Liner Package W912CH-25-R-0056 RFP.PDF

PDF 243 KB Posted

Attached to
Solicitation: NSN: 4240-01-331-0170 Liner Package
Solicitation number
W912CH-24-R-0056
Issued by

About this file

This is a Request for Proposal (RFP) for a Liner Package with National Stock Number (NSN) 4240-01-331-0170, issued by the Army Contracting Command - Detroit Arsenal. The solicitation is a total small business set-aside for a firm-fixed-price, five-year Indefinite Delivery, Indefinite Quantity (IDIQ) contract to procure a minimum of 42 and maximum of 1,243 Liner Package units over five ordering periods. The initial production quantity is 322 units in the first year, with subsequent years requiring 168 units annually.

Key details include a requirement for First Article Testing and Production Lot Testing, military preservation and packaging, and delivery to Blue Grass Army Depot in Richmond, Kentucky. Proposals are due by October 24, 2025, with a 90-day validity period. The Technical Data Package is distribution code "D", limiting access to U.S. Government agencies and contractors. The contract will use NAICS code 314999 (Other Electronic Component Manufacturing), and offerors must be registered in the System for Award Management (SAM) as a small business concern to be eligible for award.

View the file

Other files

File Type Posted
EH4L0315EH DEVCOM CBC CDRLs.docx DOCX document
First-Article-Waiver-Worksheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W912CH-25-R-0056

X

DOA4

SEE SCHEDULE

W912CH

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

EBONI ALBERT

(586)282-1234

CCTA-APS-A

EBONI.Q.ALBERT.CIV@ARMY.MIL

1 76

X 1

X 5 X 15

X 18 X 21 X 26

X 32

X 34

X 58

X 59

X 70

X 73

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: EBONI ALBERT

Buyer Office Symbol/Telephone Number: CCTA-APS-A/(586)282-1234

Type of Contract 1: Firm Fixed Price

Kind of Contract: Other

*** End of Narrative A0000 ***

Administrative Summary

A.1 BACKGROUND/DESCRIPTION OF THE ACTION

1. This solicitation is intended to result in the award of a single, Firm-Fixed Price (FFP), five-year Indefinite Delivery, Indefinite

Quantity (IDIQ) Contract of the estimated supplied specified. The resulting contract will establish pricing to be utilized through issuance of delivery orders for discrete quantities for the period stated in the schedule.

2.This solicitation is a total small business set-aside in accordance with (IAW) FAR 19.502-2.

3. There is a Technical Data Package (TDP) associated with this procurement. The TDP is Distribution Statement D, which limits access to the Department of Defense (DoD) and U.S. DoD contractors only. Please refer to Section C for additional information.

MINIMUM AND MAXIMUM QUANTITY OF SUPPLIES

4. In accordance with (IAW) Federal Acquisition Regulation (FAR) 16.504(a)(4)(ii), the minimum quantity of supplies the Government will acquire under this contract is 42 each. The Government will satisfy this minimum quantity requirement by issuing the first delivery order (DO) for the stated minimum at the time of IDIQ contract award.

5. The Government is NOT obligated to purchase any additional requirements beyond the Minimum Guaranteed Quantity.

6. The minimum quantity is 42 each and the maximum quantity is 1243 each for the Liner Package.

ORDERING PERIOD

7. There will be five, one-year ordering periods beginning the date of IDIQ contract award.

DELIVERY ORDER AWARDS

8. Future delivery orders will be awarded IAW FAR 52.216-19, Order Limitations, and FAR 52.216-22, Indefinite Quantity, and DFARS

252.216-

7006, Ordering.

SOLICITATION STRUCTURE

9. Particular attention should be given to clauses and paragraphs throughout the solicitation that require the contractor to fill-in various information.

10. The Government will utilize North American Industry Classification System (NAICS) code 314999 (Other Electronic Component

Manufacturing). This NAICS code will also be assigned to subsequent awarded delivery orders thereunder.

11. System for Award Management (SAM), Size Standards, and NAICS Codes. Failure to register in SAM for the corresponding NAICS code identified in paragraph 10 prior to submitting a proposal against this solicitation may preclude an award being made to your company.

SYSTEM FOR AWARD MANAGEMENT (SAM), SIZE STANDARDS, AND NAICS CODES

12. Failure to register in SAM for the corresponding NAICS code identified in paragraph A.3 prior to submitting a proposal against this

Solicitation may preclude an award being made to your company. Offerors should be aware of how U.S. Small Business (SB) concerns are defined in FAR Part 19, Defense Federal Acquisition Regulation Supplement (DFARS) Part 19, and 13 CFR 121, Small Business Size

Regulations. Offerors are advised to review 13 CFR 121.103, "How does SBA Determine Affiliation".

DISTRIBUTION AND DESTRUCTION OF EXPORT CONTROL TECHNICAL DATA PACKAGE

(a) This solicitation and resulting contract contains technical data whose export is restricted by the Arms Export Control Act (Title

2 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(b) To be eligible to gain access to this export controlled TDP (via SAM.gov) an offeror must have a current DD 2345, Militarily

Critical Technical Data Agreement certification on file with the Defense Logistics Information Service (DLIS). To obtain certification, contractors must submit a DD Form 2345 to the United States (U.S.)/Canada Joint Certification Office (JCO), along with a copy of supporting documentation. DD Form 2345 and instructions can be found on the Joint Certification Program website at:

http://www.dla.mil/HQ/InformationOperations/Offers/Products/LogisticsApplications/JCP.aspx Processing time is estimated at six (6) to ten (10) weeks after receipt. Upon receipt of certification, an offeror may request the TDP in accordance with the solicitation's

Section C Technical Data Package instructions.

(c) Upon completion of the purposes for which Government Technical Data has been provided, the offeror, and all subcontractors, vendors, and sub-vendors of the offeror, are required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed.

(d) Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

A.2 ARMY CONTRACTING COMMAND DETROIT ARSENAL (DTA) OMBUDSPERSON

Information regarding the Ombudsperson for this contract is located at the following website: https://www.tacom.army.mil/ombudsperson.

(Best viewed using Google Chrome or Microsoft Edge)

A.3 Electronic Contracting

(a) All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website

(https://www.sam.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

(b) As of 10 August 2015, unless directed to do otherwise in Section L of this solicitation, vendors are required to submit a quote or proposal on the website SAM.gov.

(c) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

(d) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through SAM) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.

Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.

ar(e) Solicitations may remain posted on www.SAM.gov after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.

(f) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Governments intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the

Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.

(g) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the

Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

3 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A.4 ACKNOWLEDGEMENT OF AMENDMENTS

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date below:

Amendment Number: Date:

A.5 ALL OR NONE

Offers in response to this solicitation must be submitted for the total quantity of the items identified in the solicitation.

(1) ONLY ONE AWARD WILL BE MADE AS A RESULT OF THIS SOLICITATION.

(2) OFFERS SUBMITTED FOR LESS THAN THE TOTAL QUANTITIES OF ALL THE ITEMS IN THIS SOLICITATION WILL BE DEEMED NONRESPONSIVE.

*** END OF NARRATIVE A0001 ***

4 76

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

IN THE FOUR DIGIT ITEM NUMBERS CLINS) THAT FOLLOW,

THE NUMBERING SYSTEM THAT IS USED IS AS FOLLOWS:

THE FIRST THREE DIGITS SIGNIFY ITEM AND THE FOURTH

(LAST) DIGIT SIGNIFIES THE APPLICABLE CONTRACT YEAR,

i.e., CLIN 0011 IS FOR THE FIRST ITEM FIRST ORDERING

YEAR, CLIN 0012 IS FOR THE FIRST ITEM - SECOND

ORDERING YEAR, CLIN 0013 IS FOR THE FIRST ITEM -

THIRD ORDERING YEAR, ETC.

THE FOLLOWING DEFINITIONS APPLY TO THE ENTIRE

SOLICITATION AND RESULTING CONTRACT:

FIRST ORDERING YEAR OF THE CONTRACT IS THE DATE OF

AWARD PLUS 364 DAYS.

SECOND ORDERING YEAR OF THE CONTRACT IS 365 DAYS

THROUGH 729 DAYS AFTER CONTRACT AWARD.

THIRD ORDERING YEAR OF THE CONTRACT IS 730 DAYS

THROUGH 1,094 DAYS AFTER CONTRACT AWARD.

FOURTH ORDERING YEAR OF THE CONTRACT IS 1,095 DAYS

THROUGH 1,459 DAYS AFTER CONTRACT AWARD.

FIFTH ORDERING YEAR OF THE CONTRACT IS 1,460 DAYS

THROUGH 1,824 DAYS AFTER CONTRACT AWARD.

PLEASE NOTE:

1) The quantities identified in this solicitation and the resulting contract are estimates only and not a representation that conditions affecting the

Government's needs will be stable.

2) The price applicable to an individual order is the price for the ordering year in which the order is issued. The delivery date does not determine the ordering year.

3) The information presented below applies to Item

No. 0011 Through 0015:

Minimum 5 Year Quantity: 42 EACH

Maximum 5 Year Quantity: 1243 EACH

ONLY THE MINIMUM 5 YEAR QUANTITY IS GUARANTEED.

(End of narrative A001)

0011 FIRST ORDERING YEAR EST 322 EA $ ___________________ __________________

See Range Pricing

COMMODITY NAME: LINER PACKAGE

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

40 120 $

121 350 $

351 750 $

751 1500 $

Packaging and Marking _____________________

5 76

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W22PVJ) XU W0L7 BLUE GRASS ARMY DEPOT

BLUE GRASS ARMY DEPOT

431 BATTLEFIELD MEMORIAL HIGHWAY

RICHMOND,KY,40475-5070

0012 SECOND ORDERING YEAR 168 EA $ ____________________ __________________

See Range Pricing

COMMODITY NAME: LINER PACKAGE

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

40 120 $

121 350 $

351 750 $

751 1500 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W22PVJ) XU W0L7 BLUE GRASS ARMY DEPOT

BLUE GRASS ARMY DEPOT

431 BATTLEFIELD MEMORIAL HIGHWAY

RICHMOND,KY,40475-5070

6 76

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0013 THIRD YEAR ODERING 168 EA $ __________________ __________________

See Range Pricing

COMMODITY NAME: LINER PACKAGE

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

40 120 $

121 350 $

351 750 $

751 1500 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W22PVJ) XU W0L7 BLUE GRASS ARMY DEPOT

BLUE GRASS ARMY DEPOT

431 BATTLEFIELD MEMORIAL HIGHWAY

RICHMOND,KY,40475-5070

0014 FOURTH ODERING YEAR 168 EA $ ___________________ __________________

See Range Pricing

COMMODITY NAME: LINER PACKAGE

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

40 120 $

121 350 $

351 750 $

751 1500 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

LEVEL PRESERVATION: Military

7 76

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W22PVJ) XU W0L7 BLUE GRASS ARMY DEPOT

BLUE GRASS ARMY DEPOT

431 BATTLEFIELD MEMORIAL HIGHWAY

RICHMOND,KY,40475-5070

0015 FIFTH ODERING YEAR 168 EA $ __________________ __________________

See Range Pricing

COMMODITY NAME: LINER PACKAGE

CLIN CONTRACT TYPE:

Firm Fixed Price

Range Quantities ________________

FROM TO UNIT PRICE ____ __ __________

40 120 $

121 350 $

351 750 $

751 1500 $

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

LEVEL PRESERVATION: Military

LEVEL PACKING: B

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(W22PVJ) XU W0L7 BLUE GRASS ARMY DEPOT

BLUE GRASS ARMY DEPOT

431 BATTLEFIELD MEMORIAL HIGHWAY

RICHMOND,KY,40475-5070

0016 FIRST ARTICLE TEST - SEPARATELY PRICED $ ______________________________________ __________________

8 76

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SERVICE REQUESTED: FIRST ARTICLE TEST (FATR)

FIRST ARTICLE TEST (FAT) Contractor, Pursuant to the requirements listed in:

SECTION E:

-E.1 Supplemental Requirements to First Article

Approval (CONTRACTOR TESTING);

-E.4 Inspection and Acceptance;

SECTION I:

FAR 52.209-3, First Article Approval Contractor

Testing; and

Section J:

Exhibit A, Contractor Data Requirements List DD Form

1423, A004

The First Article Test shall consist of several parts with some testing required at a government facility.

For part one: 3 liner packages, 5 sewn seam specimens, and 10 heat- sealed seam specimens

(drawing 5-19-11334) shall be examined and tested in accordance with (IAW) paragraph 4.2 of EA-L-1595 and all other pertinent documents listed in the technical data

For part two: three (3) Carrier Bags (drawing 5-19-

11062) shall be examined and tested IAW drawing 5-19-

11062 and QAP5-19-11062.

For part three: two (2) square yards of Chemical barrier Material Liner (drawing 5-19-11226) shall be examined and tested IAW Drawing 5-19-11226 and QAP5-

19-11226

For part four: seven (7) yards of Butyl Coated Cloth

(drawing 5-19-8206, and drawing 5-19-8208), shall be examined and tested IAW MIL-DTL-12189, drawing 5-19-

8206, drawing 5-19-8208, QAP5-19-8206, and QAP5-19-

8208.

**Some testing is Destructive **

For part five: three (3) samples of all other subcomponents shall be inspected and tested for all requirements listed in their respective drawing, QAP and/or specification unless the technical documents require more than 3 samples.

For part six: A packaging FAT is required and shall consist of three (3) packaged units IAW of SPI P5-19-

11334.

Agent/Stimulant FAT: Agent/Stimulant FAT testing

9 76

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

will be conducted at the government lab listed below.

The Government facility performing Agent/Stimulant testing shall be certified laboratory per the lab certification (ES 7021) narrative. The contractor shall include all government test data in with the overall FAT report.

A technology Support Agreement (TSA) will be established for this testing. It is the responsibility of the contractor to contact the

DEVCOM Chemical Biological Center Testing

Laboratories for a cost estimate of the testing, which will be included in the contractor's proposed

FAT and/or PLT price. Contacts are as follows:

Test Strategy & Project Management Branch (TSPMB), ATTN: FCDD-CBE-TT, 8242 Caliber St. Building E5165, Aberdeen Proving Ground, MD 21010-5424, Phone (443)

688-3055, Email: amanda.r.leahy.civ@army.mil

Otherwise, PBA will contact Technical Industrial

Liaison Officer, (5183 Blackhawk Road, Building

E3330, Aberdeen Proving Ground, MD 21010-542 Email:

usarmy.APGecbc.mbx.technical-outreach@army.mil phone

410-436- 4438 to establish a TSA for necessary DEVCOM

CBC testing support.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

Deliveries or Performance _________________________

9000 CONTRACT DATA ITEM- NOT PRICED ______________________________

A001 ENGINEERING CHNAGE PROPOSAL (ECP) 1 LO $ ** NSP ** _________________________________ __________________

SERVICE REQUESTED: CDRL A001 - ECP

ELIN A001 is associated with the Engineering Change

Proposal (ECP).

See Exhibit A, CDRL DD Form 1423 sequence number A001 for preparation and delivery of data submission.

(End of narrative B001)

10 76

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A002 REQUEST FOR VARIANCE (RFV) 1 LO $ ** NSP ** __________________________ __________________

SERVICE REQUESTED: CDRL A002 - RFV

ELIN A002 is associated with the Request for Variance

(RFV).

See Exhibit A, CDRL DD Form 1423 Sequence Number A002 for preparation and delivery of data submission.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A003 NOTICE OF REVISION (NOR) 1 LO $ ** NSP ** ________________________ __________________

SERVICE REQUESTED: CDRL A003

ELIN A003 is associated with the Notice of Revision

(NOR).

See Exhibit A, DD Form 1423 Sequence Number A003 for preparation and delivery of data submission.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

11 76

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

A004 FIRST ARTICLE TEST REPORT (FATR) 1 LO $ ** NSP ** ________________________________ __________________

SERVICE REQUESTED: CDRL - A0004 FATR(CONTRACTOR)

ELIN A004 is associated with the First Article

Testing (FATR) Contractor.

See Exhibit A, CDRL DD Form 1423 Sequence Number A004 for preparation and delivery of data submission.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A005 PRODUCTION LOT ACCEPTANCE TEST REPORT(PLT) 1 LO $ ** NSP ** __________________________________________ __________________

SERVICE REQUESTED: CDRL - A005 (PLT) CONTRACTOR

ELIN A005 is associated with the Production Lot

Acceptance Test Report (PLT)(Contractor)

See Exhibit A, CDRL DD Form 1423 Sequence Number A005 for preparation and delivery of data submission.

(End of narrative B001)

For Contractor PLT paragraph (b): The samples shall be selected, examined, and tested in accordance with;

For part one: The liner packages, sewn seam specimens, and heat sealed seam specimens (drawing 5-

19-11334) shall be examined and tested in accordance with (IAW) paragraph 4.3 of EA-L-1595 and all other pertinent documents listed in the technical data.

For part two: The Carrier Bags (drawing 5-19-11062) shall be examined and tested IAW drawing 5-19-11062 and QAP5-19-11062 paragraph 2.

**Some testing is Destructive **

For part three: A packaging PLT is requires and shall consist of three (3) packaged units IAW SPI P5-19-

11334.

The sample size will be based on the lot size and testing requirements for that lot size

For lab addresses, use the same labs as required by the FAT.

Test reports from the liner packages, sewn seam

12 76

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

specimens, and heat-sealed seam specimens, the agent/stimulant test must be included in the overall lot test report.

(End of narrative C001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A006 PRODUCTION LOT ACCEPTANCE TEST REPORT (PLT) 1 LO $ ** NSP ** ___________________________________________ __________________

SERVICE REQUESTED: CDRL - A006 (PLT) GOVERNMENT

ELIN A006 is associated with the Production Lot

Acceptance Test Report (PLT) Government

See Exhibit A, CDRL DD Form 1423 Sequence Number A006 for preparation and delivery of data submission.

For Govt. PLT paragraph (b): The samples shall be selected, examined, and tested in accordance with;

Pre-production testing will be conducted on the

Chemical Barrier Material Liner (drawing 5-19-11226) and Butyl Coated Cloth (drawing 5-19-8206, and 5-19-

8208) which shall be examined and tested IAW QAP5-19-

11226, QAP5-19-8206, QAP5-19-8208 paragraph 2.

**Some testing is Destructive **

The sample size will be based on the lot size and testing requirements for that lot size.

For lab addresses, use the same labs as required by the FAT.

Test reports from the Extendable Tent Liner Package, the agent/stimulant test must be included in the overall lot test report.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

13 76

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

A007 CERTIFICATE OF COMPLIANCE (COC) 1 LO $ ** NSP ** _______________________________ __________________

SERVICE REQUESTED: CDRL - A007 COC

ELIN A007 is associated with the Certificate of

Compliance (COC).

See Exhibit A, CDRL DD Form 1423 Sequence Number A007 for preparation and delivery of data submission.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

A008 QUALITY PROGRAM PLAN (QPP) 1 LO $ ** NSP ** __________________________ __________________

SERVICE REQUESTED: CDRL - A008 QPP

ELIN A008 is associated with the Quality Program Plan

(QPP).

See Exhibit A, CDRL DD Form 1423 Sequence Number A008 for preparation and delivery of data submission.

(End of narrative B001)

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 SEE DD FORM 1423

14 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1 TECHNICAL DATA PACKAGE INFORMATION

The following Xd item applies to this solicitation:

[ ] 1. There is no Technical Data Package (TDP) included with this solicitation.

[X ] 2. The TDP for this solicitation resides within the System for Award Management (SAM) (https://SAM.gov) associated with this solicitation number:

W56HZV-25-R-0056

To access the data through SAM:

a. Log on to the SAM web site: https://SAM.gov.

b. Search for the solicitation number.

c. Click on the attachment you would like to view.

d. If the attachment is restricted, request access to the document.

(1) TDPs that have an Export Control Warning Notice are subject to the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et.seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C, App. 2401 et. seq..

(2) Further dissemination must be in accordance with provisions of DoD Directive 5230.25. This also applies to distribution of the TDP to all SUBCONTRACTORS at every level.

(3) To obtain these TDPs, contractors must have a current DD 2345, Militarily Critical Technical Data Agreement on file with Defense

Logistics Information Service (DLIS). To obtain certification, go to https://public.logisticsinformationservice.dla.mil/jcp/search.aspx

(4) Upon completion of the purposes for which Government Technical Data has been provided, the Contractor is required to destroy all documents, including all reproductions, duplications, or copies thereof as may have been further distributed by the Contractor.

Destruction of this technical data shall be accomplished by: shredding, pulping, burning, or melting any physical copies of the TDP and/or deletion or removal of downloaded TDP files from computer drives and electronic devices, and any copies of those files.

e. If technical data is otherwise restricted, select Request Explicit Access. This will generate an email to the Contract Specialist and

Contracting Officer at Army Contract Command - Warren (DTA) with all the information needed to grant contractor access to restricted documents. SAM will automatically generate an email stating when the requesting contractor has permission to view or download TDP items.

f. If multiple individuals in the contractors organization need access to the Technical Data Package (TDP) for a solicitation and an explicit access request is required, each individual MUST submit an explicit access request to be granted approval to view the TDP.

Those same individuals MUST be registered in SAM. Any individuals no longer with the company should be deleted. Questions related to registration in SAM should be directed to https://www.sam.gov/ The SAM helpdesk phone number is (866) 606-8220. Vendors are responsible for placing correct information in SAM.

g. It is strongly suggested that contractors submit the explicit access request and provide the buyer with the completed Use and Non-

Disclosure Agreement at the same time if the solicitation requires both to gain access to view the TDP.

C.2 CONFIGURATION MANAGEMENT DOCUMENTATION

The Contractor may submit Engineering Change Proposals (ECPs), Requests for Variance (RFVs), and Notices of Revision (NORs) for the requirements in the Government-provided Technical Data Package (TDP).

a. The Configuration Change Management section of SAE EIA-649-1(current revision) Configuration Management Requirement for Defense

Contracts, Paragraph 3.3, shall be used for configuration control of material with the following exclusions: paragraph 3.3(3); the second sentence of paragraph 3.3.1.8.1(1).

b. Furnished item(s) shall conform to the approved configuration requirements/revision, unless a Request for Variance (RFV) is processed and approved as provided by Paragraph E. below. The term "Request for Variance" includes Requests for Deviations and Waivers.

c. Value Engineering Change Proposals (VECPs) for cost saving improvements to the TDP should not be processed per SAE EIA-649-1 and should be referred to Section I FAR Clause 52.248-1 - Value Engineering.

15 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

d. All ECPs submitted will be deemed routine. If an ECP is considered as an emergency or urgent; that justification for the rationale shall be included in the ECP submittal with all applicable supporting documentation.

e. For ECPs, RFVs, or NORs, the Contractor must submit the documentation listed in sub-paragraphs e (i) through e (iii). Failure to submit a complete legible package may result in return of the ECP/RFV/SCN/NOR without processing.

(i) for ECPs, the Contractor shall prepare and deliver the ECP in accordance with (IAW) CDRL A001.

(ii) for RFVs, the Contractor shall prepare and deliver the RFV IAW CDRL A002.

(iii) for NORs, the Contractor shall prepare and deliver the NOR IAW CDRL A003.

f. The Governments acceptance of the data deliverable required by CDRL/DD Form 1423 in e(i)-(iii) above signifies only that the data satisfies the requirements of the DID and is considered acceptable for Government processing. Acceptance of the data deliverable does not signify "technical approval" of the change proposed by the deliverable and should not be interpreted as authorizing the Contractor to proceed with the work proposed by the change. Disposition of the change (approval/disapproval) will follow acceptance of the CDRL at the Governments sole discretion. Incorporation of an approved RFV or ECP will require execution of a contract modification.

g. The Contractor should direct questions regarding the status of an ECP or RFV to the Procuring Contracting Officer (PCO) and copy the

Administrative Contracting Officer (ACO).

h. The submission of an ECP/RFV/SCN/NOR does not affect the required delivery date of the contract.

i. The contractor shall electronically transmit copies of all ECPs, NORs, RFVs and VECPs to:

DEVCOM CBC Engineering Office

OFFICE: FCDD-CBE-M

EMAIL: usarmy.ria.devcom-cbc.mbx.cmaction@army.mil

FAX: (309) 782-1919

C.3 USE OF CLASS I and CLASS II OZONE DEPLETING SUBSTANCES

(a) Definitions.

(1) Class I and Class II Ozone-Depleting Substances (CIODS) refers to the class of substances identified in Section 602(a) of the Clean

Air Act, (42 U.S.C. 7671a(a)), complete list provided at: https://www.govinfo.gov/content/pkg/USCODE-2013-title42/html/USCODE-2013-title42-chap85-subchapVI-sec7671a.htm

(2) Directly requires the use of CIODS means that the Government's specification or technical data package, at any tier, explicitly requires the use of any Class I Ozone-Depleting Substance (CIODS) in performance of the contract.

(3) Indirectly requires the use of CIODS means that the Government's specification or technical data package, while not explicitly requiring the use of any CIODS, does require a feature that the contractor can meet or produce only by the use of CIODS.

(b) Per Section 326 of Public Law 102-484, the Army cannot award any contract that directly or indirectly requires the use of CIODS without the approval of the Senior Acquisition Official, per current Army Policy the approval authority is the Army Acquisition

Executive. Thus, no CIODS shall be used in meeting the requirements of this contract. If the use of CIODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

(c) No Class II Ozone Depleting Substances shall be required in the performance of this contract without government approval. If the use of Class II ODS is required in the performance of this contract, please notify the Contracting Officer immediately in writing.

C.4 START OF WORK MEETING

a. The contractor shall hold a start of work meeting at its facility, unless some other location is designated in the contract, within -

1- days after contract award. The Start of Work Meeting is to assure a clear and mutual understanding of the contract terms, conditions, line items, technical requirements and sequence of events needed for successful execution of the subject contract effort. The contractor shall participate with the Government to arrange a schedule and agenda for the meeting.

b. The contractor shall at a minimum invite Government contracting personnel (PCO/Contract Specialist). At the discretion of the PCO, other Government technical personnel may be invited to the meeting: Contracting Officer's Representative (COR) identified in Section G or in an appointment letter; Quality Assurance personnel; DCMA; etc. All Government invitees shall be given at least 14 days advance notice of the time, date, and location of the start of work meeting. The preferred method of notification is by email. The contractor

16 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

shall provide the Government with minutes of the Start of Work Meeting within -2- days after the meeting is held.

*** END OF NARRATIVE C0001 ***

17 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D.1 PACKAGING REQUIREMENTS (SPECIAL PACKAGING INSTRUCTIONS)

(a) Military preservation, packing, and marking for this contract/order shall be accomplished in accordance with the specific requirements identified below, all the applicable requirements of, MIL-STD-2073-1, and the Special Packaging Instruction, see below.

(1) LEVEL OF PRESERVATION: Military

(2) LEVEL OF PACKING: B

(3) QUANTITY PER UNIT PACKAGE: 001

(4) SPECIAL PACKAGING INSTRUCTION NUMBER: P5-19-11334

(a) REVISION: REV E

(b) DATE OF REVISION: 17 Oct 2024

(c) THE REQUIRED SPECIAL PACKAGING INSTRUCTION (SPI) IS AVAILABLE ON THE WEB AT THE FOLLOWING URL: N/A

(Note: You must have the Adobe Acrobat reader installed on your PC to view the SPI. See Adobes website (http://get.adobe.com/reader/) for information on obtaining the latest version of the reader. If you're experiencing problems opening the Special Packaging

Instructions in Adobe .PDF images using Internet Explorer, try the following: Go to "Tools," then "Internet Options." Click on the

"Advanced" tab. Scroll down to the "Security" section. Uncheck "Do not save encrypted pages to disk." Click "Apply." Click "OK.")

(b) Unitization: Shipments of identical items going to the same destination shall be palletized if they have a total cubic displacement of 50 cubic feet or more unless skids or other forklift handling features are included on the containers. Pallet loads must be stable, and to the greatest extent possible, provide a level top for ease of stacking. A palletized load shall be of a size to allow for placement of two loads high and wide in a conveyance. The weight capacity of the pallet must be adequate for the load. The preferred pallet is a 40 x 48 inch, 4-way entry pallet although variations may be permitted as dictated by the characteristics of the items being unitized. The load shall be contained in a manner that will permit safe handling during shipment and storage.

(c) Marking: 00

(1) In addition to any special markings called out on the SPI, all unit packages, intermediate packs, exterior shipping containers, and, as applicable, unitized loads shall be marked in accordance with MIL-STD-129). The contractor is responsible for application of special markings as discussed in the Military Standard regardless of whether specified in the contract/order or not. Special markings include, but are not limited to, Shelf-life markings, structural markings, and transportation special handling markings. The marking of pilferable and sensitive materiel will not identify the nature of the materiel.

(2) Passive RFID tagging is required in all contracts that contain DFARS clause 252.211-7006. For details and most recent information, see http://www.acq.osd.mil/log/sci/ait.html (best viewed with Internet Explorer 11 or higher, or Firefox) for the current DoD Suppliers

Passive RFID Information Guide. When an item is assigned a Unique Item Identifier (UII) as indicated by the inclusion of contract clause

DFARS 252.211-7003, refer to the DoD Guide to Uniquely Identifying Items (available at:

https://www.acq.osd.mil/dpap/pdi/uid/guides.html) for development of the UII and MIL-STD-129 for UII package marking requirements. Contractors must verify the RFID and UII clauses cited above are included in this solicitation/contract.

(d) Heat Treatment and Marking of Wood Packaging Materials (WPM):

(1) In accordance with DOD 4140.65-M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material in International Trade, current edition, (hereinafter ISPM 15), the following commercial heat treatment and marking process has been approved by the American Lumber Standards Committee (ALSC) and is required for all Wood Packaging

Material (WPM). Foreign manufacturers shall comply with ISPM 15, and have the WPM heat treatment and marking verified in accordance with their National Plant Protection Organizations compliance program.

(2) Boxes/pallets and any wood used as inner packaging made of non-manufactured wood shall be heat-treated. All WPM using a conventional steam or dry kiln heat chamber (treatment code for the mark: HT) shall be heat treated to a minimum core temperature of 56 degrees

Celsius for a minimum of 30 minutes, and certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org). WPM heat treated wood using dielectric heating

(treatment code for the mark: DH) shall follow the requirements in ISPM 15, and shall be certified by an agency accredited by the ALSC in accordance with Wood Packaging Material Policy and Wood Packaging Material Enforcement Regulations (see URL: http://www.alsc.org).

The box/pallet manufacturer and the manufacturer of wood used as inner packaging shall ensure the materials used in manufacture can be traced to the original source of heat treatment, and that the original source of the heat treatment obtained the necessary

18 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

certifications.

(3) Marking: Each box/pallet shall be marked to show the conformance to the International Plant Protection Convention Standard. The ALS approved quality mark shall be placed on both ends of the outer packaging, between the end cleats or end battens. Pallet markings shall be applied to the side of the stringer or end of the block on diagonally opposite sides and ends of the pallet and be contrasting and clearly visible. All dunnage used in configuring and/or securing the load shall also comply with ISPM 15 and be marked with an ALSC approved DUNNAGE stamp. Foreign manufacturers shall comply with ISPM -15 and shall have the marking of WPM verified in accordance with their National Plant Protection Organizations compliance program.

(e) Hazardous Materials (As applicable):

(1) Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)

(2) Unless otherwise specified, packaging and marking for hazardous material shall comply with the requirements herein for the mode of transport and the applicable performance packaging contained in the following documents:

- International Air Transport Association (IATA) Dangerous Goods Regulations

- International Maritime Dangerous Goods Code (IMDG)

- Code of Federal Regulations (CFR) Title 29, Title 40 and Title 49

- Joint Service Regulation AFJMAN24-204(I)/TM38-250/NAVSUPPUB 505/MCO P4030.19(I)/DLAM 4145.3(I) (for military air shipments).

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United

Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(f) This SPI has been validated and the method of preservation/packing has proven successful in meeting the needs of the military distribution system, including indeterminate storage and shipment throughout the world. Special instructions and/or tailoring of the SPI is detailed in the Supplemental Instructions below. A prototype package is required to validate the sizes and fit requirements of the

SPI. Minor dimensional and size changes are acceptable provided contractor provides the PCO and ACO with notification 60 days prior to delivery. Any design changes or changes in the method of preservation that provide a cost savings without degrading the method of preservation or packing or affecting the serviceability of the item will be considered and responded to within 10 days of submission to

PCO and ACO. Government reserves the right to require testing to validate alternate industrial preservation methods, materials, alternate blocking, bracing, cushioning, and packing.

(g) SUPPLEMENTAL INSTRUCTIONS: PLACE A RED X AND THE WORDS SHORT BOX ON THE FRONT OF ANY BOX THAT HAS A SHORT QUANTITY, THEN PLACE THAT

BOX/BOXES WITH THE MARKINGS SHOWING ON THE TOP FRONT OF THE PALLET LOAD

(3) If the shipment originates from outside the continental United States, the shipment shall be prepared in accordance with the United

Nations Recommendations on the Transport of Dangerous Goods in a manner acceptable to the Competent Authority of the nation of origin and in accordance with regulations of all applicable carriers. A Product Material Safety Data Sheets (MSDS) is required to be included with every unit pack and intermediate container and shall be included with the packing list inside the sealed pouch attached to the outside of the package.

(g) SUPPLEMENTAL INSTRUCTIONS:

ITEM WEIGHT: 9.3 LBS

ITEM DIMENSIONS: 19.1 X 14.7 X 3.2

UNIT PACK WEIGHT: 10.8 LBS

UNIT PACK DIMENSIONS: 20.4 X 16.4 X 4.6

UNIT PACK CUBE: 0.891

-WRAP, SECURE W ASTM D5486, TYPE V. USE BG FOR TIGHT FIT IN BOX.

-PLACE A RED X AND THE WORDS SHORT BOX ON THE FRONT OF ANY

BOX THAT HAS A SHORT QUANTITY, THEN PLACE THAT BOX/BOXES WITH

THE MARKINGS SHOWING ON THE TOP FRONT OF THE PALLET LOAD

19 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

*** END OF NARRATIVE D0001 ***

20 76

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

For FAR clauses: https://www.acquisition.gov/

For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E.1 SUPPLEMENTAL REQUIREMENTS TO FIRST ARTICLE APPROVAL (CONTRACTOR TESTING)

(a) In accordance with the requirements under FAR clause 52.209-3, found in Section I of this document, the first article approval item(s) shall be examined and tested as required by the item specification(s), Quality Assurance Provisions (QAPs) and all drawings listed in the Technical Data Package.

(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package applicable to this procurement.

(c) The first article shall be inspected and tested by the contractor for all requirements of the drawing(s), the QAPs, and specification(s) referenced thereon, except for:

(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed within the last year and the results are submitted with the Certificates of Conformance are submitted with the First Article Test

Report.

(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the

First Article Test Report.

(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the

First Article Test Report.

(5) Onetime qualification tests, which are…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .