This document is Addendum No. 4 for the Lutcher High School Game Gym Renovations project, issued by St. James Parish Schools on November 18, 2024. The addendum modifies the original contract documents and provides clarifications for bidders, with a revised bid date of November 21, 2024, at 2:00 p.m. The renovation scope includes multiple aspects such as granwood floor refinishing in the practice gym, replacement of specific drawing sheets, mechanical and electrical modifications, and various clarifications on project details. Key areas of work involve floor treatments, electrical fixture installations, fire sprinkler modifications, and specific architectural changes throughout the gymnasium and adjacent areas.
The addendum addresses numerous technical and procedural questions from potential contractors, providing specific guidance on items like toilet accessories, bleacher repairs, court line refinishing, wall padding, concession window specifications, and electrical system modifications. The project involves extensive electrical work, including lighting fixture replacements, power system updates, and sound system infrastructure. No specific budget is mentioned, but the comprehensive nature of the addendum suggests a significant renovation project. The document indicates that the existing facility will undergo substantial upgrades while maintaining most of its current structural configuration, with careful attention to technical specifications and performance requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LUTCHER HIGH SCHOOL GAME GYM RENOVATIONS
ADDENDUM NO. 4
November 18, 2024
PROJECT: Lutcher High School Game Gym Renovations
Date of Addendum: November 18, 2024
Mandatory Pre-Bid Date: November 5, 2024, 10:00 a.m.
Bid Date November 14, 2024, 2:00 p.m.
Revised Bid Date November 21, 2024, 2:00 p.m.
This Addendum shall be considered part of the Contract Documents for the same above-mentioned project as though it had been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original Contract Documents, this Addendum shall govern and take precedence.
GENERAL
1. The granwood floor in the practice gym shall be sanded down to bare cement tiles, new lines painted then four coats of Granguard seal shall be applied.
DRAWINGS
1. Sheet A.2.2 – Remove in its entirety and replace with the attached.
2. Sheet A.4.7 - Remove in its entirety and replace with the attached.
MECHANICAL/ELECTRICAL
1. Please see attached letter, dated November 18, 2024, from Crumb Engineering, LLC, for mechanical and electrical items and add those items listed/discussed in the correspondence in its entirety to this addendum.
RFI’s
Question: Addendum 1 - Note 8 refers to a divider Curtain by Spalding. Does the Divider
Curtain have to be by Spalding or is this only a basis of design or equal?
Answer: This is the basis of design, and we will accept an approved equal.
Question: Addendum 1 – Removed Polyurethane Floor System. Could you provide a spec for a hard wood floor system where demo areas of the gym floor are to be replaced?
Answer: Please see detail of the existing wood basketball flooring below.
Question: Addendum 1 – Add a door slab for opening 25. (1) Can you verify size required?
Also, if any other doors will need to be replaced? (2) Could you provide a spec?
Answer: Door Number 25 is a 3’-0”x7’-0” door and shall be flat slab, paint grade, solid core wood. No other doors need to be replaced.
Question: Addendum 1 – Refers to a conflict between drawings and specs for toilet accessories it was stated to follow specs. There is no note for demo of existing accessories to be removed on demo pages.
Answer: Per Addendum Number One the contractor to provide all toilet accessories specified within specifications. The contractor shall remove all accessories that are to be replaced. The Owner will provide the following toilet accessories - toilet paper dispensers, paper towel dispensers and soap dispensers, contractor to install.
All other toilet accessories to be provided and installed by the contractor.
Question: Addendum 2 - The bleachers repairs read like an inspection list not a repair list. I am asking if your intent was to have the price of an inspection on items below included in our bid and anything that is found would be treated like a change order?
Answer: The bleach scope that shall be included in the base bid is as follows:
• Inspect and Adjust Tier catches, caster wheels, axles and e-clips as required for proper operation
• Inspect and tighten all floor anchors
• Inspect and adjust all motors
• Inspect and adjust all motor pulleys for proper alignment and functioning.
Replace all pulleys as required for proper operation
• Inspection operation of ADA seating areas, adjust as needed for proper function
• Resecure wire management so that transition wires and circuit wires are in proper placement and no wires are exposed
Question: Addendum 2 provides us a sq. ft for practice gym which is alternate 3. Could you provide us a drawing with requested lines for refinished court?
Answer: The lines will match what is currently in place.
Question: Addendum 2 – Gym padding shall be safety wall pads by great mats. Does the gym padding have to be by Great Mats or is only a basis of design or equal?
Answer: This is the basis of design, and we will accept an approved equal.
Question: Concession window opening. Spec 08 3300 - says grille, Page A4.4 drawing says shutter. Please clarify?
Answer: Concession window shall be a Grille and is 13’ wide by 6’ tall.
Question: Could you clarify on page A7.1. What is meant by the term used “shade” was it to be stain or paint on the gym floor?
Answer: Shade is referring to a tinted clear finish.
Question: Finish schedule is showing new resinous flooring in several rooms. Per our site visit most of the rooms currently have tile , but no demo is shown for these rooms.
Could you please clarify?
Answer: The existing tile shall remain; contractor shall install self-leveling over grout lines so that they do not telegraph through the resinous flooring being installed. The resinous floor shall turn up the walls 4”.
Question: Since the exterior metal panels base bid can you clarify if any Stucco Repairs be required per page A1.2?
Answer: No stucco repairs are required.
Question: Since the exterior metal panels are part of the base bid. Can you clarify if any prep and paint of all exterior cmu will be required per page A1.2?
Answer: The Contractor shall prepare existing CMU walls as required to install liquid applied vapor barrier.
Question: The Sona - spray thickness to meet the spec NRC requirements will produce an R-value of less than 2.
Answer: The Sona spray will be 5” thick and will give the R-value required to match what is currently there.
Question: Can you clarify what surface the Sona spray is being applied too?
Answer: Sona spray shall be applied to the underside of existing roof panels.
Question: Can you clarify if the surface for Sona spray is a flat surface or ribbed roof panels?
Answer: The surface will be the flat surface of the underside of the roof panel along with the exposed purlins.
Question: Can you clarify if the Sona spray will wrap columns at gym ceiling?
Answer: Sona spray will not wrap the large columns or beams. It will however wrap the purlins.
Question: On page A4.6 Detail A-1. Could you provide a width and height for the vinyl graphic?
Answer: The vinyl graphic is 10’ tall and 67’ long.
Question: On page A4.6 G-1. Could you provide a width and height for the Alpha perf panels?
Answer: The Alpha Perf panels at 8’ tall and 41’ long overall but will be broken up based on column spacing.
Question: Specs 09 8316 Acoustical Finish System. (1) Sona Spray calls for Custom Color to be selected. (2) Page A6.0 Note 3 Sona Spray to be applied and Painted. Could you clarify if the color will be mixed with Sona Spray or ceiling to be painted?
Answer: The Sona Spray color shall be selected from manufacturer's standard colors.
Question: On sheet E1.0 at the front entrance there is about 32ft of F4 fixtures. Are these supposed to be F9 fixtures?
Answer: See revised Sheet E1.0 attached.
Question: The F10 in the main lobby show being installed right at the cross sections of the grid. That’s not going to work. We would have to install a back box behind the F10 fixtures. That would prevent the grid from being installed properly.
Answer: Fixtures shall be moved to the center of the tile. See attached revised Sheet E1.0.
Question: Can you show a location for where the existing 120v panel is located? The only
120v panels we found on site did not have space for new circuits however the plans call for 8 additional circuits.
Answer: The panel is in the Mezzanine. See revised Sheet E2.0 attached with a new sub panel.
Question: On sheet E1.0 at the trophy cases there are (2) F6 fixtures shown. Can we get an elevation shot showing the F6 being installed so we know we have enough lighting?
Answer: See revised Sheet E3.0 attached.
Question: What is an F6 fixture. It doesn’t appear on the fixture schedule.
Answer: See revised Sheet E3.0 attached.
Question: What is the control mechanism for the 3 zones of F4 fixtures? How are we controlling the light’s color? How are we turning them on and off? Where will the controllers for each 3 of the zones be installed? Do the controllers need power?
Where are we getting power from for the controllers?
Answer: See revised Sheet E3.0 attached
Question: Sheet E1.0 Note 8 - What does the note 8 programmable lighting controller shown on wall of the gym control?
Answer: See revised Sheet E1.0 attached.
Question: Where are the F8 fixtures on E1.0 getting power from?
Answer: See revised Sheet E1.0 attached
Question: The high bays above the bleachers shown on E0.1 do not reflect a note 1, are they to remain?
Answer: No. See revised Sheet E0.1 attached.
Question: Do we need to move the A/V rack or not. Currently, it’s in the mezzanine. We will need 4 ¾” runs of conduit for speakers above the floor. These conduits are now shown.
Answer: Existing rack to be decommissioned by Owner. See revised Sheet E2.0 attached for conduits.
Question: What size conduit is required between the sound system control cabinet and the speaker cabinet?
Answer: 2”. See revised Sheet E2.0 attached.
Question: Does the speaker cabinet need power? Where do we get power from if needed?
Answer: No.
Question: What controls the F6 fixtures?
Answer: See revised Sheet E1.0 attached.
Question: What controls the fixtures F4 or F9 fixtures the canopy?
Answer: See revised Sheet E1.0 attached
Question: Drawing A0.0 shows fencing as black coated aluminum, but specs call for Fortress Steel. Can you please clarify which type of fence to use?
Answer: Provided fence as specified within the specifications.
Question: Could you provide a height for fence shown on Page A0.0?
Answer: 6’ to match existing.
Question: Fire Sprinkler modifications are only shown on sheet M2.0; this shows modifying existing sprinklers in the border area next to the bathrooms - removing the existing ceilings in the gym portion of the building will require turning all the existing fire sprinklers from the pendent position to upright position. Will the existing piping also need to be raised to the deck in the gym? Are the existing bleachers remaining; and is there fire sprinkler protection under the bleachers as required?
Answer: Heads will need to be changed, and piping raised, see revised Sheet M2.0 attached.
Question: Electrical
- F-4 Needs more clarification of where the LED rope lights install and what controls it.
- F-6 Print says not being used, but there are 2 in the lobby.
- Per the sound system - It appears to be extensive as per the sound contractor. There has to be some raceways installed for these units.
- F-8 Installation details and controlling them.
- F-9 Can't find them on drawings.
- Inside the newly closed-in corridor to the existing school - What type of light fixtures: switched, unswitched, OC, or photocell?
Answer: See revised Sheet E1.0 attached.
Question: What color will be needed for the Armstrong 360 Painted Grid? Black and white are standard colors. Note that for any other colors, the material will be more expensive.
Answer: Color to be selected from manufacturer's full range.
Question: More clarification is needed regarding the signage and vinyl graphics.
- Please specify if Vinyl, Acrylic, or Metal graphics are needed for text and image on pages A2.2.
Answer: Graphic shown on front and rear of building shall be as specified within Specifications 10 1401, item B fabricated metal letters and logos
- Same as above for page A2.3, please also include if this will be on pre-existing panel.
Answer: Graphic shown on front and rear of building shall be as specified within Specifications 10 1401, Item B Fabricated Metal Letters and Logos
- Page A4.6 (New Vinyl Graphic) - Is this a pre-existing panel? And would you prefer paralleled digital print or individual graphics?
Answer: Parallel digital print. This vinyl graphic is being install over the new gypsum board wall being installed.
Question: Is there new gyp board in Corridor 108 with a level 5 finish for walls and light furdowns?
Answer: New gypsum board wall is being installed at graphic location as indicated on Sheet A.3.4. The light fur downs does not require a level 5 finish
Question: Does all the structural steel paint in the Gym?
Answer: All exposed structural steel within the gym gets painted as noted on Sheet A.1.3.
Question: Do the existing doors paint?
Answer: All existing wood doors are not being painted.
Question: Is there new gyp board ceiling in Girl’s restroom 102?
Answer: Girl’s Restroom 102 has ceiling being removed and replaced per note on Sheet A.1.3
Question: I see a situation where two different systems are called out to address the existing exterior CMU. Renovation Note #18 on plan sheets A.1.2 & A.1.3 -- calls to apply 2 coats of Damplock Masonry waterproofing paint to all exterior CMU walls.
Section 072720 of the Project Manual calls out for a Fluid Applied Membrane Air Barrier to be applied to existing exterior CMU walls.
Answer: Contractor shall install fluid applied membrane air barrier.
Question: I had a question regarding the gutter and downspouts. Are they replacing all gutters and DS or just on the higher roof ?
Answer: All gutters and downspout are to be replaced.
Question: Are they keeping the two color scheme on the walls and structural steel? If so, does that include the paint line/color change at about 4’ aff?
Answer: Contractor shall price out painting as specified within Painting Section 09 9123.
Question: What is the material above the cmu walls? It looks like plywood or metal paneling.
Answer: The material above the CMU walls is metal on exterior face and Tectum on the interior face.
Question: Is the seating being painted?
Answer: No painting of seating required.
Question: The Div 09 specs don’t have CMU in the paint schedule.
Answer: Concrete Block (Sherwin Williams or Equal), Semi-Gloss WB Acrylic
1. Block Filler: Prep Rite Block Filler
2. Finish: Pro Mar 400 Interior Latex Semi-Gloss
Question: Electrical….
o 1. F-4. Need better clarification of where this LED rope lights install and what controls it.
o 2. F-6 Print says not being used, but there are 2 in the lobby.
o 3. As per the sound system. It appears to be extensive as per the sound contractor. There has to be some raceways installed for these units.
o 4. F-8 installation details and controlling them o 5. F-9 can’t find them on the drawings.
o 6. Inside the newly closed in corridor to the existing school. What type of light fixtures? Switched, unswitched, OC, photo cell?
Answer: See revised Sheets E1.0 and E2.0 attached.
HOME OF THE BULLDOGS
STATE CHAMPIONSHIPS
1975, 1978, 1983, 2003, 2008, 2015, 2016
L U
T
CHER HIGH SCH
O
O L
1'- 25 8"
'-6
3 4"
2'
M
D O
C U
M
EN
TS
M
U
ST
B E
AU
TH
O R
IZ
ED
B Y
TH
E
AR
C
H
IT
EC
T.
A
LL
R
IG
H
TS
A R
E R
ES
ER
VE
D
T O
M U
R R
AY
A
R C
H
IT
EC
TS
TH
E
PR
O
JE
C
T
ID
EN
TI
FI
ED
A N
D A
R E
N O
T
SU
IT
AB
LE
F
O R
U
SE
O N
A N
Y O
TH
ER
P R
O
JE
C T
O R
A T
AN
Y
O
TH
ER
L
O C
AT
IO
N W
IT
H
O U
T "T
H
ES
E D
O C
U M
EN
TS
A R
E
PR
O
TE
C
TE
D B
Y U
N
IT
ED
S
TA
TE
S C
O
PY
R
IG
H T
LA
W
TH
EY
H
AV
E
BE
EN
P R
EP
AR
ED
S
PE
C
IF
IC
AL
LY
F O
R
TH
E
EX
PR
ES
S
W R
IT
TE
N A
PP
R
O
VA
L
AN
D P
AR
TI
C
IP
AT
IO
N O
F M
U R
R
AY
A R
C H
IT
EC
TS
R
EP
R O
D U
C
TI
O N
O F
TH
ES
E
C O
PY
R
IG
H
T
2 3 4 6 7 8 10 11 1295 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A project number seal date phase drawing number revisions no.
1 2 3 4 6 7 8 10 11 1295 13 14 15 16 riv er ro ad de st re ha n, la
(9
) 7 fa x (9
) 7 date
1910 W Main St, Lutcher, LA 70071
ST. JAMES PARISH SCHOOLS
LUTCHER HIGH SCHOOL
02.20.2024
SD
NEW REAR EXTERIOR ELEVATION (BASE BID)A-1
1/8"=1'-0"
A.2.2
EXTERIOR ELEVATIONS
EXISTING REAR EXTERIOR ELEVATIONG-1
1/8"=1'-0"
NEW BERRIDGE HR-16 HORIZONTAL SIDING
NEW VERTICAL METAL SIDING
EXISTING ROOF TO REMAIN
NEW GUTTERS AND DOWNSPOUT
NEW BERRIDGE HR-16 HORIZONTAL SIDING
EXISTING ROOF TO REMAIN
NEW VERTICAL METAL SIDING
EXISTING ROOF TO REMAIN
NEW GRAPHIC
NEW STOREFRONT DOOR, SEE SCHEDULE NEW STOREFRONT WINDOWS, SEE SCHEDULENEW STOREFRONT DOOR, SEE SCHEDULE NEW EXTRUDED ALUMINUM CANOPY
NEW EXTRUDED ALUMINUM CANOPY
14'-93 4"
1'
8"
ADDENDUM NUMBER 4 11.18.24
HALL OF CHAMPIONS
GIRLS BASKETBALL
GIRLS SWIMMING
BASEBALL
FOOTBALL GIRLS TRACK
BOYS TRACK
GIRLS DANCE COMPETITION
BOYS POWERLIFTING
GIRLS POWERLIFTING
BOYS SWIMMING
1913, 1914, 1915
1951, 1967, 1975, 2013, 1975, 1978, 1983, 2003, 2006, 2015, 1984, 1985
1996, 1997, 1998, 2000, 2001, 2005, 2006, 2007, 2008, 2009, 2007,2008, 2009, 2010, 2011, 2012, 2013, 2015, 2010, 2021
2016, 2017, 2018, 2019, 2021, 2022, 2023, 2016, 2018, BOYS BASKETBALL
SOFTBALL
1998, M
D O
C U
M
EN
TS
M
U
ST
B E
AU
TH
O R
IZ
ED
B Y
TH
E
AR
C
H
IT
EC
T.
A
LL
R
IG
H
TS
A R
E R
ES
ER
VE
D
T O
M U
R R
AY
A
R C
H
IT
EC
TS
TH
E
PR
O
JE
C
T
ID
EN
TI
FI
ED
A N
D A
R E
N O
T
SU
IT
AB
LE
F
O R
U
SE
O N
A N
Y O
TH
ER
P R
O
JE
C T
O R
A T
AN
Y
O
TH
ER
L
O C
AT
IO
N W
IT
H
O U
T "T
H
ES
E D
O C
U M
EN
TS
A R
E
PR
O
TE
C
TE
D B
Y U
N
IT
ED
S
TA
TE
S C
O
PY
R
IG
H T
LA
W
TH
EY
H
AV
E
BE
EN
P R
EP
AR
ED
S
PE
C
IF
IC
AL
LY
F O
R
TH
E
EX
PR
ES
S
W R
IT
TE
N A
PP
R
O
VA
L
AN
D P
AR
TI
C
IP
AT
IO
N O
F M
U R
R
AY
A R
C H
IT
EC
TS
R
EP
R O
D U
C
TI
O N
O F
TH
ES
E
C O
PY
R
IG
H
T
2 3 4 6 7 8 10 11 1295 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A project number seal date phase drawing number revisions no.
1 2 3 4 6 7 8 10 11 1295 13 14 15 16 riv er ro ad de st re ha n, la
(9
) 7 fa x (9
) 7 date
1910 W Main St, Lutcher, LA 70071
ST. JAMES PARISH SCHOOLS
LUTCHER HIGH SCHOOL
02.20.2024
SD
A.4.7
INTERIOR ELEVATIONS
1/2"=1'-0"
CORRIDOR 108A-1
EXISTING DOORS TO REMAIN, PAINT EXISTING FRAMES
NEW VINYL GRAPHICS
PAINT ALL EXISTING WALLS
EXISTING DOORS TO REMAIN, PAINT EXISTING FRAMES
NEW BASE, SEE SCHEDULE
A-13 A.3.4
A-9 A.3.4
A-5 A.3.4
NEW LEXAN ON STANDOFFS
5'
TYP.
1'- 6"
TY
P.
1 / 2" ACRYLIC LETTERS
ADDENDUM NUMBER 4 11.18.24
8'-
1 2"
9'-31 2"
Crumb Engineering, LLC
4609 Fairfield Street (504) 455-4450 Metairie, LA 70006 Fax (504) 455-4451
Mr. Michael Tabb Murray Architects
RE: Lutcher High School Gymnasium Renovation Addendum #4 Items
Dear Michael:
Below is a list of electrical and mechanical addenda items for the referenced project. Please incorporate these items into your next addendum.
ADDENDUM
Plans and Specifications for the referenced project are hereby modified as follows:
ELECTRICAL
A. DRAWINGS
1. See attached sheets E0.1, E1.0, E2.0 and E3.0 attached with revisions clouded.
MECHANICAL
A. DRAWINGS
1. See attached sheet M2.0 attached with revisions clouded.
END OF ADDENDUM
If you have any questions or need any additional information, please do not hesitate to call.
Very Truly Yours, Crumb Engineering, LLC
Jason T. Crumb, PE
..\Desktop\2d-state-of-louisiana-outline-map-on-white-background-2H4YWHH.jpg
GYMNASIUM
GIRLS LOCKER ROOM
GIRLS COACH'S
OFFICE
R.R.
R.R.
STOR.
STOR.
STOR.
STOR.
JANITOR/LAUNDRY
VISITING
LOCKERS
CORRIDOR
ENTRY
LOBBY
CONCESSION
GIRLS
SHOWERS
GIRLS
RESTROOM
BOYS
RESTROOM
BOYS
SHOWERS
BOYS
LOCKER ROOM
COACHES
1111111
1 1 1 1 1 1 1
1 1 1 1 1 1 1
1111111
1 1 1 1 1 1 1
1 1 1
1 1
1 1
3 3 3 3
3 3
3 3
3 3
3 3
3 3
1 1
1 1
1 1 1
1 1
1 1 1 1
1 1 1 1
1 1 11 1 1 1
GENERAL NOTES THIS SHEET:
1. EXISTING ELECTRICAL SHOWN DASHED.
2. MAINTAIN CIRCUIT CONTINUITY FOR EXISTING LIGHTING AND POWER
CIRCUITS.
3. EXISTING ELECTRICAL TO REMAIN UNLESS NOTED OTHERWISE.
4. EXISTING SOUND RACK IN MEZZANINE TO BE DECOMMISSIONED BY
OWNER.
5. EXISTING 120V PANEL ON MEZZANINE. REMOVE (2) EXISTING 20A, 1P
BREAKERS TO PROVIDE SPACE FOR NEW SUBPANL. SEE E2.0.
SPECIFIC NOTES THIS SHEET:
REMOVE EXISTING LIGHT. TERMINATE WIRING FOR REUSE.
REMOVE EXISTING EXIT SIGN. TERMINATE WIRING FOR REUSE.
REMOVE EXISTING LIGHT. TERMINATE CIRCUIT FOR REUSE.
REMOVE POWER ON EXISTING WALL TO BE DEMO'D. TERMINATE IN
JUNCTION BOX ABOVE CEILING.
M
D O
C U
M
EN
TS
M
U
ST
B E
AU
TH
O R
IZ
ED
B Y
TH
E
AR
C
H
IT
EC
T.
A
LL
R
IG
H
TS
A R
E R
ES
ER
VE
D
T O
M U
R R
AY
A
R C
H
IT
EC
TS
TH
E
PR
O
JE
C
T
ID
EN
TI
FI
ED
A N
D A
R E
N O
T
SU
IT
AB
LE
F
O R
U
SE
O N
A N
Y O
TH
ER
P R
O
JE
C T
O R
A T
AN
Y
O
TH
ER
L
O C
AT
IO
N W
IT
H
O U
T "T
H
ES
E D
O C
U M
EN
TS
A R
E
PR
O
TE
C
TE
D B
Y U
N
IT
ED
S
TA
TE
S C
O
PY
R
IG
H T
LA
W
TH
EY
H
AV
E
BE
EN
P R
EP
AR
ED
S
PE
C
IF
IC
AL
LY
F O
R
TH
E
EX
PR
ES
S
W R
IT
TE
N A
PP
R
O
VA
L
AN
D P
AR
TI
C
IP
AT
IO
N O
F M
U R
R
AY
A R
C H
IT
EC
TS
R
EP
R O
D U
C
TI
O N
O F
TH
ES
E
C O
PY
R
IG
H
T
2 3 4 6 7 8 10 11 1295 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A project number seal date phase drawing number revisions no.
1 2 3 4 6 7 8 10 11 1295 13 14 15 16 riv er ro ad de st re ha n, la
(9
) 7 fa x (9
) 7 date
ADDENDUM NO. 4 11-18-2024
1910 W Main St, Lutcher, LA 70071
ST. JAMES PARISH SCHOOLS
LUTCHER HIGH SCHOOL
02.20.2024
SD
4609 Fairfield Street Metairie, La 70006 P-504.455.4450 crumbengineering.com
EXISTING/DEMOLITION PLAN - ELECTRICALE-0
1/8"=1'-0"
E0.1
EXISTING/ DEMOLITION PLAN - ELECTRICAL
F2 F2
F2
F2 F2
F2 F2
F2 F2F2 F1
F1 F1
F1
F1
F2
F2
F2
F2 F2
F2
F2 F2 F2 F2
F2 F2 F2 F2
F2 F2 F2 F2
F2F2F2F2
F1 F1
F2 F2
F2 F2
F3 F3 F3 F3 F3 F3 F3
F3 F3 F3 F3 F3 F3
F3 F3F3 F3F3 F3
F3 F3 F3 F3 F3 F3
F3 F3F3 F3F3 F3
F3 F3 F3 F3 F3 F3
F3
F3
F3
F3
F3
F4 F4 F4 F4 F4 F4 F4
F5 F5 F5 F5 F5
F4
F4
F8
F8
F8
F8
F8
F8
F7
F7
F7
F7
F10
F1
F10
F10
F10
F10
F10
F10 F10
F10F10
F10F10
1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1
1 1
1 1 1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1 1 1
1 1 1 1
F5 F5
PC4
SS
F11
F11
F11 F11
PC
S
SPEAKER
CONTROLS
F4
F6 F6
SEE ELEVATION VIEW FOR
FIXTURE LOCATION. ON E3.0.
CORRIDOR ELEVATION VIEW
NO SCALE
4 2 CIRCUIT PHOTOCELL
CORRIDOR LIGHT FIXTURES ARE
UNSWITCHED
GENERAL NOTES THIS SHEET:
1. ALL FIXTURES SHALL BE INSTALLED LEVEL AND TRUE, CENTER FIXTURES
WHERE APPLICABLE. REFER TO ARCHITECT'S REFLECTED CEILING PLAN AND
ARCHITECT'S ELEVATIONS FOR FIXTURE LOCATIONS.
2. ALL FIXTURES SHALL BE TYPE F1 UNLESS NOTED OTHERWISE.
3. INSTALL FIXTURES IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS. PROVIDE ALL NECESSARY WIRING, SWITCHES AND
MOUNTING HARDWARE.
4. ALL CONDUIT SHALL BE 1/2" WITH 2-#12 AWG & 1-#12 GRD UNLESS NOTED
OTHERWISE. WIRE MULTI-WAY SWITCHES AND LIGHTING CONTROLS IN
ACCORDANCE WITH THE PRODUCT LITERATURE.
5. FOR CONDUIT RUNS EXCEEDING 75', INCREASE TO #10 AWG CONDUCTORS.
6. GROUNDING SHALL BE IN ACCORDANCE WITH NEC ART. 250.
7. PROVIDE LED EXIT FIXTURES AT ALL LOCATIONS AS SHOWN ON THE LIFE
SAFETY PLAN.
8. ALL EXTERIOR LIGHTING SHALL BE PHOTOCELL CONTROLLED UNLESS NOTED
OTHERWISE.
9. PROVIDE UNSWITCHED HOT CONDUCTOR TO ALL EXIT AND EMERGENCY
FIXTURES.
10. PROVIDE DIMMING SWITCHES COMPATIBLE WITH DIMMABLE FIXTURES.
COORDINATE WIRING AND INSTALLATION WITH MANUFACTURER'S
RECOMMENDATIONS.
SPECIFIC NOTES THIS SHEET:
NEW LIGHT FIXTURE. CONNECT TO EXISTING LIGHTING CIRCUIT.
NEW EXIT AND EMERGENCY LIGHT COMBINATION. PROVIDE WIRE GUARD.
WIRE TO ADJACENT FIXTURE.
HOMERUN TO 120V PANEL AVAILABLE CIRCUIT BREAKER. VERIFY ON SITE.
WIRE TO EXISTING LIGHTING CIRCUIT AHEAD OF SWITCHES. VERIFY ON SITE.
PHOTOCELL. HOMERUN EXISTING LIGHTS THRU PHOTOCELL.
PROVIDE ON-OFF SWITCH OVERRIDE FOR UPLIGHTS.
PROGRAMMABLE LED LIGHTING CONTROLLER.
MOUNT FIXTURE TO PERIMETER OF CANOPY. COORDINATE WITH ARCHITECTURAL
PLANS.
PROVIDE RELY FOR OVERRIDE CONTROL OF F8 FIXTURE.
MOUNT F8 FIXTURES IN CONCRETE SIDEWALK. AIM TO UP-LIGHT GRAPHICS.
M
D O
C U
M E
N T
S M
U S
T B
E A
U T
H O
R
IZ
E D
B Y
T H
E A
R C
H
IT
E C
T
A L
L R
IG
H
T S
A R
E R
E S
E R
V E
D T
O M
U R
R A
Y A
R C
H
IT
E C
T S
T H
E P
R O
JE
C
T I
D E
N T
IF
IE
D A
N D
A R
E N
O T
S U
IT
A
B L
E F
O R
U S
E O
N A
N Y
O T
H E
R P
R O
JE
C
T O
R A
T A
N Y
O T
H E
R L
O C
A T
IO
N
W
IT
H O
U T
"T
H E
S E
D O
C U
M E
N T
S A
R E
P R
O T
E C
T E
D B
Y U
N
IT
E D
S T
A T
E S
C O
P Y
R
IG
H T
L A
W
T H
E Y
H A
V E
B E
E N
P R
E P
A R
E D
S P
E C
IF
IC
A L
L Y
F O
R
T H
E E
X P
R E
S S
W R
IT
T
E N
A P
P R
O V
A L
A N
D P
A R
T
IC
IP
A
T
IO
N O
F M
U R
R A
Y A
R C
H
IT
E C
T S
R
E P
R O
D U
C T
IO
N
O F
T H
E S
E
C O
P Y
R
IG
H T
2 3 4 6 7 8 10 11 1295 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A project number seal date phase drawing number revisions no.
1 2 3 4 6 7 8 10 11 1295 13 14 15 16 riv er ro ad de st re ha n, la
(9
) 7 fa x (9
) 7 date
ADDENDUM NO. 4 11-18-2024
1910 W Main St, Lutcher, LA 70071
ST. JAMES PARISH SCHOOLS
LUTCHER HIGH SCHOOL
02.20.2024
SD
4609 Fairfield Street Metairie, La 70006 P-504.455.4450 crumbengineering.com
FLOOR PLAN - LIGHTINGE-1
1/8"=1'-0"
E1.0
FLOOR PLAN - LIGHTING
GFI
CU-1
GFI GFI
J5
GFI
12 12
84"
84"
84"
FEEDER DIAGRAM
NO SCALE
EXISTING
120/208V PANEL
NEW PANEL
100A 16 SPACE
MLO
1-1/4"C, 3 #3 AWG & 1 #8 GRD.
NEW 2-POLE 100A BREAKER
GENERAL NOTES THIS SHEET:
1. REFER TO ARCHITECT'S FLOOR PLANS AND ARCHITECT'S ELEVATIONS FOR
RECEPTACLE AND OUTLET LOCATIONS. PROVIDE ADDITIONAL RECEPTACLES
AS REQUIRED.
2. PROVIDE DEDICATED NEUTRAL FOR EACH CIRCUIT. DO NOT SHARE NEUTRAL
CONDUCTORS.
3. ALL CONDUIT SHALL BE 1/2" WITH 2-#12 AWG & 1-#12 GRD UNLESS NOTED
OTHERWISE. FOR CONDUIT RUNS LONGER THAN 75', UPSIZE CONDUCTORS
TO #10 AWG.
4. GROUNDING SHALL BE IN ACCORDANCE WITH NEC ART. 250.
5. PROVIDE POWER FOR ALL EQUIPMENT SHOWN ON MECHANICAL AND
ARCHITECTURAL FLOOR PLANS. COORDINATE EXACT REQUIREMENTS WITH
SUBMITTALS.
6. ALL WORK SHALL BE IN ACCORDANCE WITH THE NEC.
7. ALL TOILET ROOM, KITCHEN, EQUIPMENT ROOM AND RECEPTACLES WITHIN 6'
OF A PLUMBING FIXTURE SHALL BE GFCI TYPE. EXTERIOR RECEPTACLES
SHALL WEATHERPROOF GFCI.
8. PROVIDE RECEPTACLES NEAR AC EQUIPMENT FOR SERVICING AS REQUIRED
BY THE NEC.
9. ALL SOUND SYSTEM WIRING SHALL BE IN CONDUIT.
10. EXISTING IT CABINET & 120V PANEL LOCATED IN MEZZANINE MECHANICAL
ROOM.
SPECIFIC NOTES THIS SHEET:
SPEAKER CABINET. SEE 274116. PROVIDE ALL REQUIRED SPEAKER CABLING.
LOCATE ABOVE GRAPHIC ART.
SOUND SYSTEM CONTROL CABINET. PROVIDE SURGE PROTECTED OUTLET
STRIP IN CABINET.
RELOCATE BACKBOARD CONTROLS TO OFFICE. EXTEND WIRING AS REQUIRED.
VERIFY ON SITE.
POWER FOR ROLL-UP DOOR. WIRE TO CONTROL SWITCH.
HOMERUN TO 120V PANEL 20A BREAKER.
30A, 2P, 208V, NEMA-3R DS.
2"C, 2 # 10AWG & 1 # 10 GRD.
HOMERUN TO EXISTING 120V PANEL. PROVIDE 2 POLE 30A BREAKER.
CONNECT TO EXISTING RECEPTACLE CIRCUIT.
INDOOR UNIT WIRED FROM OUTDOOR UNIT.
EXTEND OUTLET BOXES FOR ALL DEVICES, LIGHTS ETC. ON THIS WALL TO BE
FURRED OUT. VERIFY ON SITE.
REMOVE EXISTING SMOKE DETECTORS AN PROVIDE NEW SMOKE DETECTORS
AS REQUIRED FOR NEW CEILING LAYOUT THIS AREA. COORDINATE WITH
ARCHITECTURAL REFLECTED CEILING PLANS.
CONNECT NEW RECEPTACLE TO EXISTING 120V RECEPTACLE CIRCUIT. VERIFY
EXACT LOCATION ON SITE.
2" CONDUIT FROM SPEAKER TO CONTROL LOCATION FOR SIGNAL AND
CONTROL WIRING.
PROVIDE NEW 16 SPACE, 120/208V, 1PH, 3W 100A BUS PANEL WITH MLO. NEW
PANEL SHALL BE FED FROM EXISTING 120V PANEL. PROVIDE NEW 100A, 2P
BREAKER IN EXISTING PANEL. MOVE (2) EXISTING 20A BREAKER LOADS TO NEW
PANEL. ALL NEW CIRCUITS SHALL BE RUN TO NEW PANEL.
M
D O
C U
M
EN
TS
M
U
ST
B E
AU
TH
O R
IZ
ED
B Y
TH
E
AR
C
H
IT
EC
T.
A
LL
R
IG
H
TS
A R
E R
ES
ER
VE
D
T O
M U
R R
AY
A
R C
H
IT
EC
TS
TH
E
PR
O
JE
C
T
ID
EN
TI
FI
ED
A N
D A
R E
N O
T
SU
IT
AB
LE
F
O R
U
SE
O N
A N
Y O
TH
ER
P R
O
JE
C T
O R
A T
AN
Y
O
TH
ER
L
O C
AT
IO
N W
IT
H
O U
T "T
H
ES
E D
O C
U M
EN
TS
A R
E
PR
O
TE
C
TE
D B
Y U
N
IT
ED
S
TA
TE
S C
O
PY
R
IG
H T
LA
W
TH
EY
H
AV
E
BE
EN
P R
EP
AR
ED
S
PE
C
IF
IC
AL
LY
F O
R
TH
E
EX
PR
ES
S
W R
IT
TE
N A
PP
R
O
VA
L
AN
D P
AR
TI
C
IP
AT
IO
N O
F M
U R
R
AY
A R
C H
IT
EC
TS
R
EP
R O
D U
C
TI
O N
O F
TH
ES
E
C O
PY
R
IG
H
T
2 3 4 6 7 8 10 11 1295 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A project number seal date phase drawing number revisions no.
1 2 3 4 6 7 8 10 11 1295 13 14 15 16 riv er ro ad de st re ha n, la
(9
) 7 fa x (9
) 7 date
ADDENDUM NO. 4 11-18-2024
1910 W Main St, Lutcher, LA 70071
ST. JAMES PARISH SCHOOLS
LUTCHER HIGH SCHOOL
02.20.2024
SD
4609 Fairfield Street Metairie, La 70006 P-504.455.4450 crumbengineering.com
FLOOR PLAN - POWER AND SPECIAL SYSTEMSE-2
1/8"=1'-0"
E2.0
FLOOR PLAN - POWER AND SPECIAL SYSTEMS
DUPLEX RECEPT.MTD. ABOVE WORK SURFACE
DUPLEX RECEPTACLE MTD. 18'' ABOVE FLOOR
DUPLEX RECEPTACLE, WEATHERPROOF
ELECT .MOTOR W/APPROVED DISC. SWITCH
DUPLEX RECEPT. W/GROUND FAULT INTERRUPTER
QUADRAPLEX RECEPTACLE MTD. 18'' ABOVE FLOOR
STARTER/ DISCONNECT
M ELECTRIC METER
TELEPHONE OUTLET (WALL)
TELEPHONE OUTLET (FLOOR)
DATA/CABLE OUTLET
S
DISCONNECT SWITCH W/VISIBLE BLADES
ELECTRICAL HEATING ELEMENT
SINGLE POLE SWITCH
WEATHERPROOF TOGGLE SWITCH
HOME RUN TO PANEL
E L E C T R I C A L
DIMMER SWITCH
CONCEALED WIRING
WP
D a a
SYMBOL
THREE WAY SWITCH
CROSS LINES DENOTE
NO. OF CONDUCTORS
WHEN MORE THAN TWO
LETTER DENOTES
FIXTURE CONTROL
DESCRIPTION
FLOOR OUTLET
SPECIAL OUTLET
JUNCTION BOX
GFI
WP
SYMBOL DESCRIPTION
L E G E N D
J
S
S
S
S
TIMER SWITCH (3-WAY WHEN NOTED)TMS
DEVICE AND EQUIPMENT LABELING DETAIL
NO SCALE
XYZ:A
XYZ:A
XY
Z:
A
XYZ:A
TYPICAL DEVICE LABELING
PANEL XYZ
TYPICAL PANEL OR ENCLOSURE
WATER HEATER
XYZ:C
TYPICAL SWITCH OR CONTROLLER
XYZ:1,3,5
TYPICAL JUNCTION BOX OR PULL BOX, IN
THE CEILING CAVITY, EXPOSED, ETC.
XYZ= A NORMAL DISTRIBUTION OR LIGHTING
AND APPLIANCE TYPE PANELBOARD.
A,B,C= TYPICAL BRANCH CIRCUIT OR POLE
NUMBERS IN PANEL XYZ.
TROPHY CASE LIGHT FIXTURE ELEVATION
NO SCALE
F6
F6
F6 UNDER SHELF
TOP SHELF
BOTTOM SHELF
1ST CASE - 10'-6" LONG
2ND CASE - 12'-0" LONG
F6 UNDER SHELF
NOTE: WIRE F6 FIXTURES TO EXISTING CIRCUIT. FIXTURES
ARE ALWAYS ON.
M
D O
C U
M E
N T
S M
U S
T B
E A
U T
H O
R
IZ
E D
B Y
T H
E A
R C
H
IT
E C
T
A L
L R
IG
H
T S
A R
E R
E S
E R
V E
D T
O M
U R
R A
Y A
R C
H
IT
E C
T S
T H
E P
R O
JE
C
T I
D E
N T
IF
IE
D A
N D
A R
E N
O T
S U
IT
A
B L
E F
O R
U S
E O
N A
N Y
O T
H E
R P
R O
JE
C
T O
R A
T A
N Y
O T
H E
R L
O C
A T
IO
N
W
IT
H O
U T
"T
H E
S E
D O
C U
M E
N T
S A
R E
P R
O T
E C
T E
D B
Y U
N
IT
E D
S T
A T
E S
C O
P Y
R
IG
H T
L A
W
T H
E Y
H A
V E
B E
E N
P R
E P
A R
E D
S P
E C
IF
IC
A L
L Y
F O
R
T H
E E
X P
R E
S S
W R
IT
T
E N
A P
P R
O V
A L
A N
D P
A R
T
IC
IP
A
T
IO
N O
F M
U R
R A
Y A
R C
H
IT
E C
T S
R
E P
R O
D U
C T
IO
N
O F
T H
E S
E
C O
P Y
R
IG
H T
2 3 4 6 7 8 10 11 1295 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A project number seal date phase drawing number revisions no.
1 2 3 4 6 7 8 10 11 1295 13 14 15 16 riv er ro ad de st re ha n, la
(9
) 7 fa x (9
) 7 date
ADDENDUM NO. 4 11-18-2024
1910 W Main St, Lutcher, LA 70071
ST. JAMES PARISH SCHOOLS
LUTCHER HIGH SCHOOL
02.20.2024
SD
4609 Fairfield Street Metairie, La 70006 P-504.455.4450 crumbengineering.com
ELECTRICAL SCHEDULES AND DETAILSE-3
NO SCALE
E3.0
ELECTRICAL SCHEDULES AND DETAILS
NO SPRINKLER REQUIRED IN ADDITION
MODIFY EXISTING SPRINKLER LAYOUT
THIS AREA AS REQUIRED FOR NEW
CEILING. REFER TO ARCHITECTURAL
FLOOR PLANS AND ELEVATIONS.
EXISTING SPRINKLER HEADS TO BE REMOVED WITH CEILING
DEMOLITION. RAISE PIPING AS REQUIRED AND PROVIDE UPRIGHT
SPRINKLER HEADS. NOTE: EXISTING BLEACHER SPRINKLER PIPING
TO REMAIN.
FIRE PROTECTION GENERAL NOTES:
THE FIRE PROTECTION SYSTEM SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE
WITH NFPA 13, 24 AND 101 REQUIREMENTS.
THE CONTRACTOR SHALL COORDINATE PIPE ROUTING WITH ALL DISCIPLINES TO
IDENTIFY INTERFERENCES PRIOR TO PREPARATION OF FINAL LAYOUT OF DESIGN
AND SHOP DRAWINGS. REFER TO ARCHITECTURAL DRAWINGS FOR SLOPED CEILINGS,
FURRINGS, ETC. AND PROVIDE ADDITIONAL HEADS AS REQUIRED.
THE CONTRACTOR SHALL SIZE ALL PIPES HYDRAULICALLY IN ACCORDANCE WITH
NFPA-13 BASED ON ACTUAL ROUTING OF THE SYSTEM AND SUBMIT TO THE
ARCHITECT/ENGINEER FOR REVIEW AND APPROVAL. SUBMITTAL SHALL INCLUDE
SPRINKLER SYSTEM COMPONENTS, PIPE LAYOUT DRAWINGS, PIPE SIZES AND
HYDRAULIC CALCULATIONS. DESIGN FOR A 10% SAFETY FACTOR.
THE CONTRACTOR SHALL PERFORM THE FINAL DESIGNS, PREPARE LAYOUT AND
FABRICATION DRAWINGS AND DETAILS FOR THE SPRINKLER SYSTEM IN
ACCORDANCE WITH APPLICABLE NFPA CODES, AND MEET THE REQUIREMENTS OF
THE STATE FIRE MARSHAL, PROPERTY INSURANCE ASSOCIATION AND ALL OTHER
AGENCIES HAVING JURISDICTION. CONTRACTOR SHALL ASSUME FULL
RESPONSIBILITY OF DESIGN AND OPERATION OF THE SPRINKLER SYSTEM.
PIPE RACKS, CONDUIT BANKS, OVERHANGS, UNDER HANGS, AND DUCTWORK OVER 4'
IN WIDTH SHALL REQUIRE SPRINKLER HEADS TO BE INSTALLED BOTH ABOVE AND
BELOW. CONTRACTOR SHALL CONFORM TO NFPA-13 REQUIREMENTS.
WHERE PIPING IS EXPOSED, PIPING SHALL BE INSTALLED AS HIGH AS POSSIBLE.
THE SPRINKLER SYSTEM SHALL BE ARRANGED FOR FLUSHING. READILY REMOVABLE
FITTINGS SHALL BE PROVIDED AT THE END OF ALL CROSS MAINS. ALL BRANCH LINES
SHALL BE ARRANGED TO FACILITATE FLUSHING. ALL VALVES ON CONNECTIONS TO
WATER SUPPLIES AND IN SUPPLY PIPES TO SPRINKLERS SHALL BE LISTED INDICATING
VALVES.
ALL SPRINKLER WATER CONTROL VALVES AND SUPPLY PIPES SHALL BE PROTECTED
AGAINST FREEZING AND MECHANICAL INJURY. TAG AND IDENTIFY ALL SPRINKLER
VALVES.
ALL EXPOSED PIPING SHALL BE PAINTED PER DIVISION 9 - FINISHES.
ALL PIPING SHALL BE CONCEALED UNLESS OTHERWISE NOTED ON PLANS. EXPOSED
PIPING SHALL BE RUN TIGHT TO STRUCTURE AND SLOPE WITH THE STRUCTURE.
ALL HEADS SHALL BE QUICK RESPONSE TYPE.
ALL AREAS SHALL BE LIGHT HAZARD OCCUPANCY EXCEPT FOR EQUIPMENT ROOMS,
MECHANICAL ROOMS, ELECTRICAL ROOMS, AND JANITOR'S CLOSETS WHICH SHALL BE
ORDINARY HAZARD GROUP 1. STORAGE AREAS SHALL BE ORDINARY HAZARD GROUP
II. THE HYDRAULIC MINIMUM REQUIREMENTS SHALL BE AS FOLLOWS:
LIGHT HAZARD - 0.10 GPM/SQFT - 1500 SQFT MOST REMOTE AREA - 225 SQFT
MAX SPRINKLER SPACING - 100 GPM HOSE ALLOWANCE
ORDINARY HAZARD I - 0.15 GPM/SQFT - 1500 SQFT MOST REMOTE AREA - 130
SQFT MAX SPRINKLER SPACING - 250 GPM HOSE ALLOWANCE
ORDINARY HAZARD II - 0.20 GPM/SQFT - 1500 SQFT MOST REMOTE AREA -
130SQFT MAX SPRINKLER SPACING - 250 GPM HOSE ALLOWANCE
INCREASE REMOTE AREA 30% FOR SLOPED CEILINGS. DECREASE REMOTE
AREA PER NFPA 13:11.2.3.2.3. INCREASE REMOTE AREA FOR DRY SYSTEMS.
IN ROOMS WITH ACOUSTICAL TILE CEILINGS, ALL SPRINKLERS SHALL BE CENTERED
BOTH WAYS WITHIN CEILING TILES.
M
D O
C U
M
EN
TS
M
U
ST
B E
AU
TH
O R
IZ
ED
B Y
TH
E
AR
C
H
IT
EC
T.
A
LL
R
IG
H
TS
A R
E R
ES
ER
VE
D
T O
M U
R R
AY
A
R C
H
IT
EC
TS
TH
E
PR
O
JE
C
T
ID
EN
TI
FI
ED
A N
D A
R E
N O
T
SU
IT
AB
LE
F
O R
U
SE
O N
A N
Y O
TH
ER
P R
O
JE
C T
O R
A T
AN
Y
O
TH
ER
L
O C
AT
IO
N W
IT
H
O U
T "T
H
ES
E D
O C
U M
EN
TS
A R
E
PR
O
TE
C
TE
D B
Y U
N
IT
ED
S
TA
TE
S C
O
PY
R
IG
H T
LA
W
TH
EY
H
AV
E
BE
EN
P R
EP
AR
ED
S
PE
C
IF
IC
AL
LY
F O
R
TH
E
EX
PR
ES
S
W R
IT
TE
N A
PP
R
O
VA
L
AN
D P
AR
TI
C
IP
AT
IO
N O
F M
U R
R
AY
A R
C H
IT
EC
TS
R
EP
R O
D U
C
TI
O N
O F
TH
ES
E
C O
PY
R
IG
H
T
2 3 4 6 7 8 10 11 1295 13 14 15 16
L
K
J
H
G
F
E
D
C
B
A
M
L
K
J
H
G
F
E
D
C
B
A project number seal date phase drawing number revisions no.
1 2 3 4 6 7 8 10 11 1295 13 14 15 16 riv er ro ad de st re ha n, la
(9
) 7 fa x (9
) 7 date
ADDENDUM NO. 4 11-18-2024
1910 W Main St, Lutcher, LA 70071
ST. JAMES PARISH SCHOOLS
LUTCHER HIGH SCHOOL
02.20.2024
SD
4609 Fairfield Street Metairie, La 70006 P-504.455.4450 crumbengineering.com
FLOOR PLAN - FIRE PROTECTIONM-2
1/8"=1'-0"
M2.0
FLOOR PLAN - FIRE PROTECTION
| Addendum No 4 |
| Addendum No 4 |
| Addendum No 4 |
| A.2.2 |
| A.4.7 |
| Crumb Addendum #4 - Lutcher High |
| END OF ADDENDUM |
| Crumb Engineering, LLC |
| E0.1 |
| Sheets and Views |
| E0.1 |
| E1.0 |
| Sheets and Views |
| E1.0 |
| E2.0 |
| Sheets and Views |
| E2.0 |
| E3.0 |
| Sheets and Views |
| E3.0 |
| M2.0 |
| Sheets and Views |
| M2.0 |
File details come from the government source that posted it. Updated .