FS supplemental specifications.pdf

PDF 375 KB Posted

Attached to
Fernan Ranger Station Lobby Remodel Federal contract opportunity
Solicitation number
1240LU24Q0015
Issued by
Department of Agriculture Forest Service R1-Northern Region

About this file

This document provides details for a federal contract opportunity to remodel the lobby of the Fernan Ranger Station in Coeur d'Alene, Idaho. The solicitation number is 1240LU24Q0015 and is seeking quotes to complete the office remodel, which includes work on items such as walls, floors, and fixtures, for under $25,000 and within 60 days of award. Interested contractors should submit a completed Request for Quote form, experience questionnaire, and ensure an active SAM registration. The opportunity is issued by the Department of Agriculture Forest Service Region 1- Northern Region. Contractors can email or call Tyson Steigers at the contact information provided with any questions or to schedule a site visit to review the job requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Fernan Ranger Station Lobby Remodel, newest first.
File Type Posted
Lobby Renovations Drawings.pdf PDF
id107 Wage determinations.pdf PDF
1240LU24Q0015 Fernan RS lobby remodel.pdf PDF
Photographic References.docx DOCX document
Experience Questionnaire.pdf PDF
SOW_Fernan Lobby Renovation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Copyright 2021 AIA MasterSpec Short Form 03/21

SUBMITTAL PROCEDURES 013300 - 1

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.

SECTION 013300 - SUBMITTAL PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Submittal schedule requirements.

2. Administrative and procedural requirements for submittals.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information and physical samples that require Architect's[ and Construction Manager's] responsive action. Action submittals are those submittals indicated in individual Specification Sections as "action submittals."

B. Informational Submittals: Written and graphic information and physical samples that do not require Architect's[ and Construction Manager's] responsive action. Submittals may be rejected for not complying with requirements. Informational submittals are those submittals indicated in individual Specification Sections as "informational submittals."

1.3 SUBMITTAL SCHEDULE

A. Submittal Schedule: Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for ordering, manufacturing, fabrication, and delivery when establishing dates.

1.4 SUBMITTAL PROCEDURES

A. Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.

1.5 SUBMITTAL REQUIREMENTS

A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. Mark each copy of each submittal to show which products and options are applicable.

2. Include the following information, as applicable:

Copyright 2021 AIA MasterSpec Short Form 03/21

SUBMITTAL PROCEDURES 013300 - 2

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International Treaties. A valid, current MasterSpec license is required for editing or use of this document.

a. Manufacturer's product specifications.

b. Standard color charts.

c. Statement of compliance with specified referenced standards.

d. Availability and delivery time information.

B. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other materials.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 013300

Copyright 2020 AIA MasterSpec Short Form 09/20

SELECTIVE DEMOLITION 024119 - 1

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Demolition and removal of selected portions of building or structure.

2. Demolition and removal of selected site elements.

3. Salvage of existing items to be reused or recycled.

1.2 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

1.3 PREINSTALLATION MEETINGS

A. Pre-work meeting will be held at date to be determined after award.

1.4 INFORMATIONAL SUBMITTALS

A. Schedule of selective demolition activities with starting and ending dates for each activity.

B. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

1. Hazardous materials will be removed by Owner before start of the Work.

C. Storage or sale of removed items or materials on-site is not permitted.

D. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

E. Arrange selective demolition schedule so as not to interfere with Owner's operations.

1.5 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

SELECTIVE DEMOLITION 024119 - 2

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

3.4 PROTECTION

A. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

B. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

C. Remove temporary barricades and protections where hazards no longer exist.

3.5 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

4. Dispose of demolished items and materials promptly.

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with walkways, and other adjacent occupied and used facilities.

C. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

SELECTIVE DEMOLITION 024119 - 3

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

3. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition.

3.6 CLEANING

A. Remove demolition waste materials from Project site

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn demolished materials.

C. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

Copyright 2021 AIA MasterSpec Short Form 09/21

INTERIOR FINISH CARPENTRY 062023 - 1

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

SECTION 062023 - INTERIOR FINISH CARPENTRY

1.1 SUMMARY

A. Section Includes:

1. Interior trim, including non-fire-rated interior door frames.

2. Interior paneling/doors.

3. Shelving.

1.2 DEFINITIONS

A. MDF: Medium-density fiberboard.

B. MDO: Plywood with a medium-density overlay on the face.

C. PVC: Polyvinyl chloride.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of process and factory-fabricated product.

2.1 MATERIALS, GENERAL

A. Lumber: DOC PS 20 and applicable rules of grading agencies indicated. If no grading agency is indicated, comply with applicable rules of any rules-writing agency certified by the American Lumber Standard Committee's (ALSC) Board of Review. Grade lumber by an agency certified by the ALSC's Board of Review to inspect and grade lumber under the rules indicated.

1. Factory mark each piece of lumber with grade stamp of grading agency.

2. For exposed lumber, mark grade stamp on end or back of each piece.

B. Softwood Plywood: DOC PS 1.

C. Hardboard: ANSI A135.4.

D. MDF: ANSI A208.2, [Grade 130].

E. Particleboard: ANSI A208.1, [Grade M-2] [Grade M-2-Exterior Glue].

F. Melamine-Faced Particleboard: Particleboard complying with ANSI A208.1, Grade M-2, finished on both faces with thermally fused, melamine-impregnated decorative paper and complying with NEMA LD 3, Grade VGL, for Test Methods 3.3, 3.4, 3.6, 3.8, and 3.10.

1. Color: Match existing interior colors

INTERIOR FINISH CARPENTRY 062023 - 2

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

2.2 INTERIOR TRIM

A. Softwood Lumber Trim for Transparent Finish (Stain or Clear Finish):

1. Species and Grade: Conforms with SOW.

B. Hardwood Lumber Trim for Transparent Finish (Stain or Clear Finish):

1. Species and Grade: Conforms with SOW.

C. Hardwood Moldings for Transparent Finish (Stain or Clear Finish): Conforms with SOW.

D. MISCELLANEOUS MATERIALS

1. Fasteners for Interior Finish Carpentry: Nails, screws, and other anchoring devices of type, size, material, and finish required for application indicated to provide secure attachment, concealed where possible.

E. Glue: Aliphatic-resin, polyurethane, or resorcinol wood glue recommended by manufacturer for general carpentry use.

F. Multipurpose Construction Adhesive: Formulation, complying with ASTM D3498, that is recommended for indicated use by adhesive manufacturer.

3.1 PREPARATION

A. Clean substrates of projections and substances detrimental to application.

B. Before installing interior finish carpentry, condition materials to average prevailing humidity in installation areas for a minimum of 24 hours.

3.2 INSTALLATION, GENERAL

A. Install interior finish carpentry level, plumb, true, and aligned with adjacent materials.

1. Use concealed shims where necessary for alignment.

2. Scribe and cut interior finish carpentry to fit adjoining work. Refinish and seal cuts as recommended by manufacturer.

3. Where face fastening is unavoidable, countersink fasteners, fill surface flush, and sand unless otherwise indicated.

INTERIOR FINISH CARPENTRY 062023 - 3

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

4. Install to tolerance of 1/8 inch in 96 inches (3 mm in 2438 mm) for level and plumb.

Install adjoining interior finish carpentry with 1/32-inch (0.8-mm) maximum offset for flush installation and 1/16-inch (1.5-mm) maximum offset for reveal installation.

5. Coordinate interior finish carpentry with materials and systems in or adjacent to it.

Provide cutouts for mechanical and electrical items that penetrate interior finish carpentry.

3.3 INSTALLATION OF STANDING AND RUNNING TRIM

A. Install trim with minimum number of joints as is practical, using full-length pieces from maximum lengths of lumber available.

1. Do not use pieces less than 24 inches (610 mm) long, except where necessary.

2. Stagger joints in adjacent and related standing and running trim.

3. [Cope] [Miter] at returns, miter at outside corners, and cope at inside corners to produce tight-fitting joints with full-surface contact throughout length of joint.

4. Use scarf joints for end-to-end joints.

5. Plane backs of casings to provide uniform thickness across joints where necessary for alignment.

6. Match color and grain pattern of trim for transparent finish (stain or clear finish) across joints.

7. Install trim after gypsum-board joint finishing operations are completed.

8. Install without splitting; drill pilot holes before fastening where necessary to prevent splitting.

9. Fasten to prevent movement or warping.

10. Countersink fastener heads on exposed carpentry work and fill holes.

END OF SECTION 062023

Copyright 2017 AIA MasterSpec Short Form 12/17

HOLLOW METAL FRAMES 081213 - 1

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

SECTION 081213 - HOLLOW METAL FRAMES

ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings: Include elevations, frame profiles, metal thicknesses, and wall opening conditions.

C. Schedule: Prepared by or under the supervision of supplier, using same reference numbers for details and openings as those on Drawings.

2.1 STANDARD STEEL FRAMES

A. Construct hollow-metal frames to comply with standards indicated for materials, fabrication, hardware locations, hardware reinforcement, tolerances, and clearances, and as specified.

2.2 CUSTOM HOLLOW-METAL FRAMES

A. Interior Frames: NAAMM-HMMA 861.

1. Materials: [Uncoated] [Metallic-coated] steel sheet, minimum thickness of 0.053 inch (1.3 mm).

2. [Sidelite] [and] [Transom] Frames: Fabricated from same thickness material as adjacent door frame.

3. Construction: [Knocked down] [Slip-on drywall] [Face welded] [Full profile welded].

4. Exposed Finish: Prime.

2.3 FRAME ANCHORS

A. Jamb Anchors:

1. Type: Anchors of minimum size and type required by applicable door and frame standard, and suitable for performance level indicated.

2. Quantity: Minimum of three anchors per jamb, with one additional anchor for frames with no floor anchor. Provide one additional anchor for each 24 inches (610 mm) of frame height above 7 feet (2.1 m).

3. Postinstalled Expansion Anchor: Minimum 3/8-inch- (9.5-mm-) diameter bolts with expansion shields or inserts, with manufacturer's standard pipe spacer.

B. Floor Anchors: Provide floor anchors for each jamb and mullion that extends to floor.

C. Floor Anchors for Concrete Slabs with Underlayment: Adjustable-type anchors with extension clips, allowing not less than 2-inch (51-mm) height adjustment. Terminate bottom of frames at top of underlayment.

2.4 STEEL FINISHES

Copyright 2017 AIA MasterSpec Short Form 12/17

HOLLOW METAL FRAMES 081213 - 2

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

A. Prime Finish: Clean, pretreat, and apply manufacturer's standard primer.

1. Shop Primer: SDI A250.10.

B. Factory Finish: SDI A250.3.

3.1 INSTALLATION

A. General: Install hollow-metal frames plumb, rigid, properly aligned, and securely fastened in place. Comply with approved Shop Drawings and with manufacturer's written instructions.

B. Set frames accurately in position; plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is complete, remove temporary braces without damage to completed Work.

1. Where frames are fabricated in sections, field splice at approved locations by welding face joint continuously; grind, fill, dress, and make splice smooth, flush, and invisible on exposed faces. Touch-up finishes.

2. Install frames with removable stops located on secure side of opening.

C. Floor Anchors: Secure with postinstalled expansion anchors.

1. Floor anchors may be set with power-actuated fasteners instead of postinstalled expansion anchors if so indicated and approved on Shop Drawings.

3.2 CLEANING AND TOUCHUP

A. Prime-Coat Touchup: Immediately after erection, sand smooth rusted or damaged areas of prime coat and apply touchup of compatible air-drying, rust-inhibitive primer.

B. Metallic-Coated Surface Touchup: Clean abraded areas and repair with galvanizing repair paint according to manufacturer's written instructions.

C. Factory-Finish Touchup: Clean abraded areas and repair with same material used for factory finish according to manufacturer's written instructions.

D. Touchup Painting: Cleaning and touchup painting of abraded areas of paint are specified in painting Sections.

END OF SECTION 081213

Copyright 2021 AIA MasterSpec Short Form 06/21

FLUSH WOOD DOORS 081416 - 1

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

SECTION 081416 - FLUSH WOOD DOORS

1. Solid-core flush wood doors with plastic-laminate-faces.

2. Fire-rated wood door frames.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product, including the following:

1. Door core materials and construction.

2. Door edge construction

3. Door face type and characteristics.

4. Door louvers.

5. Door trim for openings.

6. Door frame construction.

7. Factory-machining criteria.

8. Factory-[priming] [finishing] specifications.

B. Shop Drawings: Indicate location, size, and hand of each door; elevation of each type of door;

construction details not covered in Product Data; and the following:

1. Door schedule indicating door[ and frame] location, type, size, and swing.

2. Details of frame for each frame type, including dimensions and profile.

3. Details of electrical raceway and preparation for electrified hardware, access control systems, and security systems.

4. Dimensions and locations of blocking for hardware attachment.

5. Clearances and undercuts.

6. Requirements for veneer matching.

2.1 SOLID-CORE, FIVE-PLY FLUSH WOOD VENEER-FACED DOORS FOR

TRANSPARENT FINISH

A. Interior Doors, Solid-Core Five-Ply Veneer-Faced <Insert drawing designation>:

FLUSH WOOD DOORS 081416 - 2

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

1. Performance Grade: ANSI/WDMA I.S. 1A [Heavy Duty] [Standard Duty] [as indicated on Drawings].

2. [Architectural Woodwork Standards] [ANSI/WDMA I.S. 1A] Grade: [Premium] [Custom].

3. Faces: Single-ply wood veneer not less than 1/50 inch (0.508 mm) thick.

a. Species: [Select white birch].

b. Room Match:

1) Match door faces within each separate room or area of building. Corridor-door faces do not need to match where they are separated by [10 feet (3 m)] [20 feet (6 m)] <Insert dimension> or more.

4. Exposed Vertical[ and Top] Edges: [Same species as faces or a compatible species - Architectural Woodwork Standards edge Type A] [Same species as faces - Architectural Woodwork Standards edge Type A] [Applied wood-veneer edges of same species as faces and covering edges of faces - Architectural Woodwork Standards edge Type B] [Applied wood edges of same species as faces and covering edges of crossbands - Architectural Woodwork Standards edge Type D].

5. Core for Non-Fire-Rated Doors:

a. ANSI A208.1, [Grade LD-1] [Grade LD-2] particleboard.

2.2 FABRICATION

A. Factory fit doors to suit frame-opening sizes indicated.

1. Comply with clearance requirements of referenced quality standard for fitting unless otherwise indicated.

2. For doors scheduled to receive electrified locksets, provide factory-installed raceway and wiring to accommodate specified hardware.

A. Install doors[ and frames] to comply with manufacturer's written instructions and referenced quality standard, and as indicated.

B. Install frames level, plumb, true, and straight.

1. Shim as required with concealed shims. Install level and plumb to a tolerance of 1/8 inch in 96 inches (3.2 mm in 2400 mm).

2. Anchor frames to anchors or blocking built in or directly attached to substrates.

a. Secure with countersunk, concealed fasteners and blind nailing.

b. Use fine finishing nails[ or finishing screws] for exposed fastening, countersunk and filled flush with woodwork.

FLUSH WOOD DOORS 081416 - 3

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

1) For factory-finished items, use filler matching finish of items being installed.

C. Job-Fitted Doors:

1. Align and fit doors in frames with uniform clearances and bevels as indicated below.

a. Do not trim stiles and rails in excess of limits set by manufacturer or permitted for fire-rated doors.

2. Machine doors for hardware.

3. Seal edges of doors, edges of cutouts, and mortises after fitting and machining.

4. Clearances:

a. Provide 1/8 inch (3.2 mm) at heads, jambs, and between pairs of doors.

b. Provide 1/8 inch (3.2 mm) from bottom of door to top of decorative floor finish or covering unless otherwise indicated on Drawings.

c. Where threshold is shown or scheduled, provide 1/4 inch (6.4 mm) from bottom of door to top of threshold unless otherwise indicated.

5. Bevel non-fire-rated doors 1/8 inch in 2 inches (3-1/2 degrees) at lock and hinge edges.

D. Factory-Fitted Doors: Align in frames for uniform clearance at each edge.

E. Factory-Finished Doors: Restore finish before installation if fitting or machining is required at Project site.

3.2 ADJUSTING

A. Operation: Rehang or replace doors that do not swing or operate freely.

B. Finished Doors: Replace doors that are damaged or that do not comply with requirements.

Doors may be repaired or refinished if Work complies with requirements and shows no evidence of repair or refinishing.

END OF SECTION 081416

Copyright 2020 AIA MasterSpec Short Form 12/20

DOOR HARDWARE 087100 - 1

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

SECTION 087100 - DOOR HARDWARE

1. Mechanical door hardware for the following:

a. Swinging doors.

b. Sliding doors.

c. Folding doors.

2. Cylinders for door hardware specified in other Sections.

3. Electrified door hardware.

A. Shop Drawings: For electrified door hardware.

1. Include diagrams for power, signal, and control wiring.

2. Include details of interface of electrified door hardware and building safety and security systems.

B. Samples: For each exposed product in each finish specified.

C. Door hardware schedule.

1.4 INFORMATIONAL SUBMITTALS

A. Sample warranty.

1.5 CLOSEOUT SUBMITTALS

A. Maintenance data.

1.6 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace components of door hardware that fail in materials or workmanship within specified warranty period.

1. Warranty Period: [Three] <Insert number> years from date of Substantial Completion unless otherwise indicated below:

a. [Electromagnetic] [and] [Delayed-Egress] Locks: [Five] <Insert number> years from date of Substantial Completion.

b. Exit Devices: [Two] <Insert number> years from date of Substantial Completion.

c. Manual Closers: [10] <Insert number> years from date of Substantial

Completion.

DOOR HARDWARE 087100 - 2

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

2.1 PERFORMANCE REQUIREMENTS

A. Electrified Door Hardware: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Means of Egress Doors: Latches do not require more than 15 lbf (67 N) to release the latch.

Locks do not require use of a key, tool, or special knowledge for operation.

C. Accessibility Requirements: For door hardware on doors in an accessible route, comply with [the USDOJ's "2010 ADA Standards for Accessible Design"] [the DOT's "ADA Standards for Transportation Facilities"] [the ABA standards of the Federal agency having jurisdiction] [ICC A117.1] [HUD's "Fair Housing Accessibility Guidelines"] [and] <Insert regulation>.

2.2 MECHANICAL LOCKS AND LATCHES

A. Lock Functions: As indicated in door hardware schedule.

B. Lock Throw: Comply with testing requirements for length of bolts required for labeled fire doors, and as follows:

1. Bored Locks: Minimum 1/2-inch (13-mm) latchbolt throw.

2. Mortise Locks: Minimum 3/4-inch (19-mm) latchbolt throw.

3. Deadbolts: Minimum [1-inch (25-mm)] [1.25-inch (32-mm)] <Insert dimension> bolt throw.

C. Lock Backset: 2-3/4 inches (70 mm) unless otherwise indicated.

D. Strikes: Provide manufacturer's standard strike for each lock bolt or latchbolt complying with requirements indicated for applicable lock or latch and with strike box and curved lip extended to protect frame; finished to match lock or latch.

1. Flat-Lip Strikes: For locks with three-piece antifriction latchbolts, as recommended by manufacturer.

2. Extra-Long-Lip Strikes: For locks used on frames with applied wood casing trim.

3. Aluminum-Frame Strike Box: Manufacturer's special strike box fabricated for aluminum framing.

4. Rabbet Front and Strike: Provide on locksets for rabbeted meeting stiles.

E. Push-Button Combination Locks: BHMA A156.36; cylindrical; Grade 1; lock opens by entering a one- to five-digit code by pushing correct buttons in correct sequence; automatically relocks when door is closed; with strike that suits frame.

DOOR HARDWARE 087100 - 3

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

2.3 ELECTRIC STRIKES

A. Electric Strikes: BHMA A156.31; [Grade 1] [Grade 2]; with faceplate to suit lock and frame.

2.4 ELECTROMAGNETIC LOCKS

A. Electromagnetic Locks: BHMA A156.23; electrically powered; with electromagnet attached to frame and armature plate attached to door; full-exterior or full-interior type, as required by application indicated.

B. Delayed-Egress Electromagnetic Locks: BHMA A156.24, electrically powered, with electromagnet attached to frame and armature plate attached to door; depressing push bar for more than three seconds initiates irreversible alarm and adjustable time delay for egress. When integrated with fire alarm, fire alarm voids time delay.

2.5 ELECTROMECHANICAL LOCKS

A. Electromechanical Locks: BHMA A156.25; [Grade 1] [Grade 2]; motor or solenoid driven;

with strike that suits frame.

2.6 SLIDING DOOR HARDWARE

A. Sliding Door Hardware: BHMA A156.14; consisting of complete sets including rails, hangers, supports, bumpers, floor guides, and accessories indicated.

A. Mounting Heights: Mount door hardware units at heights [indicated on Drawings] [to comply with the following] unless otherwise indicated or required to comply with governing regulations.

1. Standard Steel Doors and Frames: ANSI/SDI A250.8.

2. Custom Steel Doors and Frames: HMMA 831.

3. Wood Doors: DHI's "Recommended Locations for Architectural Hardware for Wood

Flush Doors."

B. Install each door hardware item to comply with manufacturer's written instructions. Where cutting and fitting are required to install door hardware onto or into surfaces that are later to be painted or finished in another way, coordinate removal, storage, and reinstallation of surface protective trim units with finishing work. Do not install surface-mounted items until finishes have been completed on substrates involved.

C. Hinges: Install types and in quantities indicated in door hardware schedule, but not fewer than the number recommended by manufacturer for application indicated or one hinge for every 30 inches (750 mm) of door height, whichever is more stringent, unless other equivalent means of support for door, such as spring hinges or pivots, are provided.

DOOR HARDWARE 087100 - 4

Copyright © 2021 by the American Institute of Architects. Warning: This AIA MasterSpec based document is protected by U.S. Copyright Law and International

D. Intermediate Offset Pivots: Where offset pivots are indicated, provide intermediate offset pivots in quantities indicated in door hardware schedule, but not fewer than one intermediate offset pivot per door and one additional intermediate offset pivot for every 30 inches (750 mm) of door height greater than 90 inches (2286 mm).

E. Lock Cylinders: Install construction cores to secure building and areas during construction period.

3.2 ADJUSTING

A. Adjust and check each operating item of door hardware and each door to ensure proper operation or function of every unit. Replace units that cannot be adjusted to operate as intended.

Adjust door control devices to compensate for final operation of heating and ventilating equipment and to comply with referenced accessibility requirements.

END OF SECTION 087100

ADP8BA.tmp
1.1 SUMMARY
1.2 MATERIALS OWNERSHIP
1.3 PREINSTALLATION MEETINGS
1.4 INFORMATIONAL SUBMITTALS
1.5 WARRANTY
PART 2 - PRODUCTS
PART 3 - EXECUTION
3.4 PROTECTION
3.5 SELECTIVE DEMOLITION
3.6 CLEANING
A. Remove demolition waste materials from Project site
ADPFE88.tmp
PART 1 - GENERAL
ACTION SUBMITTALS
2.1 STANDARD STEEL FRAMES
2.2 CUSTOM HOLLOW-METAL FRAMES
2.3 FRAME ANCHORS
2.4 STEEL FINISHES
PART 3 - EXECUTION
3.2 CLEANING AND TOUCHUP
ADP60.tmp
PART 1 - GENERAL
ACTION SUBMITTALS
2.1 STANDARD STEEL FRAMES
2.2 CUSTOM HOLLOW-METAL FRAMES
2.3 FRAME ANCHORS
2.4 STEEL FINISHES
PART 3 - EXECUTION
3.2 CLEANING AND TOUCHUP
ADP6892.tmp
4. Exposed Vertical[ and Top] Edges: [Same species as faces or a compatible species - Architectural Woodwork Standards edge Type A] [Same species as faces - Architectural Woodwork Standards edge Type A] [Applied wood-veneer edges of same species as fa...
ADP1203.tmp
PART 1 - GENERAL
1.4 INFORMATIONAL SUBMITTALS
1.5 CLOSEOUT SUBMITTALS
1.6 WARRANTY
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
2.2 MECHANICAL LOCKS AND LATCHES
2.3 ELECTRIC STRIKES
2.4 ELECTROMAGNETIC LOCKS
2.5 ELECTROMECHANICAL LOCKS
2.6 SLIDING DOOR HARDWARE