LSJ_Redacted.pdf

PDF 746 KB Posted

Attached to
Securadyne Systems Annual and Preventative Maintenance
Solicitation number
FA2823-25-Q-A005
Issued by

About this file

This is a Limited Sources Justification and Approval (J&A) document for a maintenance/preventative maintenance agreement for Infrastructure Security and Safety Monitor/Recording System at AFTC/PZIOA. The contract will be awarded to Securadyne Systems as a sole-source procurement under FAR 8.405-6(a)(1)(i)(B) through GSA Multiple Award Schedule Program (FAR 8.405-6).

The contract covers annual LENEL software updates, preventative maintenance (semi-annually and annually), and 24/7 service support for Securadyne installed systems. The period of performance begins at award through November 30, 2029. Securadyne Systems is justified as the sole source because they are the Original Equipment Distributor, and switching vendors would require replacing the entire system at significant cost and risk to operations. The facility currently has over 77,000 sq ft of space with installed equipment. The scope includes maintaining system functionality, technical support, and safety/security compliance using Securadyne's proprietary software. The contract will be awarded through GSA Federal Supply Schedule contract GS-07F-0251N, which has been determined to represent the best value to the government in accordance with FAR 8.404(d).

View the file

Other files

File Type Posted
NOCA_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .