Lobby Renovations Drawings.pdf

PDF 101 KB Posted

Attached to
Fernan Ranger Station Lobby Remodel
Solicitation number
1240LU24Q0015
Issued by

About this file

This document provides details for a federal contract opportunity for lobby renovations at the Fernan Ranger Station. The solicitation seeks quotes for an office lobby remodeling project in Coeur d'Alene, Idaho with a magnitude less than $25,000 to be completed within 60 days of contract award. Interested contractors should submit a request for quote using specified forms to provide details on experience and pricing. The solicitation requests that contractors fill out an experience questionnaire for references and ensure an active SAM registration. The point of contact is provided for any questions. The work is sought by the Department of Agriculture Forest Service Northern Region. Contractors can visit the office to review job requirements by contacting the individual identified in the document.

View the file

Other files

File Type Posted
1240LU24Q0015 Fernan RS lobby remodel.pdf PDF
SOW_Fernan Lobby Renovation.pdf PDF
id107 Wage determinations.pdf PDF
FS supplemental specifications.pdf PDF
Experience Questionnaire.pdf PDF
Photographic References.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FERNAN OFFICE RECEPTION RENOVATION PLAN

36"x80" FULL FRAMED DOOR

(VERIFY WITH OPENING)

1-3/4" BIRCH SLAB DOOR

SELF CLOSING HINGES.

CONTROL ELECTRIC STRIKE

FROM BUTTON IN HALLWAY,

KEYPAD IN CUSTOMER AREA.

1-3/4" THICK PASS DOOR,

BIRCH SLAB, SELF CLOSING HINGES,

ELECTRONIC KEYPAD WITH REMOTE

BUZZ-IN CONTROL INSTALLED AT

RECEPTIONIST DESK.

LOUVERS

INSTALLED

BETWEEN GAP

BETWEEN

PARTIAL WALL

AND CEILING.

SCALE: 1/4 "= 12"

HALLWAY

ENTRY

CUSTOMER

AREA

ADD BLACK

METAL POST

1-3/4" THICK, 36"x80" BIRCH SLAB DOOR

HUNG ON EXISTING POCKET DOOR

HARDWARE, WITH NEW LATCHING

MECHANISM.

CONFERENCE

ROOM

CUP CHANNEL INSTALLED ON WALL

TO ENSURE ALIGNMENT OF LOCKING

MECHANISM WHEN CLOSED.

FRAME DOOR AND FILL IN SPACES

BETWEEN POSTS WITH DRYWALL.

PAINT TO MATCH EXISTING WALLS.

REMOVE SECTION OF COUNTER TOP AND

PARTITION WALL, RECONSTRUCT PARTITION

TO CREATE SMALLER WORKSPACE WITH 30"

EGRESS BETWEEN FRONT COUNTER AND

POCKET DOOR.

30.0000

Sheets and Views
Lobby Renovations-Layout1

File details come from the government source that posted it. Updated .