M_-_Stormwater_Pollution_Control_Plan_Report.pdf

PDF 68 MB Posted

Attached to
Runway 11-29 Rehabilitation and Airport Terminal Parking Lot Rehabilitation
Solicitation number
APB034263
Issued by
Fairfield County, Bridgeport City, Connecticut

About this file

This is a Stormwater Pollution Control Plan Report prepared for the City of Bridgeport's Runway 11-29 Rehabilitation and Airport Terminal Parking Lot Rehabilitation project at Sikorsky Memorial Airport in Stratford, Connecticut. The project encompasses comprehensive construction services including mill and overlay rehabilitation of Runway 11-29, taxiway rehabilitation across six taxiways, removal of deteriorated runway shoulders, replacement of runway light fixtures and electrical systems, installation of underground electrical duct banks and power cables, runway and taxiway markings, drainage infrastructure improvements, and mill and overlay of the terminal loop road and parking lots. The work is organized across seven phased construction areas with a base bid schedule of 90 consecutive calendar days from the Notice to Proceed, plus optional alternates allowing up to 30 additional days for a maximum contract duration of 120 calendar days. Electronic bid submissions are required through the City's OpenGov Procurement Portal with a deadline of 2:00 p.m. Eastern Standard Time on Thursday, March 19, 2026. A written question submission cutoff is set for 4:00 p.m. on Friday, February 20, 2026, with all answers published as addenda. A mandatory pre-bid conference is required to discuss material requirements, quality control procedures, construction safety and phasing plans, and airport access procedures, and bidders must conduct site visits during normal working hours by contacting the owner to schedule appointments.

Qualified contractors must be licensed in Connecticut, possess valid SAM, DUNS, Connecticut, and Federal Tax ID numbers, perform at least 25 percent of work with their own organization, and maintain comprehensive insurance coverage including $2,000,000 general liability aggregate and $5,000,000 umbrella/excess liability. Contractors must comply with Connecticut prevailing wage rates effective January 26, 2026, ranging from $21.42 to $59.91 per hour plus fringe benefits of $13.95 to $43.62 per hour. Bid security of 10 percent of the maximum bid price is required, along with performance bonds, payment bonds, and a maintenance bond each at 100 percent of the contract amount (except the maintenance bond at 25 percent). The procurement is subject to a Disadvantaged Business Enterprise (DBE) program set-aside of eight percent of the contract cost, with federal requirements superseding all state and local requirements. Liquidated damages are assessed at $500 per day for individual phase milestones and $1,500 per day for overall construction completion delays, with mobilization limited to 10 percent of total project cost. Monthly progress payments are provided with a 5 percent retainage held until final acceptance, and a one-year construction warranty from final acceptance is required.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .