This is a comprehensive set of contract drawings and technical specifications for the City of Daytona Beach, Florida's Lift Station #69 Replacement project (WP Project No. 21076). The project involves the complete rehabilitation and conversion of an existing dry-pit lift station to a submersible system, including demolition of the current infrastructure, rehabilitation of the existing 10-foot diameter wetwell, installation of two new 15-horsepower Flygt submersible pumps, construction of new electrical services with a 50-kilowatt diesel generator and automatic transfer switch, installation of level monitoring systems with a new Radio Telemetry Unit (RTU), and modifications to force main piping and connections. The project site is located at 1808 Mason Avenue, Daytona Beach, FL 32117, encompassing approximately 0.07 acres. The drawings include detailed civil, process, instrumentation, and electrical plans with specifications for site demolition, concrete work, piping modifications, erosion control measures, and temporary bypass pumping operations. A non-mandatory pre-bid conference is scheduled for March 20, 2026, at 10:00 a.m. via Microsoft Teams, with a question deadline of April 9, 2026, at 5:00 p.m., and bid submission deadline of April 16, 2026, at 2:00 p.m. through the City's OpenGov platform.

Bidders must hold an active Florida General Contractor (CGC) license with a minimum of five years of successful operation and submit a Project References Questionnaire documenting three similar projects with municipal references. Bid security of 10 percent is required, with performance and payment bonds equal to 100 percent of contract value mandated for contracts exceeding $100,000. The contract is subject to Florida's Prompt Payment Act with monthly progress payments, 5 percent retainage until 50 percent completion, and 5 percent thereafter for contracts valued at $200,000 or more. The maintenance of traffic line item is budgeted at $25,000, indicating the overall project value likely exceeds $200,000. Comprehensive insurance requirements include workers' compensation, commercial general liability with minimum limits of $1,000,000 per occurrence, and excess liability of $2,000,000 per occurrence. Liquidated damages will apply for schedule failures, and the City will hold bids for up to 60 days for review and investigation prior to award. The project must comply with all applicable federal, state, and local regulations, including OSHA requirements, stormwater pollution prevention standards, and Florida Department of Transportation specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .