AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 3

0002 Nov 14, 2009 LPV 05.2a

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

LPV52A-09-H-0037

Nov 9, 2009

The above numbered solicitation for LPV 05.2a, Lake Pontchartrain And Vicinity, Louisiana Project, North Of Airline Hwy., St. Charles Parish, Levee – Reach 2A Shell Pipeline To Goodhope And Shell Pipeline Floodwall Replacement – Phase 2, is hereby amended to incorporate the attached revised Table of Contents.

Proposal due date of 11/19/2009, 2:00 PM CST remains unchanged.

Lake Pontchartrain and Vicinity Louisiana Project

North of Airline Highway St. Charles Parish

Levee – Reach 2A Shell Pipeline to Goodhope and Shell Pipeline Floodwall Replacement– Phase 2

LPV – 05.2A

PTC-i ED 09-037

PROJECT TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENT

00010 Solicitation, Offer and Award (SF-1442) Bidding Schedule 00700 Contract Clauses 01100 General Provisions

DIVISION 01 - GENERAL REQUIREMENTS

01 32 16.00 20 Construction Progress Documentation 01 33 00 Submittal Procedures 01 42 00 Sources For Reference Publications 01 45 02.0010 Quality Control System 01 45 04.00 10 Contractor Quality Control 01 53 00.01 12 Temporary Flood Protection 01 55 26.00 12 Traffic Control and Coordination 01 57 20.00 12 Environmental Protection 01 57 23.00 12 Storm Water Pollution Prevention Measures 01 57 23.01 12 Truck Wash-Down Racks

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition

DIVISION 03 – CONCRETE

03 30 04.00 12 Concrete for Minor Structures

DIVISION 31 - EARTHWORK

31 05 19.04 12 Separator Geotextile 31 05 19.05 12 Reinforcement Geotextile 31 11 00.00 12 Clearing and Grubbing

31 23 00.00 12 Excavation 31 23 16.16 12 Structural Excavation and Backfill 31 24 00.00 12 Embankment 31 62 13.20 12 Prestressed Concrete Piles

Lake Pontchartrain and Vicinity Louisiana Project

North of Airline Highway St. Charles Parish

Levee – Reach 2A Shell Pipeline to Goodhope and Shell Pipeline Floodwall Replacement– Phase 2

LPV – 05.2A

PTC-ii ED 09-037

32 34 00.02 12 Precast Concrete Bridge Deck Units

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 15 00.00 12 Surfacing (Granular) 32 31 13 Chain Link Fences and Gate 32 34 00.01 12 Precast Concrete Bridge 32 34 00.02 12 Precast Concrete Bridge Deck Units 32 92 19.04 12 Turf Establishment and Maintenance

DIVISION 34 – TRANSPORTATION

34 71 13.27 12 Guard Rail