exceed the government’s request. In order to assist in evaluating quotes, the Government does require that prospective offerors provide detailed information regarding their approach to the following paragraphs of the SOW.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .