LMTF_DRAFT_CSDR Plan_20241023.pdf
PDF 205 KB Posted
- Attached to
- FUTURE Little Mountain Test Facility (LMTF) Testing, Operation, and Maintenance Contract Federal contract opportunity
- Solicitation number
- FA820726RX00X4
About this file
This is a Cost and Software Data Reporting (CSDR) Plan for the Little Mountain Test Facility (LMTF) Operations and Maintenance contract, detailing reporting requirements for cost, software, and technical data. The plan is associated with an ACAT I (MDAP) program supporting ICBM Minuteman III, Sentinel, Long Range Stand Off (LRSO), and Mk 21A systems.
The plan specifies reporting requirements including FlexFile submissions, technical data reports, and quantity data reports with submissions scheduled from 2027 through 2031. Key testing activities to be reported include ionizing/non-ionizing radiation testing, electrical characterization, simulated flight vibrations, shock testing, rocket motor acceleration, explosive shock testing, and temperature/altitude chamber testing. The contractor must segregate recurring and non-recurring costs, report Forecast at Completion (FAC) values at the WBS level, and submit a final cost report when 95% of total costs have been incurred for each delivery order and end item. The plan covers RDT&E, procurement, and O&M appropriations, with Boeing Defense, Space & Security identified as the reporting contractor under contract FA8207-17-D-0001.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FY27 LMTF PWS RFI Draft pdf.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COST AND SOFTWARE DATA REPORTING PLAN
15. REMARKS
FAC vs EAC
The checkmarks for EAC/FAC in column 12e at the WBS level shall be reported as "Forecast at Completion" (FAC). The Forecast At Completion (FAC) required here is not subject to the standards established in ANSI/EIA-748 guideline #27 (Estimate at Complete); therefore, the FAC does not need to be, but may be, derived from Industry Earned Value Management (EVM) processes.
NON-RECURRING/RECURRING DEFINITIONS
Recurring and Non-Recurring will be segregated according to the definitions in the DID.
COST ACCOUNTING STANDARDS (CAS) DISCLOSURE STATEMENT DIFFERENCES
Describe significant accounting changes from previous accounting period in the Remarks section of the reports, if applicable.
END ITEMS/ORDER LOTS SCOPE
Block 16 Orders/Lots is meant to capture the discrete Delivery Orders/Task Orders exercised on the contract. If a Delivery Order/Task Order is exercised on the contract and the CSDR plan has not been updated, it is the Reporting Entity's responsibility to still submit the dollars and hours in the FlexFile tagged to the appropriate Delivery Orders/Task Orders. The CSDR plan will be revised accordingly to include all
FINAL COST REPORT
Final Cost Report to be submitted when final end item has been delivered and accepted by the government (e.g., as evidenced by a completed DD 250) and 95% or more of total costs for each Order/Lot (see Block 16) and each End Item (see Block 17) has been incurred.
DRAFT DD FORM 2794 (PAGE 4), REMARKS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE
OMB No. 0704-0188
1b. PHASE/MILESTONE (check all that apply) Pre-A A B
C-LRIP
C-FRP
X O&S
1d. ACQUISITION CATEGORY (ACAT) Pre-ACAT
X ACAT I (MDAP)
ACAT IA (MAIS)
ACAT II
ACAT III
Other
3. PLAN ITERATION TYPE
X INITIAL
REVISION
7. PLAN TYPE
GOVERNMENT
X CONTRACT (PRIME)
CONTRACT (SUB)
CBDR REQUIRED FOR THIS ORGANIZATION
9c. APPROPRIATION (check all that apply)
X RDT&E
X PROCUREMENT
X O&M
FMS
WCF
OTHER
X AT COMPLETION COSTS FOR STANDARD FUNCTIONAL CATEGORIES (FlexFile or Legacy) X AT COMPLETION COSTS FOR RECURRING/NONRECURRING (FlexFile only)
X TECHNICAL DATA REQUIRED
X FLEXFILE
LEGACY DD 1921 SERIES
DRAFT DD FORM 2794 (PAGE 1), METADATA, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE
5. LAST APPROVED PLAN DATE (YYYYMMDD)
4. CURRENT SUBMISSION DATE (YYYYMMDD)
COST AND SOFTWARE DATA REPORTING PLAN
Little Mountain Test Facility (LMTF) Operations and Maintenance
2. COMMODITY TYPE
1c. PRIME MISSION PRODUCT
ICBM Minuteman III (MMIII) and Sentinel, Long Range Stand Off (LRSO), and Mk 21A
The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
1a. PROGRAM NAME
Strategic Missile System
20241021
9b. CONTRACT NUMBER (List all that apply, separated by commas)
i. REPORTING ORGANIZATION NAME
ii. DIVISION NAME
iii. LOCATION
9a. CONTRACTOR NAME/ADDRESS
6a. GOVERNMENT PLAN POINT OF CONTACT (POC) NAME (Last, First, M.)
Blayton, Chris
6c. TELEPHONE NUMBER (Include Area Code)
6b. ADDRESS (Include ZIP Code)
10d. COST REPORT TYPE
6014 Dogwood Ave Hill AFB UT 84056
10c. APPROVED PLAN REQUIREMENTS
10b. APPROVED PLAN REVISION NUMBER
465 N Marshall Way, Layton UT 84041
The Boeing Company
6d. E-MAIL ADDRESS christopher.blayton@us.af.mil
iv. CONTRACTOR BUSINESS DATA REPORT (CBDR 1921-3) REQUIREMENT:
FA8207-17-D-0001
AF-21-K-C8
10a. APPROVED PLAN NUMBER
478-926-1772
Boeing Defense, Space & Security
8. PLAN GOVERNMENT PREPARING ORGANIZATION
AFNWC/NM
mailto:christopher.blayton@us.af.mil mailto:christopher.blayton@us.af.mil mailto:christopher.blayton@us.af.mil
i. QUANTITY
DATA
ii. GFE
QUANTITY
1.0 1 LMTF Operations & Maintenance
1.1 2 Test Execution
1.1.1 3 Ionizing Radiation Testing X X
1.1.2 3 Non-Ionizing Radiation Testing X X
1.1.3 3 Electrical Characterization X X
1.1.4 3 Simulated Flight Vibrations X X
1.1.5 3 Shock, Vibration, and Transportation & Handling X X
1.1.6 3 Rocket Motor Acceleration (Centrifuge) X X
1.1.7 3 Explosive Shock (Ordnance) X X
1.1.8 3 Temperature/Altitude Chamber X X
1.1.9 3 Other ICBM Tests 1…n (Specify) X X
1.2 2 Test Equipment
1.2.1 3 Radiation Lab
1.2.1.1 4 New Equipment X X X
1.2.1.2 4 Lab Consumables X X X
1.2.1.3 4 Equipment Repair and Maintenance X X
1.2.2 3 Electromagnetic Effects Lab
1.2.2.1 4 New Equipment X X X
1.2.2.2 3 Lab Consumables X X X
1.2.2.3 3 Equipment Repair and Maintenance X X
1.2.3 3 Shock and Vibration Lab
1.2.3.1 4 New Equipment X X X
1.2.3.2 3 Lab Consumables X X X
1.2.3.3 3 Equipment Repair and Maintenance X X
1.3 2 Platform Integration, Assembly, Test, and Checkout X X
1.4 2 Systems Engineering
1.4.1 3 Software Systems Engineering X X
1.4.2 3 Integrated Logistics Support (ILS) Systems Engineering X X
1.4.3 3 Cybersecurity Systems Engineering X X
1.4.4 3 Core Systems Engineering X X
1.4.5 3 Other Systems Engineering 1...n (Specify) X X
1.5 2 Program Management
1.5.1 3 Software Program Management X X
1.5.2 3 Integrated Logistics Support (ILS) Program Management X X
1.5.3 3 Cybersecurity Management X X
1.5.4 3 Core Program Management X X
1.5.5 3 Travel X X
1.5.6 3 Other Program Management 1...n (Specify) X X
1.6 2 System Test and Evaluation
1.6.1 3 Development Test and Evaluation
1.6.1.1 4 Engineering Development Tests X X
1.6.1.2 4 System Qualification X X
1.6.1.3 4 Live Fire X X
1.6.1.4 4 Service/Agency DT&E 1...n (Specify) X X
1.6.2 3 Operational Test and Evaluation
1.6.2.1 4 Live Fire X X
1.6.2.2 4 Other OT&E (1...n) X X
1.6.3 3 Cybersecurity Test and Evaluation
1.6.3.1 4 Cybersecurity Development Test X X
1.6.3.2 4 Cybersecurity Operational Test X X
1.6.3.3 4 Cybersecurity Other (1...n) X X
1.6.4 3 Mock-ups/System Integration Labs (SILs) X X
1.6.5 3 Test and Evaluation Support X X
1.6.6 3 Test Facilities
1.6.6.1 4 Commercial
1.6.6.1.1 5 Facility Lease X X
1.6.6.1.2 5 Other Commercial Test Facility (Specify) X X
1.6.6.2 4 Government
1.6.6.2.1 5 Facilitites Maintenance X X
1.6.6.2.2 5 Other Government Test Facility (Specify) X X
1.6.6.3 4 Instrument Testing X X
1.7 2 Training
1.7.1 3 Equipment
1.7.1.1 4 Operator Instructional Equipment X X X
1.7.1.2 4 Maintainer Instructional Equipment X X X
c. WBS ELEMENT NAME a. ACTUALS TO
DATE (ATD)
b. LEGACY 1921-1
c. LEGACY 1921-2
d. LEGACY 1921-5
e. EAC/FAC (See item 10d)
a. QUANTITY
b. SRDR
FORMATS
c.
MAINT. &
REPAIR
PARTS
COST AND SOFTWARE DATA REPORTING PLAN
11. WORK BREAKDOWN STRUCTURE (WBS) 12. COST 13. TECHNICAL DATA
a. WBS
CODE
b. WBS
LEVEL
1.7.2 3 Services
1.7.2.1 4 Operator Instructional Services X X
1.7.2.2 4 Maintainer Instructional Services X X
1.7.3 3 Facilities X X
1.7.4 3 Training Software X X
1.8 2 Data
1.8.1 3 Data Deliverables X X
1.8.2 3 Data Repository X X
1.8.3 3 Data Rights X X
1.9 2 Peculiar Support Equipment
1.9.1 3 Test and Measurement Equipment X X X
1.9.2 3 Support and Handling Equipment X X X
1.10 2 Common Support Equipment
1.10.1 3 Test and Measurement Equipment X X X
1.10.2 3 Support and Handling Equipment X X X
1.11 2 Operational/Site Activation
1.11.1 3 System Assembly, Installation, and Checkout on Site
1.11.1.1 4 Deployment HW and SW X X
1.11.1.2 4 Site Activation X X
1.11.2 3 Contractor Technical Support X X
1.11.3 3 Site Construction X X
1.11.4 3 Site/Ship/Vehicle Conversion X X
1.11.5 3 Interim Contractor Support (ICS) X X
1.12 2 Contractor Logistics Support (CLS) X X
1.13 2 Industrial Facilities
1.13.1 3 Construction/Conversion/Expansion X X
1.13.2 3 Equipment Acquisition or Modernization X X
1.13.3 3 Maintenance (Industrial Facilities) X X
1.14 2 Initial Spares and Repair Parts
1.14.1 3 Test Equipment Spare and Repair 1...n (Specify) X X X
1.14.2 3 Support Equipment Spare and Repair Parts X X
1.14.3 3 Training Equipment Spare and Repair Parts X X
1.14.4 3 Packaging, Handling, Storage, and Transportation (PHS&T) X X
Subtotal Cost X X
Reporting Contractor G&A X X Reporting Contractor Undistributed Budget X X Reporting Contractor Management Reserve X X Reporting Contractor FCCM X X Total Cost X
Reporting Contractor Profit/Loss or Fee X X
Total Price X X
DRAFT DD FORM 2794 (PAGE 2), REPORTING, JANUARY 2019
e. AS OF DATE f. DUE DATE
(YYYYMMDD) (YYYYMMDD)
1 Cost and Hour Report (FlexFile), Quantity Data Report Annual Cost Report 1 Initial 20270331 20270530 2 Technical Data Report Initial Tech Report Initial 20270331 20270530 3 Cost and Hour Report (FlexFile), Quantity Data Report Annual Cost Report 2 Interim 20280331 20280530 4 Cost and Hour Report (FlexFile), Quantity Data Report Annual Cost Report 3 Interim 20290331 20290530 5 Technical Data Report Interim Tech Report Interim 20290331 20290530 6 Cost and Hour Report (FlexFile), Quantity Data Report Annual Cost Report 4 Interim 20300331 20300530 7 Cost and Hour Report (FlexFile), Quantity Data Report Final Tech Report Final 20310331 20310530 8 Technical Data Report Contract Completion Final 20310331 20310530
DRAFT DD FORM 2794 (PAGE 3), SUBMISSION EVENTS, JANUARY 2019 PREVIOUS EDITION IS OBSOLETE
COST AND SOFTWARE DATA REPORTING PLAN
14. CSDR SUBMISSION EVENTS
d.
REPORT CYCLE
a.
EVENT ID
b.
DATA REPORT(S)
c.
SUBMISSION EVENT NAME
a. ID c. PHASE/MILESTONE
a. ID
a. ORDER/LOT ID b. END ITEM ID c. UNIT/SUBLOT REPORTING (X if applicable)
d. UNIT SEQUENCING (X if applicable)
DRAFT DD FORM 2794 (PAGE 5), INTRA-CONTRACT SCOPE, JANUARY 2019
COST AND SOFTWARE DATA REPORTING PLAN
INTRA-CONTRACT SCOPE REPORTING DEFINITION
System/Program 1…n (Specify)
Common
18. UNIT/SUBLOT REPORTING AND UNIT SEQUENCING REQUIREMENTS
16. ORDERS/LOTS
17. END ITEMS
b. NAME
b. NAME
Delivery Order 1…n (Specify)
Major Test Equipment 1…n
26. WBS ELEMEN
a. PARAMETER NAME b. UNIT OF MEASURE c. UNIT OF MEASURE QUALIFIER d. REPEATABLE e. REMARKS
1.1.1 Ionizing Radiation Testing Sustainment Number of Tests Quantity Events RAD
1.1.2 Non-Ionizing Radiation Testing Sustainment Number of Tests Quantity Events EME
1.1.3 Electrical Characterization Sustainment Number of Tests Quantity Events RAD
1.1.4 Simulated Flight Vibrations Sustainment Number of Tests Quantity Events SAV
1.1.5 Shock, Vibration, and Transportation & Handling Sustainment Number of Tests Quantity Events SAV
1.1.6 Rocket Motor Acceleration (Centrifuge) Sustainment Number of Tests Quantity Events SAV
1.1.7 Explosive Shock (Ordnance) Sustainment Number of Tests Quantity Events SAV
1.1.8 Temperature/Altitude Chamber Sustainment Number of Tests Quantity Events SAV
1.1.9 Other ICBM Tests 1…n (Specify) Sustainment Number of Tests Quantity Events
DD FORM 2794 (PAGE 8), TECHNICAL PARAMETER REQUIREMENTS, JANUARY 2019
COST AND SOFTWARE DATA REPORTING PLAN - TECHNICAL PARAMETER REQUIREMENTS
TECHNICAL PARAMETER REQUIREMENTS
27. WBS ELEMENT NAME 28. ITEM TYPE
29. TECHNICAL PARAMETER
| DD Form 2794, Pg 4 (REMARKS) |
| DD Form 2794, Pg 1 (METADATA) |
| DD Form 2794, Pg 2 (REPORTING) |
| DD Form 2794, Pg 3 (EVENTS) |
| DD Form 2794, Pg 5 (SCOPE DEF) |
| DD Form 2794, Pg 8 (TECH RQTS) |
File details come from the government source that posted it. Updated .