Runway 11-29 Rehabilitation and Airport Terminal Parking Lot Rehabilitation
This is an Invitation to Bid (ITB APB034263) issued by the City of Bridgeport Department of Public Purchases for comprehensive construction services at Sikorsky Memorial Airport (BDR) in Stratford, Connecticut. The project encompasses mill and overlay rehabilitation of Runway 11-29, taxiway rehabilitation across six taxiways (D, H, E, K, J, and A), removal of deteriorated runway shoulders, replacement of runway light fixtures and electrical systems, underground electrical duct banks and power cable installation, runway and taxiway markings, drainage infrastructure improvements, and mill and overlay of the terminal loop road and five separate parking lots. The base bid includes 33 pay items with quantities ranging from single fixtures to 148,700 square feet of pavement markings, along with six bid alternates for loop road and parking lot rehabilitation phases. Electronic bid submissions are required through the OpenGov Procurement Portal with a deadline of 2:00 p.m. Eastern Standard Time on Thursday, March 19, 2026. The written question cutoff is 4:00 p.m. on Friday, February 20, 2026, with all answers published as addenda. A mandatory pre-bid conference is required to discuss material requirements, quality control procedures, construction safety and phasing plans, and airport access procedures. The base bid work is scheduled for 90 consecutive calendar days from the Notice to Proceed, with optional alternates adding a maximum of 30 additional days for a total possible contract duration of 120 calendar days.
Bid security of 10 percent of the maximum bid price is required in the form of a certified check, bank money order, or bid bond. The awarded contractor must post performance and payment bonds each at 100 percent of the contract amount, plus a maintenance bond at 25 percent. A Disadvantaged Business Enterprise (DBE) program set-aside of eight percent of the contract cost applies, with federal requirements superseding all state and local requirements. Qualified contractors must be licensed in Connecticut, possess valid SAM, DUNS, Connecticut, and Federal Tax ID numbers, and perform at least 25 percent of the work with their own organization. Comprehensive insurance coverage is required, including $2,000,000 general liability aggregate and $5,000,000 umbrella/excess liability. Connecticut prevailing wage rates established by the Connecticut Department of Labor effective January 26, 2026, apply to all work, with wage classifications ranging from $21.42 to $59.91 per hour plus fringe benefits of $13.95 to $43.62 per hour. Liquidated damages are assessed at $500 per day for individual phase milestones and $1,500 per day for overall construction completion delays. Monthly progress payments are made with 5 percent retainage held until final acceptance. The contract award will be made to the responsible bidder submitting the lowest responsive bid that is most advantageous to the City considering cost, resources, equipment availability, and other specified factors. The specific award value or budget range is not disclosed in the bidding documents.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
APB034263
RUNWAY 11-29 REHABILITATION AND AIRPORT
TERMINAL PARKING LOT REHABILITATION
CITY OF BRIDGEPORT
DEPARTMENT OF PUBLIC PURCHASES
999 BROAD STREET
BRIDGEPORT CT 06604
Submission Deadline:
Thursday, March 19, 2026 by 2:00 pm
Table Of Contents
1. Introduction
2. Bid Information
3. Statement of Work
4. Bid Sheet
5. Submission Instructions
6. Terms and Conditions
7. Vendor Questionnaire & Submission
Attachments:
A - FAA General Provision
B - FAA Technical Provisions
C - Supplemental Technical Provisions
D - CTDOT Specifications
E - FAA 150_5370-2G - Operational Safety On Airports During Construction
F - Instructions to Bidders
G - Prevailing Wage Rates_BridgeportSikorskyAirport_Runway11-29Rehabilitation_25-7557
H - Construction Services Insurance Rider
I - Contract for Construction Services
J - General Conditions for Construction
K - Geotechnical Engineering Report
L - Construction Safety and Phasing Plan Report
M - Stormwater Pollution Control Plan Report
N - BDR Rwy 11-29 - Plans TAS Signed
1. Introduction
The City of Bridgeport seeks bids for Runway 11-29 Rehabilitation and Airport Terminal
Parking Lot Rehabilitation. Interested firms should respond to this request on or before the time due for submission. Submissions will be received by the City of Bridgeport, Department of
Public Purchases, 2nd floor, 999 Broad Street, Bridgeport, CT 066604 until 2:00 pm on
Thursday, March 19, 2026, at which time and then at said office will be publicly opened.
Any questions regarding this bid must be presented in writing and may be posted directly on the
OpenGov Procurement https://procurement.opengov.com/portal/bridgeportct website question sections. The cut-off date for questions and answers is 4:00 pm on Friday, February 20, 2026. All answers will be published in the form of an addenda. All bidders shall check https://procurement.opengov.com/portal/bridgeportct regularly to see if any addendums are issued.
1.1. Bridgeport-Sikorsky Airport Background
Bridgeport-Sikorsky Airport is the City of Bridgeport Municipal Airport and provides a number of services as a non-commercial flight airport. The airport goal is to maximize the airport’s economic and public service value to the City and this region, as well as providing a safe and secure aviation facility for the public and general and corporate aviation.
The City of Bridgeport owns and operates Bridgeport-Sikorsky Airport located in Stratford, Connecticut. The airport is situated on 800 acres of land in the Lordship section of Stratford on the coast. The airport facilities include 2 runways, one 4,677ft long by 100ft wide paved and grooved runway (Runway 6-24) and one that is 4759ft by 150ft wide runway (Runway 11-29)
(2). Both runways have High Intensity Runway Lights (HIRL). There are 9 taxiways with various widths and lengths at the airport. The airport also has and maintains 3 aircraft parking aprons as well as 5 aprons leased to 2 FBO's. The airport FBO's both service aircraft with Jet A and 100LL fuel.
The City of Bridgeport, acting through Sikorsky Memorial Airport, participates in the FAA
Airport Improvement Program (AIP).
1.2. City Background
Bridgeport, the most populous city in Connecticut and the fifth-most populous in New England, is situated in eastern Fairfield County at the mouth of the Pequonnock River on Long Island
Sound. With a population of 148,654 in 2020, it is 60 miles from Manhattan and 40 miles from
The Bronx, forming part of the New York metropolitan area. The city borders Trumbull to the north, Fairfield to the west, and Stratford to the east. Bridgeport is a significant part of the
Greater Bridgeport Planning Region and the Bridgeport-Stamford-Norwalk-Danbury metropolitan statistical area, the second largest in Connecticut.
Since the early 21st century, Bridgeport has seen extensive redevelopment in its downtown and other neighborhoods. Bridgeport is home to several educational institutions, including the
University of Bridgeport, Housatonic Community College, and part of Sacred Heart University, https://procurement.opengov.com/portal/bridgeportct https://procurement.opengov.com/portal/bridgeportct https://procurement.opengov.com/portal/bridgeportct as well as the state's only zoo, Connecticut's Beardsley Zoo. The city is also nicknamed "Park
City" for its 35 public parks, covering 1,300 acres, including two large parks. Despite not being headquartered in the city, over a dozen Fortune 500 companies are based in the metropolitan area shared with Stamford.
Bridgeport is a culturally vibrant city with three museums, numerous parks, and significant venues like Seaside Park, the Total Mortgage Arena, and the Hartford HealthCare Amphitheater.
The Barnum Museum and Connecticut's Beardsley Zoo are notable attractions, enhancing the city's cultural and recreational appeal. Recognized for its diversity, Bridgeport is consistently ranked among the 25 most ethnically and culturally diverse cities in the United States.
2. Bid Information
The Invitation to Bid (ITB) is to obtain pricing for Runway 11-29 Rehabilitation and Airport
Terminal Parking Lot RehabilitationAny brand or trade names used by the City of Bridgeport in bid specifications are for the purpose of describing and establishing the standard of quality, performance and characteristics desired and are not intended to limit or restrict competition.
Bidders may submit bids for equivalent products to those designated except where “No
Substitutes” are indicated on the attached “price” list. Bidders must clearly identify all proposed substitutions, brand and/or unit of measure must be declared (with line item # referenced) on a separate sheet in the procurement portal, OpenGov. All of Brand substitutions shall be subject to purchaser’s approval.
The City of Bridgeport reserves the right to reject any bid when the product information submitted with the bid is incomplete.
No work or deliveries shall be performed under the contract award until the purchase order has been issued by the purchasing department.
2.1. Bid Bond
Include with the submitted bid, a ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with its bid submission if the bid is $50,000.00.
2.2. Payment and Performance Bond
The successful bidder, prior to permission to proceed, will be required to post a payment bond of 100% of the contract price if the contract price is in excess of $100,000, and a performance bond, for 100% of the contract price, if the bid is $50,000.00, or more.
2.3. Prevailing Wage Rates
Bids in excess of $100,000 must include Prevailing Wage Rates set by the Connecticut
Department of Labor (CTDOL).
2.4. Contractors Requirements and Responsibilities
Contractor must be licensed in the State of Connecticut and all employees must be properly certified and qualified to perform the work. Out of state bidder must provide the City of
Bridgeport with a Certificate of Authority to Do Business in the State of Connecticut within five days of a Notice of Intent to Award. This can be obtained from the Connecticut Secretary of
State.
The contractor will be responsible for the safety of the work site.
The contractor is responsible obtaining and paying for any and all permits as required.
This contract award will require that the successful vendor have a valid SAM, DUNS, CT and
Federal Tax ID numbers prior to commencing work.
The Contractor is prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.
2.5. Contract Award
Any contract entered into by the City of Bridgeport shall be in response to the invitation to bid.
The award of contract shall be made to the responsible bidder whose bid, conforming to the solicitation, most advantageous to the City of Bridgeport in terms of cost, price, and other factors specified elsewhere in this solicitation, considering the bidder’s price, resources, equipment, availability, selection, or other factors to be determined to be in the best interest of the City.
The awarded contractor must accurately complete and submit No Conflicts/Disclosure form when it receives a Notice of Intent to Award. Failure to submit the No Conflicts/Disclosure Form within three (3) days of receipt of the Notice of Intent to Award may result in the loss of the award.
Bids may be held by the City for a period not to exceed one hundred and twenty (120) days from the date of the opening of bids for the purpose of reviewing the proposals and investigating the qualifications of Bidder, prior to awarding of the Contract. No proposal may be withdrawn within one hundred twenty (120) days after the date of opening thereof.
The bid shall not include in the quotation taxes for which the City is not liable; tax certificates will be furnished upon request.
The City of Bridgeport reserves the right to accept or reject any or all bids received as a result of this request, or to cancel in part or in its entirety this Invitation to Bid, if it is in the best interest of the City of Bridgeport to do so.
2.6. Minority and Buy Local
INTENTIONALLY OMITTED
2.7. Minority Business Enterprise (MBE) and, or as a City Based Business (CBB):
INTENTIONALLY OMITTED
3. Statement of Work
Please see attachments section for a more Detailed Scope of Services.
3.1. Project Description
The work of this Contract consists of the Rehabilitation of Runway 11-29 and Airport Terminal
Parking Lot. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. The work of this contract is located in the City of Stratford. Details of the project are presented in plans and specifications that have been prepared by CHA Project No.: 056200.
Please see the following attachments for a more Detailed Scope of Services.
A. FAA General Provisions, B. FAA Technical Provisions, C. Supplemental Technical
Provisions, D. CTDOT Specifications, E. FAA 150/5370-2G Operational Safety On Airports
During Construction, F. Instructions to Bidders, G. Prevailing Wage Rates, H. Construction
Services Insurance Rider, I. Contract for Construction Services, J. General Conditions for
Construction, K. Geotechnical Engineering Report, L. Construction Safety and Phasing Plan
Report, M. Stormwater Pollution Control Plan Report, N. BDR Rwy 11-29 Plans TAS Signed.
4. Bid Sheet
ITEMIZED PROPOSAL
SIKORSKY MEMORIAL AIRPORT (BDR) Runway 11-29 Rehabilitation & Airport Terminal
Parking Lot Rehabilitation
ITEM NO. SPECIFICATION DESCRIPTION OF
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
BASE BID
1 C-100 CONTRACTOR
QUALITY
CONTROL
PROGRAM (CQCP)
LS 1
2 C-102-5.1E INSTALLATION
AND REMOVAL OF
12" FILTER SOCK
LF 11,350
3 C-105 MOBILIAZATION LS 1
4 P-101-5.1 JOINT AND CRACK
REPAIR (1/4" TO
3/4")
LF 7,500
ITEM NO. SPECIFICATION DESCRIPTION OF
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
5 P-101-5.2 ASPHALT MILLING,
0" TO 4" DEPTH
SY 50,000
6 P-101-5.3 ASPHALT MILLING,
4" TO 5" DEPTH
SY 39,500
7 P-101-5.4 REMOVE
ELEVATED LIGHT
FIXTURE
EA 59
8 P-101-5.5 REMOVE IN-
PAVEMENT LIGHT
FIXTURE AND
BASE CAN TOP
SECTION
EA 12
9 P-101-5.6 PAVEMENT
REMOVAL
SY 40,000
10 P-401.8.1A ASPHALT SURFACE
COURSE -
GRADATION 2
TON 14,700
11 P-401-8.1B ASPHALT BASE
COURSE -
GRADATION 1
TON 7,100
12 P-603-5.1 BITUMINOUS TACK
COAT
GAL 12,250
13 P-605-5.1 TYPE I CRACK
REPAIR (1/4" TO
3/4")
LF 7,000
14 P-605-5.2 TYPE II CRACK
REPAIR (GRATER
THAN 3/4")
LF 3,000
15 P-620-5.1 SURFACE
PREPARATION
SF 14,000
16 P-620-5.2 RUNWAY AND
TAXIWAY
PAVEMENT
MARKINGS (100%
APPLICATION)
SF 148,700
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
17 P-620-5.3 TEMPORARY
RUNWAY AND
TAXIWAY
PAVEMENT
MARKINGS (50%
APPLICATION)
SF 148,700
18 D-751-5.4 ADJUST
INSPECTION HOLE
TO GRADE
EA 11
19 T-901-5.1 SEEDING ACRE 9
20 T-905-5.1 TOPSOILING
(OBTAINED FROM
ON-SITE)
CY 4,750
21 T-908-5.1 MULCHING ACRE 9
22 L-108-5.1 REMOVE NO. 8
CABLE FROM
EXISTING DUCT
BANK OR CONDUIT
LF 21,500
23 L-108-5.2 INSTALL NO. 8
AWG, 5 KV, L-824,
TYPE C CABLE, IN
EXISTING DUCT
BANK OR CONDUIT
LF 21,500
24 L-109-7.1 REMOVAL OF
EQUIPMENT
WITHIN EXISTING
AIRIELD
ELECTRICAL
VAULT
LS 1
25 L-109-7.2 INSTALLATION OF
EQUIPMENT
WITHIN EXISTING
AIRFIELD
ELECTRICAL
VAULT
LS 1
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
26 L-125.5.1 L-862, LED, HIGH
INTENSITY
RUNWAY EDGE
LIGHT ON
EXISTING BASE
EA 35
27 L-125-5.2 L-850C, LED, HIGH
INTENSITY FLUSH
MOUNT RUNWAY
EDGE LIGHT ON
EXISTING BASE
EA 11
28 L-125-5.3 L-850C, LED, HIGH
INTENSITY FLUSH
MOUNT RUNWAY
EDGE LIGHT ON
NEW BASE CAN
EA 1
29 L-125-5.4 L-862E, LED, HIGH
INTENSITY
THRESHOLD/END
LIGHT ON
EXISTING BASE
EA 24
30 MST-01 FIELD OFFICE AND
LABORATORY
LS 1
31 MST-02 MAINTENANCE OF
TRAFFIC
LS 1
32 MST-03 CONSTRUCTION
ENGINEERING
LS 1
33 MST-04 PROJECT
SECURITY
LS 1
Base Bid Pay Item Subtotal =
TOTAL
ITEMIZED PROPOSAL
SIKORSKY MEMORIAL AIRPORT (BDR) Runway 11-29 Rehabilitation & Airport Terminal
Parkin Lot Rehabilitation
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
BID ALTERNATE NO. 1 - LOOP ROAD
1 1.20-9.75 MOBILIZATION
FOR FACILITES
CONSTRCUTION
LS 1
2 2.19 SEDIMENTATION
CONTROL SYSTEM
-12" FILTER SOCK
LF 1,300
3 2.19 SEDIMENTATION
CONTROL SYSTEM
- INLET
PROTECTION
EA 7
4 4.09 FINE MILLING OF
BITUMINOUS
CONCRETE, 1.5"
DEPTH
SY 16,600
5 4.09 REMOVE ASPHALT
CURB
LF 290
6 4.06 BITUMINUS
CONCRETE
TON 1,450
7 4.06 MATERIAL FOR
TACK COAT
GAL 800
8 9.71 MAINTENANCE
AND PROTECTION
OF TRAFFIC
LS 1
9 12.08 SIGN FACE - SHEET
ALUMINUM
EA 4
10 12.09 PAINTED
PAVEMENT
MARKINGS
SF 2,020
11 4.06 CLEANING AND
SEALING JOINTS
AND CRACKS
(BETWEEN 1/4"
AND 3/4")
LF 1,350
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
12 4.06 CLEANING AND
SEALING JOINTS
AND CRACKS
(GREATER THAN
3/4")
LF 600
Bid Additive No. 1 - Pay Item Subtotal =
Parking Lot Rehabilitation
ITEM NO. SPECIFICATION DESCRIPTION OF
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
BID ALTERNATE NO. 2 - PARKING LOT 1
1 1.20-9.75 MOBILIZATION
FOR FACILITIES
CONSTRUCTION
LS 1
2 2.19 SEDIMENTATION
CONTROL SYSTEM
- INLET
PROTECTION
EA 2
3 4.09 FINE MILLING OF
BITUMINOUS
CONCRETE, 1.5"
DEPTH
SY 8,600
4 4.06 BITUMINUS
CONCRETE
TON 750
5 4.06 MATERIAL FOR
TACK COAT
GAL 400
6 9.71 MAINTENANCE
AND PROTECTION
OF TRAFFIC
LS 1
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
7 12.08 SIGN FACE - SHEET
ALUMINUM
EA 2
8 12.09 PAINTED
PAVEMENT
MARKINGS
SF 2,200
9 4.06 CLEANING AND
SEALING JOINTS
AND CRACKS
(BETWEEN 1/4"
AND 3/4")
LF 700
10 4.06 CLEANING AND
SEALING JOINTS
AND CRACKS
(GREATER THAN
3/4")
LF 300
Bid Additive No. 2 - Pay Item Subtotal =
Parking Lot Rehabilitation
ITEM NO. SPECIFICATION DESCRIPTION OF
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
BID ALTERNATE NO. 3 - PARKING LOT 2
1 1.20-9.75 MOBILIZATION
FOR FACILITIES
CONSTRUCTION
LS 1
2 2.19 SEDIMENTATION
CONTROL SYSTEM
- INLET
PROTECTION
EA 3
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
3 4.09 FINE MILLING OF
BITUMINOUS
CONCRETE, 1.5"
DEPTH
SY 6,800
4 4.06 BITUMINUS
CONCRETE
TON 600
5 4.06 MATERIAL FOR
TACK COAT
GAL 320
6 9.71 MAINTENANCE
AND PROTECTION
OF TRAFFIC
LS 1
7 12.08 SIGN FACE - SHEET
ALUMINUM
EA 8
8 12.09 PAINTED
PAVEMENT
MARKINGS
SF 1,650
9 4.06 CLEANING AND
SEALING JOINTS
AND CRACKS
(BETWEEN 1/4"
AND 3/4")
LF 550
10 4.06 CLEANING AND
SEALING JOINTS
AND CRACKS
(GREATER THAN
3/4")
LF 250
Bid Additive No. 3 - Pay Item Subtotal =
Parking Lot Rehabilitation
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
BID ALTERNATE NO. 4 - PARKING LOT 3
1 1.20-9.75 MOBILIZATION
FOR FACILITIES
CONSTRUCTION
LS 1
2 2.19 SEDIMENTATION
CONTROL SYSTEM
- INLET
PROTECTION
EA 1
3 4.09 FINE MILLING OF
BITUMINOUS
CONCRETE, 1.5"
DEPTH
SY 4,900
4 4.06 BITUMINUS
CONCRETE
TON 430
5 4.06 MATERIAL FOR
TACK COAT
GAL 230
6 9.71 MAINTENANCE
AND PROTECTION
OF TRAFFIC
LS 1
7 12.08 SIGN FACE - SHEET
ALUMINUM
EA 6
8 12.09 PAINTED
PAVEMENT
MARKINGS
SF 1,500
9 4.06 CLEANING AND
SEALING JOINTS
AND CRACKS
(BETWEEN 1/4"
AND 3/4")
LF 400
10 4.06 CLEANING AND
SEALING JOINTS
AND CRACKS
(GREATER THAN
3/4")
LF 175
Bid Additive No. 4 - Pay Item Subtotal =
ITEM
UNIT QUANTITY UNIT
PRICE
Parking Lot Rehabilitation
ITEM NO. SPECIFICATION DESCRIPTION OF
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
BID ALTERNATE NO. 5 - PARKING LOT 4
1 1.20-9.75 MOBILIZATION
FOR FACILITIES
CONSTRUCTION
LS 1
2 2.19 SEDIMENTATION
CONTROL SYSTEM
- INLET
PROTECTION
EA 1
3 4.09 FINE MILLING OF
BITUMINOUS
CONCRETE, 1.5"
DEPTH
SY 3,850
4 4.06 BITUMINUS
CONCRETE
TON 340
5 4.06 MATERIAL FOR
TACK COAT
GAL 180
6 9.71 MAINTENANCE
AND PROTECTION
OF TRAFFIC
LS 1
7 12.08 SIGN FACE - SHEET
ALUMINUM
EA 6
8 12.09 PAINTED
PAVEMENT
MARKINGS
SF 1,630
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
9 4.06 CLEANING AND
SEALING JOINTS
AND CRACKS
(BETWEEN 1/4"
AND 3/4")
LF 300
10 4.06 CLEANING AND
SEALING JOINTS
AND CRACKS
(GREATER THAN
3/4")
LF 150
Bid Additive No. 5 - Pay Item Subtotal =
Parking Lot Rehabilitation
ITEM NO. SPECIFICATION DESCRIPTION OF
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
BID ALTERNATE NO. 6 - PARKING LOT 5
1 1.20-9.75 MOBILIZATION
FOR FACILITIES
CONSTRUCTION
LS 1
2 2.19 SEDIMENTATION
CONTROL SYSTEM
- INLET
PROTECTION
EA 1
3 4.09 FINE MILLING OF
BITUMINOUS
CONCRETE, 1.5"
DEPTH
SY 4,850
4 4.06 BITUMINUS
CONCRETE
TON 430
5 4.06 MATERIAL FOR
TACK COAT
GAL 230
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
6 9.71 MAINTENANCE
AND PROTECTION
OF TRAFFIC
LS 1
7 12.08 SIGN FACE - SHEET
ALUMINUM
EA 3
8 12.09 PAINTED
PAVEMENT
MARKINGS
SF 1,950
9 4.06 CLEANING AND
SEALING JOINTS
AND CRACKS
(BETWEEN 1/4"
AND 3/4")
LF 400
10 4.06 CLEANING AND
SEALING JOINTS
AND CRACKS
(GREATER THAN
3/4")
LF 175
Bid Additive No. 6 - Pay Item Subtotal =
TOTAL BID AMOUNT
Parking Lot Rehabilitation
ITEM NO. Custom DESCRIPTION OF
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
1 BID BASE - PAY
ITEM SUBTOTAL
1-33 1
2 BID ADDITIVE NO. 1
- LOOP ROAD - PAY
ITEM SUBTOTAL
1-12 1
ITEM NO. Custom DESCRIPTION OF
ITEM
UNIT QUANTITY UNIT
PRICE
TOTAL
3 BID ADDITIVE NO. 2
- PARKING LOT 1 -
PAY ITEM
SUBTOTAL
1-10 1
4 BID ADDITIVE NO. 3
- PARKING LOT 2 -
PAY ITEM
SUBTOTAL
1-10 1
5 BID ADDITIVE NO. 4
- PARKING LOT 3 -
PAY ITEM
SUBTOTAL
1-10 1
6 BID ADDITIVE NO. 5
- PARKING LOT 4 -
PAY ITEM
SUBTOTAL
1-10 1
7 BID ADDITIVE NO. 6
- PARKING LOT 5 -
PAY ITEM
SUBTOTAL
1-10 1
TOTAL BID AMOUNT
5. Submission Instructions
5.1. Submission Instructions
All submissions must be submitted via the procurement portal.
Special Submission Circumstances: The procurement portal, OpenGov, is the electronic bid submission process of choice for City of Bridgeport purchases. In the event, a bidder is unable to submit electronically through the city’s procurement portal, bids can be submitted, by mail, as outlined below. Non-electronic submissions are accepted on an exception only basis.
5.2. Contacting the City of Bridgeport
The exclusive means by which all prospective respondents may obtain ITB packages, direct inquires, request and receive addenda and supplemental information, and submit proposals shall be through the City of Bridgeport’s bidding platform.
The City of Bridgeport has made it possible for vendors to view our solicitations, download bid packages and ask questions, free of charge.
Instructions to do so are as follows:
1. Go to the procurement portal, OpenGov
2. Click on any bid you see. It will take you that bid’s page.
3. On the right-hand side of the page, click on Register now for free!
4. After you register, you'll be able to view/download or ask questions on any bid you have interest in.
If you have any trouble registering on the procurement portal, please email OpenGov at procurement-support@opengov.com
General Information: All inquiries regarding this bid must be presented in writing and may be posted directly on the procurement portal, OpenGov. All answers will be published in the form of addenda on the procurement portal.
Addenda Notification: Respondents are required to register on the procurement portal, OpenGov. Once the respondent has completed registration, they will receive addenda notifications in their email. Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda.
Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.
5.3. Electronic Submission Instructions
THIS METHOD IS PREFERRED.
The City of Bridgeport is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup.
Once you have completed account registration, browse back to this page, click on "Submit
Response", and follow the instructions to submit the electronic bid.
5.4. Paper Submission Instructions
SEALED ONE (1) ORIGINAL, THREE (3) COPIES AND ONE (1) ELECTRONIC VIA
THUMBDRIVE MUST BE SUBMITTED.
Bid Submission: Sealed submissions must be received and time-stamped by the Department of
Public Purchases prior to ITB closing time. No submission received after closing time will be considered. The opening will be in the City of Bridgeport Department of Public Purchases’ https://procurement.opengov.com/signup
Conference Room. To ensure proper handling and avoid misdirected delivery, please mark your
ITB envelope as follows:
APB034263 Runway 11-29 Rehabilitation and Airport Terminal Parking Lot
Rehabilitation
If your envelope is not marked accordingly, the City will not assume responsibility for late delivery or deliver to the incorrect location.
Mail your submissions to:
Caroline Sanchez City of Bridgeport
Department of Public Purchases 2nd floor, 999 Broad Street Bridgeport, CT 06604
ITB submissions are due:
Thursday, March 19, 2026 no later than 2:00 pm Eastern Standard Time (EST)
Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.
5.5. Submission Compliance
Certificates of Insurance: Certificates of insurance will be required from the awarded contractor prior to the commencement of any work and shall be furnished to the Department of
Public Purchases, Margaret E. Morton Government Center, Second Floor, 999 Broad Street, Bridgeport, Connecticut 06604 and must be shown to the City of Bridgeport as an additional insured with thirty (30) days’ notice for cancellation or non-renewal of policy. A copy of the endorsement insurance will also be required for this project.
No Conflicts| Disclosure: the awarded contractor must accurately complete and submit the No
Conflicts/Disclosure Form when it receives a Notice of Intent to Award. Failure to submit the No
Conflicts within three (3) business days of receipt of the Notice of Intent may result in the loss of the award.
Non-Collusion Affidavit: all bidders must accurately complete and submit non-collusion affidavits with all bids or bids will be considered non-responsive.
Addendums: all bidders shall check the procurement portal regularly to see if any addendums are issued.
Contract Award Requirements: the contract award will require that the successful will require that the successful vendor have a valid SAM, DUNS, CT, and Federal Tax ID numbers prior to commencing work.
5.6. Reservation of Rights
This solicitation is for an “Invitation to Bid (ITB) only”. This invitation to bid is not to be construed as a specific proposal or an offer to buy any products or services. Notwithstanding anything else herein to the contrary, the City expressly reserves all rights in its sole discretion and in the best interests of the City at any time prior to the selection of a preferred respondent and purchase order:
Bid Rejection: The City of Bridgeport reserves the right to reject any and all bids in whole or in part or to accept any bid, in its sole discretion if doing so deemed to be in the best interest of the
City of Bridgeport. This includes the right to reject any or all bids or to decline to make an award. Further, the City of Bridgeport reserves the right to make an award to more than one bidder or make awards not based solely on low bid when time is of the essence.
Expenses: The City shall not be responsible for and/or shall not pay any costs associated with the preparation, submission, or presentation of any submission, or costs incurred by the responding firms during the interview and negotiations phase of the solicitation process
Information and Materials: Any information or materials submitted to this ITB shall become the property of the City of Bridgeport and will not be returned. All submitted materials will be available for public review.
MSDS: The City of Bridgeport may request MSDS (Material Safety Data Sheets) or additional product information and literature or samples on any brands or products proposed as equivalents to those listed herein prior to award or to be included with shipment.
Tax Delinquency: The City of Bridgeport reserves the right to ensure bidders are not delinquent on any City real estate and personal property taxes, ate the time of bid opening.
Purchase Order: No work of deliveries shall be performed under the contract award until a
Purchase Order has been issued by the Purchasing Department.
Contract Award: The City of Bridgeport reserves the right to award a purchase order to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the
City of Bridgeport in terms of cost. Other factors such as lead time, equipment, availability and other factors specified in this solicitation may be considered.
Bid Dates: The City of Bridgeport reserves the right to modify any dates other terms of the ITB upon posting notice. Please keep in mind dates are estimates only and are subject to change.
Liability: The City of Bridgeport is not liable to any Respondent for damages of any type, however arising.
Title: vendors are prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.
Taxes: bidders should not include any taxes in their quotation for which the city is not liable. The City of Bridgeport will issue tax-exempt certificates covering the work upon request.
6. Terms and Conditions
6.1. Terms and Conditions
All City of Bridgeport contracture terms, conditions, and requirements apply.
6.2. Openness of Procurement Process
Written responses, other discussions, correspondence, and all other pertinent records shall be handled as public records in compliance with State and Federal open records statutes and regulations.
6.3. Errors and Omissions
Once a response is submitted, the City of Bridgeport may consider requests by any contractor to correct errors or omissions but shall retain sole discretionary authority to determine the outcome of such a request.
6.4. Collusion
By offering a response to this ITB the supplier certifies that no attempt has been made or will be made by the consultant to induce any other person or firm to submit or not to submit a proposal for the purpose of restricting competition. All persons interested in this project, principal or principals being named therein, and no other person have an interest in this project or in the
Agreement which they may participate in. No person or agency has been employed or retained to solicit or secure this Agreement upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting legitimate employees or established commercial agencies maintained by the consultant for the purpose of doing business. All firms interested in this project (including the firm's employees, representatives, agents, lobbyists attorneys and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process, including the evaluation panel and other administrative staff. The policy is intended to create a level playing field for all potential firms; assure that contract decisions are made in public and to protect the integrity of the selection process.
6.5. Suspension and Debarment
The City will not participate in contracts with parties that have been debarred, suspended or excluded from Federal assistance programs per 2 CFR part 180 and part 1532 and 40 CFR part
31.35. Further, the respondent is required to verify that the respondent, or its principals, as defined at 49 CFR 19.995, or affiliates, as defined at 49 CFR 29.905, are excluded or disqualified as defined at 49 CFR 29.40 and 29.945
The respondent is required to comply with 49 CFR 29, Subpart C and must include the requirement to comply with 49 CFR 29, Subpart C in any lower-tier covered transaction it participates in.
By signing and submitting its bid or proposal, the respondent or proposer certifies as follows:
The certification in this clause is a material representation of fact relied upon by the City if it is later determined that the respondent or proposer knowingly rendered an erroneous certification, in addition to remedies available to the City the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment. The respondent or proposer agrees to comply with the requirements of 49 CFR 29, Subpart C while this offer is valid and throughout the period of any contract that may arise from this offer. The respondent or proposer further agrees to include a provision requiring such compliance in its lower-tier covered transactions.
7. Vendor Questionnaire & Submission
1. Federal I.D. Number or Social Security Number:*
*Response required
2. Confirmation*
Pursuant to and in compliance with your Invitation To Bid relating thereto, the submitter states that he has examined the Contract Documents and the site of the work, and that he understands the purport and magnitude of the work intended, and the undersigned hereby offers to furnish all plant, materials, supplies, equipment, labor, and other facilities and things necessary or proper for or incidental to, the proper construction of the work, and to construct the said work in strict accordance with the Contract Documents and such detailed directions, plans, and drawings as may be furnished from time to time during the progress of construction by the Engineer at the following unit and lump sum prices which prices include all incidental work, viz.
☐ Please confirm
*Response required
3. Contractor's License Number*
*Response required
4. BID BOND: *
Bidder must Include with the submitted bid, a CURRENT CERTIFIED ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with their bid submission if the bid is $50,000.00. Bid bonds must reference the current project.
*Response required
5. Contractor's Designation of Compliance Officer*
Please download the below documents, complete, and upload.
• Contractor's_Designation_of...
*Response required
6. Contractor's Good Standing Certification*
Please download the below documents, complete, and upload.
• Contractor's_Good_Standing_...
*Response required
7. Contractor's Wage Certification Form*
Please download the below documents, complete, and upload.
• Contractor's_Wage_Certifica...
*Response required
8. Owner's Instructions to Bond Insurance*
Please download the below documents, complete, and upload.
• EJCDC_Owner's_Instructions_...
*Response required
9. Electronic Work Product Release*
Please download the below documents, complete, and upload.
• Electronic_Work_Product_Rel...
*Response required
10. Equal Opportunity Policy Statement*
Please download the below documents, complete, and upload.
• Equal_Opportunity_Policy_St...
*Response required
11. No Conflicts-Disclosure Form*
Please download the below documents, complete, and upload.
• NO_CONFLICTS_FORM_10-2018_a...
*Response required
12. Proposal*
Please download the below documents, complete, and upload.
• Proposal_1-6_pgs.pdf https://government-project.s3.us-west-2.amazonaws.com/172703/488265f9-c0df-46ad-8be0-89c5bc0e91b0_Contractor%27s_Designation_of_Compliance_Officer.pdf https://government-project.s3.us-west-2.amazonaws.com/172703/7f638227-bce6-48bc-be7b-3ef478893364_Contractor%27s_Good_Standing_Certification.pdf https://government-project.s3.us-west-2.amazonaws.com/172703/482e7fce-1b08-4d61-8549-3c00095d695d_Contractor%27s_Wage_Certification_Form.pdf https://government-project.s3.us-west-2.amazonaws.com/172703/af8cb6e3-8d7b-44da-a62d-c86519eb169e_EJCDC_Owner%27s_Instructions_to_Engineer_Converning_Bonds_Insurance.pdf https://government-project.s3.us-west-2.amazonaws.com/172703/3e707966-0225-4874-b80c-011718495f2e_Electronic_Work_Product_Release.pdf https://government-project.s3.us-west-2.amazonaws.com/172703/1309feec-fb16-4775-9442-d6917caeef44_Equal_Opportunity_Policy_Statement_09162025REV.pdf https://government-project.s3.us-west-2.amazonaws.com/115403/31223730-5bed-41f3-bdeb-c2f97ce250c6_NO_CONFLICTS_FORM_10-2018_and_02-2025.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4PJMSXSWW%2F20260226%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260226T170453Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEF8aCXVzLXdlc3QtMiJHMEUCIQDCaiGiq4wDmN5sqpWmufqfSgr1lBN94MMDzLXqt2U8AwIgZG1C7jBzAZKm72S6wCZOGw9K7M%2By8%2FJThhurapxuC%2FEqjAUIKBACGgw4OTIzNjQ2ODc2NzIiDCvT%2FpvJzL3mPSO%2B6CrpBDt9OmWI8hEZxtdjjjo1lS0gHKod%2FxwL8CQH8FM7fPLg%2FGXdDqVRZbxOIwX7Zg7M%2F7dRCqnM2SEflCeWGWYDXWNNJyWey2jadDP%2B8MFOGMt8ky7LTRwLKayA%2FknvD8mbtDiBUCbaiwXHpCdE29uQAq7V9uxJyyairBNSDOQ1z7pH%2B7Kz1mF68QlFM2GQEmIecrmQbsJ0bWSE96l%2Fo3aEA89R1M%2BLj7hoq%2BZcZ0%2FvgqGGqxI1pYwoT8hXnGaf3HvPUiZUrGrAoKoKtdvDgk6vnP8mVIpIf8fBmvTB%2Fh1qXXLe6g2v%2FUfDqiiMRO8RcLB3iSqQf3%2BgXHBBRYTzqPZ6gMljfYYEUB%2FwxJvaG%2FfA1jFcnlc80E0vKte0O%2F2848I7hmT2FM71P2E9Qe6qDmhmDYfi0%2Fh2%2FuT2XM%2BG2qwtLuu87o14gTUITW3yQHB5j%2FnapqYUW2cLWG74m3OAkEwpaz%2By25lvh8Q1cYSNcYPDeC3LFodBUIhPB4zOqSAm8aJcFTM8Ckkm6jYos1famo7ZYmeZWCEy9L%2Fkaqz16me0Ed4DSHY6R5wtJyBXlLLTG7NZ%2BGayJHhbpDVaSsmNh2VaJsg33On0b1%2F7TXKTYX9nHNnzr85eS1YPCRx1sQ%2BH%2BhGMcHyaKoCpKAAVYUlXXGk0XH%2B4publo6mUxaTCyULuasukUNmIOzAfciSKDwKMI79KQfgYpRL1R4kBTs%2B5Xv6ZdO%2BhJ5nOYuuCuM%2B0bmRHXHl%2FPQv2OAVCLDvRaUbHfK8%2BjfX7n3prf%2BgEzUYSeQNNWDSdLT0ziVs3A32R3ZVz0oiPp1lrN3LGFsaPMLnGgc0GOpkBg27%2FExRKrHcWGd8cpjORrEr7rx3O6YNUPEazs1z2QkYBymIecJjoVQimaGFOpvrMkEzOlSjNx643bkzxMG%2FDpbCBYwknnNH3T11OBg1B8jI0Q0CtXLrGXQm5%2BXUsdYyU5gbhXBwlwRIAI1WJ5OouK1WALRxVUBUv%2Bq4ZoOFCInY4YeK7VuiRwMqBdwBJvGn6gCGA8WWCujIx&X-Amz-Signature=4142c4f592571ea47178ee4f23a56c1b5bf0fc7f330604a485c415146e02b346&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22NO_CONFLICTS_FORM_10-2018_and_02-2025.pdf%22&x-id=GetObject https://government-project.s3.us-west-2.amazonaws.com/172703/13c4e4d4-6c3f-4365-bc04-1cbe61d7ef44_Proposal_1-6_pgs.pdf
*Response required
13. Qualification Statement Form*
Please download the below documents, complete, and upload.
• Qualification_Statement_EJC...
*Response required
14. Sample Erosion Control Inspection Report*
Please download the below documents, complete, and upload.
• Sample_Erosion_Control_Insp...
*Response required
15. Additional Contractor Documents (optional)
Contractor can upload additional documents relevant to solicitation.
https://government-project.s3.us-west-2.amazonaws.com/172703/d88af3eb-1e19-4c6c-9448-60ad5e24aa1a_Qualification_Statement_EJCDC_Form.pdf https://government-project.s3.us-west-2.amazonaws.com/172703/4c1ee84a-201a-4fb3-86ea-d890cfb96af3_Sample_Erosion_Control_Inspection_Report.pdf
File details come from the government source that posted it. Updated .