This is a set of construction plans and specifications for the City of Lompoc's 123 North H Street EV Charger Parking Lot Project in California. The project involves the development of a new electric vehicle charging facility in downtown Lompoc, transforming an existing City-owned parking lot into a functional, accessible public EV charging space. The scope of work includes grading and paving improvements, concrete walkways, curbing, ADA-compliant accessible parking, installation of four EV charging stations (three Level 2 chargers at 208V and one Level 3 DC fast charger at 480V), protective bollards, landscaping with decomposed granite planters and architectural boulders, site lighting with four light poles, and all associated pavement markings and signage. The plans comprise 12 sheets detailing site layouts, electrical systems, structural foundations, striping, and signage requirements. Bids are due by 2:00 p.m. on Thursday, January 29, 2026, with proposals valid for 90 calendar days following the bid opening date. The project engineer is registered civil engineer Gabriel Do-Reynoso (License #81090, expiring 09-30-2025) with MNS Engineers, and the electrical engineer is licensed registered electrical engineer C. Stephens (License #22907, expiring 09-30-2025) with R M Engineering.
The plans indicate a 300-kilovolt-ampere (KVA) padmount transformer (12.47KV:480/277V) serving as the primary electrical supply, with a 112.5-kilovolt-ampere dry type transformer (480V:120/208V) stepping down voltage for the charging stations and site lighting. The contractor must hold a valid California Class A or C-8 contractor's license at the time of award and obtain a City of Lompoc business license prior to commencing work. Subcontractors are required to maintain valid California business licenses throughout the project. All work shall comply with the 2021 Standard Specifications for Public Works Construction (Greenbook), City of Lompoc Standard Requirements, and the 2022 California Electrical Code. The contractor is responsible for identifying existing utilities, calling Underground Service Alert (USA) at least two working days prior to construction start, performing all traffic control, and repairing any damage to existing structures and utilities resulting from project operations. The project includes coordination with the City of Lompoc Electric Utility Division and compliance with associated utility installation standards for the transformer vault, primary and secondary conduit, and pull boxes.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUELLTONLOMPOC
LOS
ALAMOS
ORCUTT
SANTA
MARIA
GOLETA SANTA
BARBARA
DESCRIPTION
OF
PROJECT NUMBER10 2
DESIGNED:
BYDATEREV
SHEET NUMBER
DRAWING NUMBERDRAWN:
CHECKED:
QA/QC:
CONSTRUCTABILITY:
THIS BAR IS 2 INCHES AT FULL
SCALE. IF NOT 2 INCHES, THEN
SCALE ACCORDINGLY.
1/2
DATEPROJECT ENGINEER:
R.C.E. 81090 EXP. 09-30-2025
CITY OF LOMPOC
123 NORTH H STREET EV CHARGER PARKING LOT CILMP.240425
C :\B ox \P ro je ct s\
C
IL
M P
Lo m po c\
C
IL
M P.
E
V C ha rg in g
Lo t\5
E ng
C
AD
\2
S he et s\
Ti tle
.d w g Th u
.M ar
.2
1:
:5
AM
b y:
G ab rie l D o- R ey no so
201 Industrial Way Buellton, CA 93427
805-692-6921 | www.mnsengineers.com
100% PLANS
GD
GD
RT
KY
EW
03/28/2025
GABRIEL
DO-REYNOSO
No. 81090
Exp. 09/30/25
CIVIL
RE
G
IS
TE
RE
D PROFESS IONAL ENG
I NEER
STATE OF CAL I FORN IA
1 12
TITLE SHEET G-01
LOCATION MAP
PROJECT AREA
N.T.S.
CITY OF LOMPOC, CALIFORNIA
MARCH 2025
123 NORTH H STREET EV CHARGER PARKING LOT DESIGN
VICINITY MAP
N.T.S.
1. ALL WORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREENBOOK"), 2021 EDITION, THE STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION, IN ACCORDANCE WITH THE CITY OF LOMPOC STANDARD REQUIREMENTS FOR THE DESIGN AND CONSTRUCTION OF SUBDIVISIONS AND SPECIAL DEVELOPMENTS, THESES PLANS, AND THE PROJECT
SPECIFICATIONS.
2. WORK SHOWN OR INDICATED ON THESE PLANS OR CALLED FOR IN THE SPECIFICATIONS, BUT NOT INCLUDED AS PAY QUANTITY ITEMS SHALL BE CONSIDERED INCIDENTAL WORK, THE COST OF WHICH SHALL BE INCLUDED IN
THE CONTRACTOR'S BID FOR PAY QUANTITY ITEMS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO EXISTING UTILITIES, PAVEMENTS, SIDEWALKS, CURBS, GUTTERS, STRUCTURES, TREES AND LANDSCAPING, AS A RESULT OF THEIR OPERATIONS, AND WILL BE REQUIRED TO REPAIR OR REPLACE IN KIND TO THE SATISFACTION OF AND AS DIRECTED BY THE CITY ENGINEER.
4. THE LOCATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS WAS OBTAINED FROM A SEARCH OF EXISTING RECORDS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO IDENTIFY RESPECTIVE UTILITIES TO DETERMINE THE EXACT FIELD LOCATIONS OF UTILITIES WHICH MAY CONFLICT WITH THIS WORK.
5. THE CONTRACTOR SHALL HAVE COPIES OF THE APPROVED PLANS AND SPECIFICATIONS FOR THIS PROJECT ON THE JOB SITE AT ALL TIMES, AND HE SHALL BE FAMILIAR WITH ALL APPLICABLE STANDARDS AND
SPECIFICATIONS.
6. A CITY OF LOMPOC BUSINESS LICENSE SHALL BE OBTAINED BY THE CONTRACTOR AT HIS EXPENSE, PRIOR TO STARTING THE WORK. SUBCONTRACTORS WORKING FOR THE GENERAL CONTRACTOR ON THIS PROJECT WILL BE REQUIRED TO HAVE A VALID CALIFORNIA BUSINESS LICENSE WHILE WORKING ON THIS PROJECT.
7. THE CONTRACTOR SHALL POSSESS A VALID CLASS A OR C-8 LICENSE AT THE TIME OF AWARD.
8. CONTRACTOR SHALL CALL UNDERGROUND SERVICE ALERT (USA) AT (800) 422-4133 A MINIMUM OF TWO
WORKING DAYS PRIOR TO THE START OF CONSTRUCTION.
9. CONTRACTOR SHALL PERFORM ALL TRAFFIC CONTROL NECESSARY TO PERFORM THE WORK, AND AS DIRECTED
BY THE ENGINEER, IN ACCORDANCE WITH THE SPECIFICATIONS.
GENERAL NOTES
AB AGGREGATE BASE
AC ASPHALT CONCRETE
ADD/ALT ADDITIVE/ ALTERNATE
CENTER LINE
C&G CURB AND GUTTER
CNC CONCRETE
CP CONTROL POINT
EG EXISTING GRADE
EL ELEVATION
EP EDGE OF PAVEMENT
EX. EXISTING
FG FINISHED GRADE
FL FLOWLINE
F.O.C. FACE OF CURB
FS FINISHED SURFACE
GL GUTTER LIP
GM GAS METER
MBD METAL BOLLARD
MOB. MONUMENT
O.C. ON CENTER
PCC PORTLAND CEMENT CONCRETE
PP POWER POLE
R.C. RELATIVE COMPACTION
R/W RIGHT OF WAY
SN SIGN
SWK SIDEWALK
TC TOP OF CURB
TYP TYPICAL
UG UNDERGROUND
WM WATER METER
WT. WEIGHT
WV WATER VALVE
ABBREVIATIONS
SHEET INDEX
SHEET NO. DRAWING NO. DESCRIPTION
1 G-01 TITLE SHEET
2 HC-01 HORIZONTAL CONTROL PLAN
3 C-01 SITE PLAN
4 C-02 GRADING PLAN
5 C-03 DETAILS
6 ST-01 STRIPING AND SIGNAGE PLAN
7 S-01 STRUCTURAL DETAILS
8 E0 SYMBOL, NOTES, & ABBREVIATIONS
9 E1 ELECTRICAL SITE PLAN
10 E2 ELEVATION & DETAILS
11 E3 SINGLE LINE DIAGRAM
12 DT-01 CITY DETAILS
SAWCUT
LEGEND
CL
H S
TR
EE
T
A
LL
EY
100.00
CP SCBX TC
99.12
CP MAG WSHR MNS
EXISTING BUILDING
EXISTING BUILDING
(3.9%)
(0 .9
(9 8.
4) (9
8.
6)
(9 8.
8)
(1.8%)
(1.4%)
(1.4%)
(1.1%)
(99.63)(99.38)(99.13)
(9 9.
0)
(9 8.
8)
(99.2) (99.4)
(99.4)
(99.34)(99.22) (99.79)
D R
IV
EW
A Y
D R
IV
EW
A Y
DESCRIPTION
OF
PROJECT NUMBER10 2
DESIGNED:
BYDATEREV
SHEET NUMBER
DRAWING NUMBERDRAWN:
CHECKED:
QA/QC:
CONSTRUCTABILITY:
THIS BAR IS 2 INCHES AT FULL
SCALE. IF NOT 2 INCHES, THEN
SCALE ACCORDINGLY.
1/2
DATEPROJECT ENGINEER:
R.C.E. 81090 EXP. 09-30-2025
CITY OF LOMPOC
123 NORTH H STREET EV CHARGER PARKING LOT CILMP.240425
C :\B ox \P ro je ct s\
C
IL
M P
Lo m po c\
C
IL
M P.
E
V C ha rg in g
Lo t\5
E ng
C
AD
\2
S he et s\
H or iz on ta l C on tro l.d w g M on
0.
Fe b.
4:
:5
PM
b y:
G ab rie l D o- R ey no so
201 Industrial Way Buellton, CA 93427
805-692-6921 | www.mnsengineers.com
100% PLANS
GD
GD
RT
KY
EW
03/28/2025
GABRIEL
DO-REYNOSO
No. 81090
Exp. 09/30/25
CIVIL
RE
G
IS
TE
RE
D PROFESS IONAL ENG
I NEER
STATE OF CAL I FORN IA
2 12
HORIZONTAL CONTROL PLAN HC-01
BASIS OF BEARINGS
THE BEARING N00°01'42"E BETWEEN FOUND CENTERLINE MONUMENTS (301 AND 302) PER BOOK 173, PAGE 81 OF RECORD OF SURVEYS, FILED WITH THE COUNTY OF SANTA BARBARA, WAS HELD AS THE BASIS OF BEARINGS FOR THIS SURVEY. COORDINATES FOR THE PROJECT ARE ASSUMED
AT POINT 1 (N 10,000, E 10,000).
BASIS OF ELEVATIONS
ELEVATIONS FOR THE PROJECT ARE ASSUMED AT POINT 1 (ELEV 100.00')
LOCAL HORIZONTAL AND VERTICAL CONTROL MONUMENTS (US SURVEY FEET)
POINT NORTHING EASTING ELEVATION DESCRIPTION
1 10000.0003 99999.9990 100.00' CP SCBX TC
3 9944.01 9806.65 99.12' CP MAG WSHR MNS
0'0'10' 10'5'5'
SCALE: 1" = 10'
±1 8.
5'
.2 4'
6.5
9' Typ
9'VAN
ACCESSIBLE
8'
H S
TR
EE
T
A
LL
EY
20'
0.
'PL
PL
PL
123467
11 12 13 14
±7 .5
SAWCUT
1'
SAWCUT
3'
2'
L1
L2
L3
L4 L13
L1
L15
L1
L17
C1
C2 C6
L5
C3
L6
L7
L8
DRIVEWAY
N 10032.3897 E 9809.7325
N 9982.5133 E 9809.7104 N 9982.4624
E 9949.8004
N 10024.7124 E 9949.8158
1'Typ
C4
PL
' C lr 7' Typ
8' Typ 10
'10 ' T yp
1' Typ
4'
BUILDING
L18
C7
C8
L19
N 9983.1131 E 9879.0824
3.2
C5
L1
L11
L1
L9
1'
1.7 5'
20' Typ
3' Ty p
4'
9' 9'
3' Typ
3' Typ
2.
5'
Ty p
2.3'
3.6
1.8 2'
Typ 3.2
5'
5'
4'
2' Typ
2' Typ
CURVE TABLE
CURVE #
C1
C2
C3
C4
C5
C6
C7
C8
RADIUS
10.00
10.00
10.00
10.00
2.00
2.00
2.50
10.00
LENGTH
15.71
7.85
15.71
7.86
4.71
4.71
6.25
6.44
DELTA
90°00'00"
45°00'00"
89°59'33"
45°00'27"
134°59'52"
134°59'52"
143°07'48"
36°52'12"
LINE TABLE
LINE #
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19
LENGTH
19.358
140.090
7.242
1.136
20.823
7.663
8.618
30.438
13.054
10.727
6.883
11.000
11.796
17.242
140.090
8.323
10.348
17.358
19.358
DIRECTION
S44° 58' 45.00"E
S89° 58' 45.00"E
N00° 01' 15.00"E
S89° 58' 45.00"E
N45° 01' 15.00"E
S89° 58' 18.00"E
S00° 01' 15.00"W
S89° 44' 56.11"E
N89° 58' 36.61"W
N45° 01' 15.00"E
S89° 58' 45.00"E
S00° 01' 15.00"W
S89° 58' 53.39"E
S00° 01' 14.60"W
S89° 58' 45.00"E
N45° 01' 15.00"E
N44° 58' 45.00"W
N44° 58' 45.00"W
S44° 58' 45.00"E
DESCRIPTION
OF
PROJECT NUMBER10 2
DESIGNED:
BYDATEREV
SHEET NUMBER
DRAWING NUMBERDRAWN:
CHECKED:
QA/QC:
CONSTRUCTABILITY:
THIS BAR IS 2 INCHES AT FULL
SCALE. IF NOT 2 INCHES, THEN
SCALE ACCORDINGLY.
1/2
DATEPROJECT ENGINEER:
R.C.E. 81090 EXP. 09-30-2025
CITY OF LOMPOC
123 NORTH H STREET EV CHARGER PARKING LOT CILMP.240425
C :\B ox \P ro je ct s\
C
IL
M P
Lo m po c\
C
IL
M P.
E
V C ha rg in g
Lo t\5
E ng
C
AD
\2
S he et s\
Si te
P la n.
dw g Th u
.M ar
.2
1:
:2
AM
b y:
G ab rie l D o- R ey no so
201 Industrial Way Buellton, CA 93427
805-692-6921 | www.mnsengineers.com
100% PLANS
GD
GD
RT
KY
EW
03/28/2025
GABRIEL
DO-REYNOSO
No. 81090
Exp. 09/30/25
CIVIL
RE
G
IS
TE
RE
D PROFESS IONAL ENG
I NEER
STATE OF CAL I FORN IA
0'0'10' 10'5'5'
SCALE: 1" = 10'
3 12
SITE PLAN C-01
CONSTRUCTION NOTES
INSTALL VAN ACCESSIBLE COMPLIANT PARKING PER CALTRANS STANDARD PLAN A90A.
FOR SIGNAGE SEE SHEET ST-01.
INSTALL ZEROSCAPE DECOMPOSED GRANITE PLANTER WITH ARCHITECTURAL BOULDERS.
INSTALL CURB (TYPE A1-6) PER CALTRANS STANDARD PLAN A87A.
INSTALL WHEEL STOP PER DETAIL 3 ON SHEET C-03.
FOR PAVEMENT STRIPING AND MARKINGS SEE SHEET ST-01.
SEE ELECTRICAL PLANS FOR UTILITY LAYOUT, EV CHARGING STATION INSTALLATION, AND SITE LIGHTING.
PROTECT EXISTING IMPROVEMENTS TO REMAIN.
REMOVE AND REPLACE 3.5 INCHES OF ASPHALT. COMPACT CLASS 2 AGGREGATE BASE TO 95% RELATIVE
COMPACTION PER CALTRANS STANDARD SPECIFICATIONS.
REMOVE ASPHALT ALL THE WAY TO THE BUILDING. PROTECT EXISTING BUILDING.
CONSTRUCT 3 FOOT WIDE RIBBON GUTTER. SEE DETAIL 2, SHEET C-03.
INSTALL ROCK. SEE DETAIL 4, SHEET C-03.
INSTALL 51"W X 51"L X 24"D CONCRETE FOUNDATION. CONCRETE SHALL BE 2500 PSI, STANDARD GRAY WITH
MEDIUM BROOM FINISH AND ROUNDED EDGES. SEE DETAIL 2 ON SHEET S-01.
INSTALL 24"W X 24"L X 24"D CONCRETE FOUNDATION. CONCRETE SHALL BE 2500 PSI, STANDARD GRAY WITH
MEDIUM BROOM FINISH AND ROUNDED EDGES. SEE DETAIL 3 ON SHEET S-01.
INSTALL BOLLARD PER CITY STANDARD DETAIL. SEE SHEET DT-01.
INSTALL CURB (BUILDING) SEE DETAIL 5, SHEET C-03.
INSTALL 3 1/2" THICK CONCRETE WALK. CONCRETE SHALL BE 2500 PSI, STANDARD GRAY WITH MEDIUM BROOM
FINISH AND ROUNDED EDGES.
Typ
5 Typ
Typ
GENERAL NOTES
1. LANDSCAPE AREA : 638 SQFT
2. TYPICAL BOULDERS. BURY THE BOULDERS APPROXIMATELY 13 INTO THE GROUND. COORDINATE THE INSTALLATION AND LOCATION OF THE BOULDER WITH THE CITY'S REPRESENTATIVE. THE ACTUAL LOCATION OF THE BOULDERS MAY VARY FROM THE PLAN IF DIRECTED BY THE CITY'S REPRESENTATIVE. THE BOULDERS ARE TO BE LOCAL ROCK. THE PARTICULAR SOURCE FOR THE BOULDERS IS TO BE DETERMINED BY THE CONTRACTOR PRIOR TO BIDDING. OBTAIN APPROVAL OF THE BOULDER TYPE AND SIZE PRIOR TO BEGINNING GRADING WORK. THE SIZE OF THE BOULDERS INDICATE AN APPROXIMATE OVERALL LENGTH, AND THE BOULDER BID WILL INCLUDE THE FOLLOWING QUANTITIES:
SIZE
5'-0" 6'-0"
TOTAL
Typ
Typ
WATER QUALITY CONTROL NOTES
CONTRACTOR SHALL IMPLEMENT CONSTRUCTION BMP'S AS NECESSARY TO PROTECT WATER QUALITY. CONTRACTOR SHALL INSTALL INLET PROTECTION DOWNSTREAM AND STREET SWEEPING AS A MINIMUM CONTROL MEASURE PER
CASQA STANDARDS OR AS DIRECTED BY THE CITY'S AUTHORIZED REPRESENTATIVE.
12 Typ
Typ
Typ
Typ
6 Typ
Typ
Typ
TR
EE
T
A
LL
EY
.4
0.5%0.5%
(0 .6
(3.9%)
(0 .9
(98.4)
(98.6)
(98.8)
(1.4%)
(1.4%)
(1.4%)
(1.9%)
(1.1%)
1.1%
99.67 FS
(99.63)(99.37)(99.00)
(9 9.
0)(98.8)
(99.2) (99.4)
(99.4)
99.53 FS
(99.34)
99.35 FS
(99.22)
99.81 FS
(99.79)
98.87 FL
99.53 HP/FL
(99.20) (98.74)
(98.56)
(99.11)
99.6
0.5%
1.0% 5.0%0.6%0.6%
99.40 FS
99.29 FS99.46 FS
99.75 FS
99.28 TC 99.23 FS
99.16 FS
(99.41)
99.38 FS
99.14 FS
(99.13)
.0
99.2
99.4
99.6
99.67 FS
99.36 FS
99.48 FS
(98.94)
99.44 FL
99.50 FS
3.2%
99.50 FS
(98.84)
99.35 FS 99.54 FS 99.81 FS
99.85 TC
0.5%1.5%
99.33 FL
99.39 FS
99.39 FS
4.
0%
4.
0%
99.01 FL98.92 FL
0.5%
4.
0%
4.
0%
99.79 TC
99.20 FS
99.70 TC
99.66 TC
0.6%
(99.54)
99.55 FS
(99.53)(98.61)
98.78 FS
99.51 TC
99.73 TC
(99.4)
(99.6)
99.07 FS
99.57 TC
7.6%7.6%
99.15 FS
99.65 TC
99.83 TC
99.67 FS
(99.52)
99.67 FS
100.17 TC
99.00 FS
99.50 TC
99.93 TC
99.42 FS
(99.43)
100.17 TC
99.56 FS
1.1%
1.0%
1.2% 1.3
0.7
0.9
1.
0%
1.5%
99.04 FS
99.54 TC
99.03 FS
99.53 TC
98.98 FS
99.48 TC
0.6% 0.7%
(98.95)
98.87 FS
99.37 TC
(98.79)
98.98 FS
99.48 TC
99.53 HP
99.07 FS
98.89 FS
98.89 FS 0.9%
99.17 FL
99.23 FS
99.23 FS
99.42 FS
99.96 TC
0.5
1.2%
98.91 FS
(98.89)
(99.19)
99.49 FS
0.5%
99.35 FS
99.85 TC
99.29 FS
99.32 FS
99.82 TC
99.02 FS 99.07 FS
0.4%
1.0%
99.88 TC
DESCRIPTION
OF
PROJECT NUMBER10 2
DESIGNED:
BYDATEREV
SHEET NUMBER
DRAWING NUMBERDRAWN:
CHECKED:
QA/QC:
CONSTRUCTABILITY:
THIS BAR IS 2 INCHES AT FULL
SCALE. IF NOT 2 INCHES, THEN
SCALE ACCORDINGLY.
1/2
DATEPROJECT ENGINEER:
R.C.E. 81090 EXP. 09-30-2025
CITY OF LOMPOC
123 NORTH H STREET EV CHARGER PARKING LOT CILMP.240425
C :\B ox \P ro je ct s\
C
IL
M P
Lo m po c\
C
IL
M P.
E
V C ha rg in g
Lo t\5
E ng
C
AD
\2
S he et s\
G ra di ng
.d w g Tu e
.M ar
.2
3:
:0
PM
b y:
G ab rie l D o- R ey no so
201 Industrial Way Buellton, CA 93427
805-692-6921 | www.mnsengineers.com
100% PLANS
GD
GD
RT
KY
EW
03/28/2025
GABRIEL
DO-REYNOSO
No. 81090
Exp. 09/30/25
CIVIL
RE
G
IS
TE
RE
D PROFESS IONAL ENG
I NEER
STATE OF CAL I FORN IA
0'0'10' 10'5'5'
SCALE: 1" = 10'
4 12
GRADING PLAN C-02
MATCH EXISTING
MATCH EXISTING
MATCH
EXISTING
G R
AD
E
BR
EA
K
PROPOSED SURFACE ELEVATION
LEGEND
99.86 TC
EXISTING SURFACE ELEVATION(99.86)
PROPOSED CONTOUR LABEL99.86
EXISTING CONTOUR LABEL(99.86)
G R
AD
E
BR
EA
K
6" 11 2"
2"
6"
6" 3 4"
3'
3" C
LR
(T
YP
7.5"
7"
DESCRIPTION
OF
PROJECT NUMBER10 2
DESIGNED:
BYDATEREV
SHEET NUMBER
DRAWING NUMBERDRAWN:
CHECKED:
QA/QC:
CONSTRUCTABILITY:
THIS BAR IS 2 INCHES AT FULL
SCALE. IF NOT 2 INCHES, THEN
SCALE ACCORDINGLY.
1/2
DATEPROJECT ENGINEER:
R.C.E. 81090 EXP. 09-30-2025
CITY OF LOMPOC
123 NORTH H STREET EV CHARGER PARKING LOT CILMP.240425
C :\B ox \P ro je ct s\
C
IL
M P
Lo m po c\
C
IL
M P.
E
V C ha rg in g
Lo t\5
E ng
C
AD
\2
S he et s\
D et ai ls
.d w g M on
4.
Fe b.
1:
:5
PM
b y:
G ab rie l D o- R ey no so
201 Industrial Way Buellton, CA 93427
805-692-6921 | www.mnsengineers.com
100% PLANS
GD
GD
RT
KY
EW
03/28/2025
GABRIEL
DO-REYNOSO
No. 81090
Exp. 09/30/25
CIVIL
RE
G
IS
TE
RE
D PROFESS IONAL ENG
I NEER
STATE OF CAL I FORN IA
5 12
DETAILS C-03
CURB TYPE A1-6
NTS
1 RIBBON GUTTER
NTS
R=1/2" (TYP)
R=1/2" (TYP)
(3) #4 BAR EQUALLY SPACED
2" DECOMPOSED GRANITE
COMPACT TO FIRM AND
UNYIELDING
BOULDER
SEE PLANS FOR SIZES
NATIVE OR IMPORTED SOIL COMPACTED
TO 95% UNDER BOULDER TO PREVENT
SHIFTING OR SINKING
2/3 OF BOULDER
THICKNESS
1/3 OF BOULDER
THICKNESS
NOTES
1. BOULDER SIZE AND TYPE SHALL BE PER PLAN.
2. BOULDER LOCATIONS AND FACE SHALL BE APPROVED PRIOR TO PLACEMENT.
WHEEL STOP
NTS
BOULDER DETAIL
NTS
6'
9"7" 3"
8" 8"B
B
A A
5'-6"
PLAN VIEW
72'
7"
3" 4"
1 1/2"Ø HOLE, 16" LONG GALVANIZED
STEEL ANCHOR (TYP EACH END)
SECTION A-A SECTION B-B
NOTES
1. NATIVE SOIL COMPACTED TO 95% RELATIVE COMPACTION
2. COMPACT 8" CLASS 2 AGGREGATE BASE.
3. USE 2,500 PSI PCC.
4. AFTER FORMS ARE STRIPPED, EXPOSED SURFACES SHALL
BE FINISHED SMOOTH WITH A STEEL TROWEL AND A FINE
BRUSH FINISH WITH STROKES PARALLEL TO THE CURB.
NOTES
1. NATIVE SOIL COMPACTED TO 95% RELATIVE COMPACTION
2. COMPACT 8" CLASS 2 AGGREGATE BASE.
3. USE 3,250 PSI PCC.
4. CROSS GUTTER TO BE INSTALLED PRIOR TO ASPHALT PAVING.
5. FINISH RIBBON GUTTER WITH LIGHT BROOM FINISH. NOTE
1. INSTALL WHEEL STOP PER CALTRANS STANDARD SPECIFICATION SECTION 78-5.
CURB (BUILDING)
NTS
R=1/2" (TYP)
NOTES
1. NATIVE SOIL COMPACTED TO 95% RELATIVE COMPACTION
2. USE 2,500 PSI PCC.
3. AFTER FORMS ARE STRIPPED, EXPOSED SURFACES SHALL
BE FINISHED SMOOTH WITH A STEEL TROWEL AND A FINE
BRUSH FINISH WITH STROKES PARALLEL TO THE CURB.
EXISTING BUILDING
2%
4%
1/2" EXPANSION JOINT
TR
EE
T
A
LL
EY
DESCRIPTION
OF
PROJECT NUMBER10 2
DESIGNED:
BYDATEREV
SHEET NUMBER
DRAWING NUMBERDRAWN:
CHECKED:
QA/QC:
CONSTRUCTABILITY:
THIS BAR IS 2 INCHES AT FULL
SCALE. IF NOT 2 INCHES, THEN
SCALE ACCORDINGLY.
1/2
DATEPROJECT ENGINEER:
R.C.E. 81090 EXP. 09-30-2025
CITY OF LOMPOC
123 NORTH H STREET EV CHARGER PARKING LOT CILMP.240425
C :\B ox \P ro je ct s\
C
IL
M P
Lo m po c\
C
IL
M P.
E
V C ha rg in g
Lo t\5
E ng
C
AD
\2
S he et s\
St rip in g.
dw g
Tu e
.M ar .2
3:
:4
PM
b y:
G ab rie l D o-
R ey no so
201 Industrial Way Buellton, CA 93427
805-692-6921 | www.mnsengineers.com
100% PLANS
GD
GD
RT
KY
EW
03/28/2025
GABRIEL
DO-REYNOSO
No. 81090
Exp. 09/30/25
CIVIL
RE
G
IS
TE
RE
D PROFESS IONAL ENG
I NEER
STATE OF CAL I FORN IA
6 12
STRIPING AND SIGNAGE PLAN ST-01
STRIPING AND SIGNAGE CONSTRUCTION NOTES
INSTALL R5-1 "DO NOT ENTER" AND R5-1a "WRONG WAY" PER MUTCD.
INSTALL R100B (CA) PER CALTRANS STANDARD PLAN A90A.
INSTALL R99C (CA) AND R7-8b PER CALTRANS STANDARD PLAN A90A.
INSTALL "NO PARKING" PER CALTRANS STANDARD PLAN A90A.
INSTALL ISA MARKING PER CALTRANS STANDARD PLAN A90A.
INSTALL TYPE I 10'-0" ARROW PER CALTRANS STANDARD PLAN A24A.
INSTALL 4" WHITE LINE
INSTALL 4" WHITE LINE DIAGONAL AT 3'-0" MAX CENTERS PER CLATRANS STANDARD PLAN A90A.
INSTALL 4" BLUE LINE BORDERS PER CLATRANS STANDARD PLAN A90A.
7 TYP
2 14
PARKING
7 TYP
NO
5'-6"
EMBED. MIN.
2'-0"
MIN.
FG
LIGHT POLE
PER MFR.
4" CHAMFER
2"
(2) #4 TIES @
4" OC
ANCHOR BOLT PER
MFR (SIZE, QUANTITY,
LOCATION & GRADE)
(6) #5 VERT.
#4 TIES @ 8"
OC. TYP.
1'-6"Ø
CONC. PIER
A
VERTICAL BARS
SEE ELEVATION
POLE PER MFR.
TIES
SEE ELEVATION
BASE ⅊ PER MFR.
135° HOOKS
CL. COL.
CL. PIER
C L.
C O
L.
C
L.
P
IE
R
CONC. PIER DIAMETER
SEE ELEVATION
3" CLR.
TYP.
PER MFR.
PER MFR.
6"
2"
SWITCHBOARD ANCHOR
BOLT PER
MFR.
REINF. PER PLAN
#4 AT 12" O.C.
EACH WAY
3" BASE COURSE
PER PLAN
6" COMPACTED
NATIVE SOIL
FINISH GRADE
PER CIVIL
SEE
ELECTRICAL
PLANS
DESCRIPTION
OF
PROJECT NUMBER10 2
DESIGNED:
BYDATEREV
SHEET NUMBER
DRAWING NUMBERDRAWN:
CHECKED:
QA/QC:
CONSTRUCTABILITY:
THIS BAR IS 2 INCHES AT FULL
SCALE. IF NOT 2 INCHES, THEN
SCALE ACCORDINGLY.
1/2
DATEPROJECT ENGINEER:
R.C.E. 81090 EXP. 09-30-2025
CITY OF LOMPOC
123 NORTH H STREET EV CHARGER PARKING LOT CILMP.240425
C :\B ox \P ro je ct s\
C
IL
M P
Lo m po c\
C
IL
M P.
E
V C ha rg in g
Lo t\5
E ng
C
AD
\2
S he et s\
D et ai ls
.d w g M on
4.
Fe b.
1:
:5
PM
b y:
G ab rie l D o- R ey no so
201 Industrial Way Buellton, CA 93427
805-692-6921 | www.mnsengineers.com
100% PLANS
GD
GD
RT
KY
EW
03/28/2025
GABRIEL
DO-REYNOSO
No. 81090
Exp. 09/30/25
CIVIL
RE
G
IS
TE
RE
D PROFESS IONAL ENG
I NEER
STATE OF CAL I FORN IA
7 12
STRUCTURAL DETAILS S-01
B B
POLE LIGHT FOUNDATION
NTS
1 51" x 51" EV CHARGER FOUNDATION
SCALE: 1"=20'
SECTION A
SWITCHBOARD CONCRETE PAD
NTS
SECTION B
51"
TO BE INSTALLED PER MFR.
INSTALLATION INSTRUCTIONS
COMPACTED SUBGRADE
CLASS II AGGREGATE BASE TO
95% RELATIVE COMPACTION
6"
TO BE INSTALLED PER MFR.
INSTALLATION INSTRUCTIONS
#4 AT 18" O.C. EACH WAY
3" C
LR
T
YP
3" CLR. TYP.
24" x 24" EV CHARGER FOUNDATION
SCALE: 1" = 20'
TO BE INSTALLED PER MFR.
INSTALLATION INSTRUCTIONS
TO BE INSTALLED PER MFR.
INSTALLATION INSTRUCTIONS
24"
C C
SECTION C
CLASS II AGGREGATE BASE TO
95% RELATIVE COMPACTION
#4 AT 18" O.C. EACH WAY
COMPACTED SUBGRADE
6" 3"
C
LR
T
YP
3" CLR. TYP.
NOTE:
1. USE 3,250 PSI PCC. NOTE:
1. USE 2,500 PSI PCC.
NOTE:
1. USE 2,500 PSI PCC.
NOTE:
1. USE 2,500 PSI PCC.
DESCRIPTION
OF
PROJECT NUMBER1
SCALE:
0 2
DESIGNED: CS
BYDATEREV
SHEET NUMBER
DRAWING NUMBERDRAWN: BP
CHECKED: KY
QA/QC: KY
CONSTRUCTABILITY: KY
THIS BAR IS 2 INCHES AT FULL
SCALE. IF NOT 2 INCHES, THEN
SCALE ACCORDINGLY.
1/2
DATEPROJECT ENGINEER:
R.E.E. 22907 EXP. 09-30-2025
CITY OF LOMPOC
123 NORTH H STREET EV CHARGER PARKING LOT
CILMP.240425
AS NOTED
R M Engineering PO Box 3343 SAN LUIS OBISPO, CA 93403 www.RNM-ENG.com
100% PLANS
REV1CS02/06/251
REV2CS02/24/252
REV3CS03/28/252
03/28/25
1. NOT ALL UNDERGROUND UTILITIES (ELECTRICAL OR OTHER) ARE SHOWN IN THESE
DRAWINGS. THE ELECTRICAL CONTRACTOR SHALL VERIFY ALL EXISTING
CONDITIONS AND SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES WITH
CONTRACT DOCUMENTS BEFORE COMMENCING ANY WORK.
2. ALL WORK, LABOR AND MATERIALS SHALL BE PERFORMED IN STRICT COMPLIANCE
WITH THE 2022 CALIFORNIA ELECTRIC CODE.
3. CONDUIT IS SHOWN DIAGRAMMATICALLY AND SHALL BE ROUTED TO SUIT
CONDITIONS IN THE FIELD.
4. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMITY TO ALL
LOCAL CODES AND ORDINANCES, THE STATE OF CALIFORNIA ELECTRICAL SAFETY
CODES, THE NATIONAL ELECTRIC CODE, CITY OF LOMPOC STANDARD DETAILS, CITY
OF LOMPOC STANDARD SPECIFICATIONS, AND ANY ADDITIONAL JURISDICTIONS
RELATING TO THEIR WORK.
5. ALL CONDUCTORS SHALL BE COPPER UL LISTED THWN U.O.N. (MINIMUM SIZE #12
AWG UNLESS SPECIFICALLY NOTED OTHERWISE). ALL INDICATIONS OF NUMBER OF
CONDUCTORS INCLUDE THE GROUND WIRE WHICH MUST BE PROVIDED.
6. ALL ELECTRICAL EQUIPMENT AND ALL MATERIAL SHALL BE NRTL, (NATIONAL
RECOGNIZED TESTING LABORATORY) NEMA AND UL RATED.
7. ALL CIRCUIT BREAKERS SHALL BE RATED FOR 75°C TEMPERATURE CONDUCTORS.
8. THE CONTRACTOR IS RESPONSIBLE FOR DETAILS, PART NUMBER VERIFICATIONS
AND ACCURACY FOR CONFIRMING AND CORRELATING ALL QUANTITIES AND
DIMENSIONS FOR SELECTING FABRICATION PROCESSES, FOR TECHNIQUES OF
ASSEMBLY AND FOR PERFORMING WORK IN A SAFE MANNER.
9. PROVIDE MINIMUM 36" WORK CLEARANCE IN FRONT OF ELECTRICAL EQUIPMENT.
PROVIDE MINIMUM 42" WORK CLEARANCE IN FRONT OF 480V EQUIPMENT. PROVIDE
A MINIMUM 30" WIDE WORK SPACE
10. ALL EXPOSED EXTERIOR CONDUIT SHALL BE GALVANIZED RIGID. ALL
UNDERGROUND CONDUITS SHALL BE PVC SCH 80. ALL UNDERGROUND VERTICAL
SWEEPS SHALL BE PVC COATED RMC
11. THE ELECTRICAL PLANS INDICATE THE GENERAL LAYOUT AND ARRANGEMENT; THE
CIVIL DRAWINGS AND FIELD CONDITIONS SHALL DETERMINE EXACT LOCATIONS.
FIELD VERIFY ALL CONDITIONS AND MODIFY AS REQUIRED TO SATISFY DESIGN
REQUIREMENTS.
GENERAL NOTES
SYMBOLS
METER
SWITCH
REFERENCE TO SHEET NOTE
DETAIL REFERENCE;
DETAIL NUMBER / SHEET DRAWN
FUSE
EGC
(F)
HP
(E)
GND
CU
BKR
AC, A/C
C.B.
BLDG.
A.F.F.
C.O.
COMM
C
A
RIGID STEEL CONDUIT
SPECIFICATIONS
UNLESS OTHERWISE NOTED
GROUND
HORSEPOWER
EQUIPMENT GROUNDING CONDUCTOR
FUTURE
EXISTING
COPPER
COMMUNICATION
W/ WITH
U.O.N.
V
RSC
SPECS.
TYP OR (TYP)
VOLT
TYPICAL
CONTINUOUS OPERATION)
NIGHT LIGHT (CONNECT FOR
MANUFACTURES ASSOC.
NATIONAL ELECTRICAL
MISCELLANEOUSABOVE FINISH FLOOR
BREAKER
CONDUIT ONLY
CONDUIT
BUILDING
CIRCUIT BREAKER
AMPERES
ALTERNATING CURRENT,
PH
RM
P
NL
NEMA
(N)
PHASE
ROOM
POLE
NEW
MIN/MAX
MISC
MINIMUM/MAXIMUM
A.H.J. AUTHORITY HAVING JURISDICTION
GFI GROUND FAULT INTERRUPTER
E.V. ELECTRIC VEHICLE/EQUIPMENT VENDOR
P.V. PHOTOVOLTAIC
KVA KILOVOLT-AMPERES
ES ENERGY SAVING
C.E.C. CALIFORNIA ELECTRICAL CODE
U/G UNDERGROUND
WP WEATHERPROOF
EL OR EM UL LISTED 90-MINUTE EMERGENCY
BALLAST PACK
AIR CONDITIONING
ABBREVIATIONS
GES GROUNDING ELECTRODE SYSTEM
GEC GROUNDING ELECTRODE CONDUCTOR
ATS AUTOMATIC TRANSFER SWITCH
STAINLESS STEELS.S.
UNDERGROUND PULL SECTIONUGPS
SWITCHBOARDSWBD
VS VERTICAL SECTION
O/H OVERHEAD
CIRCUIT BREAKER
NEC NATIONAL ELECTRICAL CODE
TRANSFORMER
GROUNDING ELECTRODE
XFRMR TRANSFORMER
CONDUIT(S) OR CIRCUIT ABOVE GRADE
REFERENCE TO FEEDER
SCHEDULE8
SURGE PROTECTOR
DUPLEX RECEPTACLE, MOUNTED +18" A.F.F. U.O.N.
# - INDICATES CKT NUMBER
G - INDICATES GROUND FAULT TYPE
+ - INDICATES ABOVE COUNTER MOUNTING
REFER TO ARCH. SHEETS FOR EXACT HEIGHT
* - INDICATES SPECIAL MOUNTING, REFER TO SHEET NOTES
WP - INDICATES IN USE WEATHER PROOF TYPE
CONDUIT(S) OR CIRCUIT BELOW GRADE
GROUNDING CONDUCTOR BELOW GRADE
DISCONNECT SWITCH, NEMA 3R WHERE INSTALLED OUTDOORS
LIGHT POLE
E0
ELECTRICAL SYMBOLS, NOTES
& ABBREVIATIONS 8
MFR MANUFACTURER
BCW BARE COPPER WIRE
CStephens
PROJECT NUMBER1
SCALE:
0 2
DESIGNED: CS
BYDATEREV
SHEET NUMBER
DRAWING NUMBERDRAWN: BP
CHECKED: KY
QA/QC: KY
CONSTRUCTABILITY: KY
THIS BAR IS 2 INCHES AT FULL
SCALE. IF NOT 2 INCHES, THEN
SCALE ACCORDINGLY.
1/2
DATEPROJECT ENGINEER:
R.E.E. 22907 EXP. 09-30-2025
CITY OF LOMPOC
123 NORTH H STREET EV CHARGER PARKING LOT
CILMP.240425
AS NOTED
R M Engineering PO Box 3343 SAN LUIS OBISPO, CA 93403 www.RNM-ENG.com
100% PLANS
REV1CS02/06/251
REV2CS02/24/252
REV3CS03/28/252
03/28/25
1. CONTRACTOR TO PROVIDE AND INSTALL 4'X4' PRIMARY VAULT ASSEMBLY WITH 12" GRADE RING PER CITY OF LOMPOC ELECTRIC UTILITY DIVISION STANDARD DRAWING #VT-1306. COORDINATE WITH CITY OF
LOMPOC ELECTRIC FOR PROPER VAULT ORIENTATION PRIOR TO INSTALL.
2. CONTRACTOR TO PROVIDE AND INSTALL 72"X94"X6" TRANSFORMER PAD PER CITY OF LOMPOC ELECTRIC
UTILITY DIVISION STANDARD DRAWINGS #PE-1101 & PE-1131
3. CONTRACTOR TO PROVIDE AND INSTALL MINIMUM 48" BELOW TOP GRADE ONE (1)-4" SCH80 PVC PRIMARY RISER CONDUIT TO EXISTING UTILITY POLE PER CITY OF LOMPOC ELECTRIC UTILITY DIVISION STANDARD DRAWING #TR-1008 & #VT-1335. PRIMARY RISER TO BE INSTALLED IN NORTHEAST QUADRANT OF POLE.
CITY TO PROVIDE AND INSTALL 1-4" RIGID CONDUIT AND SWEEP AND COMPLETE RISER INSTALLATION UP POLE. CONTRACTOR TO COORDINATE WITH CITY FOR EXCAVATION NEAR UTILITY POLE. USE MINIMUM 3'
RADIUS SWEEPS AT TURNS AS NEEDED
4. CONTRACTOR TO PROVIDE AND INSTALL MINIMUM 48" BELOW TOP GRADE ONE (1)-4" SCH80 PVC PRIMARY CONDUIT PER LOMPOC ELECTRIC UTILITY DIVISION STANDARD DRAWINGS #TR-1008, #PE-1131 AND #VT-1335.
MINIMUM 3' RADIUS SWEEPS AT TURNS AS NEEDED
5. CITY TO PROVIDE, CONTRACTOR TO PICK UP FROM CITY YARD AND INSTALL (1) 17"X30" H-20 TRAFFIC RATED SECONDARY PULL BOX ASSEMBLY WITH 12" EXTENSION RING PER CITY OF LOMPOC ELECTRIC UTILITY
DIVISION STANDARD DRAWING #PB-1220
6. CONTRACTOR TO PROVIDE AND INSTALL MINIMUM 36" BELOW TOP GRADE TWO (2)-4" SCH80 PVC SECONDARY CONDUIT PER LOMPOC ELECTRIC UTILITY DIVISION STANDARD DRAWINGS #TR-1008, #PE-1131.
MINIMUM 3' RADIUS SWEEPS AT TURNS AS NEEDED
7. BOLLARD PER LOMPOC UTILITY DIVISION STANDARD DRAWINGS #MS-1515 AND #MS-1525. BOLLARDS IN
FRONT OF TRANSFORMER TO BE REMOVABLE TYPE
8. PROVIDE HOUSE KEEPING PAD FOR (N) SWITCHBOARD, SEE CIVIL AND STRUCTURAL SHEETS
9. CITY OF LOMPOC FURNISHED, CONTRACTOR INSTALLED LIGHT POLE PER DETAIL 5 ON SHEET E2, TYP OF 4
10. CONC. HOUSEKEEPING PAD REBAR GROUND CONNECTION
11. GROUND ROD PER DETAIL 3 ON SHEET E2
12. CITY OF LOMPOC FURNISHED, CONTRACTOR INSTALLED LEVEL 2, 208V EV CHARGER, TYP OF 4. SEE
TYPICAL DETAIL 2 ON SHEET E2. SEE CIVIL AND STRUCTURAL DRAWINGS FOR FOUNDATION AND BOLLARDS.
13. CITY OF LOMPOC FURNISHED, CONTRACTOR INSTALLED LEVEL 3, 480V (DC FAST) EV CHARGER, SEE
TYPICAL DETAIL 2 ON SHEET E2. SEE CIVIL AND STRUCTURAL DRAWINGS FOR FOUNDATION AND BOLLARDS
REFERENCE NOTES
E1
5 7
ELECTRICAL SITE PLAN
SCALE: 1" = 5'
E1
N
TYP
UV-1
PB-1
UP-1
T-U
UG/PS DPH T-1 DPL
MSB
P-1
P-3
EV-1
EV-H
ELECTRICAL SITE PLAN
P-4
P-2
TYP OF 4
1. REFER TO SINGLE LINE DIAGRAM FOR CONDUIT SIZES.
2. SEE SHEET E2 FOR TRENCH AND PULLBOX DETAILS FOR CUSTOMER
SIDE ELECTRICAL CONVEYENCE.
3. PROVIDE PULLBOXES IN UNDERGROUND CONDUIT RUNS AS REQUIRED.
ALL PULLBOXES SHALL BE LOCATED IN NON-TRAFFIC AREAS
4. SEE TYPICAL CHARGER DETAIL ON SHEET E2. COORDINATE EXACT
INSTALLATION WITH ALL MANUFACTURER REQUIREMENTS. REVIEW
MANUFACTURER'S INSTALLATION GUIDELINES AND MANUALS.
GENERAL NOTES
12 TYP OF 4
EV-3 EV-4
EV-2
TYPICAL EV CHARGER
10' x 3/4" COPPER
GROUND ROD
#6 BCW TO GROUND
TERMINAL
CONDUIT(S) PER PLAN.
STUB LENGTH AND EXACT
LOCATION PER MFR'S
INSTALLTION MANUAL
FINISH GRADE
PVC TO RMC COUPLING
PVC COATED
RMC SWEEP
FOUNDATION PER CIVIL AND
STRUCTURAL SHEETS
DESCRIPTION
OF
PROJECT NUMBER1
SCALE:
0 2
DESIGNED: CS
BYDATEREV
SHEET NUMBER
DRAWING NUMBERDRAWN: BP
CHECKED: KY
QA/QC: KY
CONSTRUCTABILITY: KY
THIS BAR IS 2 INCHES AT FULL
SCALE. IF NOT 2 INCHES, THEN
SCALE ACCORDINGLY.
1/2
DATEPROJECT ENGINEER:
R.E.E. 22907 EXP. 09-30-2025
CITY OF LOMPOC
123 NORTH H STREET EV CHARGER PARKING LOT
CILMP.240425
AS NOTED
R M Engineering PO Box 3343 SAN LUIS OBISPO, CA 93403 www.RNM-ENG.com
100% PLANS
REV1CS02/06/251
REV2CS02/24/252
REV3CS03/28/252
03/28/25
TYPICAL EV CHARGER DETAIL
SCALE: NTS
MIN 6" CRUSHED
ROCK DRAIN BASE
CONDUIT(S) AS OCCURING
BOX EXTENSION
WHERE REQUIRED
FINISHED GRADE
HEX BOLT (TYP. OF 2)
CONCRETE REINFORCED
FIBERGLASS PULL BOX
COVER, LABEL PER USE
NON-UTILITY PULLBOX DETAIL
SCALE: NTS
NON-UTILITY TRENCH DETAIL
SCALE: NTS
24" MIN. COVER
SAND BACKFILL
FINISH PER CIVILWARNING TAPE
NATIVE BACKFILL
12"
TYPICAL LIGHT POLE DETAIL
SCALE: NTS
E2
E2
E2
3" MIN
3" MIN
CONDUIT PER PLANS
E2
E2
ELECTRICAL DETAILS
DRAIN BASE
GROUND WIRE
COPPER GROUND
MIN. 6" CRUSHED ROCK
ROD. 10' x 3/4"Ø
PRE CAST CONCRETE
GROUND ROD CLAMP
CONCRETE BOX COVER
LABEL GROUND ELECTRODE
BURNDY YG TYPE
12"
18"
24"
FINISHED GRADE
GROUND WELL BOX
SIZE PER PLANS
GROUND WELL DETAIL
SCALE: NTS
E2
CITY OF LOMPOC
STANDARD FIXTURE
SPRING CITY
ALMNWF-LE060-EVX-L18
-40-CR3-YS19-FPL-TR7P-CU
14' DECORATIVE POLE
SPRING CITY
APSNRT-M_-17-14.00-E5
-TN4.00-3.00-CU
TAMPER
RESISTANT HAND
HOLE
CONNECT BRANCH
CKT EGC AND
FOUNDATION
GROUND AT POLE
LUG
(4) ANCHOR BOLTS
SIZED BY OTHERS
FINISH GRADE
PVC LIGHTING
BRANCH CONDUIT.
PER PLANS
FOUNDATION PER CIVIL
AND STRUCTURAL SHEETS
PVC TO RMC COUPLING
PVC COATED RMC
SWEEP
MIN 10' OF #6 GND
COILED AT BOTTOM,
CONTINUE TO POLE
GROUND LUG
EXOTHERMIC WELD
GROUND TO REBAR
INLINE FUSE PER MFR
COORDINATE EXACT
BASE PLATE
INSTALLATION WITH
MANUFACTURER
24"
PROJECT NUMBER1
SCALE:
0 2
DESIGNED: CS
BYDATEREV
SHEET NUMBER
DRAWING NUMBERDRAWN: BP
CHECKED: KY
QA/QC: KY
CONSTRUCTABILITY: KY
THIS BAR IS 2 INCHES AT FULL
SCALE. IF NOT 2 INCHES, THEN
SCALE ACCORDINGLY.
1/2
DATEPROJECT ENGINEER:
R.E.E. 22907 EXP. 09-30-2025
CITY OF LOMPOC
123 NORTH H STREET EV CHARGER PARKING LOT
CILMP.240425
AS NOTED
R M Engineering PO Box 3343 SAN LUIS OBISPO, CA 93403 www.RNM-ENG.com
100% PLANS
REV1CS02/06/251
REV2CS02/24/252
REV3CS03/28/252
03/28/25
UTILITY POLE
UP-1
UTILITY VAULT
UV-1
T-U
300KVA PADMOUNT
12.47KV:480/277 3ɸ-4W
MIN. 3.5%Z
PB-1
DPL
400A, 120/208V 3ɸ-4W
42KAIC
MSB
NEMA 3R
400A, 480/277V-3ɸ 4W
42KAIC N
G
T-1
112.5KVA DRY TYPE
480V:120/208V 3ɸ-4W
MIN 4.3%Z
M
N G
4"C SCH80 PVC
4"C SCH80 PVC
EV-H
480V 3PH , 62.5KW
LEVEL 3 DC FAST
CHARGER
SITE LIGHTING
EV-2
208V 1PH, 16KW
LEVEL 2
CHARGER
100A 2P
EV-1
208V 1PH, 16KW
LEVEL 2
CHARGER
100A 2P
EV-3
208V 1PH, 16KW
LEVEL 2
CHARGER
100A 2P
EV-4
208V 1PH, 16KW
LEVEL 2
CHARGER
100A 2P
MAIN
400A 3P
100A 3P
175A 3P
MAIN
400A 3P
20A 1P
6 6 6 6 7
1. 4"C - 4#600KCMIL & #1/0G
2. 2-4"C SPARE
3. 2"C - 4#2 & #8G
4. 3#2/0 & #6G (BY MANUFACTURER)
5. 4#600KCMIL & #1/0G (BY MANUFACTURER)
6. 1.5"C - 2#1 & #8G
7. 1"C - 2#10 & #12G
8. 3/4"C - 2#14 & #14G (SHUNT TRIP CONTROLS)
FEEDER SCHEDULE
1. CONTRACTOR TO PROVIDE AND INSTALL 4'X4' PRIMARY VAULT ASSEMBLY
WITH 12" GRADE RING PER CITY OF LOMPOC ELECTRIC UTILITY DIVISION
STANDARD DRAWING #VT-1306. COORDINATE WITH CITY OF LOMPOC
ELECTRIC FOR PROPER VAULT ORIENTATION PRIOR TO INSTALL.
2. CONTRACTOR TO PROVIDE AND INSTALL 72"X94"X6" TRANSFORMER PAD PER
CITY OF LOMPOC ELECTRIC UTILITY DIVISION STANDARD DRAWINGS #PE-1101
& PE-1131
3. CONTRACTOR TO PROVIDE AND INSTALL MINIMUM 48" BELOW TOP GRADE ONE
(1)-4" SCH80 PVC PRIMARY RISER CONDUIT TO EXISTING UTILITY POLE PER
CITY OF LOMPOC ELECTRIC UTILITY DIVISION STANDARD DRAWING #TR-1008 &
#VT-1335. PRIMARY RISER TO BE INSTALLED IN NORTHEAST QUADRANT OF
POLE. CITY TO PROVIDE AND INSTALL 1-4" RIGID CONDUIT AND SWEEP AND
COMPLETE RISER INSTALLATION UP POLE. CONTRACTOR TO COORDINATE
WITH CITY FOR EXCAVATION NEAR UTILITY POLE. USE MINIMUM 3' RADIUS
SWEEPS AT TURNS AS NEEDED
4. CONTRACTOR TO PROVIDE AND INSTALL MINIMUM 48" BELOW TOP GRADE ONE
(1)-4" SCH80 PVC PRIMARY CONDUIT PER LOMPOC ELECTRIC UTILITY DIVISION
STANDARD DRAWINGS #TR-1008, #PE-1131 AND #VT-1335. MINIMUM 3' RADIUS
SWEEPS AT TURNS AS NEEDED
5. CITY TO PROVIDE, CONTRACTOR TO PICK UP FROM CITY YARD AND INSTALL (1)
17"X30" H-20 TRAFFIC RATED SECONDARY PULL BOX ASSEMBLY WITH 12"
EXTENSION RING PER CITY OF LOMPOC ELECTRIC UTILITY DIVISION STANDARD
DRAWING #PB-1220
6. CONTRACTOR TO PROVIDE AND INSTALL MINIMUM 36" BELOW TOP GRADE
TWO (2)-4" SCH80 PVC SECONDARY CONDUIT PER LOMPOC ELECTRIC UTILITY
DIVISION STANDARD DRAWINGS #TR-1008, #PE-1131. MINIMUM 3' RADIUS
SWEEPS AT TURNS AS NEEDED
7. PROVIDE SHUNT TRIP EQUIPPED BREAKER WITH 120V SUPPLY. SWITCHBOARD
MFR TO PROVIDE 480:120V CPT IN 480V SECTION FOR SHUNT TRIP SUPPLY
VOLTAGE. WIRE SHUNT TRIP TO DRY CONTACT AT EV-H
8. #6 BARE COPPER GEC TO 10' x 3/4" COPPER GROUND ROD
9. #1/0 BARE COPPER TO REBAR OF HOUSEKEEPING PAD. BOND TO REBAR WITH
EXOTHERMIC WELD.
10. PROVIDE PHOTOCELL CONTROLS
11. PROVIDE BREAKER WITH LOCKING MECHANISM PER NEC 110.25
12. AVAILABLE 3PH SYMMETRICAL FAULT CURRENT AT EQUIPMENT, TYPICAL
REFERENCE NOTES
UGPS
DPH
400A, 480/277V 3ɸ-4W
42KAIC
LOAD SCHEDULE
GENERAL NOTES
1. SERVICE CONDUIT AND CONDUCTORS PROVIDED AND INSTALLED BY
CONTRACTOR PER C.E.C.
2. CONTRACTOR TO SUBMIT PANEL DRAWINGS TO CITY OF LOMPOC ELECTRIC
FOR REVIEW AND APPROVAL PRIOR TO PURCHASE.
3. ELECTRIC SERVICE EQUIPMENT MUST BE INSTALLED TO MEET EUSERC
STANDARDS ACCEPTABLE TO CITY OF LOMPOC.
4. ANY LOCKS RESTRICTING ACCESS TO CITY OF LOMPOC ELECTRIC
METERING MUST BE KEYED TO SCHLAGE LOCK NUMBER C38587.
E3
PANEL SCHEDULE
SINGLE LINE DIAGRAM
ST
(10.2kA)
(8.2kA) (4.9kA) (3.9kA) (3.7kA) (3.5kA)
(5.6kA)
11 11 11 11
PROJECT NUMBER10 2
DESIGNED:
BYDATEREV
SHEET NUMBER
DRAWING NUMBERDRAWN:
CHECKED:
QA/QC:
CONSTRUCTABILITY:
THIS BAR IS 2 INCHES AT FULL
SCALE. IF NOT 2 INCHES, THEN
SCALE ACCORDINGLY.
1/2 CITY OF LOMPOC
123 NORTH H STREET EV CHARGER PARKING LOT CILMP.240425
C :\B ox \P ro je ct s\
C
IL
M P
Lo m po c\
C
IL
M P.
E
V C ha rg in g
Lo t\5
E ng
C
AD
\2
S he et s\
D et ai ls
-C ity
.d w g Th u
.M ar
.2
2:
:3
PM
b y:
G ab rie l D o- R ey no so
201 Industrial Way Buellton, CA 93427
805-692-6921 | www.mnsengineers.com
100% PLANS
GD
GD
RT
KY
EW 12 12
CITY DETAILS
DT-01
| 1 Title Sheet |
| 2 Horizontal Control Plan |
| 3 SITE PLAN |
| 4 Grading Plan |
| 5 Details |
| 6 City Details |
| 6 STRIPING AND SIGNAGE PLAN |
| 7 STRUCTURAL DETAILS |
| 12 City Details |