LYDA FISHWAY 2022 drawing.pdf
PDF 3 MB Posted
- Attached to
- ODFW Shop Steel
- Solicitation number
- S-63500-00005753
- Issued by
- Wasco County, Oregon
About this file
This document is a set of construction specifications and drawings for the Lyda Fishway project in 15 Mile Creek, Wasco County, Oregon. The project is being led by the Oregon Department of Fish and Wildlife (ODFW) Fish Division Fish Screening and Passage Program. The scope of work includes excavation, dewatering, structural fill, concrete work, steel fabrication and installation, and installation of a pre-fabricated vertical slot fishway structure. The fishway will have three segments with a turning pool, and the total length is approximately 34 feet.
The document provides detailed specifications for the materials, installation, and construction methods required. It also includes drawings showing the layout, dimensions, and connections for the fishway structure. There is no indication of an estimated cost, set-asides, or funding sources provided. The document states that the construction work must be completed between specific dates to avoid impacts to the active stream.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Purchase_Order TC~23.xlsx | XLSX spreadsheet | |
| Stainless Steel Material List Lyda Fishway Amended.pdf | ||
| Dalles Shop Stainless steel Bid Form List B Amended.pdf | ||
| Bidding Instructions stainless steel.pdf | ||
| Dalles Shop Steel Bid Proposal Form ListA.pdf | ||
| Preliminary BID_TAB~9.xlsx | XLSX spreadsheet | |
| OregonBuys_RegistrationGuide~32.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PORTLAND
SALEM
ASTORIA
BEND
MADRAS
TILLAMOOK
ALBANY
EUGENE
SEASIDE
THE DALLES
LINCOLN
CITY
McMINNVILLE
NEWBERG
SANDY
NEWPORT DETROIT
CORVALLIS
LEBANON
SWEETHOME
WALDPORT
FLORENCE
REEDSPORT
COOS
BAY
OAKRIDGE
SUTHERLAND
ROSEBURG
COQUILLE
PORT
ORFORD
GOLD
BEACH
BROOKINGS
CAVE
JCT.
GRANTS
PASS
MEDFORD
ASHLAND
KLAMATH FALLS
CHILOQUIN
LA
PINE
PRINEVILLESISTERS
REDMOND
CONDON
PAISLEY
BURNS
LAKEVIEW
MITCHELL
JOHN DAY
DAYVILLE
FOSSIL
ARLINGTON
HEPPNER
BOARDMAN
UMATILLA
HERMISTON
PENDLETON
UKIAH
PILOT ROCK
LA GRAND
ELGIN
WALLOWA
LOSTINE
ENTERPRISE
JOSEPH
UNION
NORTH
POWDER
BAKER CITY
PRAIRIE CITY UNITY
VALE
ONTARIO
NYSSA
JORDAN
VALLEY
SENECA
SCALE: N.T.S.VICINITY MAP1
G1
PROJECT LOCATION
PROJECT LOCATION
FISHWAY INFORMATION
FISHWAY TYPE: VERTICAL SLOT
STRUCTURE TYPE: STAINLESS STEEL
MAX Q: 8.4 CFS
AVG Q: 5.0 CFS
LOW Q: 4.3 CFS
ENGINEER
OREGON DEPARTMENT OF FISH AND WILDLIFE
FISH DIVISION
FISH SCREENING AND PASSAGE PROGRAM
4034 FAIRVIEW INDUSTRIAL DRIVE SE
SALEM, OR 97302
(503)947-6224
X:\PRO
JECT FO
LDERS\BASIN
4 - H
O O
D\P-04-6004 LYDA - M
L, JW
\DESIG
N
\LYDA_2022\LYDA_FISH
W
AY2022_G
-SH
EETS.DW
G
- Thursday, January 26, 2023 2:56:30 PM
- 11X17 PLO
TTED AT H
ALF SCALE
DATE:
R
EV
DRAWN BY:
FILE NO.
FI
SH
S C
R E
E N
IN
G
A N
D P
A
SS
A G
E P
R O
G R
A M
F A
IR
V
IE
W
IN
D
U
ST
R
IA
L D
R . S
.E
SA
LE
M , O
R E
G O
N
D E
PA
R
TM
E
N T
O F
FI
SH
A N
D W
IL
D
LI
FE
O re go n
FI
SH
D
IV
IS
IO
N
SHEET
DESIGN BY:
OF
CHECKED BY:
D A
TE
D
ES
C
R
IP
TI
O
N
PH
O
N E
3)
-6
F A
X
3)
-6
NOTES:
O R
E G
O N
Fi sh
W ild lif e
LY
D
A F
IS
H
W A
Y
M
IL
E C
R
EE
K W
A
SC
O C
O U
N
TY
TI
TL
E
SH
EE
T
1-26-2023
JMW
LWS
P-04-0050
G1
LYDA FISH PASSAGE IMPROVEMENTS PRELIMINARY NOT
FOR
CONSTRUCTION
SCALE: N.T.S.LOCATION MAP2
G1
SHEET LIST
G-SHEETS
G1 TITLE SHEET
G2 STANDARD ABBREVIATIONS AND SYMBOLS
G3 CONSTRUCTION SPECIFICATIONS
G4 CONSTRUCTION SPECIFICATIONS CONT'D
G5 CONSTRUCTION SPECIFICATIONS CONT'D
C-SHEETS
C1 EXISTING SITE PLAN
C2 STAGING AND DEWATERING PLAN
C3 SITE PLAN
S-SHEETS
S1 FISHAY LAYOUT
S2 SEGMENT A LAYOUT
S3 SEGMENT A LAYOUT
S4 SEGMENT B LAYOUT
S5 SEGMENT B INSIDE ELEVATION VIEW
S6 SEGMENT B LAYOUT
S7 SEGMENT C LAYOUT
S8 SEGMENT C LAYOUT
S9 SEGMENT C INSIDE ELEVATION VIW
S10 TURNING POOL SCHEMATIC
S11 CONNECTION DETAILS
X:\PRO
JECT FO
LDERS\BASIN
4 - H
O O
D\P-04-6004 LYDA - M
L, JW
\DESIG
N
\LYDA_2022\LYDA_FISH
W
AY2022_G
-SH
EETS.DW
G
- Thursday, January 26, 2023 2:56:31 PM
- 11X17 PLO
TTED AT H
ALF SCALE
DATE:
R
EV
DRAWN BY:
FILE NO.
FI
SH
S C
R E
E N
IN
G
A N
D P
A
SS
A G
E P
R O
G R
A M
F A
IR
V
IE
W
IN
D
U
ST
R
IA
L D
R . S
.E
SA
LE
M , O
R E
G O
N
D E
PA
R
TM
E
N T
O F
FI
SH
A N
D W
IL
D
LI
FE
O re go n
FI
SH
D
IV
IS
IO
N
SHEET
DESIGN BY:
OF
CHECKED BY:
D A
TE
D
ES
C
R
IP
TI
O
N
PH
O
N E
3)
-6
F A
X
3)
-6
NOTES:
O R
E G
O N
Fi sh
W ild lif e
LY
D
A F
IS
H
W A
Y
M
IL
E C
R
EE
K W
A
SC
O C
O U
N
TY
ST
A
N D
A R
D A
B B
R
EV
IA
TI
O N
S
S
YM
B O
LS
1-26-2023
LWS
P-04-0050
G2
A - TOE WIDTH
AB - ANCHOR BOLT
ABDN - ABANDON
AC - ASPHALT CONCRETE
AD - AREA DRAIN
ADDL - ADDITIONAL
ADJ - ADJACENT
AFF - ABOVE FINISH FLOOR
AFG - ABOVE FINISH GRADE
AGGR - AGGREGATE
AJ - ADJUSTABLE
AL - ALUMINUM
ALTN - ALTERNATE
ALUM - ALUMINUM
ANCH - ANCHOR
APPROX - APPROXIMATE
APVD - APPROVED
AUX - AUXILIARY
AVG - AVERAGE
- BOUNDARY LINE
BLDG - BUILDING
BLK - BLOCK
BM - BEAM OR BENCHMARK
BO - BOTTOM OF
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BRG - BEARING
BRKR - BREAKER
BTW - BETWEEN
BV - BALL VALVE
°C - DEGRESS CENTRIGRADE
C - CONDUIT
C TO C - CENTER TO CENTER
CAB - CABINET
CB - CATCH BASIN
CC - CONTROL CABLE
CD - CHECK DAM
CFM - CUBIC FEET PER MINUTE
CFS - CUBIC FEET PER SECOND
CHAN - CHANNEL
CJ - CONSTRUCTION JOINT
℄ OR CL - CENTERLINE
CLR - CLEAR
CMP - CORRUGATED METAL PIPE
CONC - CONCRETE
CONN - CONNECTION
CONSTR - CONSTRUCTION
CONT - CONTINUOUS`
CONT'D - CONTINUED
COORD - COORDINATE
CTR - CENTER
CNTD - CENTERED
CU FT - CUBIC FEET
CU IN - CUBIC INCH
CU YD - CUBIC YARD
CV - CHECK VALVE
Db - BAR OR BOLT DIAMETER
DEG - DEGREE
DET - DETAIL
DF-L - DOUGLAS FIR/LARCH
DIA - DIAMETER
DISCH - DISCHARGE
DTI - DIRECT TENSION INDICATOR
DTLS - DETAILS
DWG - DRAWING
E - EAST
EA - EACH
EL - ELEVATION
ELEV - ELEVATION
EF - EACH FACE
EOC - EDGE OF CONCRETE
EOP - EDGE OF PAVING
EP - EDGE OF PAVING
EQL - EQUAL
EW - EACH WAY
EXP - EXPANSION
EXST - EXISTING
°F - DEGREES FARENHEIT
FAB - FABRICATION
f'c - CONCRETE COMPRESSIVE STRENGTH
FB - FLAT BAR
FD - FLOOR DRAIN
FDN - FOUNDATION
FF - FINISHED FLOOR
FG - FINISH GRADE
FNSH - FINISH
FT - FOOT OR FEET
FTG - FOOTING
Fy - STEEL TENSILE YIELD STRESS
SB - SEDIMENT BASIN
SCH - SCHEDULE
SECT - SECTION
SF - SQUARE FEET
SHT - SHEET
SIM - SIMILAR
SQ - SQUARE
SQ FT - SQUARE FEET
SQ IN - SQUARE INCHES
SPECS - SPECIFICATIONS
S.S./SS - STAINLESS STEEL
STL - STEEL
STR - STRUCTURE
STRL - STRUCTURAL
STRUCT - STRUCTURAL
T&B - TOP AND BOTTOM
T&G - TONGUE AND GROOVE
T/ - TOP OF
TF - FOOTING THICKNESS
TH - TOP HINGED
THD - THREAD
THK - THICKNESS
THRU - THROUGH
TOC - TOP OF CONCRETE
TOS - TOP OF SLAB
TOW - TOP OF WALL
TS - TUBE STEEL
TW - WALL THICKNESS
TYP - TYPICAL
UHMW - ULTRA-HIGH MOLECULAR
WEIGHT POLYETHYLENE PLASTIC
UNO - UNLESS NOTED OTHERWISE
UON - UNLESS OTHERWISE NOTED
V - VOLTS, VALVE
VB - VAPOR BARRIER
VEL - VELOCITY
VERT - VERTICAL
W - WEST OR WIDTH
W/ - WITH
WD - WOOD
WS - WATER SURFACE, WATERSTOP
WSE - WATER SURFACE ELEVATION
WTR - WATER
XFMR - TRANSFORMER
∠ - ANGLE
° - DEGREES
Δ - DELTA
Ø - DIAMETER
± - PLUS OR MINUS
@ - AT
G - GROUND
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GRTG - GRATING
GV - GATE VALVE
H - HEIGHT
HDPE - HIGH DENSITY POLYETHYLENE PLASTIC
HGL - HYDRAULIC GRADE LINE
HK - HOOK
HORIZ - HORIZONTAL
HP - HORSE POWER
HWL - HIGH WATER LEVEL
ID - INSIDE DIAMETER
IE - INVERT ELEVATION
IN - INCH
INV - INVERT
JCT - JUNCTION
JT - JOINT
KIP - THOUSAND POUNDS
KW - KILOWATT
L - LENGTH
LAT - LATITUDE
LB(S) - POUND(S)
LF - LINEAR FEET
LG - LONG
LLV - LONG LEG VERTICAL
LONG - LONGITUDINAL
LPT - LOW POINT
LWL - LOW WATER LEVEL
MATL - MATERIAL
MAX - MAXIMUM
MB - MACHINE BOLT
MFD - MANUFACTERED
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM
MISC - MISCELLANEOUS
MTL - METAL
N - NORTH
NA - NOT APPLICABLE
NC - NORMALLY CLOSED
NEUT - NEUTRAL
NGVD - NATIONAL GEODETIC VERTICAL
DATUM
NIC - NOT IN CONTACT
N.O. - NORMALLY OPEN
NO. - NUMBER
NS - NONSHRINK
NTE - NOT TO EXCEED
NTS - NOT TO SCALE
O TO O - OUT TO OUT
OC - ON CENTER
OD - OUTSIDE DIAMETER OR OVERFLOW
DRAIN
OF - OUTSIDE FACE
OPNG - OPENING
PBE - POOL BOTTOM ELEVATION
PERF - PERFORATED
PERP - PERPENDICULAR
PH - PHASE
PJF - PREMOLDED JOINT FILLER
⅊ - PROPERTY LINE
PL - PLATE
PLWD - PLYWOOD
PRES - PRESSURE
PROP - PROPERTY
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PT - PRESSURE TREATED
PVC - POLYVINYL CHLORIDE PLASTIC
PVMT - PAVEMENT
R OR RAD- RADIUS
RC - REINFORCED CONCRETE
RD - ROAD
REF - REFERENCE
REINF - REINFORCED
REQD - REQUIRED
RR - RIPRAP/RAILROAD
R.O. - ROUGH OPENING
RPM - REVOLUTION PER MINUTE
SECTION (LETTER) OR DETAIL
(NUMBER) DESIGNATION
SHOWS THE VIEW OR
SECTION
ON DRAWING WHERE SECTION OR
DETAILS ARE TAKEN OR
SHEET/DRAWING NUMBER WHERE
SHOWN
DETAIL AND SECTION DESIGNATION
CONTROL POINT STATION SETUP (TS)OR(BS)
CIVIL SHEETS MARKERS AND LINE TYPES
MAJOR CONTOURS
MINOR CONTOURS
TREE (ANY) UTILITY POLE
CONSTRUCTION AND DRAWING REFERENCES
CONSTRUCTION NOTE DETAIL CALL OUT DETAIL OR DRAWING REVISION
SCALE: 3"=1'-0"
DETAIL INFO
DETAILX
BOOK NUMBERXX
X
XX GC
X
XX X
PRELIMINARY NOT
FOR
CONSTRUCTION
STREAM NAME
WATER SURFACE
X
XX
STREAM AND DITCH FLOW DESIGNATION
DRAWING ELEVATION
SHEET NORTH ARROW
LDERS\BASIN
4 - H
O O
D\P-04-6004 LYDA - M
L, JW
\DESIG
N
\LYDA_2022\LYDA_FISH
W
AY2022_G
-SH
EETS.DW
G
- Thursday, January 26, 2023 2:56:31 PM
- 11X17 PLO
TTED AT H
ALF SCALE
DATE:
R
EV
DRAWN BY:
FILE NO.
FI
SH
S C
R E
E N
IN
G
A N
D P
A
SS
A G
E P
R O
G R
A M
F A
IR
V
IE
W
IN
D
U
ST
R
IA
L D
R . S
.E
SA
LE
M , O
R E
G O
N
D E
PA
R
TM
E
N T
O F
FI
SH
A N
D W
IL
D
LI
FE
O re go n
FI
SH
D
IV
IS
IO
N
SHEET
DESIGN BY:
OF
CHECKED BY:
D A
TE
D
ES
C
R
IP
TI
O
N
PH
O
N E
3)
-6
F A
X
3)
-6
NOTES:
O R
E G
O N
Fi sh
W ild lif e
LY
D
A F
IS
H
W A
Y
M
IL
E C
R
EE
K W
A
SC
O C
O U
N
TY
C O
N
ST
R U
C
TI
O N
S
PE
C
IF
IC
A
TI
O
N S
1-26-2023
LWS
P-04-0050
G3
EARTHWORK CONT'D
B. CRUSHED AGGREGATE BASE FOR SLABS - 1" MINUS CRUSHED GRAVEL OR CRUSHED ROCK FREE OF
ORGANIC MATERIAL.
2.2 PERFORATED FOUNDATION DRAINS
A. PERFORATED PIPE
1. ASTM D2729, 4"Ø RIGID PVC PIPE.
2. SLOTS OR
2" DIAMETER HOLES, 6" OC, IN 2 ROWS AT 80 DEGREE ANGLES
3. WRAP WITH FILTER FABRIC
B. FILTER FABRIC
1. NON-WOVEN POLYPROPYLENE
2. MINIMUM TENSILE STRENGTH 100 PSI (ASTM D1682)
3. GRAB ELONGATION 15-70 (ASTM D1682)
4. MINIMUM BURST STRENGTH 200 PSI (ASTM D751)
C. DRAIN ROCK - CLEAN NATURAL GRAVEL MEETING THE FOLLOWING GRADATION:
SIEVE %PASSING
2" 100 4" 70-100 #4 40-100 #100 0-8 #200 0-4
A. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING ALL UTILITIES PRIOR TO BEGINNING
EXCAVATION.
B. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING OPEN EXCAVATIONS FROM THE WEATHER
AND SLOPE INSTABILITY. MATERIAL WHICH IS MADE UNSUITABLE BY THE WEATHER WILL BE
REPLACED BY THE CONTRACTOR WITH STRUCTURAL FILL AT NO COST TO THE OWNER/AGENCY.
3 EXECUTION
3.1 GENERAL
A. STRIP THE ENTIRE AREA WITHIN THE STRUCTURE PERIMETER TO A MINIMUM OF 6 INCHES, TO
INCLUDE ALL GRASS, WEED ROOTS, TRASH AND VEGETATION. REMOVE ALL MATERIALS
GENERATED BY THE STRIPPING OPERATION FROM THE SITE. STOCKPILE ANY MATERIAL
DETERMINED BY THE ENGINEER'S REPRESENTATIVE AS SUITABLE FOR FUTURE USE.
B. AFTER STRIPPING PROOF ROLL THE STRUCTURE SITE.
1. PROOF ROLL WITH FULLY LOADED, TANDEM AXLE DUMP TRUCK OR
EQUIVALENT,
2. PROVIDE TWO COMPLETE COVERAGES IN OPPOSITE DIRECTIONS.
3. NOTIFY ENGINEER'S REPRESENTATIVE AND HAVE THEM PRESENT DURING PROOF
ROLLING
4. OVEREXCAVATE AREAS THAT BUMP OR RUT WITH COMPACTED
STRUCTURAL FILL WHERE DIRECTED BY THE ENGINEER.
3.2 SITE PREPARATION
A. PLACE STRUCTURAL FILL, WHERE REQUIRED, BEGINNING AT SUBGRADE, DESCRIBED ABOVE, AND
SPREAD IN LEVEL LAYERS NOT EXCEEDING 8" COMPACTED THICKNESS. COMPACT EACH
LAYER TO 93% OF MODIFIED PROCTOR MAXIMUM DRY DENSITY (ASTM D1557). THE WATER
CONTENT AT THE TIME OF COMPACTION SHALL BE WITHIN ±3% OF OPTIMUM.
3.7 STRUCTURAL FILL
A. PLACE 6" OF GRANULAR BASE OVER STRUCTURAL FILL OR UNDISTURBED NATIVE SOIL. COMPACT
BASE COURSE TO 93% OF MODIFIED PROCTOR MAXIMUM DRY DENSITY (ASTM D1557).
B. FINISH GRADE FOR FOOTINGS TO THE LINES AND GRADES SHOWN ON THE PLANS.
3.8 PREPARATION OF GRANULAR BASE FOR SLABS AND FOOTINGS
A. PLACE 4" PVC PERFORATED PIPE AROUND PERIMETER OF FOUNDATION WALL SURROUND
PERFORATED PIPE WITH MINIMUM 2 FOOT BY 2 FOOT LAYER OF DRAIN ROCK OR AS SHOWN
ON PLANS AND DETAILS. SEPARATE DRAIN ROCK FROM UNCLASSIFIED FILL WITH FILTER FABRIC.
SEE FOUNDATION PLAN AND DETAILS.
3.9 FOUNDATION DRAINS
CONCRETE FORMWORK
1 GENERAL
1.1 CONTRACT CONDITIONS
A. NONE SPECIFIED
1.2 DESCRIPTION
A. WORK INCLUDED: FORMS FOR ALL CAST-IN-PLACE CONCRETE INDICATED ON THE DRAWINGS AND
SUBSEQUENT REMOVAL OF ALL SUCH FORMS.
1.3 REFERENCES
A. GUIDE TO FORMWORK OF CONCRETE, ACI 347, AMERICAN CONCRETE INSTITUTE,
CURRENT EDITION.
B. FORMWORK FOR CONCRETE, SP-4, AMERICAN CONCRETE INSTITUTE,
CURRENT EDITION.
1.4 SUBMITTALS
A. NONE REQUIRED UNLESS SPECIFICALLY REQUESTED BY ENGINEER.
1.5 PRODUCT DELIVERY, STORAGE AND HANDLING
A. USE ALL MEANS NECESSARY TO PROTECT FORMWORK MATERIALS BEFORE,
DURING AND AFTER INSTALLATION AND PROTECT THE INSTALLED WORK AND MATERIALS
OF ALL OTHER TRADES.
B. IN THE EVENT OF DAMAGE, IMMEDIATELY MAKE ALL REPAIRS AND REPLACEMENT
NECESSARY TO THE APPROVAL OF THE ENGINEER AND AT NO ADDITIONAL COST TO THE
OWNER.
A. PLYWOOD FORMS: 58" MEDIUM DENSITY OVERLAY FOR ALL EXPOSED CONCRETE. PLYWOOD TO BE
NEW FOR THIS PROJECT. BURIED OR PERMANENTLY CONCEALED CONCRETE MAY BE FORMED
WITH BB FORMPLY, OR EQUAL, OR LUMBER.
B. ROUND COLUMN FORMS: SONOTUBE OR STEEL FORM
C. KEY, JOINTS AND CHAMFERS: DOUGLAS FIR MATERIAL MOLDING OR APPROVED, CONFORMING
TO SHAPE AND DIMENSIONS SPECIFIED OR DETAILED.
D. TIES: METAL TIES, NO METAL WITHIN 1" OF SURFACE AFTER TIE REMOVAL. ALIGN TIE HOLES
WHERE FINISH IS EXPOSED.
E. FORM OIL: SEI GCC-100 FRW WATER-BASED, OR APPROVED BY ENGINEER. FORM OIL FOR
CONCRETE TO BE PAINTED OR LEFT IN NATURAL FINISH CONTACT ENGINEER FOR
INFORMATION.
F. SCREED JOINT: BURKE KEYED KOLD JOINT OR APPROVED BY ENGINEER.
G. EXPANSION JOINTS: BURKE COMPANY FIBER EXPANSION JOINT, OR APPROVED BY ENGINEER.
H. CONTROL JOINTS: ZIPSTRIP OR APPROVED BY ENGINEER
2 PRODUCTS
2.1 MATERIALS
A. COMPLY WITH ALL PERTINENT RECOMMENDATIONS CONTAINED IN AMERICAN CONCRETE
INSTITUTE PUBLICATIONS SP-4 AND ACI-347, CURRENT EDITIONS.
3 EXECUTION
3.1 FORMWORK DESIGN
A. VERIFY LINES, LEVELS AND MEASUREMENT BEFORE PROCEEDING WITH FORMWORK.
B. ALIGN FORM JOINTS. SYMMETRICALLY ALIGN EXPOSED FORM TIE HOLES. MINIMIZE FORM JOINTS.
C. DO NOT APPLY FORM RELEASE AGENT WHERE CONCRETE SURFACES RECIEVE SPECIAL FINISHES
OR APPLIED COATINGS WHICH MAY BE AFFECTED BY AGENT.
D. COORDINATE WORK OF OTHER TRADES IN FORMING AND SETTING OPENINGS, SLOTS, RECESSES, CHASE, SLEEVES, BOLTS, FILLETS, ANCHORS AND OTHER INSERTS. CAP ENDS OF FUTURE USE
SLEEVES WITH DUCT TAPE.
E. PROVIDE 34" CHAMFER STRIPS ON EXTERNAL CORNERS OF ALL EXPOSED VERTICAL AND
HORIZONTAL CONCRETE WORK UNLESS OTHERWISE NOTED ON PLANS.
F. BRACE ALL FORMWORK TO MAINTAIN DESIGNED POSITION, DIMENSIONS AND CONTOURS.
G. MAKE FORMS TIGHT TO PREVENT CONCRETE LEAKAGE.
H. REMOVE ALL FOREIGN MATTER FROM FORMS BEFORE PLACING CONCRETE.
3.2 FORMWORK ERECTION
3.3 ANCHORAGE ITEMS: INSTALL DOWELS, ANCHOR BOLTS, ANCHOR PLATES, ANGLES, INSERTS AND ALL
OTHER EMBEDDED ITEMS SHOWN ON DRAWINGS OR AS SPECIFIED.
A. SLAB ON GRADE EDGE FORMS: 12 HOURS
B. SIDE FORMS FOR WALLS, BEAMS AND COLUMNS: 72 HOURS
C. BEAM SOFFITS AND ELEVATED SLABS: 7 DAYS AND 100% OF DESIGN STRENGTH.
3.4 MINIMUM CURE TIME PRIOR TO FORM REMOVAL:
C. STREAM BED MATERIAL - COORDINATE WITH ODFW DISTRICT BIOLOGIST
2.3 RIPRAP
A. ROCK
1. HARD, DENSE, AND DURABLE
(A). MINIMUM SPECIFIC GRAVITY, ASTM C97: 2.5
2. MAXIMUM ABSORPTION, ASTM C97: 2%
3. MAXIMUM LOSS, SULFATE SOUNDESS, ASTM C88: 10%
B. EITHER QUARRY ROCK OR BOULDERS MAY BE USED FOR RIPRAP
C. SHAPE
1. PREDOMINANTLY ANGULAR
2. MAXIMUM DIMENSION NOT GREATER THAN 3 TIMES MINIMUM DIMENSION
3. MAXIMUM DIAMETER AND/OR WEIGHT INDICATED ON PLANS
D. GRADATION
1. REASONABLY WELL GRADED WITH A MIXTURE OF STONE SIZES RANGING FROM LARGEST TO
SMALLEST SUCH THAT RIPRAP GRADATION SHALL FALL WITHIN THE FOLLOWING LIMITS:
(A). 24" RIPRAP
PARTICLE Ø % PASSING
36" 100 24" 50 1" 0
EARTHWORK CONT'D
A. FOR THE PURPOSE OF THIS PROJECT STAFF FROM THE OREGON DEPARTMENT OF FISH AND
WILDLIFE WILL BE PERFORMING THE CONSTRUCTION ACTING AS THE CONTRACTOR AND WILL
HEREIN AFTER BE REFERRED TO AS CONTRACTOR
B. INTENT: THE SCOPE OF WORK IS TO CONSTRUCT A PRE-FABRICATED STEEL FISHWAY, FOR THE POINT OF DIVERSION KNOWN AS LYDA. OFF CHANNEL WORK INCLUDES BUT IS NOT LIMITED TO:
EXCAVATION, SPOILS DISPOSAL, SUB-BASE PREPARATION, STRUCTURAL FILL PLACEMENT,
BACKFILL & COMPACTION, FURNISHING AND INSTALLING RIP RAP, FURNISHING AND INSTALLING , SITE CLEAN UP AND RESTORATION. CONTRACTOR SHALL INCLUDE ALL NECESSARY MATERIALS
AND LABOR TO COMPLETE ALL WORK SHOWN ON THE DRAWINGS AND DESCRIBED IN THESE
SPECIFICATIONS.
C. COMPLETION TIME: ALL OFF CHANNEL WORK SHALL BE COMPLETED BETWEEN
D. COST FOR DELAY: NONE SPECIFIED
E. TEMPORARY FACILITIES: THE CONTRACTOR SHALL FURNISH ALL TEMPORARY FACILITIES SUCH AS
POWER, LIGHTS, HEAT, WATER, TELEPHONE, SANITARY AND JOB OFFICE AS NEEDED TO PERFORM
THE WORK.
F. THE OWNER WILL BE REQUIRED TO OBTAIN AND PAY FEES FOR ANY OTHER NECESSARY PERMITS
IN WASCO COUNTY. PRIOR TO COMMENCEMENT OF WORK, THE OWNER SHALL CONFIRM WITH
THE ENGINEER THAT THE AGENT OF THE PROPERTY HAS GIVEN CLEARANCE FOR THE WORK. THE AGENT HAS RECEIVED THE FILL AND REMOVAL PERMITS. THE OWNER SHALL BE RESPONSIBLE FOR
COMPLYING WITH ALL CONDITIONS AND REQUIREMENTS OF THESE PERMITS DURING
CONSTRUCTION.
G. ENVIRONMENTAL PROTECTION:
1. THE CONTRACTOR SHALL AT ALL TIMES DIRECT HIS/HER ACTIVITIES IN SUCH A MANNER TO
MINIMIZE ADVERSE EFFECTS ON THE ENVIRONMENT. HANDLING OF FUELS AND OTHER
SUBSTANCES SHALL BE CONDUCTED SO NO SPILLAGE OR LEAKING, DIRECTLY OR THROUGH
THE SOIL, WILL OCCUR THAT MAY POLLUTE ADJACENT STREAMS OR GROUND WATER
SUPPLIES, OR BECOME HAZARDOUS TO HUMAN OR AQUATIC LIFE.
2. PRESSURE WASH AND WIRE BRUSH CLEAN ALL NEW EXPOSED CONCRETE SURFACES PRIOR
TO FLOODING WITH WATER. REMOVED ALL FORM OIL, SCALE, CEMENT DUST, AND
RESIDUE FROM EXPOSED SURFACES. DO NOT DAMAGE FINISHED SURFACES THAT REQUIRE
A MEASURED SURFACE ROUGHNESS TOLERANCE.
3. EXCAVATION, BACKFILL AND PLACEMENT OF CONCRETE SHALL BE IN WORK AREAS ISOLATED
FROM THE ACTIVE FLOWING RIVER BY SUITABLE SETTLING BASIN AWAY FROM THE
STREAM TO PREVENT CONTAMINATION OF THE STREAM. UPON COMPLETION OF
CONSTRUCTION, THE SURFACES SHALL BE RESTORED AT THE SETTLING BASIN.
4. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE HIS/HER CONSTRUCTION
SCHEDULE AND MATERIAL AND EQUIPMENT DELIVERIES WITH THE AFOREMENTIONED
PROVISIONS AND RESTRICTION AND WITH THE REQUIREMENTS OF SECTION 1.1 (B) AND
WITH THE REQUIREMENTS OF APPLICABLE PERMITS.
H. ACCESS TO THE WORK AREA
1. CONTRACTOR SHALL COORDINATE ACCESS TO THE SITE WITH AGENT FOR FOR
ACCESS TO THE WORK AND STORAGE AREAS DURING THE CONSTRUCTION PERIOD. ANY
WORK REQUIRED TO MAKE THESE ROADS SERVICEABLE FOR CONSTRUCTION OPERATIONS
SHALL BE AT THE CONTRACTOR'S EXPENSE.
2. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO ACCESS FACILITIES AND ROADWAYS FOR
WHICH THE OWNER IS RESPONSIBLE AND SHALL RESTORE THEM TO CONDITIONS AT LEAST
EQUALING PRE-CONSTRUCTION CONDITIONS.
3. THE CONTRACTOR SHALL TAKE REASONABLE MEASURE TO LIMIT ENTRY OF PERSONS AND
VEHICLES TO THE WORK AREAS TO EMPLOYEES, AGENTS, ETC., REQUIRED FOR THE
PERFORMANCE OF THIS CONTRACT, AND TO AUTHORIZED PERSONNEL OF FEDERAL, STATE
AND LOCAL AGENCIES, AND TO OTHERS HAVING A RIGHT THERETO.
I. RESTORATION OF EXISTING FACILITIES: UPON COMPLETION OF THE CONSTRUCTION WORK, THE
CONTRACTOR SHALL RESTORE ALL AREAS UTILIZED FOR PERFORMANCE OF THE WORK TO
A CONDITION SATISFACTORY TO THE AGENT FOR THE LANDOWNER MEETING
PRE-CONSTRUCTION CONDITIONS.
GENERAL
1 GENERAL
1.1 DESCRIPTION
3.5 GRADES
A. PERFORM ALL WORK TO LINES, GRADES AND CROSS SECTIONS SHOWN ON THE DRAWINGS.
B. FINAL GRADES SHALL MATCH EXISTING GRADES UNLESS OTHERWISE NOTED ON THE
DRAWINGS. WHERE FINAL GRADES ARE INDICATED ON THE DRAWINGS, GRADES SHALL
SLOPE UNIFORMLY BETWEEN ELEVATIONS SHOWN. ALL FINAL GRADES SHALL BE FREE OF
HOLLOWS, WHICH WOULD POND RAINWATER AND SHALL SLOPE TO ALLOW FOR SURFACE
DRAINAGE. WHERE PRACTICABLE, NO SUCH SLOPES SHALL BE FLATTER THAN 2%, EXCEPT
WHERE SPECIFICALLY SHOWN OTHERWISE. ALL EARTHWORK SHALL HAVE FINISHED
SURFACES, WHICH HAVE NEAT, REASONABLY UNIFORM APPEARANCE.
C. ALL MATERIAL SOURCES ARE SUBJECT TO THE ENGINEER'S APPROVAL. APPROVAL OF A
MATERIAL SOURCE SHALL NOT BE CONSTRUED AS AN APPROVAL FOR ALL MATERIALS
REMOVED FROM THAT SOURCE.
3.6 DEMOLITION AND DISPOSAL
A. ALL DEMOLITION DEBRIS AND ALL WASTE MATERIALS RESULTING FROM CLEARING,
GRUBBING, AND REMOVAL OF EXISTING STRUCTURES, ROCK , CONCRETE, AND
MISCELLANEOUS DEBRIS, SHALL BE REMOVED FROM THE SITE AND LEGALLY DISPOSED OF
BY THE CONTRACTOR IN ACCORDANCE WITH ALL APPLICABLE LAWS, ORDINANCES, RULES,
AND REGULATIONS.
A. THE CONTRACTOR SHALL EXCAVATE TO THE LINES AND GRADES SHOWN ON THE DRAWINGS.
EXTREME CARE SHALL BE TAKEN TO ISOLATE EXCAVATION OF MATERIALS FROM THE STREAM
WATERS WITH COFFERDAM, SANDBAGS, OR OTHERS METHODS TO PREVENT MUD OR DEBRIS
FROM ENTERING THE STREAM WATERS.
B. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CARE OF WATER, DEWATERING AND
DRAINAGE OF WORK AREAS DURING CONSTRUCTION AND SHALL MAINTAIN ALL EXCAVATIONS
AND OTHER PARTS OF THE WORK FREE FROM WATER AS REQUIRED FOR THE SATISFACTORY
CONSTRUCTION OF EACH PART OF THE WORK. EXCAVATION SHALL BE PERFORMED IN THE DRY,
UNLESS OTHERWISE SPECIFIED. CARE OF WATER, DEWATERING AND DRAINAGE SHALL BE
PERFORMED SUCH THAT THE SUBGRADE IS FREE OF SOFT AREAS ATTRIBUTABLE TO AN
UNDRAINED SOIL MASS.
C. THE CONTRACTOR SHALL PROPERLY STOCKPILE SLOPES WHERE REQUIRED TO PREVENT EROSION OR SLOPE INSTABILITY. EROSION FENCING SHALL BE PLACED AT THE TOE OF THE STOCKPILE
SLOPE.
D. STOCKPILE TOPSOIL AND MATERIAL UNSUITABLE FOR BACKFILL OR EMBANKMENT, BUT SUITABLE
FOR USE IN SURFACE RESTORATION; SUCH MATERIAL THEN TO BE USED FOR SURFACE
RESTORATION. SEE VEGETATION SECTION.
3.3 EXCAVATION
2. BACKFILL OR EMBANKMENT SHALL BE PLACED ON FIRM, UNDISTURBED AND DEWATERED
SUBGRADE. NO BACKFILL OR EMBANKMENT SHALL BE PLACED OVER VEGETATION,
SURFACE ORGANICS, TREE STUMPS, TOPSOIL, ROOTS OR DEBRIS OF ANY KIND, OR
SATURATED OR EXCESSIVELY DISTURBED, FROZEN, OR UNCOMPACTED SUBGRADE. THE
CONTRACTOR SHALL PROPERLY DEWATER THE SUBGRADE AND MAINTAIN IT IN A
DEWATERED CONDITION FOR CONSTRUCTION OPERATIONS. ALL STUMP HOLES, CAVITIES
AND OTHER DEPRESSIONS SHALL BE BACKFILLED. THE CONTRACTOR'S SELECTION OF
EQUIPMENT SHALL BE APPROPRIATE TO THE SUBGRADE CONDITIONS.
3. NO BACKFILL OR EMBANKMENT SHALL BE PLACED UNLESS THE INSPECTOR IS PRESENT
EXCEPT AS APPROVED BY THE ENGINEER.
C. SOURCES:
1. MATERIALS FOR REQUIRED FILL AND BACKFILL SHALL BE OBTAINED FROM REQUIRED
EXCAVATION AND/OR FROM SOURCES SELECTED BY THE CONTRACTOR AND APPROVED BY
THE ENGINEER.
2. ALL MATERIALS FROM REQUIRED EXCAVATION AND TRENCHING WHICH ARE SUITABLE FOR
EMBANKMENTS, AND/OR BACKFILLING, SHALL BE STOCKPILED IN AN ORDERLY MANNER
FOR FUTURE USE.
(A). STOCKPILES SHALL BE LOCATED A SUFFICIENT DISTANCE FROM THE BANKS OF THE
EXCAVATION OR TRENCH TO AVOID OVERLOADING AND TO PREVENT SLIDES OR CAVE-INS.
D. PLACEMENT & CONSTRUCTION
1. BACKFILL AND EMBANKMENT MATERIALS SHALL BE PLACED AND COMPACTED (EXCEPT
WHERE INDICATED OTHERWISE) IN CONTINOUS HORIZONTAL LAYERS. SUCCEEDING LAYERS
SHALL NOT BE PLACED UNTIL THE PRECEDING LAYER HAS BEEN SATISFACTORILY
COMPACTED AND TESTED. THE SUBGRADE SHALL BE COMPACTED PRIOR TO PLACEMENT
OF THE FIRST LAYER.
(A). COMPACTION BESIDE STRUCTURES: ALL GENERAL BACKFILL PLACED WITHIN 10'-0" OF
A STRUCTURE (WALL, FOOTING, SLAB) SHALL BE SPREAD IN UNIFORM LIFTS NOT TO
EXCEED 8" IN THICKNESS AND COMPACTED TO 92% OF ITS MAXIMUM MODIFIED PROCTOR
DRY DENSITY (ASTM D1557). THE WATER CONTENT AT THE TIME OF COMPACTION SHALL
BE WITHIN ±3% OF OPTIMUM.
3.4 BACKFILL AND EMBANKMENT CONT'D
D. BACKFILL
1. ALL BACKFILL MATERIAL REQUIRED TO OBTAIN INDICATED GRADES NOT UNDER STRUCTURES
SHALL BE SELECTED NATURAL FILL MATERIAL FROM EITHER PREAPPROVED ON-SITE
EXCAVATION OPERATIONS OR FROM AN APPROVED OFF-SITE BORROW. IT SHALL CONSIST
OF THE FOLLOWING:
(A). WELL GRADED FREE DRAINING OR CRUSHED ROCK UP TO 11
2" MAXIMUM SIZE
(B). NOT MORE THAN 15% OF FINES PASSING THROUGH A #200 SIEVE.
3. PLACEMENT BELOW WATER SURFACE SHALL BE CONTROLLED IN A MANNER SATISFACTORY
TO THE ENGINEER.
4. PLACEMENT OF SMALL STONE TO CHOKE THE INTERSTICES BETWEEN LARGER ROCKS FOR
LEVELING THE SURFACE WILL NOT BE PERMITED.
5. BREAKING OF INDIVIDUAL PIECES IN PLACE EITHER BY BLASTING OR MECHANICAL METHODS
WILL NOT BE PERMITTED.
6. RIPRAP SHALL BE PLACED TO ITS FULL COURSE THICKNESS AT ONE OPERATION AND IN SUCH
MANNER AS TO AVOID DISPLACING THE UNDERLYING MATERIAL.
7. PLACING RIPRAP BY DUMPING INTO CHUTES OR BY SIMILAR METHODS LIKELY TO CAUSE
SEGREGATION OF THE VARIOUS SIZES WILL NOT BE PERMITTED.
8. THE DESIRED DISTRIBUTION OF THE VARIOUS SIZES OF STONES THROUGHOUT THE MASS
SHALL BE OBTAINED BY SELECTIVE LOADING AT THE QUARRY OR OTHER SOURCE, BY
CONTROLLED BUMPING OF SUCCESSIVE LOADS DURING PLACING, OR BY OTHER METHODS
OF PLACEMENT THAT WILL PRODUCE THE SPECIFIED RESULTS.
9. REARRANGING OF INDIVIDUAL STONES BY MECHANICAL EQUIPMENT OR BY HAND WILL BE
REQUIRED TO THE EXTENT NECESSARY TO CORRECT DEFICIENCIES.
10. RIPRAP MATERIALS THAT DO NOT MEET THE SPECIFIED REQUIREMENTS FOR SIZE, QUALITY, OR DISTRIBUTION OF SIZES, SHALL BE REMOVED AND REPLACED WITH SUITABLE
MATERIALS AT NO ADDITIONAL COST TO THE OWNER/AGENCY.
D. TOLERANCES
1. RIPRAP SHALL BE PLACED TO THE FULL THICKNESS SHOWN ON THE DRAWINGS AND NO
MINUS TOLERANCE WILL BE PERMITTED.
2. A GREATER THICKNESS WILL BE PERMITTED PROVIDED THE OUTSIDE SLOPES PRESENT A
UNIFORM APPEARANCE WITH A MINIMUM OF PIECES PROJECTING OUTSIDE THE FINISHED
SLOPE SURFACE.
3.10 RIPRAP PLACEMENT CONT'D
EARTHWORK CONT'D
A. WORK INCLUDED - ALL EXCAVATION AND BACKFILL WITHIN THE PERIMETER OF THE STRUCTURE, THE DITCH(ES), EXCAVATION(S), THE BYPASS PIPE EXCAVATION, THE DISCHARGE PIPE
EXCAVATION, THE JUNCTION BOX EXCAVATION. INCLUDING BUT NOT LIMITED TO STRIPPING,
EXCAVATION AND BACKFILL FOR FOOTINGS, WALLS AND SLABS. FOUNDATION DRAINS AND BASE
ROCK PLACEMENT FOR SLABS ON GRADE. THIS ITEM ALSO INCLUDES REMOVAL OF ALL
UNSUITABLE MATERIALS, ALL DEMOLITION, OTHER SITE WORK, AND RELATED OPERATIONS FROM
THE SITE AS WELL AS PURCHASING SELECT MATERIALS REQUIRED BY SPECIFICATION.
EARTHWORK
1 GENERAL
1.1 DESCRIPTION
1.2 SUBMITTALS
A. STRUCTURAL FILL - SUBMIT SAMPLES OF PROPOSED STRUCTURAL FILL MATERIALS TO THE
ENGINEER ALONG WITH LABORATORY ANALYSIS SHOWING THAT THE MATERIAL MEETS JOB
SPECIFICATIONS.
1.3 QUALITY ASSURANCE
A. NOTIFY THE ENGINEER 48 HOURS PRIOR TO REQUIRED TESTING OR INSPECTIONS.
B. REQUIRED TESTS AND INSPECTIONS
1. SUBGRADE INSPECTION BY THE ENGINEER'S REPRESENTATIVE PRIOR TO BEGINNING ANY FILL.
2. ONE COMPACTION TEST PER EVERY 4000 SF OF SUBGRADE PLACEMENT. 2 FEET OF DEPTH
MAX PLACEMENT WITHOUT A TEST.
3. SUBGRADE INSPECTION PRIOR TO COVERING WITH BASEROCK.
C. ALL TESTS WILL BE PERFORMED BY THE OWNER'S TESTING LAB. REQUIRED TESTS AS LISTED
ABOVE WILL BE PAID BY THE OWNER. RETESTS OF FAILING TESTS WILL BE BILLED TO THE
CONTRACTOR. ANY OVERTIME PREMIUM WILL BE PAID BY THE CONTRACTOR.
D. ANY FILL MATERIAL USED IN THE PROJECT SHALL BE FREE OF CONSPICUOUS PLASTICITY, FROZEN
MATERIAL, PEAT, OR WASTE AS LARGE ROOTS, OVERSIZE ROCK, LUMBER, LOGS AND OTHER
FOREIGN MATERIAL AND SHALL BE FURNISHED FROM AN APPROVED SOURCE.
A. STRUCTURAL FILL - FURNISH STRUCTURAL FILL MEETING THE REQUIREMENTS LISTED BELOW:
1. WELL GRADED GRANULAR MATERIALS. PIT RUN GRAVEL, CRUSHED ROCK OR QUARRY ROCK.
2. NO PEAT, ROOTS, SOD OR OTHER DELETERIOUS MATERIALS.
3. MAXIMUM SIZE = 4"Ø
4. LESS THAN 12% PASSING #200 SIEVE.
5. PRIOR APPROVAL REQUIRED BEFORE PLACING FILL MATERIALS.
2 PRODUCTS
2.1 FILL MATERIALS
A. ALL EARTHEN MATERIALS, EXCEPT RIPRAP, PLACED BELOW INDICATED OR DIRECTED FINISH
GRADES ARE SUBJECT TO THE REQUIREMENTS OF THIS SUBSECTION EXCEPT AS SPECIFICALLY
INDICATED OTHERWISE.
B. GENERAL
1. THE CONTRACTOR SHALL FILL TO LINES AND GRADES SHOWN ON THE DRAWINGS AND AS
SPECIFIED HEREIN USING MATERIALS DESIGNATED. WHERE EXISTING SURFACE LEVELS ARE
BELOW PLANNED GRADE OR SUBGRADE ELEVATIONS OR EXCESS EXCAVATION IS
PERFORMED, BACKFILL SHALL BE PROVIDED TO INDICATED GRADES OR SUBGRADES.
3.4 BACKFILL AND EMBANKMENT
2.1 FILL MATERIALS CONT'D
A. RIPRAP FOUNDATION PREPARATION
1. SLOPES TO BE PROTECTED BY RIPRAP SHALL BE FREE OF BRUSH, TREES, STUMPS, AND OTHER
OBJECTIONABLE MATERIAL AND SHALL BE TRIMMED AND DRESSED TO PRESENT A TRUE,
EVEN PLANE WITH NO ABRUPT RIDGES OR DEPRESSIONS. ALL SOFT OR SPONGY MATERIAL
SHALL BE REMOVED AS DIRECTED BY THE ENGINEER AND REPLACED WITH STRUCTURAL
FILL.
2. EXCAVATION OF RIPRAP TOE TRENCHES SHALL BE COORDINATED WITH THE PLACEMENT OF
RIPRAP IN SUCH A MANNER AS TO PREVENT THE TOE TRENCHES FROM BEING FILLED WITH
OTHER MATERIALS PRIOR TO THE PLACEMENT OF RIPRAP BEDDING AND STONE; AND ANY
SUCH MATERIAL DEPOSITED IN THE TOE TRENCH PRIOR TO PLACEMENT OF RIPRAP SHALL
BE REMOVED AND DISPOSED OF AT NO COST TO THE OWNER.
3. SEE PLANS FOR SPECIFIC CONSTRUCTION DETAILS.
B. RIPRAP CONSTRUCTION
1. RIPRAP SHALL BE PLACED ON THE PREPARED SLOPES, IN THE TOE, AND AROUND
STRUCTURES WITHIN THE LIMITS SHOWN ON THE DRAWINGS, OR AS OTHERWISE
REQUIRED BY THE ENGINEER.
2. THE FINISHED RIPRAP SLOPES SHALL PRESENT A REASONABLY UNIFORM AND REGULAR
SURFACE NOT STEEPER THAN THOSE SHOWN ON THE DRAWINGS.
3. THE CONTRACTOR SHALL MAINTAIN THE RIPRAP PROTECTION IN ANY INCOMPLETE REACH
UNTIL FINAL ACCEPTANCE AND ANY MATERIAL DISPLACED SHALL BE REPLACED, AT HIS/HER
EXPENSE, TO THE SLOPES, LINES AND GRADES SHOWN ON THE DRAWINGS.
4. A COMPLETE REACH OF RIPRAP SHALL CONSIST OF ALL REQUIRED RIPRAP BETWEEN
INDICATED DISCONTINUITIES AND SHALL INCLUDE ALL REQUIRED TOE TRENCH BACKFILL.
C. PLACEMENT
1. RIPRAP STONE SHALL BE PLACED ON THE PREPARED BASE IN SUCH A MANNER AS TO
PRODUCE A WELL-KEYED MASS OF ROCK WITH INDIVIDUAL STONES TIGHLY IN CONTACT
WITH THE LEAST PRACTICABLE AMOUNT OF VOID SPACES.
2. THE FINISHED RIPRAP SHALL BE FREE FROM POCKETS OF STONE LESS THAN THE SPECIFIED
MINIMUM SIZE OR WHICH WOULD PREVENT CONTACT BETWEEN THE SPECIFIED SIZES.
3.10 RIPRAP PLACEMENT
VEGETATION
A. COORDINATE WITH LOCAL ODFW BIOLOGIST TO DETERMINE WHICH SPECIES AND PLANTING PLAN
FOR ALL DISTURBED OR EXPOSED SOILS DUE TO PROJECT.
1 GENERAL
1.1 DESCRIPTION
PRELIMINARY NOT
FOR
CONSTRUCTION
LDERS\BASIN
4 - H
O O
D\P-04-6004 LYDA - M
L, JW
\DESIG
N
\LYDA_2022\LYDA_FISH
W
AY2022_G
-SH
EETS.DW
G
- Thursday, January 26, 2023 2:56:32 PM
- 11X17 PLO
TTED AT H
ALF SCALE
DATE:
R
EV
DRAWN BY:
FILE NO.
FI
SH
S C
R E
E N
IN
G
A N
D P
A
SS
A G
E P
R O
G R
A M
F A
IR
V
IE
W
IN
D
U
ST
R
IA
L D
R . S
.E
SA
LE
M , O
R E
G O
N
D E
PA
R
TM
E
N T
O F
FI
SH
A N
D W
IL
D
LI
FE
O re go n
FI
SH
D
IV
IS
IO
N
SHEET
DESIGN BY:
OF
CHECKED BY:
D A
TE
D
ES
C
R
IP
TI
O
N
PH
O
N E
3)
-6
F A
X
3)
-6
NOTES:
O R
E G
O N
Fi sh
W ild lif e
LY
D
A F
IS
H
W A
Y
M
IL
E C
R
EE
K W
A
SC
O C
O U
N
TY
C O
N
ST
R U
C
TI
O N
S
PE
C
IF
IC
A
TI
O
N S
C O
N T'
D
1-26-2023
LWS
P-04-0050
G4
A. NONE SPECIFIED
CONCRETE REINFORCEMENT
1 GENERAL
1.1 CONTRACT CONDITIONS
A. WORK INCLUDED: FURNISH AND INSTALL ALL REINFORCEMENT AND ASSOCIATED ITEMS
REQUIRED AND/OR INDICATED ON THE DRAWINGS FOR ALL CAST-IN-PLACE CONCRETE.
1.2 DESCRIPTION
A. INTERNATIONAL BUILDING CODE (IBC)
1. CHAPTER 19
B. AMERICAN CONCRETE INSTITUTE (ACI)
1. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, ACI 318 LATEST EDITION
2. ACI DETAILING MANUAL, SP-66 LATEST EDITION
3. STANDARD TOLERANCES FOR CONCRETE CONSTRUCTION AND MATERIALS,
C. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
1. REINFORCING BARS: ASTM A615 STANDARD SPECIFICATION FOR DEFORMED AND PLAIN
BILLET-STEEL BARS FOR CONCRETE REINFORCEMENT.
2. WELDED WIRE FABRIC: ASTM A185, STANDARD SPECIFICATION FOR WELDED STEEL
WIRE FABRIC FOR CONCRETE REINFORCEMENT.
D. CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
1. MANUAL OF STANDARD PRACTICE
2. PLACING REINFORCING BARS
1.3 REFERENCES
A. SUBMIT SHOP DRAWINGS SHOWING SIZES AND DIMENSIONS FOR FABRICATION AND PLACING OF
REINFORCING STEEL AND BAR SUPPORTS.
B. INDICATE BAR SCHEDULES, STIRRUP SPACING AND DIAGRAMS OF BENT BARS. IDENTIFY BAR
FUNCTION ON MATERIAL LIST AND SHOP DRAWINGS (TRANSVERSE, LONGITUDINAL, DOWELS,
STIRRUPS, TIES, ETC.)
C. DO NOT BEGIN FABRICATION PRIOR TO RECEIVING REVIEWED COPIES OF THE SUBMITTALS FROM
THE ENGINEER.
1.4 SUBMITTALS
A. ACCEPTABLE MANUFACTURERS: REGULARLY ENGAGED IN MANUFACTURE OF STEEL BAR AND
WELDED WIRE FABRIC REINFORCING.
B. SUBMIT MILL TEST CERTIFICATES IDENTIFYING CHEMICAL AND PHYSICAL ANALYSIS OF EACH LOAD
AND REINFORCING STEEL DELIVERED.
C. NOTIFY ENGINEER IN AMPLE TIME FOR ON SITE OBSERVATION OF REINFORCING STEEL
PLACEMENT BEFORE POURING CONCRETE, MINIMUM 72 HOURS.
1.5 QUALITY ASSURANCE
A. DELIVER REINFORCEMENT TO PROJECT SITE IN BUNDLES MARKED WITH METAL TAGS INDICATING
BAR SIZE AND LENGTH.
B. HANDLE AND STORE MATERIALS TO PREVENT CONTAMINATION.
1.6 PRODUCT DELIVERY, STORAGE AND HANDLING
A. COMPLY WITH ALL REQUIREMENTS OF ACI 318 CHAPTER 3 FOR MATERIALS.
B. COMPLY WITH ALL REQUIREMENTS OF ACI 318 CHAPTER 7 FOR FABRICATION OF REINFORCING
STEEL.
2 PRODUCTS
2.1 CODE REQUIREMENTS
A. BARS: ASTM A615 GRADE 60
NOTE: WHEN WELDING REBAR THE ONLY REBAR THAT IS READY TO WELD IS
W-GRADE (LOW ALLOY-A706)
B. WELDED WIRE FABRIC: ASTM A185
2.2 MATERIALS
A. COMPLY WITH ALL REQUIREMENTS OF ACI 318 CHAPTER 7 FOR FABRICATION AND PLACING OF
REINFORCING STEEL.
B. INSPECTION:
1. PRIOR TO INSTALLATION OF THE WORK OF THIS SECTION, CAREFULLY INSPECT THE INSTALLED
WORK OF ALL OTHER TRADES AND VERIFY THAT ALL SUCH WORK IS COMPLETE TO THE
PONT WHERE THIS INSTALLATION MAY PROPERLY COMMENCE.
2. VERIFY THAT CONCRETE REINFORCEMENT IS INSTALLED IN STRICT ACCORDANCE WITH ALL
PERTINENT CODES AND REGULATIONS, THE APPROVED SHOP DRAWINGS AND THE
ORIGINAL DESIGN.
C. BENDING
1. BENDING AND CUTTING SHALL CONFORM TO ACI 315 AND APPLICABLE PROVISIONS OF ACI
318. ALL HOOKS SHOWN ON THE DRAWINGS ARE TO BE STANDARD HOOKS EXCEPT WHERE
DESIGNATED OTHERWISE.
D. SPLICING
1. REINFORCING BARS SHALL BE FURNISHED IN FULL LENGTHS WHERE POSSIBLE.
2. WHERE SPLICING IS REQUIRED FOR RECOMMENDED, THE LENGTH OF THE SPLICE SHALL BE
48 BAR DIAMETERS.
3. SPLICE DETAILS ARE SUBJECT TO ALL APPLICABLE PROVISIONS OF ACI 318.
4. SPLICES SHALL BE LOCATED AT POINTS OF LOW TENSILE STRESS WHERE POSSIBLE,
OTHERWISE DISTRIBUTED TO AVOID A CONCENTRATION OF SPLICES AT A PARTICULAR LINE
OR LEVEL.
5. IN ALL CASES SPLICES AT LOCATIONS NOT SHOWN ON THE DRAWINGS ARE SUBJECT TO THE
ENGINEER'S APPROVAL.
6. NO SPLICES SHALL BE MADE IN CONCRETE REINFORCEMENT WHERE THE SECTION IS NOT
SUFFICIENT TO PROVIDE A MINIMUM OF 2 BAR DIAMETERS CLEAR COVER AND A
MINIMUM CLEARANCE OF 3 BAR DIAMETERS BETWEEN SPLICED BARS AND ADJACENT
BARS.
7. BARS SHALL BE RIGIDLY WIRED AT SPLICES.
E. DISCREPANCIES: IN THE EVENT OF DISCREPANCY, IMMEDIATELY NOTIFY THE ENGINEER. DO NOT
PROCEED WITH INSTALLATION IN AREAS OF DISCREPANCY UNTIL ALL SUCH DISCREPANCIES
HAVE BEEN FULLY RESOLVED.
F. PLACING:
1. PLACEMENT OF ALL REINFORCEMENT SHALL CONFORM TO ACI 318. MINIMUM CLEAR
DISTANCE BETWEEN BARS 1" OR 1 BAR DIAMETER WHICHEVER IS GREATER.
2. WIRE ALL INTERSECTIONS WITH 18 GUAGE BLACK ANNEALED WIRE. SUPPORT ADEQUATELY
BY CHAIRS AND SPACERS; FOOTING REINFORCEMENT MAY BE SUPPORTED ON CONCRETE
BLOCKS. MAINTAIN MINIMUM 3 INCH CLEARANCE TO GROUND.
3. BEFORE PLACING CONCRETE, CLEAN REINFORCEMENT OF BOND INHIBITING COATINGS.
4. PLACE, SUPPORT, AND SECURE REINFORCEMENT AGAINST DISPLACEMENT.
5. PROVIDE 2 - #4 x 4'-0" LONG DIAGONALLY AT ALL SLAB-ON-GRADE RE-ENTRANT CORNERS.
6. PROVIDE .0018 TIMES CONCRETE CROSS SECTIONAL AREA REINFORCING STEEL EACH WAY
FOR ALL CONCRETE UNLESS OTHERWISE NOTED.
7. ALL LAP SPLICES TO BE 48 BAR DIAMETERS UNLESS OTHERWISE NOTED.
8. WHERE CONCRETE IS TO BE DRILLED LATER FOR ANCHOR BOLTS, EXPANSION SHELLS,
EXPANSION BOLTS, ETC., AS REQURIED IN THE DRAWINGS, SPECIAL CARE SHALL BE TAKEN
TO COORDINATE EXACT LOCATION OF REINFORCEMENT SUCH THAT IT WILL NOT INTERFERE
WITH SUCH DRILLING.
3 EXECUTION
3.1 INSTALLATION
A. WORK INCLUDED: MECHANICAL ANCHORS FOR CONNECTING WOOD AND STEEL MEMBERS TO
CONCRETE. TYPES OF FASTENERS INCLUDED ARE:
1. ADHESIVE ANCHORS
2. EXPANSION ANCHORS
3. POWDER ACTUATED FASTENERS
B. CAST IN PLACE ANCHOR BOLTS ARE SPECIFIED UNDER STRUCTURAL STEEL
CONCRETE ANCHORS
1 GENERAL
1.1 DESCRIPTION
A. HILTI PRODUCT TECHNICAL GUIDE
B. SIMPSON STRONG-TIE TECHNICAL GUIDE
C. RAMSET/RED HEAD TECHNICAL GUIDE
1.2 REFERENCES
A. NOT REQUIRED IF SPECIFIED PRODUCT IS USED.
B. IF ANY PRODUCT(S) OTHER THAN THE SPECIFIED PRODUCT(S) IS/ARE PROPOSED SUBMITTALS
MUST BE RECEIVED AND APPROVED PRIOR TO THEIR USE. THESE SUBMITTALS MUST INCLUDE
THE FOLLOWING INFORMATION:
1. AN ANCHOR BY ANCHOR LISTING OF THE PROPOSED ANCHORS AND WHAT SPECIFIED
ANCHOR EACH PROPOSED ANCHOR IS REPLACING.
2. ICBO REPORT NUMBERS FOR ALL PROPOSED ANCHORS.
3. EVIDENCE THAT THE RATED CAPACITY OF THE PROPOSED ANCHOR IS EQUAL OR GREATER
THAN THE SPECIFIED ANCHOR.
4. ANY DIFFERENCES IN HOLE DEPTH, SPACING, EDGE DISTANCE, END DISTANCE OR
INSTALLATION METHOD WHICH ARE REQUIRED BY THE PROPOSED PRODUCT.
5. SPECIAL INSPECTION REQUIREMENTS IF DIFFERENT FROM SPECIFIED PRODUCT.
1.3 SUBMITTALS
A. SPECIAL INSPECTIONS IN ACCORDANCE WITH IBC CHAPTER 17 ARE REQUIRED FOR:
1. ALL EPOXY ANCHORS
2. EXPANSION ANCHORS WHERE SHOWN ON PLANS
3. POWDER ACTUATED FASTENERS WHERE SHOWN ON PLANS
1.4 QUALITY ASSURANCE
A. EXPANSION ANCHORS
1. HILTI KWIK-BOLT II
2. SIMPSON STRONG-TIE SLEEVE ALL
3. RAMSET/RED HEAD TRUBOLT
B. ADHESIVE ANCHORS
1. HILTI HIT EPOXY ADHESIVE
2. SIMPSON STRONG-TIE ET EPOXY ADHESIVE
3. SIMPSON STRONG-TIE SET EPOXY ADHESIVE
4. RAMSET/RED HEAD C6 EPOXY ADHESIVE
2 PRODUCTS
2.1 MATERIALS
A. ALTERNATE ANCHORS MAY BE SUBSTITUTED SUBJECT TO THE FOLLOWING CONDITIONS:
1. PROPOSED PRODUCT MUST BE SAME TYPE OF ANCHOR AS THE SPECIFIED PRODUCT (I.E.
EXPANSION ANCHORS MAY NOT BE SUBSTITUTED WHERE ADHESIVE ANCHORS ARE SHOWN.)
2. DIAMETER FOR EXPANSION ANCHORS AND ADHESIVE ANCHORS MUST BE THE SAME AS THE
DIAMETER SHOWN ON THE PLANS.
3. PROPOSED PRODUCT MUST HAVE A CURRENT ICBO REPORT LISTING WHICH COVERS THE
SPECIFIC APPLICATION FOR WHICH THE PRODUCT IS BEING USED.
4. CAPACITIES, AS SHOWN IN THE ICBO REPORT, MUST BE EQUAL OR GREATER THAN THE
VALUES FOR THE SPECIFIED PRODUCT.
5. SUBMITTALS, AS DESCRIBED IN SECTION 1.3 ABOVE MUST BE APPROVED PRIOR TO THE USE
OF ALTERNATE MATERIALS ON THE JOB.
2.2 ALTERNATE MANUFACTURERS
A. DO NOT INSTALL ANY DRILLED IN CONCRETE ANCHORS UNTIL CONCRETE HAS CURED FOR AT
LEAST 10 DAYS.
B. MAINTAIN PROPER EDGE DISTANCES AS REQUIRED BY THE MANUFACTURER AND AS SHOWN ON
THE PLANS.
3 EXECUTION
3.1 INSTALLATION - GENERAL
A. INSTALL ACCORDING TO MANUFACTURERS INSTRUCTIONS AND CURRENT ICBO REQUIREMENTS.
3.2 INSTALLATION - EXPANSION ANCHORS
A. INSTALL ACCORDING TO MANUFACTURERS INSTRUCTIONS AND CURRENT ICBO REQUIREMENTS.
3.3 INSTALLATION - ADHESIVE ANCHORS
A. INSTALL ACCORDING TO MANUFACTURERS INSTRUCTIONS AND CURRENT ICBO REQUIREMENTS.
3.4 INSTALLATION - POWDER ACTUATED FASTENERS
A. CONCRETE PROPORTIONS: CONCRETE SHALL BE STONE CONCRETE COMPOSED OF CEMENT, FINE
AGGREGATE, COARSE AGGREGATE AND WATER.
B. DESIGN: PREPARE THE DESIGNS OF MIXES FOR EACH CLASS OF CONCRETE SPECIFIED TO BE USED.
DESIGN CONCRETE MIXES IN ACCORDANCE WITH IBC STANDARD 19-3 TO PRODUCE THE
STRENGTH FOR EACH TYPE OF CONCRETE WITH THE SLUMPS AND MAXIMUM SIZES OF
COURSE AGGREGATE SPECIFIED. COMPRESSIVE STRENGTH, MAXIMUM WATER CONTENT AND
MAXIMUM SLUMP SHALL BE AS FOLLOWS:
1. CONCRETE, UNLESS OTHERWISE SPECIFIED:
(A). COMPRESSIVE STRENGTH AT 28 DAYS: 4,500 PSI
(B). MINIMUM CEMENT CONTENT: 61
2 SACK PER CUBIC YARD
(C). MAXIMUM SLUMP: 4 INCH
2. AIR ENTRAINMENT:
(A). FOR ALL EXPOSED CONCRETE: 4% TO 7%
(B). FOR ALL OTHER CONCRETE: NOT REQUIRED
C. TESTING
1. TESTING AND ANALYSIS OF CONCRETE WILL BE PERFORMED BY ENGINEER'S
REPRESENTATIVE.
2. CONCRETE TESTING IS REQUIRED EVEN WHEN SPECIAL INSPECTION IS NOT REQUIRED.
3. PERFORM THE FOLLOWING TESTS WHENEVER TESTING IS REQUIRED:
(A). SLUMP TEST PER ASTM C143
(B). CAST FOUR CONCRETE CYLINDERS
(C). AIR ENTRAINMENT TEST, WHERE AIR ENTRAINED CONCRETE IS
REQUIRED
4. FREQUENCY OF TESTS
(A). NOT LESS THAN ONCE PER DAY
(B). NOT LESS THAN ONCE PER 150 CUBIC YARDS OF CONCRETE IN A GIVEN
DAY
(C). NOT LESS THAN ONCE PER 5000 SQUARE FEET OF SLAB OR WALL AREA
5. LAB CURE ALL SAMPLES. PROTECT SAMPLES FROM ADVERSE WEATHER CONDITIONS.
6. TEST CYLINDERS AT THE FOLLOWING DATES:
(A). ONE BREAK AT 7 DAYS
(B). TWO BREAKS AT 28 DAYS
(C). HOLD ONE CYLINDER IN CASE OF PROBLEMS WITH 28 DAY
BREAK
7. SEND COPIES OF REPORT TO THE OWNER'S REPRESENTATIVE, THE CONTRACTOR, AND THE
ENGINEER
D. WEATHER REQUIREMENTS:
1. COLD WEATHER: CONFORM TO ACI 306. PROCEDURES FOR PLACING AND PROTECTING
CONCRETE WORK DURING FREEZING WEATHER BY ENGINEER'S APPROVAL ONLY. ASSUME
ALL RISKS FOR CONCRETE WORK DURING FREEZING WEATHER. REMOVE AND REPLACE
FROZEN CONCRETE AT CONTRACTOR'S EXPENSE. KEEP ABOVE FREEZING POINT UNTIL
THOROUGHLY SET. USE NO ADMIXTURES TO PREVENT FREEZING WITHOUT PRIOR
APPROVAL.
2. HOT WEATHER: CONFORM TO ACI 305. TEMPORARILY DISCONTINUE PLACEMENT WHEN, IN
THE OPINION OF ENGINEER'S REPRESENTATIVE, CLIMATIC CONDITIONS OF SUN, HEAT,
WIND, OR HUMIDITY PREVENT PROPER PLACEMENT, CONSOLIDATION OR FINISHING. USE OF
APPROVED RETARDANT ADMIXTURE SHALL BE PROVIDED AT NO ADDITIONAL CHARGE TO
THE OWNER IF, IN THE OPINION OF THE ENGINEER, CLIMATIC CONDITIONS SO INDICATE.
E. FIBER REINFORCED CONCRETE
1. WHERE FIBER REINFORCED CONCRETE IS USED ON THE PROJECT A DELIVERY TICKET,
SIGNED BY THE WEIGHMASTER, SHALL BE AVAILABLE TO THE ENGINEER'S REPRESENTATIVE
UPON REQUEST.
2. THE DELIVERY TICKET SHALL INCLUDE, IN ADDITION TO THE ITEMS NOTED IN SECTION OF
ASTM C94, THE TYPE AND AMOUNT OF FIBERS ADDED TO THE CONCRETE MIX.
CAST IN PLACE CONCRETE CONT'D
1 GENERAL
1.4 QUALITY ASSURANCE
A. PORTLAND CEMENT: TYPE I OR II LOW ALKALI PCC THAT CONFORMS TO ASTM C-150
B. CONCRETE AGGREGATES: CONFORM TO ASTM C-33. 34" MAXIMUM SIZE FOR EXPOSED CONCRETE.
2" MAXIMUM SIZE FOR FOOTINGS.
C. WATER: CLEAN AND FREE OF SUBSTANCES HARMFUL TO CONCRETE
D. GROUTING: NON-SHRINK, PRE-MIXED GROUT. MASTER BUILDERS, SONNEBORN, FOSROC, OR
EQUAL. CONFORM TO ASTM C-1107
E. WATER REDUCING ADMIXTURE
1. MID-RANGE WATER REDUCING ADMIXTURE
2. NO CALCIUM CHLORIDE
3. ASTM C-494, TYPE A ADMIXTURE
F. AIR ENTRAINING ADMIXTURES FOR CONCRETE: CONFORM TO ASTM C-260
G. LIQUID MEMBRANE-FORMING COMPOUNDS FOR CURING CONCRETE: CONFORM TO ASTM C-309.
PROVIDE SEI GCC-300 OR APPROVED.
H. LIQUID MEMBRANE-FORMING COMPOUNDS HAVING SPECIAL PROPERTIES FOR CURING AND
SEALING CONCRETE: CONFORM TO ASTM C-1315. PROVIDE ONLY VOC COMPLIANT
MATERIALS.
I. EXPANSION JOINT MATERIAL: PREFORMED, NON-EXTRUDING RESILIENT FILLER SATURATED WITH
BITUMINOUS MATERIALS HAVING PRESERVATIVE CHARACTERISTICS. BURKE FIBER EXPANSION
JOINT OR APPROVED EQUAL. 12' THICKNESS UNLESS OTHERWISE NOTED ON PLANS.
J. CONCRETE BONDING AGENT: FOX INDUSTRIES FX-752 OR APPROVED BY ENGINEER
2 PRODUCTS
2.1 MATERIALS
A. NOTIFY ENGINEER IN AMPLE TIME FOR ON SITE OBSERVATIONS OF REINFORCING STEEL
PLACEMENT BEFORE POURING CONCRETE. MINIMUM 72 HOURS.
B. EXAMINE AREA SCHEDULED TO RECEIVE CONCRETE MIX FOR CONDITIONS THAT WILL ADVERSELY
AFFECT EXECUTION, PERMANENCE OR QUALITY OF WORK AS FOLLOWS:
1. FORMWORK ERECTED AND CLEAN
2. REINFORCEMENT PLACED CORRECTLY INTO POSITION
3. WATER, SNOW AND ICE REMOVED FROM FORMS
3 EXECUTION
3.1 PERIODIC ON SITE OBSERVATION
CAST IN PLACE CONCRETE CONT'D
A. ADD FIBROUS CONCRETE REINFORCEMENT TO CONCRETE MATERIALS AT THE TIME CONCRETE IS
BATCHED IN AMOUNTS AS STATED SECTION 2.2(C)
B. MIX BATCHED CONCRETE IN STRICT ACCORD WITH FIBROUS CONCRETE REINFORCEMENT
MANUFACTURER'S INSTRUCTION AND RECOMMENDATIONS FOR UNIFORM AND COMPLETE
DISPERSION
C. PROVIDE CONCRETE MEETING REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE AND ALL
SUPPLEMENTS AS ADOPTED BY THE MOST RECENT REPORT OF THE INTERNATIONAL CONGRESS
OF BUILDING OFFICIALS
D. PROVIDE THE SERVICES OF A QUALIFIED TECHNICAL REPRESENTATITVE TO INSTRUCT THE
CONCRETE SUPPLIER IN PROPER BATCHING AND MIXING OF MATERIALS TO BE PROVIDED, AS
REQUIRED.
3.2 FIBROUS REINFORCEMENT
A. CONCRETE TRANSPORT: MOVE FROM PLANT TO JOB SITE AS RAPIDLY AS PRACTICAL. CONTACT ENGINEER FOR APPROVAL IF TRAVEL TIME BETWEEN PLANT AND PROJECT WILL EXCEED 1 HOUR OF TIME. AVOID SEPARATION OR LOSS OF INGREDIENTS. MAXIMUM CLEAR DROP 5 FEET; 12 FEET IF
TREMIE IS USED.
B. VIBRATION OF CONCRETE: COMPACT WITH MECHANICAL VIBRATORS. DO NOT USE FOR
TRANSPORTING CONCRETE. PROVIDE A SPARE VIBRATOR AT JOB SITE DURING ALL CONCRETE
POURS.
C. BONDING AND GROUTING: BEFORE DEPOSITING NEW CONCRETE ON OR AGAINST CONCRETE WHICH HAS SET, THOROUGHLY CLEAN AND ROUGHEN SURFACES, REMOVING LAITANCE, LOOSE PARTICLES
AND FOREIGN MATTER
D. FLOOR LEVELS: SCREED TO TRUE LEVELS OF SLOPES, FURNISH TOLERANCE AT SURFACE OF CONCRETE PLUS OR MINUS 18" IN 10 FEET NOT TO EXCEED 38" PLUS OR MINUS, OVER ENTIRE AREA. FINISH
FLOOR PATCHING SHALL BE FLUSH WITH EXISTING CONCRETE.
E. MECHANICAL SCREEDS ARE PERMITTED
F. POUR RETAINING WALLS IN SECTIONS NOT TO EXCEED 24'. PROVIDE 12" EXPANSION JOINT MATERIALS
BETWEEN POURS.
G. CONSTRUCTION JOINTS SHALL BE PLACED FOR EVERY 2000SF OF SLAB POUR. CONTROL JOINTS SHALL
BE PLACED EVERY 600SF OF SLAB POUR. SEE DETAILS IN PLANS FOR JOINT CONSTRUCTION.
H. DURING CURING PERIOD, THE CONCRETE SHALL BE PROTECTED FROM DAMAGING MECHANICAL
DISTURBANCES, SUCH AS LOAD STRESSES, HEAVY SHOCK, AND EXCESSIVE VIBRATION.
3.3 INSTALLATION
A. DO NOT BACKFILL CONCRETE WALLS UNTIL CONCRETE HAS REACHED 100% OF DESIGN STRENGTH
AND MINIMUM 96 HOURS.
B. BACKFILL THAT DOES NOT EXCEED TWO FEET HIGHER ON ONE SIDE THAN THE OTHER IS
PERMITTED AFTER 72 HOURS.
3.4 BACKFILLING
A. PROVIDE FINISHED AS FOLLOWS:
1. VERTICAL EXPOSED CONCRETE: SMOOTH FORM FINISH. FILL ALL HOLES GREATER THAN 14"
IN ANY DIMENSION. REMOVE ALL FINS, PROJECTIONS AND FORM MARKS. PROVIDE
CONCRETE SMOOTH TO THE TOUCH WITHIN THE FISHWAY.
2. SLABS: DENSE SMOOTH STEEL TROWEL FINISH.
B. AFTER FORM TIE REMOVAL, FILL HOLES WITH STANDARD GROUT MIXED AS DRY AS FEASIBLE, RAM
SOLID AND RUB SMOOTH.
C. SLOPE ALL EXTERIOR WALKS AND SLABS A MINIMUM 18" PER FOOT ACROSS WIDTH TO DRAIN.
D. DEFECTS IN POURED-IN-PLACE CONCRETE WORK: CORRECT AGGREGATE POCKETS,
HONEYCOMBING OR OTHER DEFECTS BY PATCHING AND SACKING TO SATISFACTION OF
ENGINEER OR ENGINEERS REPRESENTATIVE, IMMEDIATELY FOLLOWING FORM REMOVAL. COAT
WITH CONCRETE BONDING AGENT BEFORE PATCHING.
E. ALL EXPOSED CONCRETE: GRIND OFF ALL FINS AND PROJECTIONS. SURFACES SHOULD BE TRUE, SMOOTH AND EVEN.
3.5 CONCRETE FINISHING
A. CURE BY MOISTENING ALL CONCRETE SURFACES. KEEP MOIST FOR 7 DAYS. USE FOG SPRAY
CONTINUOUSLY WHEN TEMPERATURES EXCEED 80°F.
B. CURING COMPOUNDS ARE PERMITTED. SUBMIT TO ENGINEER FOR APPROVAL PRIOR TO USE.
3.6 CURING
A. REMOVE AND REPLACE, AT CONTRACTOR'S EXPENSE, WHEN DIRECTED BY THE ENGINEER, ANY
WORK JUDGED BY THE ENGINEER TO BE IN NON-COMPLIANCE WITH THESE SPECIFICATIONS.
3.7 DEFECTIVE WORK
STRUCTURAL STEEL
1 GENERAL
A. WORK INCLUDED: STRUCTURAL STEEL FRAMING MEMBERS, STEEL SUPPORT MEMBERS, AND
MISCELLANEOUS STEEL CONNECTIONS AND SUPPORTS WITH REQUIRED BRACING, WELDS,
FASTENERS, GUARDRAILS/HANDRAILS, AND GRATING.
1.1 DESCRIPTION
A. ASTM A36 - STANDARD SPECIFICATION FOR CARBON STRUCTURAL STEEL
B. ASTM A53 - STANDARD SPECIFICATION FOR PIPE, STEEL, BLACK AND HOT DIPPED, ZINC-COATED
WELDED AND SEAMLESS
C. ASTM A 123/123M - SPECIFICATION FOR ZINC (HOT-DIP GALVANZIED) COATINGS ON IRON AND
STEEL PRODUCTS
D. ASTM A153/153M - SPECIFICATION FOR ZINC COATING (HOT-DIP GALVANIZED) ON IRON AND
STEEL HARDWARE
E. ASTM A307 - STANDARD SPECIFICATION FOR CARBON STEEL BOLTS AND STUDS, 60,000 PSI
TENSILE STRENGTH
F. ASTM A325 - STANDARD SPECIFICATION FOR HIGH STRENGTH BOLTS FOR STRUCTURAL STEEL
JOINTS
G. ASTM F436 - STANDARD SPECIFICATION FOR HARDENED STEEL WASHERS
H. ASTM A500 - STANDARD SPECIFICATION FOR COLD-FORMED WELDED AND SEAMLESS CARBON
STEEL STRUCTURAL TUBING IN ROUNDS AND SHAPES
I. ASTM A501 - STANDARD SPECIFICATION FOR HOT-FORMED WELDED AND SEAMLESS CARBON
STEEL STRUCTURAL STEEL TUBING
J. ASTM A572 - STANDARD SPECIFICATION FOR HIGH STRENGTH, LOW-ALLOY,
COLUMBIUM-VANADIUM STEELS OF STRUCTURAL QUALITY
K. ASTM F593 - STANDARD SPECIFICATION FOR STAINLESS STEEL BOLTS, HEX CAP SCREWS, AND
STUDS
L. ASTM F594 - STANDARD SPECIFICATION FOR STAINLESS STEEL NUTS
M. ASTM A 992 - STANDARD SPECIFICATION FOR STEEL FOR STRUCTURAL SHAPES FOR USE IN
BUILDING FRAMING
N. RCSC - RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS - SPECIFICATION FOR STRUCTURAL
JOINTS USING ASTM A325 OR A490 BOLTS
O. AWS - ANSI/AWS D1.1 - STRUCTURAL WELDING CODE
P. AISC - AMERICAN INSTITUTE FOR STEEL CONSTRUCTION - SPECIFICATION FOR THE DESIGN, FABRICATION AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS
1.2 REFERENCES
CAST-IN-PLACE CONCRETE
A. WORK INCLUDED: ALL CAST-IN-PLACE CONCRETE INCLUDING FOOTINGS, SLABS, COLUMNS,
BEAMS, SIDEWALKS AND CURBS AND ALL EQUIPMENT TO INSTALL INDICATED ITEMS.
1 GENERAL
1.1 DESCRIPTION
A. INTERNATIONAL BUILDING CODE, CURRENT EDITION, CHAPTER 19
B. INTERNATIONAL BUILDING CODE STANDARD 19-3, READY-MIX CONCRETE (BASED ON ASTM C94) C. ASTM 211 - STANDARD RECOMMENDED PRACTICE FOR SELECTING PROPORTIONS OF CONCRETE
D. AMERICAN CONCRETE INSTITUTE, HOT WEATHER CONCRETING (ACI 305)
E. AMERICAN CONCRETE INSTITUTE, COLD WEATHER CONCRETING (ACI 306)
1.2 REFERENCES
A. SUBMIT MIX DESIGNS TO THE ENGINEER AT LEAST 14 DAYS PRIOR TO FIRST SCHEDULED
CONCRETE PLACEMENT.
B. SUBMIT SEPARATE MIX DESIGN FOR EACH TYPE OF CONCRETE TO BE USED ON THE PROJECT.
C. MIX DESIGNS MUST INCLUDE THE FOLLOWING:
1. BATCH WEIGHTS PER CUBIC YARD FOR CEMENT, AGGREGATES AND WATER
2. MANUFACTURER, PRODUCT AND AMOUNT PER CUBIC YARD FOR EACH ADMIXTURE
3. MAXIMUM WATER/CEMENT RATIO
4. MANUFACTURER, PRODUCT AND WEIGHT PER CUBIC YARD FOR FIBROUS REINFORCEMENT,
WHERE USED
5. SUPPLIER'S MIX NUMBER
6. RECORD OF 30 PAST CYLINDER BREAKS FOR THE MIX BEING USED INDICATING PAST
SUCCESSFUL STRENGTH PERFORMANCE IN ACCORDANCE WITH IBC 1905. REQUIRED
AVERAGE STRENGTH MUST EXCEED THE DESIGN STRENGTH BY THE AMOUNTS GIVEN IN IBC
1905.
D. SUBMIT DELIVERY TICKET IN ACCORDANCE WITH ASTM C94 SECTION 16. ALL INFORMATION LISTED IN C94 SUBSECTION 16.1, 16.2.7, AND 16.2.8, AND QUANTITY OF WATER ADDED BY
THE TRUCK OPERATOR FROM THE MIXING TANK, SHALL BE FURNISHED ON THE DELIVERY
TICKET.
1.3 SUBMITTALS
A. FIBROUS REINFORCEMENT SHALL BE USED IN AREAS SHOWN ON PLANS.
B. FIBROUS REINFORCEMENT SHALL BE POLYPROPYLENE FIBERS AS PRODUCED BY FIBER MESH
COMPANY. PROVIDE FIBER MESH 300 FOR USE IN BATCH MIX.
C. RATE OF ADDITION OF FIBERS SHALL BE 1.5LB/CU YD UNLESS A DIFFERENT AMOUNT IS APPROVED
BASED ON SUBMITTAL INFORMATION.
2.2 FIBROUS REINFORCEMENT
A. ALL CONCRETE TO BE PLANT MIX BY A FIRM REGULARLY ENGAGED IN PLANT MIXING AND
DELIVERY.
B. MIX AND DELIVER IN ACCORDANCE WITH REQUIREMENTS OF ASTM C94 (READY MIXED
CONCRETE) OR ASTM C685 (CONCRETE MADE BY VOLUMETRIC BATCHING AND CONTINUOUS
MIXING).
2.3 MIXES
A. CONDUITS AND PIPES SHALL NOT BE PASSED THROUGH STRUCTURAL MEMBERS EXCEPT WHERE
DETAILED ON THE DRAWINGS. EXCEPT WHERE DETAILED ON THE DRAWINGS OR APPROVED BY
THE ENGINEER, NO REINFORCEMENT SHALL BE DISPLACED OR CUT TO PROVIDE CLEARANCE
FOR PENETRATIONS, INSERTS, OR EMBEDMENTS.
3.8 INSETS, EMBEDMENTS, ETC.
PRELIMINARY NOT
LDERS\BASIN
4 - H
O O
D\P-04-6004 LYDA - M
L, JW
\DESIG
N
\LYDA_2022\LYDA_FISH
W
AY2022_G
-SH
EETS.DW
G
- Thursday, January 26, 2023 2:56:32 PM
- 11X17 PLO
TTED AT H
ALF SCALE
DATE:
R
EV
DRAWN BY:
FILE NO.
FI
SH
S C
R E
E N
IN
G
A N
D P
A
SS
A G
E P
R O
G R
A M
F A
IR
V
IE
W
IN
D
U
ST
R
IA
L D
R . S
.E
SA
LE
M , O
R E
G O
N
D E
PA
R
TM
E
N T
O F
FI
SH
A N
D W
IL
D
LI
FE
O re go n
FI
SH
D
IV
IS
IO
N
SHEET
DESIGN BY:
OF
CHECKED BY:
D A
TE
D
ES
C
R
IP
TI
O
N
PH
O
N E
3)
-6
F A
X
3)
-6
NOTES:
O R
E G
O N
Fi sh
W ild lif e
LY
D
A F
IS
H
W A
Y
M
IL
E C
R
EE
K W
A
SC
O C
O U
N
TY
C O
N
ST
R U
C
TI
O N
S
PE
C
IF
IC
A
TI
O
N S
C O
N T'
D
1-26-2023
LWS
P-04-0050
G5
STRUCTURAL STEEL
1 GENERAL
A. SHOP DRAWINGS: SUBMIT SHOP DRAWINGS FOR APPROVAL 14 DAYS PRIOR TO BEGINNING
FABRICATION. INCLUDE THE FOLLOWING INFORMATION ON SHOP DRAWINGS:
1. SIZES, SHAPES, WEIGHT OF EACH PIECE AND DIMENSION OF ALL MATERIALS USED.
2. FABRICATION DETAILS.
3. DETAILS OF ALL WELDED AND BOLTED CONNECTIONS.
B. CERTIFICATIONS: SUBMIT MILL TEST REPORTS CERTIFYING THE MATERIALS MEET THE
REFERENCED ASTM SPECIFICATIONS:
1. STRUCTURAL SHAPES AND PLATES
2. BOLTS, NUTS AND WASHERS
C. SUBMIT WELDER CERTIFICATION PAPERS FOR ALL WELDERS DOING FIELD WELDING. SUBMIT
LETTER FROM MANUFACTURER STATING ALL OFFSITE FABRICATION IS DONE BY CERTIFIED
WELDERS.
D. SUBMIT REPORTS FROM SPECIAL INSPECTOR TO CONTRACTOR AND ENGINEER AS THEY ARE
GENERATED.
1.3 SUBMITTALS
A. PROVIDE SPECIAL INSPECTION FOR ALL WELDING IN ACCORDANCE WITH IBC CHAPTER 17.
B. SPECIAL INSPECTION IS REQUIRED FOR ALL WELDING REGARDLESS OF WHETHER IT IS PERFORMED
IN THE FIELD OR IN THE SHOP.
C. PROVIDE NON-DESTRUCTIVE TESTING FOR WELDED CONNECTIONS BETWEEN THE PRIMARY
MEMBERS OF MOMENT FRAMES IN ACCORDANCE WITH IBC SECTION 1703. AS A MINIMUM
THIS TESTING MUST INCLUDE:
1. PROVIDE ULTRASONIC TESTING FOR ALL COMPLETE PENETRATION GROOVE WELDS IN
JOINTS AND SPLICES.
2. FOR COMPLETE PENETRATION GROOVE WELDS ON MATERIAL LESS THAN
16"
CONTINUOUS INSPECTION IS REQUIRED BUT ULTRASONIC TESTING IS NOT.
1.4 QUALITY ASSURANCE
2 PRODUCTS
A. WIDE FLANGE BEAMS - ASTM A992, GRADE 50
B. CHANNELS, ANGLES AND PLATES - ASTM A36
C. COVER PLATES AT MOMENT CONNECTIONS - ASTM…