Lompoc_Wastewater_Master_Plan.pdf

PDF 12 MB Posted

Attached to
HEADWORKS and INFLUENT METER IMPROVEMENTS PROJECT
Solicitation number
2025-RFP-015DW
Issued by
Santa Barbara County, Long Beach City, California

About this file

This is a Wastewater Master Plan document prepared for the City of Lompoc, California, detailing infrastructure and planning considerations for the Regional Wastewater Reclamation Plant. The document outlines the city's strategic approach to facility improvements and modernization, serving approximately 9,000 sewer connections with a current Average Dry Weather Flow capacity of 5.0 MGD. The Headworks and Influent Meter Improvements Project represents a critical component of this phased modernization effort, requiring comprehensive design and engineering services for replacing the 1974 influent gate and actuator, installing three new bar screens, rehabilitating concrete influent channels, developing a bypass pumping plan, and implementing an odor control system. A mandatory pre-bid job walk is scheduled for May 14, 2025, with proposals due by June 30, 2025, at 3:00 pm. All proposals must remain valid for 90 calendar days after the bid opening date, and the City will award the contract to the most responsive and responsible bidder based on evaluation of technical capabilities and proposed approach.

Compensation for the selected engineering consultant will be determined on an approved actual time and materials basis, not to exceed an agreed-upon "Not-to-Exceed Fee," with progress-based payments contingent on task completion. The project builds upon previous master planning efforts, including a 2002 master plan by Kennedy/Jenks Consultants and a 2005 design report by Brown and Caldwell, with estimated total project costs for various plant improvements ranging from approximately $300,000 to over $41 million for comprehensive upgrades. Insurance requirements are comprehensive, mandating $1,000,000 in Errors and Omissions Professional Insurance, with additional coverage for general liability, automobile liability, and worker's compensation. The contract does not explicitly specify set-aside designations for disadvantaged enterprises, and the selected consultant will be responsible for creating preliminary and final design documents, construction documents, and an operation and maintenance manual.

View the file

Other files

File Type Posted
HEADWORKS_and_INFLUENT_METER_IMPROVEMENTS_PROJECT_(Addendum_#2_Revision).pdf PDF
LRWRP_Design_Report_Chapter_10.pdf PDF
LRWRP_Design_Report_Chapter_8.pdf PDF
LRWRP_Design_Report_Chapter_3.pdf PDF
LRWRP_Design_Report_Chapter_7.pdf PDF
LRWRP_Design_Report_Chapter_8.pdf PDF
LRWRP_Design_Report_Chapter_9.pdf PDF
LRWRP_Design_Report_Chapter_9.pdf PDF
LRWRP_Design_Report_Cover_Page.pdf PDF
Lompoc_Salts_Mgt_Plan_010611.pdf PDF
LRWRP_Design_Report_Chapter_10.pdf PDF
LRWRP_Design_Report_Chapter_4.pdf PDF
LRWRP_Design_Report_Chapter_5.pdf PDF
LRWRP_Design_Report_Chapter_6.pdf PDF
LRWRP_Design_Report_Chapter_6.pdf PDF
LRWRP_Design_Report_Cover_Page.pdf PDF
LRWRP_Design_Report_Chapter_3.pdf PDF
LRWRP_Design_Report_Chapter_4.pdf PDF
LRWRP_Design_Report_TOC.pdf PDF
LRWRP_Design_Report_Appendix_D.pdf PDF
LRWRP_Design_Report_Appendix_E.pdf PDF
LRWRP_Design_Report_Appendix_A.pdf PDF
LRWRP_Design_Report_Chapter_1.pdf PDF
Vol.II_Appendices.pdf PDF
LRWRP_Design_Report_Appendix_D.pdf PDF
LRWRP_Design_Report_Chapter_1.pdf PDF
LRWRP_Design_Report_Chapter_2.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_II_-_Appendices.pdf PDF
Vol.II_Appendices.pdf PDF
LRWRP_Design_Report_Appendix_A.pdf PDF
LRWRP_Design_Report_Appendix_C.pdf PDF
LRWRP_Design_Report_Appendix_F.pdf PDF
Lompoc_Wastewater_Master_Plan.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_III_-_Executive_Summary.pdf PDF
LRWRP_Design_Report_Appendix_B.pdf PDF
LRWRP_Design_Report_Appendix_C.pdf PDF
LRWRP_Design_Report_Appendix_D.pdf PDF
LRWRP_Design_Report_Appendix_E.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_III_-_Executive_Summary.pdf PDF
LRWRP_Design_Report_Appendix_A.pdf PDF
LRWRP_Design_Report_Appendix_C.pdf PDF
LRWRP_Design_Report_Appendix_E.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_III_-_Executive_Summary.pdf PDF
LRWRP_Design_Report_Chapter_1.pdf PDF
LRWRP_Design_Report_Chapter_2.pdf PDF
Lompoc_Wastewater_Master_Plan_Volume_I_-_Report.pdf PDF
Consultant_Services_Agreement_2025.doc DOC document
INDEMNITY_AND_INSURANCE_REQUIREMENTS.docx DOCX document
INDEMNITY_AND_INSURANCE_REQUIREMENTS.docx DOCX document
INDEMNITY_AND_INSURANCE_REQUIREMENTS.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .