LHS Gym Reno Addendum No 1.pdf
PDF 1 MB Posted
- Attached to
- Lutcher High School Game Gym Renovations
- Solicitation number
- 10-17-2024
- Issued by
- St. Martin Parish, Louisiana
About this file
This Addendum No. 1 is issued by St. James Parish School Board for the Lutcher High School Game Gym Renovations project. The addendum provides updated details for a comprehensive renovation of the existing gymnasium, with a bid date of November 14, 2024, at 2:00 p.m. The project includes a 150-calendar day construction timeline with liquidated damages of $1,000 per day. The scope encompasses multiple alternates: Alternate No. 1 involves installing additional concrete between the gym and track, Alternate No. 2 includes test and balance for existing equipment, and Alternate No. 3 involves refinishing the existing practice gym floor. The project is divided into two phases, with a procurement phase starting January 6, 2025, and construction beginning March 17, 2025.
The project is sales tax exempt and requires several key modifications to the original contract documents. These include replacing the Louisiana Uniform Public Work Bid Form, adding sections for alternates, metal wall panels, hardwood sport floor finishing, and acoustical wall panels, while removing the polyurethane floor system section. The addendum also provides clarification on various technical specifications, including mounting details for perforated acoustical panels, metal siding requirements, and installation guidelines for different project components. Bidders are required to provide comprehensive documentation, including shop drawings, product data, and samples, and must comply with specific performance requirements and installation standards outlined in the detailed specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LUTCHER HIGH SCHOOL GAME GYM RENOVATIONS
ADDENDUM NO. 1
November 8, 2024
PROJECT: Lutcher High School Game Gym Renovations
Date of Addendum: November 8, 2024
Mandatory Pre-Bid Date: November 5, 2024, 10:00 a.m.
Bid Date November 14, 2024, 2:00 p.m.
This Addendum shall be considered part of the Contract Documents for the same above-mentioned project as though it had been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original Contract Documents, this Addendum shall govern and take precedence.
GENERAL
1. Prebid Sign-In Sheet attached.
2. Bids are due at 2:00 pm November 14, 2024, at the School Board Office or online at
Bidnet Direct.
3. The construction time is 150 calendar days.
4. The liquidated damages are $1,000 per day.
5. This project is sales tax exempt.
6. Project Timeline
a. Bid Date November 14, 2024
b. Phase 1 notice to proceed January 6, 2025 (procurement)
c. Phase 2 notice to proceed March 17, 2025 (Start of Construction)
7. Alternates listed below have been added to the project.
a. Alternate Number 1 – Install additional concrete between back of Gym and Track
See attached Sheet A.0.0.
b. Alternate Number 2 – Provide test and balance for existing equipment per specification 230592 TEST & BALANCE.
c. Alternate Number 3 – Refinish existing practice gym floor located in main building per attached specification Section 09 9310 – Hardwood Sport Floor Finishing and Maintenance.
8. The contractor shall provide and install fold up curtain item no 401-105 by Spalding that will divide the court in half.
9. All cabinets within concession area shall be lockable and keyed alike.
10. Owner will engage a qualified material testing agency; testing services shall be coordinated by the Contractor.
SPECIFICATIONS
1. Louisiana Uniform Public Work Bid Form – Remove in its entirety and replace with the attached.
2. Section 01 2300 – Alternates – Add to the project manual in its entirety.
3. Section 07 4213 - Formed Metal Wall Panels – Add to the project manual in its entirety.
4. Section 09 9310 – Hardwood Sport Floor Finishing and Maintenance – Add to the project manual in its entirety.
5. Section 09 3500 – Polyurethane Floor System – Remove from the project manual in its entirety.
6. Section 09 8400 Alphaperf® V-Faced Metal Acoustical Wall Panels – Add to the project manual in its entirety.
7. Section 10 5300 – Aluminum Walkway Cover – Add to the project manual in its entirety.
DRAWINGS
Sheet A.0.0 – Remove in its entirety and replace with the attached.
Sheet A.1.0 - Remove in its entirety and replace with the attached.
Sheet A.4.6 - Remove in its entirety and replace with the attached.
RFI’s
Question: 230592 TEST & BALANCE spec section calls for all water and air systems to be tested as part of alternate – no indication of this elsewhere in document. Advise if this is to be an alternate or part of the base bid.
Answer: This shall be Alternate number 2
Question: Provide formal specifications for Alphaperf Perforated Acoustical Metal Panels.
Confirm color selection, perforation size, patterns, etc.
Answer: See attached Section 09 8400 Alphaperf® V-Faced Metal Acoustical Wall Panels specification.
Question: Provide applicable mounting/blocking details for perforated acoustical panels
Answer: They are to be flush mounted as shown on drawings.
Question: 074120 PRE-FORMED METAL SIDING W/ CONCEALED FASTENERS – spec section refers to PacClad panels which are not shown in the documents.
Drawings call out Berridge HR16 in vertical and horizontal orientations. Provide specification section & confirm gauge/thickness/color etc.
Answer: Guage shall be 24, color to be determine from manufacturers full spectrum.
Panels shall be as called out on drawings
Question: Provide formal specification provided “thin line panel” ceilings – note 8 on RCP.
Answer: See attached Section 07 4213 - Formed Metal Wall Panels for thin line panel specification
Question: Provide information on construction, framing & suspension of gypsum board letters in Corridor 108. (1) Note if this is to be a custom product /what manufacturer/etc. and (2) Note if perimeter of letters is to have Armstrong Axion or USG Knife Edge trim and provide color selections, model numbers and information for curved pieces, straight pieces, corners and end caps.
Answer: The letters are made of metal studs and gypsum per drawings.
Question: Clarify if existing ACT ceiling assembly in Entry Lobby 101 is to be removed to receive new grid. Does existing tile get detached, reset in new grid and painted?
Answer: Existing ceiling and grid remain in Lobby 101 and get painted black. A new Armstrong 360 painted grid shall be installed below as indicated within wall section A-16/A.3.1
Question: Note if existing scoreboard will need to be detached and rest to apply vinyl graphics at Gymnasium 120 elevation shown in Detail G1 on Sheet A4.6.
Answer: Existing scoreboards are to remain. They will not be removed or altered in any way.
Question: How many days are allowed for construction? I could not find in the specifications.
Answer: 150 Calendar days.
Question: Is there a specification available for doors & frames required?
Answer: Please see Section 08 4113 Aluminum-Framed Entrances and Storefronts for new exterior doors. For new door installed in opening 25, contractor shall provide solid core wood door to be painted to match existing.
Question: Sht. A 0.0 Is there a detail for the concrete paving showing thickness, reinforcing, expansion joints, etc?
Answer: All new concrete shall be 4” thick, 3,000 psi with control joints at 5’ o.c. and expansion joints at 30’ o.c. each way.
Question: Sht A 0.0 There are notes 1 & 2 listed in the legend / schedule but not shown on drawing. Please clarify.
Answer: See attached updated Sheet A.0.0.
Question: Sht A 1.0 Note # 1 in the demo notes calls to remove and replace toilet partitions.
On sht. A 1.0 note 1 points to exterior doors. Please clarify.
Answer: See attached updated Sheet A.1.0.
Question: Sht. A1.0 and A 1.1 do not show demo notes 13 and 14. Is this work required?
Answer: 13 and 14 are required within the main gym
Question: Sht. A 1.3 shows a canopy. Are there specifications and details for this canopy?
Answer: See attached specification 10 5300 Aluminum Walkway Covers.
Question: Sht. A 1.13 calls for new metal wall panels, gutters, and downspouts in Alt. # 1.
Shts. A 2.0, 2.1, 2.2, and 2.3 call for these items in the Base Bid. Please clarify.
Answer: New exterior metal wall panels shall be part of base bid.
Question: Specifications call for a myriad of new toilet accessories. I only see 2 mirrors and 11 toilet paper dispensers on the plans. Are all the other accessories required?
Are the toilet paper dispensers furnished by the owner? Please clarify.
Answer: Follow the specifications requirements.
Question: Sht 4.6 Detail A-1 Can you provide more details on gym padding requirements, ie: quantity required, graphics required, etc.
Answer: See attached updated Sheet A.4.6 with additional dimension of padding
LOUISIANA UNIFORM PUBLIC WORK BID FORM
TO: St. James Parish School Board_______________
1876 West Main Street_ _____________________ Lutcher, LA 70071 ________________________ (Owner to provide name and address of owner)
BID FOR: Lutcher High School Game Gym Renovations (Owner to provide name of project and other identifying information)
The undersigned bidder hereby declares and represents that she/he: a) has carefully examined and understands the Bidding Documents, b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by: Murray Architects, Inc. and dated:
February 20, 2024 (Owner to provide name of entity preparing bidding documents.)
Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the
Designer has assigned to each of the addenda that the Bidder is acknowledging) __________________________________________ .
TOTAL BASE BID: For all work required by the Bidding Documents (including any and all unit prices designated “Base Bid”
* but not alternates) the sum of:
Dollars ($ )
ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description.
Alternate No. 1 Install additional concrete between back of Gym and Track for the lump sum of:
Alternate No. 2 Provide test and balance for existing equipment per specification 230592 TEST & BALANCE for the lump sum of:
Alternate No. 3 Refinish existing practice gym floor located in main building per specification Section 09 9310 – Hardwood Sport Floor Finishing and Maintenance for the lump sum of:
NAME OF BIDDER:
ADDRESS OF BIDDER:
LOUISIANA CONTRACTOR’S LICENSE NUMBER:
NAME OF AUTHORIZED SIGNATORY OF BIDDER:
TITLE OF AUTHORIZED SIGNATORY OF BIDDER:
SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **:
DATE: _______________________
THE FOLLOWING ITEMS ARE TO BE INCLUDED WITH THE SUBMISSION OF THIS LOUISIANA
UNIFORM PUBLIC WORK BID FORM:
* The Unit Price Form shall be used if the contract includes unit prices. Otherwise it is not required and need not be included with the form. The number of unit prices that may be included is not limited and additional sheets may be included if needed.
** A CORPORATE RESOLUTION OR WRITTEN EVIDENCE of the authority of the person signing the bid for the public work as prescribed by LA R.S. 38:2212(B)(5).
BID SECURITY in the form of a bid bond, certified check or cashier’s check as prescribed by LA R.S. 38:2218(A) attached to and made a part of this bid.
LOUISIANA UNIFORM PUBLIC WORK BID FORM
UNIT PRICE FORM
TO: St. James Parish School Board BID FOR: Lutcher High School Game Gym Renovations 1876 West Main Street Lutcher, LA 70071
(Owner to provide name and address of owner) (Owner to provide name of project and other identifying information)
UNIT PRICES: This form shall be used for any and all work required by the Bidding Documents and described as unit prices. Amounts shall be stated in figures and only in figures.
DESCRIPTION: Base Bid or Alt.# ___ REF. NO. QUANTITY: UNIT OF MEASURE: UNIT PRICE UNIT PRICE EXTENSION (Quantity times Unit Price)
Wording for “DESCRIPTION” is to be provided by the Owner.
All quantities are estimated. The contractor will be paid based upon actual quantities as verified by the Owner.
ALTERNATES 01 2300 - 1
SECTION 01 2300 - ALTERNATES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes administrative and procedural requirements for alternates.
1.3 DEFINITIONS
A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the Bidding Requirements that may be added to or deducted from the base bid amount if Owner decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
1. Alternates described in this Section are part of the Work only if enumerated in the Agreement.
2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.
1.4 PROCEDURES
A. Coordination: Modify or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.
1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
B. Execute accepted alternates under the same conditions as other work of the Contract.
C. Schedule: A schedule of alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 SCHEDULE OF ALTERNATES
ALTERNATES 01 2300 - 2
A. Alternate Number 1 – Install additional concrete between back of Gym and Track.
B. Alternate Number 2 – Provide test and balance for existing equipment per specification
230592 TEST & BALANCE.
C. Alternate Number 3 – Refinish existing practice gym floor located in main building per specification Section 09 9310 – Hardwood Sport Floor Finishing and Maintenance.
FORMED METAL WALL PANELS 07 4213 - 1
SECTION 07 4213 - FORMED METAL WALL PANELS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Metal liner panels.
1.3 PREINSTALLATION MEETINGS
A. Preinstallation Conference: Conduct conference at Project site.
1. Meet with Owner, Architect, Owner's insurer if applicable, metal panel Installer, metal panel manufacturer's representative, structural-support Installer, and installers whose work interfaces with or affects metal panels, including installers of doors, windows, and louvers.
2. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
3. Review methods and procedures related to metal panel installation, including manufacturer's written instructions.
4. Examine support conditions for compliance with requirements, including alignment between and attachment to structural members.
5. Review flashings, special siding details, wall penetrations, openings, and condition of other construction that affect metal panels.
6. Review governing regulations and requirements for insurance, certificates, and tests and inspections if applicable.
7. Review temporary protection requirements for metal panel assembly during and after installation.
8. Review of procedures for repair of metal panels damaged after installation.
9. Document proceedings, including corrective measures and actions required, and furnish copy of record to each participant.
1.4 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each type of panel and accessory.
FORMED METAL WALL PANELS 07 4213 - 2
B. Sustainable Design Submittals:
1. Product Data: For recycled content, indicating postconsumer and preconsumer recycled content and cost.
C. Shop Drawings:
1. Include fabrication and installation layouts of metal panels; details of edge conditions, joints, panel profiles, corners, anchorages, attachment system, trim, flashings, closures, and accessories; and special details.
2. Accessories: Include details of the flashing, trim, and anchorage systems, at a scale of not less than 3" = 1'-0" (1:5).
D. Calculations:
1. Include calculations with registered engineer seal, verifying wall panel and attachment method resist wind pressures imposed on it pursuant to applicable building codes.
E. Samples for Initial Selection: For each type of metal panel indicated with factory-applied finishes.
1. Include Samples of trim and accessories involving color selection.
F. Samples for Verification: For each type of exposed finish, prepared on Samples of size indicated below:
1. Metal Panels: 12 inches (305 mm) long by actual panel width. Include fasteners, closures, and other metal panel accessories.
1.5 INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer and Manufacturer.
B. Product Test Reports: For each product, for tests performed by a qualified testing agency.
C. Field quality-control reports.
D. Sample Warranties: For special warranties.
1.6 CLOSEOUT SUBMITTALS
A. Maintenance Data: For metal panels to include in maintenance manuals.
1.7 QUALITY ASSURANCE
A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer.
FORMED METAL WALL PANELS 07 4213 - 3
B. Manufacturer Qualifications: Company specializing in Architectural Sheet Metal Products.
C. Mockups: Build mockups to verify selections made under Sample submittals and to demonstrate aesthetic effects and set quality standards for fabrication and installation.
1. Build mockup of typical metal panel assembly as shown on Drawings, including soffits, supports, attachments, and accessories.
2. Water-Spray Test: Conduct water-spray test of metal panel assembly mockup, testing for water penetration according to AAMA 501.2.
3. Approval of mockups does not constitute approval of deviations from the Contract Documents contained in mockups unless Architect specifically approves such deviations in writing.
4. Subject to compliance with requirements, approved mockups may become part of the completed Work if undisturbed at time of Substantial Completion.
1.8 DELIVERY, STORAGE, AND HANDLING
A. Deliver components, metal panels, and other manufactured items so as not to be damaged or deformed. Package metal panels for protection during transportation and handling.
B. Unload, store, and erect metal panels in a manner to prevent bending, warping, twisting, and surface damage.
C. Stack metal panels horizontally on platforms or pallets, covered with suitable weathertight and ventilated covering. Store metal panels to ensure dryness, with positive slope for drainage of water. Do not store metal panels in contact with other materials that might cause staining, denting, or other surface damage.
D. Remove strippable protective covering on metal panels as panels are being installed. Do not leave the film on installed panels.
1.9 FIELD CONDITIONS
A. Weather Limitations: Proceed with installation only when existing and forecasted weather conditions permit assembly of metal panels to be performed according to manufacturers' written instructions and warranty requirements.
1.10 COORDINATION
A. Coordinate metal panel installation with rain drainage work, flashing, trim, construction of soffits, and other adjoining work to provide a leakproof, secure, and noncorrosive installation.
FORMED METAL WALL PANELS 07 4213 - 4
1.11 WARRANTY
A. Galvalume Substrate Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of metal panel systems that fail in materials or workmanship within specified warranty period.
1. Failures include, but are not limited to, the following:
a. Structural failures including rupturing or perforating.
b. Deterioration of metals and other materials beyond normal weathering.
2. Warranty Period: 20 years and 6 months from date of Substantial Completion.
B. Special Warranty on Panel Finishes: Manufacturer's standard form in which manufacturer agrees to repair finish or replace metal panels that show evidence of deterioration of factory-applied finishes within specified warranty period.
1. Exposed Panel Finish: Deterioration includes, but is not limited to, the following:
a. Color fading more than 5 Hunter units when tested according to ASTM D 2244.
b. Chalking in excess of a No. 8 rating when tested according to ASTM D 4214.
c. Cracking, chipping, peeling, or failure of paint to adhere to bare metal.
2. Finish Warranty Period: 20 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Recycled Content: Postconsumer recycled content plus one-half of preconsumer recycled content not less than 29 percent.
B. Structural Performance: Provide metal panel systems capable of withstanding the effects of the following loads, based on testing according to ASTM E 330:
1. Wind Loads: As indicated on Drawings.
2. Deflection Limits: For wind loads, no greater than 1/240 of the span.
2.2 METAL LINER PANELS
A. General: Provide factory-formed metal liner panels designed for interior side walls and field assembled by lapping and interconnecting side edges of adjacent panels and mechanically attaching through panel to supports using concealed fasteners in side laps. Include accessories required for a complete installation.
B. Metal Liner Panels Thin Line Panels: Solid panels formed with a flat pan between panel edges;
with a flush joint between panels.
FORMED METAL WALL PANELS 07 4213 - 5
1. Basis-of-Design Product: Subject to compliance with requirements, provide Berridge Manufacturing Company; Thin Line or comparable product by one of the following:
2. Metallic-Coated Steel Sheet: Aluminum-zinc alloy-coated steel sheet complying with ASTM A 792/A 792M, Class AZ50 (Class AZM150) coating designation; structural quality. Prepainted by the coil-coating process to comply with ASTM A 755/A 755M.
a. Nominal Thickness: 0.024 inch (0.61 mm).
b. Surface: Smooth, flat finish.
c. Exterior Finish: Two-coat fluoropolymer
d. Color: As selected by Architect from manufacturer's full range.
3. Panel Coverage: 3.625 inches (92 mm).
4. Seam Height: 0.375 inches (10 mm).
2.3 UNDERLAYMENT MATERIALS
A. Self-Adhering, High-Temperature Underlayment: Provide self-adhering, cold-applied, sheet underlayment, a minimum of 40 mils (1.02 mm) thick, consisting of slip-resistant, polyethylene-film top surface laminated to a layer of butyl or SBS-modified asphalt adhesive, with release-paper backing. Provide primer when recommended by underlayment manufacturer.
1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
a. Grace Ultra
b. Mid-States Asphalt Quick Stick HT Pro
c. Polyglass Polystick MTS
d. Soprema Lastobond Shield HT
e. Tamko TW Underlayment or TW Metal & Tile Underlayment
2. Thermal Stability: Stable after testing at 240 deg F (116 deg C); ASTM D 1970.
3. Low-Temperature Flexibility: Passes after testing at minus 20 deg F (29 deg C);
ASTM D 1970.
B. Felt Underlayment: ASTM D 226/D 22M, Type II (No. 30), asphalt-saturated organic felts.
2.4 MISCELLANEOUS MATERIALS
A. Miscellaneous Metal Subframing and Furring: ASTM C 645, cold-formed, metallic-coated steel sheet, ASTM A 653/A 653M, G90 (Z275) hot-dip galvanized coating designation or ASTM A 792/A 792M, Class AZ50 (Class AZM150) aluminum-zinc-alloy coating designation unless otherwise indicated. Provide manufacturer's standard sections as required for support and alignment of metal panel system.
B. Panel Accessories: Provide components required for a complete, weathertight panel system including trim, copings, fasciae, mullions, sills, corner units, clips, flashings, sealants, gaskets, http://www.specagent.com/Lookup?ulid=6911
FORMED METAL WALL PANELS 07 4213 - 6
fillers, closure strips, and similar items. Match material and finish of metal panels unless otherwise indicated.
1. Closures: Provide closures at eaves and rakes, fabricated of same metal as metal panels.
2. Backing Plates: Provide metal backing plates at panel end splices, fabricated from material recommended by manufacturer.
3. Closure Strips: Closed-cell, expanded, cellular, rubber or crosslinked, polyolefin-foam or closed-cell laminated polyethylene; minimum 1-inch- (25-mm-) thick, flexible closure strips; cut or premolded to match metal panel profile. Provide closure strips where indicated or necessary to ensure weathertight construction.
C. Flashing and Trim: Provide flashing and trim formed from same material as metal panels as required to seal against weather and to provide finished appearance. Locations include, but are not limited to, bases, drips, sills, jambs, corners, endwalls, framed openings, rakes, fasciae, parapet caps, soffits, reveals, and fillers. Finish flashing and trim with same finish system as adjacent metal panels.
D. Panel Fasteners: Self-tapping screws designed to withstand design loads. Provide exposed fasteners with heads matching color of metal panels by means of factory-applied coating.
Provide EPDM or PVC sealing washers for exposed fasteners.
E. Panel Sealants: Provide sealant type recommended by manufacturer that are compatible with panel materials, are nonstaining, and do not damage panel finish.
1. Sealant Tape: Pressure-sensitive, 100 percent solids, gray polyisobutylene compound sealant tape with release-paper backing. Provide permanently elastic, nonsag, nontoxic, nonstaining tape 1/2 inch (13 mm) wide and 1/8 inch (3 mm) thick.
2. Joint Sealant: ASTM C 920; elastomeric polyurethane or silicone sealant; of type, grade, class, and use classifications required to seal joints in metal panels and remain weathertight; and as recommended in writing by metal panel manufacturer.
3. Butyl-Rubber-Based, Solvent-Release Sealant: ASTM C 1311.
2.5 FABRICATION
A. General: Fabricate and finish metal panels and accessories at the factory, by manufacturer's standard procedures and processes, as necessary to fulfill indicated performance requirements demonstrated by laboratory testing. Comply with indicated profiles and with dimensional and structural requirements.
B. Provide panel profile, including major ribs and intermediate stiffening ribs, if any, for full length of panel.
C. Sheet Metal Flashing and Trim: Fabricate flashing and trim to comply with manufacturer's recommendations and recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to design, dimensions, metal, and other characteristics of item indicated.
1. Form exposed sheet metal accessories that are without excessive oil canning, buckling, and tool marks and that are true to line and levels indicated, with exposed edges folded back to form hems.
FORMED METAL WALL PANELS 07 4213 - 7
2. Seams for Aluminum: Fabricate nonmoving seams with flat-lock seams. Form seams and seal with epoxy seam sealer. Rivet joints for additional strength.
3. Seams for Other Than Aluminum: Fabricate nonmoving seams in accessories with flat-lock seams. Tin edges to be seamed, form seams, and solder.
4. Sealed Joints: Form nonexpansion, but movable, joints in metal to accommodate sealant and to comply with SMACNA standards.
5. Conceal fasteners and expansion provisions where possible. Exposed fasteners are not allowed on faces of accessories exposed to view.
6. Fabricate cleats and attachment devices from same material as accessory being anchored or from compatible, noncorrosive metal recommended in writing by metal panel manufacturer.
a. Size: As recommended by SMACNA's "Architectural Sheet Metal Manual" or metal wall panel manufacturer for application but not less than thickness of metal being secured.
2.6 FINISHES
A. Protect mechanical and painted finishes on exposed surfaces from damage by applying a strippable, temporary protective covering before shipping.
B. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in same piece are not acceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast.
C. Steel Panels and Accessories:
1. Two-Coat Fluoropolymer: AAMA 621. Fluoropolymer finish containing not less than 70 percent PVDF resin by weight in color coat applied by panel manufacturer on a continuous coil coating line, with a top side dry film thickness of 0.75± 0.05 mil (0.019±
0.0013 mm) over 0.2± 0.05 mil (0.05± 0.0013 mm) primer coat, to provide a total dry film thickness of 0.95± 0.10 mil (0.024± 0.0025 mm). Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.
2. Mica Fluoropolymer: AAMA 621. Two-coat fluoropolymer finish with suspended mica flakes containing not less than 70 percent PVDF resin by weight in color coat applied by panel manufacturer on a continuous coil coating line, with a top side dry film thickness of 0.75± 0.05 mil (0.019± 0.0013 mm) over 0.2± 0.05 mil (0.05± 0.0013 mm) primer coat, to provide a total dry film thickness of 0.95± 0.10 mil (0.024± 0.0025 mm). Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.
3. Metallic Fluoropolymer: AAMA 621. Two-coat fluoropolymer finish with suspended metallic flakes containing not less than 70 percent PVDF resin by weight in color coat applied by panel manufacturer on a continuous coil coating line, with a top side dry film thickness of 0.75± 0.05 mil (0.019± 0.0013 mm) over 0.2± 0.05 mil (0.05± 0.0013 mm) primer coat, to provide a total dry film thickness of 0.95± 0.10 mil (0.024± 0.0025 mm).
FORMED METAL WALL PANELS 07 4213 - 8
Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.
4. Concealed Finish: Apply pretreatment and manufacturer's standard white or light-colored acrylic or polyester backer finish consisting of prime coat and wash coat with a minimum total dry film thickness of 0.35 mil (0.009 mm).
D. Aluminum Panels and Accessories:
1. Two-Coat Fluoropolymer: AAMA 2605. Fluoropolymer finish containing not less than 70 percent PVDF resin by weight in color coat applied by panel manufacturer on a continuous coil coating line, with a top side dry film thickness of 0.75± 0.05 mil (0.019±
0.0013 mm) over 0.2± 0.05 mil (0.05± 0.0013 mm) primer coat, to provide a total dry film thickness of 0.95± 0.10 mil (0.024± 0.0025 mm). Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.
2. Mica Fluoropolymer: AAMA 2605. Two-coat fluoropolymer finish with suspended mica flakes containing not less than 70 percent PVDF resin by weight in color coat applied by panel manufacturer on a continuous coil coating line, with a top side dry film thickness of 0.75± 0.05 mil (0.019± 0.0013 mm) over 0.2± 0.05 mil (0.05± 0.0013 mm) primer coat, to provide a total dry film thickness of 0.95± 0.10 mil (0.024± 0.0025 mm). Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.
3. Metallic Fluoropolymer: AAMA 2605. Two-coat fluoropolymer finish with suspended metallic flakes containing not less than 70 percent PVDF resin by weight in color coat applied by panel manufacturer on a continuous coil coating line, with a top side dry film thickness of 0.75± 0.05 mil (0.019± 0.0013 mm) over 0.2± 0.05 mil (0.05± 0.0013 mm) primer coat, to provide a total dry film thickness of 0.95± 0.10 mil (0.024± 0.0025 mm).
Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturers' written instructions.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates, areas, and conditions, with Installer present, for compliance with requirements for installation tolerances, metal panel supports, and other conditions affecting performance of the Work.
1. Examine wall framing to verify that girts, angles, channels, studs, and other structural panel support members and anchorage have been installed within alignment tolerances required by metal wall panel manufacturer.
2. Examine wall sheathing to verify that sheathing joints are supported by framing or blocking and that installation is within flatness tolerances required by metal wall panel manufacturer.
a. Verify that air- or water-resistive barriers have been installed over sheathing or backing substrate to prevent air infiltration or water penetration.
FORMED METAL WALL PANELS 07 4213 - 9
B. Examine roughing-in for components and systems penetrating metal panels to verify actual locations of penetrations relative to seam locations of metal panels before installation.
C. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Miscellaneous Supports: Install subframing, furring, and other miscellaneous panel support members and anchorages according to ASTM C 754 and metal panel manufacturer's written recommendations.
3.3 METAL PANEL INSTALLATION
A. General: Install metal panels according to manufacturer's written instructions in orientation, sizes, and locations indicated. Install panels perpendicular to supports unless otherwise indicated. Anchor metal panels and other components of the Work securely in place, with provisions for thermal and structural movement.
1. Shim or otherwise plumb substrates receiving metal panels.
2. Flash and seal metal panels at perimeter of all openings. Fasten with self-tapping screws.
Do not begin installation until air- or water-resistive barriers and flashings that will be concealed by metal panels are installed.
3. Install screw fasteners in predrilled holes.
4. Locate and space fastenings in uniform vertical and horizontal alignment.
5. Install flashing and trim as metal panel work proceeds.
6. Locate panel splices over, but not attached to, structural supports. Stagger panel splices and end laps to avoid a four-panel lap splice condition.
7. Align bottoms of metal panels and fasten with blind rivets, bolts, or self-tapping screws.
Fasten flashings and trim around openings and similar elements with self-tapping screws.
8. Provide weathertight escutcheons for pipe- and conduit-penetrating panels.
B. Fasteners:
1. Steel Panels: Use stainless-steel fasteners for surfaces exposed to the exterior; use galvanized-steel fasteners for surfaces exposed to the interior.
2. Aluminum Panels: Use stainless-steel fasteners for surfaces exposed to the exterior; use stainless-steel fasteners for surfaces exposed to the interior.
C. Metal Protection: Where dissimilar metals contact each other or corrosive substrates, protect against galvanic action as recommended in writing by metal panel manufacturer.
D. Lap-Seam Metal Panels: Fasten metal panels to supports with fasteners at each lapped joint at location and spacing recommended by manufacturer.
1. Lap ribbed or fluted sheets one full rib. Apply panels and associated items true to line for neat and weathertight enclosure.
2. Provide metal-backed washers under heads of exposed fasteners bearing on weather side of metal panels.
FORMED METAL WALL PANELS 07 4213 - 10
3. Locate and space exposed fasteners in uniform vertical and horizontal alignment. Use proper tools to obtain controlled uniform compression for positive seal without rupture of washer.
4. Install screw fasteners with power tools having controlled torque adjusted to compress washer tightly without damage to washer, screw threads, or panels. Install screws in predrilled holes.
5. Flash and seal panels with weather closures at perimeter of all openings.
E. Watertight Installation:
1. Apply a continuous ribbon of sealant or tape to seal lapped joints of metal panels, using sealant or tape as recommend by manufacturer on side laps of nesting-type panels; and elsewhere as needed to make panels watertight.
2. Provide sealant or tape between panels and protruding equipment, vents, and accessories.
3. At panel splices, nest panels with minimum 6-inch (152-mm) end lap, sealed with sealant and fastened together by interlocking clamping plates.
F. Metal Liner Panels: Install panels on exterior side of girts, with girts exposed to the interior.
G. Accessory Installation: Install accessories with positive anchorage to building and weathertight mounting, and provide for thermal expansion. Coordinate installation with flashings and other components.
1. Install components required for a complete metal panel system including trim, copings, corners, seam covers, flashings, sealants, gaskets, fillers, closure strips, and similar items.
Provide types indicated by metal wall panel manufacturer; or, if not indicated, provide types recommended by metal panel manufacturer.
H. Flashing and Trim: Comply with performance requirements, manufacturer's written installation instructions, and SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners where possible, and set units true to line and level as indicated. Install work with laps, joints, and seams that are permanently watertight.
1. Install exposed flashing and trim that is without buckling and tool marks, and that is true to line and levels indicated, with exposed edges folded back to form hems. Install sheet metal flashing and trim to fit substrates and achieve waterproof performance.
2. Expansion Provisions: Provide for thermal expansion of exposed flashing and trim. Space movement joints at a maximum of 10 feet (3 m) with no joints allowed within 24 inches (610 mm) of corner or intersection. Where lapped expansion provisions cannot be used or would not be sufficiently waterproof, form expansion joints of intermeshing hooked flanges, not less than 1 inch (25 mm) deep, filled with mastic sealant (concealed within joints).
3.4 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections.
B. Water-Spray Test: After installation, test area of assembly as directed by Architect for water penetration according to AAMA 501.2.
FORMED METAL WALL PANELS 07 4213 - 11
C. Manufacturer's Field Service: Engage a factory-authorized service representative to test and inspect completed metal wall panel installation, including accessories.
D. Remove and replace metal wall panels where tests and inspections indicate that they do not comply with specified requirements.
E. Additional tests and inspections, at Contractor's expense, are performed to determine compliance of replaced or additional work with specified requirements.
F. Prepare test and inspection reports.
3.5 CLEANING AND PROTECTION
A. Remove temporary protective coverings and strippable films, if any, as metal panels are installed, unless otherwise indicated in manufacturer's written installation instructions. On completion of metal panel installation, clean finished surfaces as recommended by metal panel manufacturer. Maintain in a clean condition during construction.
B. After metal panel installation, clear weep holes and drainage channels of obstructions, dirt, and sealant.
C. Replace metal panels that have been damaged or have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.
END OF SECTION 074213.13
HARDWOOD SPORT FLOOR FINISHING AND MAINTENANCE 09 9310 - 1
SECTION 09 9310 - HARDWOOD SPORT FLOOR FINISHING AND MAINTENANCE
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Hardwood sport floor finishing and maintenance of the following types
1. Waterborne finishes and sealers.
2. Oil-modified finishes and sealers.
3. Paint.
4. Sport floor maintenance.
1.2 SUBMITTALS
A. Submit under provisions of Section 01 3300 - Administrative Requirements.
B. Product Data: Manufacturer's data sheets on each product to be used, including:
1. Preparation instructions and recommendations.
2. Storage and handling requirements and recommendations.
3. Installation methods.
C. Selection Samples: For each finish product specified, two complete sets of color chips representing manufacturer's full range of available colors and patterns.
D. Verification Samples: For each finish product specified, two samples, minimum size 6 inches (150 mm) square representing actual product, color, and patterns.
1.3 QUALITY ASSURANCE
A. Installer Qualifications: Trained in application of the manufacturer's floor products.
B. Mock-Up: Provide a mock-up for evaluation of surface preparation techniques and application workmanship.
1. Finish areas designated by Architect.
2. Do not proceed with remaining work until workmanship, color, and sheen are approved by Architect.
3. Refinish mock-up area as required to produce acceptable work.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Store products in manufacturer's unopened packaging until ready for installation.
B. Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction.
1.5 PROJECT CONDITIONS
A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products
November 8, 2024
HARDWOOD SPORT FLOOR FINISHING AND MAINTENANCE 09 9310 - 2
under environmental conditions outside manufacturer's absolute limits.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Acceptable Manufacturer: Bona US, which is located at: 24 Inverness Place E. Suite 100; Englewood, CO 80112; ASD Toll Free Tel: 800-872-5515; Tel: 303-371-1411;
Fax: 303-307-5029; Email:Frank.Coppolino@bona.com;
Web:https://www.bona.com
B. Requests for substitutions will be considered in accordance with provisions of Section 01 6000.
2.2 WATERBORNE FlNlSHES AND SEALERS
A. Finishes:
1. Product: Bona SuperSport ELITE as manufactured by Bona US.
a. Ingredients: Water, Polymeric Resin, Amorphous Silica, and Dipropylene Glycol Dimethyl Ether.
b. Color: Milky, off white (wet).
c. pH: 8.3.
d. Clarity: Clear when dry.
e. Solids: 32 percent.
f. Density: 8.67 lbs per gal (1.039 grams per cu cm).
g. US Regulatory VOC Compliant: 275 grams per L.
h. Gloss Level: Greater than 87. Satin (Matte): Less than 20.
i. Odor: Non-offending.
j. Stability: 1-year shelf life in unopened container.
k. Leveling: Excellent.
l. Defoaming: Excellent.
m. Drying Time: 2 to 3 hours.
n. Coverage: 450 to 550 square feet per gallon.
o. Curing: Fully cured in 3 days.
2. Product: Bona Activator as manufactured by Bona US.
3. Product: Bona Sport Crosslinker as manufactured by Bona US. To be used with Bona 2-component finishes.
B. Sealers:
1. Product: Bona SuperSport DTS as manufactured by Bona US.
a. Ingredients: Water, polymeric resin, silica derivate, diethylene glycol monoethyl ether, propylene glycol.
b. Color: Milky white (wet).
c. Clarity: Clear when dry.
d. pH: 7.5 to 7.9.
e. Solids: 31 to 32 percent.
f. Density: 8.66 lbs./gallon (1.04 S.G.).
g. US Regulatory VOC: 250 g/L.
mailto:Frank.Coppolino@bona.com?subject=RE:%20Spec%20Question%20(09931bon):%20%20 https://www.bona.com/
November 8, 2024
HARDWOOD SPORT FLOOR FINISHING AND MAINTENANCE 09 9310 - 3
h. Odor: Non-offending.
2. Product: ClearSeal as manufactured by Bona US.
a. Ingredients: Water, acrylic resin, urethane resin, dipropylene glycol monomethyl ether (DPM), binding agent.
b. Color: Milky white (wet).
c. Clarity: Clear when dry.
d. pH: 7.7.
e. Solids: 32 percent.
f. Density: 8.70 lbs per gal (1.04 s.g.).
g. US Regulatory VOC: 100 g/L.
h. Gloss Level: N/A.
i. Odor: Non-offending.
j. Clarity: Clear when dry.
k. Leveling: Excellent.
l. Defoaming: Excellent.
m. Drying Time: Approximately 1-2 hours (high humidity and/or low temperature conditions will extend the drying time).
n. Stability: 1-year shelf life in unopened container.
2.3 PAINT
A. Court Sport Floor Paint:
1. Product: Bona CourtLines Sport Floor Paint as manufactured by Bona US.
a. Ingredients: Alkyd resins, odorless mineral spirits, pigments, driers, titanium dioxide.
b. Base Colors: Red, yellow, green, lt. blue, dark blue, orange, brown, black, white, gold, maroon, purple, lt. beige, gray, NC blue. Refer to drawings and finish schedule.
c. Odor: Non-offending low odor.
d. Solids: Colors - 47-51 percent; White - 66 percent.
e. Flash Point: 100 degrees F (TCC).
f. Density: Colors - 7.6 to 7.9 lbs./gallon; White - 11.1 lbs./gallon.
g. US Regulatory VOC: Does not exceed 490 g/L.
h. Stability: 2-year shelf life in unopened container
i. Color: Light Blue.
j. Color: Red.
k. Color: Green.
l. Color: White.
m. Color: Black.
n. Color: Orange.
o. Color: Dark Blue.
p. Color: Yellow.
q. Color: Brown.
r. Color: Purple.
s. Color: Gold.
t. Color: Maroon.
u. Color: Grey.
November 8, 2024
HARDWOOD SPORT FLOOR FINISHING AND MAINTENANCE 09 9310 - 4
v. Color: Light Beige.
w. Color: NC Blue.
2. Product: Bona SuperSport Paint
a. Ingredients: Polymer, Water, Dipropylene glycol n butyl ether, Dipropylene glycol monoethyl ether, and Pigments.
b. Odor: Non-offending low odor.
c. Solids: Colors: 32 - 46 percent.
d. Density: Colors: 8.8-10.2 lbs./gallon; White: 9.9 lbs./gallon.
e. US Regulatory VOC: Does not exceed 150 g/L.
f. Stability: 18 months shelf life in unopened container.
g. Drying Time: 3-4 hours before coating with waterborne finish, 12-16 hours for oil-modified. A second coat of paint can be applied within 30- 90 minutes.
h. Color: Light Beige.
i. Color: Black.
j. Color: Dark Blue.
k. Color: League Blue.
l. Color: NC Blue.
m. Color: Brown.
n. Color: Gold.
o. Color: Gray.
p. Color: Green.
q. Color: Light Green.
r. Color: Maroon.
s. Color: Orange.
t. Color: Purple.
u. Color: Red.
v. Color: White.
w. Color: Yellow.
x. Color: Light Yellow.
B. Stains:
1. System: Bona DriFast Stain.
a. Ingredients: Wood tones: Oil-modified resins, mineral spirits (solvent), pigments, driers. White: Oil-modified resins, mineral spirits (solvent), titanium dioxide, fillers.
b. Colors: Wood tones: Natural, Golden Oak, Nutmeg, Early American, Provincial, Special Walnut, Rosewood, Red Mahogany, Jacobean, Graphite, Medium Brown, Antique Brown, Puritan Pine, Cherry, Sedona Red, Spice Brown, Grey, Ebony, Bark, Cocoa, Driftwood, Birch, Aged Pewter, Twig and Sand Dune.
c. Pastel: White (Not recommended on white oak due to excessive color variation).
d. Solids: 5-47 percent
e. Density: Wood tones: 7.2-7.5 lbs.s/gallon (0.86-0.90 s.g.), White: 8.7-9.0 lbs.s/gallon (1.04-1.8 s.g.)
f. US Regulatory VOC: 550 g/L
November 8, 2024
HARDWOOD SPORT FLOOR FINISHING AND MAINTENANCE 09 9310 - 5
g. Odor: Mild solvent odor
h. Stability: Two-year shelf life in unopened container
i. Flashpoint: 116.6 degrees F (47 degrees C)
j. Clarity: Semi-transparent (dry)
k. Drying Time: 2 hours for wood tones, 6 hours minimum for white and
12-18 hours for Ebony, Spice Brown, Bark and Cocoa under ideal conditions of 60 degrees - 80 degrees F (16 degrees - 27 degrees C) with 35-75 percent relative humidity.
2. Product: Bona DriFast Stain - Metropolitan.
3. Product: Bona DriFast Stain - Classic.
4. Product: Bona DriFast Stain - Essentials.
5. Product: Bona DriFast Stain - Naturals.
C. Tints and Blends:
1. Contact manufacturer.
D. Color Blend Formulas. Contact your Bona Sale Representative or email Paint.Request@bona.com.
2.4 SPORT FLOOR MAINTENANCE
A. Floor Cleaners:
1. Product: Bona SuperCourt Cleaner.
a. Leaves no residue.
b. Safe for wood floors.
c. Specifically designed for gym floor cleaning/auto scrubber.
d. Tilt-n-Measure for easy use.
e. Concentrated 1:128.
B. Accessories:
1. Bona SuperCourt Athletic Floor Care System
2. Bona SuperCourt Athletic Floor Care Microfiber Scrubbing Pads.
3. Bona SuperCourt Athletic Floor Care Microfiber Dry Dusting Pads.
4. Bona SuperCourt Athletic Floor Care Microfiber Wet Cleaning Pads.
5. Bona SuperCourt Dispensing Unit.
C. Sport Cleaner Concentrate:
1. Product: Bona Pro Series Hardwood Cleaner Concentrate as manufactured by
Bona US.
a. Ingredients: Water, glycol ether solvents, non-ionic and anionic surfactants.
b. Color: Light purple (wet).
c. pH: 7.0 to 8.0.
d. Solids: Less than 1 percent.
e. Density: 8.34 lbs per gal (1.0 s.g.).
f. VOC: Less than 1 percent.
g. Odor: Non-Offending.
November 8, 2024
HARDWOOD SPORT FLOOR FINISHING AND MAINTENANCE 09 9310 - 6
D. Prep System and Recoat Optimizer:
1. Product: Bona Prep as manufactured by Bona US.
a. Ingredients: Surfactants, Dipropylene Glycol Monomethyl Ether, Ethylene Glycol Monobutyl Ether, water, other proprietary ingredients.
b. Color: Amber (wet).
c. Clarity: Negligible residue (dry).
d. pH: 7.0 to 8.0.
e. Solids: Less than 1 percent.
f. Density: 8.32 lbs./gallon (1.0 S.G.).
g. VOC: Less than 2 percent.
h. Odor: Light antiseptic.
PART 3 EXECUTION
3.1 MANUFACTURER'S INSTRUCTIONS
A. Comply with the instructions and recommendations of the floor finish system manufacturer.
B. For new installation of floors, use only in structures with humidity and temperature controls. Do not use over channel and clip floor systems in environments not controlled for temperature and humidity.
3.2 EXAMINATION
A. Do not begin installation until substrates have been properly prepared.
B. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding.
3.3 PREPARATION
A. Protection: Protect adjacent finish surface to prevent damage during sanding and sport floor system application.
B. Surface Preparation:
1. Sand and prepare floor using MFMA accepted methods.
2. For Sport Poly 350 oil modified system, make final sanding cut to 100 - 120 grit paper. Screen with 100 - 120 grit screen.
3. For Sport Poly 275 oil modified system, make final sanding cut to 100 - 120 grit paper. Screen with 100 - 120 grit screen.
4. For SuperSport waterborne system, make final cut with 100 - 120 grit sandpaper and screen to 120 - 150 grit.
5. Vacuum thoroughly.
6. For Sport Poly 350, tack with mineral spirits.
7. For Sport Poly 275, tack with mineral spirits, a slightly damp Bona SuperCourt
Microfiber Wet Tacking Pad, or a dry Bona SuperCourt Microfiber Tacking Pad
November 8, 2024
HARDWOOD SPORT FLOOR FINISHING AND MAINTENANCE 09 9310 - 7
8. For SuperSport, tack with slightly water dampened Bona Mop or cloth.
3.4 APPLICATION
A. Specific application methods vary with product. Consult manufacturer and comply fully with manufacturer's application recommendations.
1. Before using these products, read and understand all directions and the
Material Safety Data Sheets (MSDS).
2. Shake well before using.
3. Do not thin products.
4. Keep from freezing.
B. Finish System: As scheduled or indicated on the drawings.
1. 4-coat system, 2 to 3 coats of a sport sealer, court lines paint (where scheduled or indicated) and 3 to 4 coats of a sport court finish.
3.5 PROTECTION
A. After application, protect floor finish from damage during subsequent work.
B. Do not allow foot traffic until floor is sufficiently dried and cured.
END OF SECTION
ALPHAPERF® V-FACED METAL ACOUSTICAL WALL PANELS 09 8400 - 1
SECTION 09 8400 - ALPHAPERF® V-FACED METAL ACOUSTICAL WALL PANELS
PART 1 GENERAL
A. Sound Absorptive Wall Panels B. Miscellaneous Accessories
1.2 REFERENCES
A. ASTM International:
1. ASTM C423 Standard Test Method for Sound Absorption and Sound Absorption Coefficients by the…
This is the start of the file's text. The full file is on GovTribe.