Lobby Renovations Drawings.pdf
PDF 101 KB Posted
- Attached to
- Fernan Ranger Station Lobby Remodel Federal contract opportunity
- Solicitation number
- 1240LU24Q0015
About this file
This document provides details for a federal contract opportunity for lobby renovations at the Fernan Ranger Station. The solicitation seeks quotes for an office lobby remodeling project in Coeur d'Alene, Idaho with a magnitude less than $25,000 to be completed within 60 days of contract award. Interested contractors should submit a request for quote using specified forms to provide details on experience and pricing. The solicitation requests that contractors fill out an experience questionnaire for references and ensure an active SAM registration. The point of contact is provided for any questions. The work is sought by the Department of Agriculture Forest Service Northern Region. Contractors can visit the office to review job requirements by contacting the individual identified in the document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| id107 Wage determinations.pdf | ||
| 1240LU24Q0015 Fernan RS lobby remodel.pdf | ||
| FS supplemental specifications.pdf | ||
| Photographic References.docx | DOCX document | |
| Experience Questionnaire.pdf | ||
| SOW_Fernan Lobby Renovation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FERNAN OFFICE RECEPTION RENOVATION PLAN
36"x80" FULL FRAMED DOOR
(VERIFY WITH OPENING)
1-3/4" BIRCH SLAB DOOR
SELF CLOSING HINGES.
CONTROL ELECTRIC STRIKE
FROM BUTTON IN HALLWAY,
KEYPAD IN CUSTOMER AREA.
1-3/4" THICK PASS DOOR,
BIRCH SLAB, SELF CLOSING HINGES,
ELECTRONIC KEYPAD WITH REMOTE
BUZZ-IN CONTROL INSTALLED AT
RECEPTIONIST DESK.
LOUVERS
INSTALLED
BETWEEN GAP
BETWEEN
PARTIAL WALL
AND CEILING.
SCALE: 1/4 "= 12"
HALLWAY
ENTRY
CUSTOMER
AREA
ADD BLACK
METAL POST
1-3/4" THICK, 36"x80" BIRCH SLAB DOOR
HUNG ON EXISTING POCKET DOOR
HARDWARE, WITH NEW LATCHING
MECHANISM.
CONFERENCE
ROOM
CUP CHANNEL INSTALLED ON WALL
TO ENSURE ALIGNMENT OF LOCKING
MECHANISM WHEN CLOSED.
FRAME DOOR AND FILL IN SPACES
BETWEEN POSTS WITH DRYWALL.
PAINT TO MATCH EXISTING WALLS.
REMOVE SECTION OF COUNTER TOP AND
PARTITION WALL, RECONSTRUCT PARTITION
TO CREATE SMALLER WORKSPACE WITH 30"
EGRESS BETWEEN FRONT COUNTER AND
POCKET DOOR.
30.0000
| Sheets and Views |
| Lobby Renovations-Layout1 |
File details come from the government source that posted it. Updated .