08-T-9023 RSC Amend 01.doc
DOC document 38 KB Posted
- Attached to
- Upgrade of Rotary Screw Compressor (RSC)
- Solicitation number
- M00146-08-T-9023
- Issued by
-
United States Marine Corps
About this file
Amendment 0001
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
CORRECTIONS TO SOW
As a result of technical questions to clarify the Government’s Statement of Work (SOW), the following paragraphs in the SOW are being amended.
a) Paragraph 2.1. Government documents. The Government has amended the SOW to add the General Building Requirements, UFC 1-200-1.
b) Paragraph 2.2.1. Non-Government Documents. The SOW is being amended to delete a duplicate reference for the National Electrical Code NFPA 70.
c) Paragraph 2.2.1. Non-Government Documents. The SOW is being amended to add the reference for the Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA)
d) Under Paragraph 3.2.1. Equipment Installation. Paragraph 3.2.1.b.(13) has been amended and clarifies the Government’s requirement in the SOW for weatherproofing of the existing shed.
e) Paragraph 3.2.2. Contractor’s License has been amended in the SOW and clarifies the Government’s requirement for licensing of general contractors.
f) Paragraph 3.3.1.2. Capacity has been amended in the SOW to clarify the Government’s requirement for “motor controlled by a variable frequency drive.”
g) Paragraph 3.3.1.8. Air Dryer Instrumentation and Controls has been amended to clarify the intent of the connection to the existing Johnson METASYS system.
h) Paragraph 3.3.4.2.13 Air Dryer Instrumentation and Controls has been amended to clarify the intent of the connection to the existing Johnson METASYS system.
i) Paragraph 3.3.5.4. Electrical System has been amended to clarify what must be furnished by the contractor and the Government.
j) Paragraph 3.4.1.1. Compressed Air Piping has been amended to clarify the Government’s intent for the site test.
k) Paragraph 3.6.5.1. Contractor work scheduling considerations has been amended to clarify the Government’s requirement to have existing 50HP and 25HP compressors and dryer to remain in operation during the entire fourteen (14) day installation period.
l) Paragraph 3.6.5.1.1. Optional portable units to supplement production needs, is a new paragraph.
m) Paragraph 5.1. Publication Sources has been amended to add the contact information and phone number for the Sheet Metal and Air Conditioning Contractors National Association, Inc. (SMACNA)
INSTRUCTIONS TO OFFERORS
Paragraph 2)a.i.1 of the Instructions to Offerors on Page 54 of the solicitation is corrected to read as follows:
The proposal shall provide a general description of how the OEM will meet and/or exceed the government’s requirement. This acquisition is conducted pursuant to FAR Subpart 13.5, and will utilize the streamlined evaluation procedures set forth in FAR Part 13. As such, the Government does not desire the submission of detailed quotes addressing each aspect of the specification in response to this solicitation. Rather, the Government seeks quotes that acknowledge compliance with the requirements set forth in the Statement of Work and highlight any portions of the proposal that offer innovative solutions or exceed the government’s request. In order to assist in evaluating quotes, the Government does require that prospective offerors provide detailed information regarding their approach to the following paragraphs of the SOW.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .