LH_VOLUME 03_Revised_RTA_2023-03-01.pdf

PDF 23 MB Posted

Attached to
LINCOLN HALL RENOVATION, BLDG. 607 Federal contract opportunity
Solicitation number
W912DS
Issued by
Department of the Army Corps of Engineers Engineering District New York

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 2 3 4 5

D

C

B

A

US Army Corps of Engineers ®

USMA BUILDING 607 LINCOLN HALL RENOVATION

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

CIVIL LANDSCAPE STRUCTURAL ARCHITECTURE INTERIORS

FIRE PROTECTION

LIFE SAFTEY

PLUMBING

MECHANICAL

ELECTRICAL

TELECOM

SECURITY

HAZMAT

NO SEAL

SHEETS ARE FOR

BIDDING AND

INFORMATION

ONLY

D3296400

REVISED RTA SUBMISSION

03/01/2023

ISSUE DATE: 01 MARCH 2023

WEST POINT, NY

CONTRACT NUMBER : W912DS-19-C-0031-L

SOLICITATION NUMBER : W912DS-19-R-0014

G-031

C O

V E

R S

H E

E T

V

O L U

M E

T H

R E

E

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

A F

L O

R A

A F

L O

R A

D M

A N

T Y

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

VOLUME THREE

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

G-032

IN

D

E X

O F

D R

A W

IN

G

S

V O

L U

M E

O N

E A

N D

T W

O

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

A F

L O

R A

A F

L O

R A

D M

A N

T Y

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

REVISED RTA SUBMISSION 03/01/2023

NUMBER DRAWING NAME

LIFE SAFETY

LS001 LIFE SAFETY CODE SUMMARY

LS101 LEVEL B3 FLOOR PLAN - LIFE SAFETY

LS102 LEVEL B2 FLOOR PLAN - LIFE SAFETY

LS103 LEVEL B1 FLOOR PLAN - LIFE SAFETY

LS104 LEVEL 1 FLOOR PLAN - LIFE SAFETY

LS105 LEVEL 2 FLOOR PLAN - LIFE SAFETY

LS106 LEVEL 3 FLOOR PLAN - LIFE SAFETY

LS107 LEVEL 4 FLOOR PLAN - LIFE SAFETY

HAZARDOUS

H-101 LEVEL B3 HAZMAT PLAN

H-102 LEVEL B2 HAZMAT PLAN

H-103 LEVEL B1 HAZMAT PLAN

H-104 LEVEL 1 HAZMAT PLAN

H-105 LEVEL 2 HAZMAT PLAN

H-106 LEVEL 3 HAZMAT PLAN

H-107 LEVEL 4 HAZMAT PLAN

CIVIL

C-001 GENERAL NOTES

C-002 GENERAL NOTES, LEGEND, AND ABBREVIATIONS

BB501 SOIL BORING LOG

C-101 EXISTING CONDITIONS PLAN

CD101 DEMOLITION PLAN

CS101 SITE PLAN

CS102 TRUCK ACCESS PLAN

CS103 CONSTRUCTION LOGISTICS PLAN

CG101 GRADING AND DRAINAGE PLAN

CG102 SOIL EROSION PLAN

CU101 UTILITY PLAN

C-201 DRAINAGE PROFILE

C-501 CONSTRUCTION DETAILS

C-502 CONSTRUCTION DETAILS

C-503 CONSTRUCTION DETAILS

C-504 CONSTRUCTION DETAILS

C-505 CONSTRUCTION DETAILS

C-506 CONSTRUCTION DETAILS

LANDSCAPE

L-101 LANDSCAPE PLAN

L-501 LANDSCAPE DETAILS

L-502 LANDSCAPE DETAILS

STRUCTURAL

S-001 GENERAL STRUCTURAL NOTES

S-002 STRUCTURAL ABBREVIATIONS, SYMBOLS, LEGEND

S-010 LOAD PLANS

S-011 SNOW AND WIND LOADING PLANS

SD101 LEVEL B3 DEMOLITION PLAN

SD102 LEVEL B2 DEMOLITION PLAN

SD103 LEVEL B1 DEMOLITION PLAN

SD104 LEVEL 1 DEMOLITION PLAN

SD105 LEVEL 2 DEMOLITION PLAN

SD106 LEVEL 3 DEMOLITION PLAN

SD107 LEVEL 4/ROOF DEMOLITION PLAN - SOUTH WING

SD108 ROOF DEMOLITION PLAN - NORTH WING AND TOWER

SD401 LARGE SCALE VIEWS

SD402 LARGE SCALE VIEWS

S-101 LEVEL B3 FLOOR PLAN

S-102 LEVEL B2 FLOOR PLAN

S-103 LEVEL B1 FLOOR PLAN

S-104 LEVEL1 FLOOR PLAN

S-105 LEVEL2 FLOOR PLAN

S-106 LEVEL3 FLOOR PLAN

S-107 LEVEL 4/ROOF PLAN - SOUTH WING

S-108 ROOF PLAN - NORTH WING AND TOWER

S-201 ELEVATIONS

S-401 LARGE SCALE VIEWS

S-402 LARGE SCALE VIEWS

S-403 LARGE SCALE VIEWS

S-404 LARGE SCALE VIEWS

S-501 TYPICAL DETAILS - FOUNDATIONS, WALLS, SLABS-ON-GRADE, SLABS

S-502 TYPICAL DETAILS - DEVELOPMENT LENGTHS, POST-INSTALLED ANCHORS, STEEL BEAMS

S-503 TYPICAL DETAILS - STEEL BEAMS AND LINTELS

S-504 TYPICAL DETAILS - STEEL BEAMS AND LINTELS

S-505 TYPICAL DETAILS - STEEL DETAILS

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

INDEX OF DRAWINGS - VOLUME ONE INDEX OF DRAWINGS - VOLUME TWO

NUMBER DRAWING NAME

A-511 EXTERIOR DETAILS

A-512 EXTERIOR DETAILS

A-513 EXTERIOR DETAILS

A-514 EXTERIOR DETAILS

A-521 WINDOW DETAILS

A-522 WINDOW DETAILS

A-523 WINDOW DETAILS

A-531 ROOF DETAILS

A-532 ROOF DETAILS

A-533 STAIR TOWER ATTIC ACCESS DETAILS

A-541 EXTERIOR GUARDRAIL AND HANDRAIL DETAILS

A-542 RETAIL STORE STAIR DETAILS

A-543 RETAIL STORE STAIR DETAILS

A-545 INTERIOR STAIR DETAILS

A-546 INTERIOR STAIR DETAILS

A-551 CEILING DETAILS

A-552 TV STUDIO CEILING AND PARTITION DETAILS

A-553 TV STUDIO CEILING DETAILS

A-554 TV STUDIO CEILING DETAILS

A-561 MILLWORK DETAILS - CAFE

A-562 MILLWORK DETAILS - BRIEFING ROOM

A-563 MILLWORK DETAILS - TYPICAL

A-564 MILLWORK DETAILS - TYPICAL

A-601 PARTITION TYPES

A-602 PARTITION TYPES

A-604 DOOR SCHEDULE AND DETAILS

A-605 DOOR SCHEDULE AND DETAILS

A-606 GLAZED PARTITION AND DOOR DETAILS

A-607 DOOR DETAILS

A-608 DOOR DETAILS

A-609 EXTERIOR DOOR DETAILS

A-610 EXTERIOR DOOR DETAILS

A-615 WINDOW TYPES AND SCHEDULE

A-620 INTERIOR ALUMINUM FRAME SYSTEM

A-621 INTERIOR ALUMINUM FRAME SYSTEM

A-901 EXTERIOR RESTORATION ELEVATIONS

A-902 EXTERIOR RESTORATION ELEVATIONS

A-903 EXTERIOR RESTORATION ELEVATIONS

A-904 EXTERIOR RESTORATION ELEVATIONS

A-905 EXTERIOR RESTORATION ELEVATIONS

A-906 EXTERIOR RESTORATION ELEVATIONS

A-907 EXTERIOR RESTORATION ELEVATIONS

ARCHITECTURAL SIGNAGE

AG001 SITE SIGNAGE PLAN

AG101 LEVEL B3 FLOOR PLAN -SIGNAGE

AG102 LEVEL B2 FLOOR PLAN - SIGNAGE

AG103 LEVEL B1 FLOOR PLAN - SIGNAGE

AG104 LEVEL 1 FLOOR PLAN - SIGNAGE

AG105 LEVEL 2 FLOOR PLAN - SIGNAGE

AG106 LEVEL 3 FLOOR PLAN - SIGNAGE

AG107 LEVEL 4 FLOOR PLAN - SIGNAGE

AG201 SIGNAGE - EXTERIOR SIGN ELEVATIONS

AG202 SIGNAGE - INTERIOR SIGN ELEVATIONS

AG203 SIGNAGE - INTERIOR SIGN ELEVATIONS

AG501 SIGNAGE LAYOUTS

AG502 SIGNAGE LAYOUTS

AG601 SIGNAGE SCHEDULE

INTERIOR

I-101 LEVEL B3 FLOOR PLAN - FINISH

I-102 LEVEL B2 FLOOR PLAN - FINISH

I-103 LEVEL B1 FLOOR PLAN - FINISH

I-104 LEVEL 1 FLOOR PLAN - FINISH

I-105 LEVEL 2 FLOOR PLAN - FINISH

I-106 LEVEL 3 FLOOR PLAN - FINISH

I-107 LEVEL 4 FLOOR PLAN - FINISH

I-111 LEVEL B3 FLOOR PLAN - FURNITURE

I-112 LEVEL B2 FLOOR PLAN - FURNITURE

I-113 LEVEL B1 FLOOR PLAN - FURNITURE

I-114 LEVEL 1 FLOOR PLAN - FURNITURE

I-115 LEVEL 2 FLOOR PLAN - FURNITURE

I-116 LEVEL 3 FLOOR PLAN - FURNITURE

I-117 LEVEL 4 FLOOR PLAN - FURNITURE

I-400 ENLARGED FINISH FLOOR PLANS - CORRIDORS

I-401 ENLARGED FINISH FLOOR PLANS - CORRIDORS, CAFE, RESTROOMS

I-402 ENLARGED FINISH FLOOR PLANS - RETAIL STORE, CORRIDOR

I-403 ENLARGED FINISH FLOOR PLANS - CORRIDORS

I-404 ENLARGED FINISH FLOOR PLANS - CENTRAL STAIR

I-405 ENLARGED FINISH FLOOR PLANS - CENTRAL STAIR, BREAK ROOMS

I-406 ENLARGED FINISH FLOOR PLANS - PHOTO STUDIO

I-500 INTERIOR DETAILS

I-501 INTERIOR DETAILS

I-600 COLOR MATERIAL LEGEND

I-601 COLOR MATERIAL LEGEND

I-602 FINISH MATERIAL SCHEDULE

I-603 FINISH MATERIAL SCHEDULE

I-604 FINISH MATERIAL SCHEDULE

NUMBER DRAWING NAME

ARCHITECTURAL

A-001 ABBREVIATIONS, MOUNTING HEIGHTS, AND SYMBOLS

AD101 LEVEL B3 DEMOLITION PLAN

AD102 LEVEL B2 DEMOLITION PLAN

AD103 LEVEL B1 DEMOLITION PLAN

AD104 LEVEL 1 DEMOLITION PLAN

AD105 LEVEL 2 DEMOLITION PLAN

AD106 LEVEL 3 DEMOLITION PLAN

AD107 LEVEL 4 DEMOLITION PLAN

AD108 ROOF DEMOLITION PLAN

A-101 LEVEL B3 FLOOR PLAN

A-102 LEVEL B2 FLOOR PLAN

A-103 LEVEL B1 FLOOR PLAN

A-104 LEVEL 1 FLOOR PLAN

A-105 LEVEL 2 FLOOR PLAN

A-106 LEVEL 3 FLOOR PLAN

A-107 LEVEL 4 FLOOR PLAN

A-108 ROOF PLAN

A-111 LEVEL B3 REFLECTED CEILING PLAN

A-112 LEVEL B2 REFLECTED CEILING PLAN

A-113 LEVEL B1 REFLECTED CEILING PLAN

A-114 LEVEL 1 REFLECTED CEILING PLAN

A-115 LEVEL 2 REFLECTED CEILING PLAN

A-116 LEVEL 3 REFLECTED CEILING PLAN

A-117 LEVEL 4 REFLECTED CEILING PLAN

A-201 SOUTH WING ELEVATIONS

A-202 SOUTH WING ELEVATIONS

A-203 NORTH WING AND TOWER ELEVATIONS

A-204 NORTH WING AND TOWER ELEVATIONS

A-205 ENLARGED ELEVATIONS - PENTHOUSE AND SALLY PORT

A-206 ENLARGED EXTERIOR ELEVATIONS, RETAINING WALLS

A-211 EXTERIOR WALL TYPICAL CONDITION PHOTOS

A-212 EXTERIOR WALL TYPICAL CONDITIONS PHOTOS

A-301 SOUTH WING BUILDING SECTION

A-302 SOUTH AND NORTH WING BUILDING SECTIONS

A-303 NORTH WING BUILDING SECTIONS

A-311 PARTIAL BUILDING SECTIONS

A-321 EXTERIOR WALL/ROOF SECTIONS PENTHOUSE

A-322 SHAFT SECTIONS

A-401 ENLARGED RESTROOM FLOOR PLANS

A-402 LEVEL B2 - ENLARGED CENTRAL STAIR FLOOR PLANS

A-403 LEVEL 1 AND 2 - ENLARGED CENTRAL STAIR FLOOR PLANS

A-404 LEVEL 3 AND 4 - ENLARGED CENTRAL STAIR FLOOR PLANS

A-405 ENLARGED CENTRAL STAIR RCPS

A-406 INTERIOR STAIRS ENLARGED PLANS & SECTIONS

A-407 ELEVATOR FLOOR PLANS, SECTIONS AND ELEVATIONS

A-411 CENTRAL STAIR TOWER SECTIONS/ELEVATIONS

A-412 CENTRAL STAIR LOBBY ELEVATIONS

A-413 CENTRAL STAIR LOBBY ELEVATIONS

A-414 CENTRAL STAIR LOBBY ELEVATIONS

A-415 CENTRAL STAIR LOBBY ELEVATIONS

A-421 CAFE ENLARGED PLANS AND ELEVATIONS

A-423 RETAIL STORE ENLARGED PLANS

A-424 RETAIL STORE ENLARGED PLANS

A-425 RETAIL STORE ELEVATIONS

A-426 RETAIL STORE ELEVATIONS AND DETAILS

A-427 RETAIL STORE DISPLAY WINDOW ELEVATIONS

A-428 RETAIL STORE PERSPECTIVE VIEWS AND DETAILS

A-429 ENLARGED BRIEFING ROOM PLANS AND ELEVATIONS

A-430 ENLARGED TV STUDIO PLANS

A-431 ENLARGED TV STUDIO SECTIONS/ELEVATIONS

A-432 INTERIOR ELEVATIONS - TV STUDIO

A-433 ENLARGED BREAK ROOM PLANS AND ELEVATIONS

A-434 ENLARGED CONFERENCE ROOM PLANS AND ELEVATIONS

A-435 ENLARGED CONFERENCE ROOM PLANS AND ELEVATIONS

A-436 OPEN OFFICE ENLARGED EXTERIOR WALL ELEVATIONS

A-437 OPEN OFFICE ENLARGED EXTERIOR WALL ELEVATIONS

A-439 ENLARGED PHOTO STUDIO PLANS AND ELEVATIONS

A-440 ENLARGED CHANGING ROOM PLANS AND ELEVATIONS

NUMBER DRAWING NAME

GENERAL

G-011 COVER SHEET - VOLUME ONE

G-012 INDEX OF DRAWINGS - VOLUME ONE AND TWO

G-013 INDEX OF DRAWINGS - VOLUME THREE AND FOUR

NUMBER DRAWING NAME

GENERAL

G-021 COVER SHEET - VOLUME TWO

G-022 INDEX OF DRAWINGS - VOLUME ONE AND TWO

G-023 INDEX OF DRAWINGS - VOLUME THREE AND FOUR

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

G-033

IN

D

E X

O F

D R

A W

IN

G

S

V O

L U

M E

T H

R E

E A

N D

F O

U R

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

A F

L O

R A

A F

L O

R A

D M

A N

T Y

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

REVISED RTA SUBMISSION 03/01/2023

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

NUMBER DRAWING NAME

MECHANICAL

M-001 HVAC LEGEND

M-002 HVAC LEGEND

MD101 LEVEL B3 DEMOLITION PLAN - HVAC

MD102 LEVEL B2 DEMOLITION PLAN - HVAC

MD103 LEVEL B1 DEMOLITION PLAN - HVAC

MD104 LEVEL 1 DEMOLITION PLAN - HVAC

MD105 LEVEL 2 DEMOLITION PLAN - HVAC

MD106 LEVEL 3 DEMOLITION PLAN - HVAC

MD107 LEVEL 4 DEMOLITION PLAN - HVAC

MD108 ROOF DEMOLITION PLAN - HVAC

MH101 LEVEL B3 FLOOR PLAN - DUCTWORK

MH102 LEVEL B2 FLOOR PLAN - DUCTWORK

MH103 LEVEL B1 FLOOR PLAN - DUCTWORK

MH104 LEVEL 1 FLOOR PLAN - DUCTWORK

MH105 LEVEL 2 FLOOR PLAN - DUCTWORK

MH106 LEVEL 3 FLOOR PLAN - DUCTWORK

MH107 LEVEL 4 FLOOR PLAN - DUCTWORK

MH108 ROOF PLAN - DUCTWORK

MP101 LEVEL B3 FLOOR PLAN - PIPING

MP102 LEVEL B2 FLOOR PLAN - PIPING

MP103 LEVEL B1 FLOOR PLAN - PIPING

MP104 LEVEL 1 FLOOR PLAN - PIPING

MP105 LEVEL 2 FLOOR PLAN - PIPING

MP106 LEVEL 3 FLOOR PLAN - PIPING

MP107 LEVEL 4 FLOOR PLAN - PIPING

MP108 ROOF PLAN - PIPING

M-301 MECHANICAL SECTIONS - HVAC SHAFTS

M-302 MECHANICAL SECTIONS

M-303 MECHANICAL SECTIONS

M-401 HVAC ENLARGED PLANS

M-402 HVAC ENLARGED PLANS

M-501 HVAC DETAILS

M-502 HVAC DETAILS

M-503 HVAC DETAILS

M-504 HVAC DETAILS

M-505 HVAC DETAILS

M-506 HVAC DETAILS

M-507 HVAC DETAILS

M-601 HVAC SCHEDULES

M-602 HVAC SCHEDULES

M-603 HVAC SCHEDULES

M-604 HVAC SCHEDULES

M-605 HVAC SCHEDULES

M-701 STEAM AND HOT WATER FLOW DIAGRAM

M-702 CHILLED WATER FLOW DIAGRAMS - CAMPUS CHW AND CHILLED BEAM LOOP

M-703 HYDRONIC FLOW DIAGRAM - LEVEL B2 AND B3

M-704 HYDRONIC FLOW DIAGRAM - LEVEL B1

M-705 HYDRONIC FLOW DIAGRAM - LEVEL 1

M-706 HYDRONIC FLOW DIAGRAM - LEVEL 2

M-707 HYDRONIC FLOW DIAGRAM - LEVEL 3

M-708 HYDRONIC FLOW DIAGRAM - LEVEL 4 AND ROOF

M-709 AIRFLOW RISER DIAGRAM - DOAS-1

M-710 AIRFLOW RISER DIAGRAM - DOAS-2

M-711 AIRFLOW RISER DIAGRAM - MAU-1

M-801 CONTROL SCHEMATIC SYMBOLS, ABBREVIATIONS AND ACRONYMS

M-802 HVAC CONTROL DIAGRAM

M-803 HVAC CONTROL DIAGRAM

M-804 HVAC CONTROL DIAGRAM

M-805 HVAC CONTROL DIAGRAM

M-806 HVAC CONTROL DIAGRAM

M-807 HVAC CONTROL DIAGRAM

M-808 HVAC CONTROL DIAGRAM

M-809 HVAC CONTROL DIAGRAM

M-810 HVAC CONTROL DIAGRAM

M-811 HVAC CONTROL DIAGRAM

M-812 HVAC CONTROL DIAGRAM

M-813 HVAC CONTROL DIAGRAM

M-814 HVAC CONTROL DIAGRAM

M-815 HVAC CONTROL DIAGRAM

M-816 HVAC CONTROL DIAGRAM

M-817 HVAC CONTROL DIAGRAM

M-818 HVAC CONTROL DIAGRAM

M-819 HVAC CONTROL DIAGRAM

M-820 HVAC CONTROL DIAGRAM

M-821 HVAC CONTROL DIAGRAM

M-822 HVAC CONTROL DIAGRAM

M-823 HVAC CONTROL DIAGRAM

M-824 HVAC CONTROL POINTS SCHEDULE

M-825 HVAC CONTROL POINTS SCHEDULE

M-826 HVAC CONTROL POINTS SCHEDULE

M-827 HVAC CONTROL POINTS SCHEDULE

M-828 HVAC CONTROL POINTS SCHEDULE

M-829 HVAC CONTROL POINTS SCHEDULE

M-830 HVAC CONTROL POINTS SCHEDULE

M-831 HVAC CONTROL POINTS SCHEDULE

M-832 HVAC CONTROL POINTS SCHEDULE

M-833 HVAC CONTROL POINTS SCHEDULE

M-834 HVAC CONTROL POINTS SCHEDULE

M-835 HVAC CONTROL POINTS SCHEDULE

M-836 HVAC CONTROL POINTS SCHEDULE

M-837 HVAC CONTROL POINTS SCHEDULE

M-838 HVAC CONTROL POINTS SCHEDULE

M-839 HVAC CONTROL POINTS SCHEDULE

M-840 HVAC CONTROL POINTS SCHEDULE

M-841 HVAC CONTROL POINTS SCHEDULE

M-842 HVAC CONTROL POINTS SCHEDULE

M-843 HVAC CONTROL POINTS SCHEDULE

M-844 HVAC CONTROL POINTS SCHEDULE

M-845 UMCS SCHEDULES

M-846 THERMOSTAT SCHEDULE

M-847 THERMOSTAT SCHEDULE

M-848 VALVE & DAMPER SCHEDULES

NUMBER DRAWING NAME

FIRE ALARM

FA001 FIRE ALARM - SYMBOLS, ABBREVIATIONS, GENERAL NOTES, AND MASS NOTIFICATION

FD101 LEVEL B3 DEMOLITION PLAN - FIRE ALARM

FD102 LEVEL B2 DEMOLITION PLAN - FIRE ALARM

FD103 LEVEL B1 DEMOLITION PLAN - FIRE ALARM

FD104 LEVEL 1 DEMOLITION PLAN - FIRE ALARM

FD105 LEVEL 2 DEMOLITION PLAN - FIRE ALARM

FD106 LEVEL 3 DEMOLITION PLAN - FIRE ALARM

FD107 LEVEL 4 DEMOLITION PLAN - FIRE ALARM

FA101 LEVEL B3 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION

FA102 LEVEL B2 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION

FA103 LEVEL B1 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION

FA104 LEVEL 1 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION

FA105 LEVEL 2 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION

FA106 LEVEL 3 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION

FA107 LEVEL 4 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION

FA108 ROOF PLAN - FIRE ALARM PLAN AND MASS NOTIFICATION

FA701 FIRE ALARM AND MASS NOTIFICATION DETAILS

FA702 FIRE ALARM AND MASS NOTIFICATION DETAILS

FA703 FIRE ALARM AND MASS NOTIFICATION DETAILS

FIRE SUPPRESSION

FX001 FIRE SUPPRESSION - SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES

FD111 LEVEL B3 DEMOLITION PLAN - FIRE SUPPRESSION

FD112 LEVEL B2 DEMOLITION PLAN - FIRE SUPPRESSION

FD113 LEVEL B1 DEMOLITION PLAN - FIRE SUPPRESSION

FD114 LEVEL 1 DEMOLITION PLAN - FIRE SUPPRESSION

FD115 LEVEL 2 DEMOLITION PLAN - FIRE SUPPRESSION

FD116 LEVEL 3 DEMOLITION PLAN - FIRE SUPPRESSION

FD117 LEVEL 4 DEMOLITION PLAN - FIRE SUPRESSION

FX101 LEVEL B3 FLOOR PLAN - FIRE SUPPRESSION

FX102 LEVEL B2 FLOOR PLAN - FIRE SUPPRESSION

FX103 LEVEL B1 FLOOR PLAN - FIRE SUPPRESSION

FX104 LEVEL 1 FLOOR PLAN - FIRE SUPPRESSION

FX105 LEVEL 2 FLOOR PLAN - FIRE SUPPRESSION

FX106 LEVEL 3 FLOOR PLAN - FIRE SUPPRESSION

FX107 LEVEL 4 FLOOR PLAN - FIRE SUPPRESSION

FX108 ROOF PLAN - FIRE SUPPRESSION PLAN

FX501 FIRE SUPPRESSION DETAILS

FX502 FIRE SUPPRESSION DETAILS

PLUMBING

P-001 PLUMBING ABBREVIATIONS, SYMBOLS AND GENERAL NOTES

PD101 LEVEL B3 DEMOLITION PLAN - PLUMBING

PD102 LEVEL B2 DEMOLITION PLAN - PLUMBING

PD103 LEVEL B1 DEMOLITION PLAN - PLUMBING

PD104 LEVEL 1 DEMOLITION PLAN - PLUMBING

PD105 LEVEL 2 DEMOLITION PLAN - PLUMBING

PD106 LEVEL 3 DEMOLITION PLAN - PLUMBING

PD107 LEVEL 4 DEMOLITION PLAN - PLUMBING

PD108 ROOF DEMOLITION PLAN - PLUMBING

P-101 LEVEL B3 FLOOR PLAN - PLUMBING

P-102 LEVEL B2 FLOOR PLAN - PLUMBING

P-103 LEVEL B1 FLOOR PLAN - PLUMBING

P-104 LEVEL 1 FLOOR PLAN - PLUMBING

P-105 LEVEL 2 FLOOR PLAN - PLUMBING

P-106 LEVEL 3 FLOOR PLAN - PLUMBING

P-107 LEVEL 4 FLOOR PLAN - PLUMBING

P-108 ROOF PLAN - PLUMBING

P-401 TOILET ENLARGED PLANS

P-402 TOILET ENLARGED PLANS

P-403 ENLARGED PLANS

P-501 PLUMBING DETAILS

P-502 PLUMBING DETAILS

P-503 PLUMBING DETAILS

P-604 SCHEDULES

P-701 DOMESTIC WATER RISER DIAGRAMS

P-702 SANITARY AND VENT RISER DIAGRAMS

P-703 STORM WATER RISER DIAGRAMS

INDEX OF DRAWINGS - VOLUME THREE INDEX OF DRAWINGS - VOLUME FOUR

NUMBER DRAWING NAME

TELECOMMUNICATIONS

T-001 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

TD101 LEVEL B3 COMMUNICATION DEMOLITION PLAN

TD102 LEVEL B2 COMMUNICATIONS DEMOLITION PLAN

TD103 LEVEL B1 COMMUNICATIONS DEMOLITION PLAN

TD104 LEVEL 1 - COMMUNICATIONS DEMOLITION PLAN

TD105 LEVEL 2 - COMMUNICATIONS DEMOLITION PLAN

TD106 LEVEL 3 - COMMUNICATIONS DEMOLITION PLAN

TD107 LEVEL 4 - COMMUNICATIONS DEMOLITION PLAN

TS101 PARTIAL TELECOM SITE PLAN

TS102 PARTIAL TELECOM SITE PLAN

T-101 LEVEL B3 FLOOR PLAN - COMMUNICATIONS

T-102 LEVEL B2 FLOOR PLAN - COMMUNICATIONS

T-103 LEVEL B1 FLOOR PLAN - COMMUNICATIONS

T-104 LEVEL 1 FLOOR PLAN - COMMUNICATIONS

T-105 LEVEL 2 FLOOR PLAN - COMMUNICATIONS

T-106 LEVEL 3 FLOOR PLAN - COMMUNICATIONS

T-107 LEVEL 4 FLOOR PLAN - COMMUNICATIONS

TY101 LEVEL B3 FLOOR PLAN - SECURITY

TY102 LEVEL B2 FLOOR PLAN - SECURITY

TY103 LEVEL B1 FLOOR PLAN - SECURITY

TY104 LEVEL 1 FLOOR PLAN - SECURITY

TY105 LEVEL 2 FLOOR PLAN - SECURITY

TY106 LEVEL 3 FLOOR PLAN - SECURITY

TY107 LEVEL 4 FLOOR PLAN - SECURITY

TY501 SECURITY DOOR AND CAMERA DETAILS

TY601 SECURITY PATHWAY DIAGRAM

T-201 RACK ELEVATIONS

T-202 RACK ELEVATIONS

T-203 RACK ELEVATIONS

T-204 RACK ELEVATIONS

T-401 ENLARGED TELECOM ROOM PLANS

T-402 ENLARGED TELECOM ROOM PLANS

T-403 ENLARGED TELECOM ROOM PLANS

T-404 ENLARGED TELECOM ROOM PLANS

T-501 COMMUNICATIONS OUTLET DETAILS

T-502 COMMUNICATIONS DETAILS

T-503 GROUNDING AND BONDING DETAILS

T-504 CABLE TRAY DETAILS

T-600 VOICE AND DATA OSP ONE-LINE DIAGRAM

T-601 NIPR VOICE AND DATA ONE-LINE DIAGRAM

T-602 WREN AND WAP DATA ONE-LINE DIAGRAM

T-603 F-DAS, C-DAS AND CLOCK ONE-LINE DIAGRAM

T-604 TELECOM BONDING AND GROUNDING ONE-LINE DIAGRAM

NUMBER DRAWING NAME

ELECTRICAL

E-001 GENERAL NOTES, AND ABBREVIATIONS

E-002 SYMBOLS

ED100 SITE DEMOLITION PLAN

ED101 LEVEL B3 DEMOLITION PLAN

ED102 LEVEL B2 DEMOLITION PLAN

ED103 LEVEL B1 DEMOLITION PLAN

ED104 LEVEL 1 DEMOLITION PLAN

ED105 LEVEL 2 DEMOLITION PLAN

ED106 LEVEL 3 DEMOLITION PLAN

ED107 LEVEL 4 DEMOLITION PLAN

ED108 ROOF DEMOLITION PLAN

ED601 DEMOLITION - RISER DIAGRAM

EL101 LEVEL B3 LIGHTING PLAN

EL102 LEVEL B2 LIGHTING PLAN

EL103 LEVEL B1 LIGHTING PLAN

EL104 LEVEL 1 LIGHTING PLAN

EL105 LEVEL 2 LIGHTING PLAN

EL106 LEVEL 3 LIGHTING PLAN

EL107 LEVEL 4 LIGHTING PLAN

EL108 ROOF LIGHTING PLAN

EL701 LUMINAIRE SCHEDULE

EL702 LIGHTING CONTROL SCHEDULES

EL703 LIGHTING CONTROL SCHEDULES

ES100 SITE PLAN

EP101 LEVEL B3 POWER PLAN

EP102 LEVEL B2 POWER PLAN

EP103 LEVEL B1 POWER PLAN

EP104 LEVEL 1 POWER PLAN

EP105 LEVEL 2 POWER PLAN

EP106 LEVEL 3 POWER PLAN

EP107 LEVEL 4 POWER PLAN

EP108 ELECTRICAL ROOF POWER PLAN

EP401 ELARGED POWER PLANS

EP402 ENLARGED POWER PLANS

EM101 ELECTRICAL LEVEL B3 EQUIPMENT PLAN

EM102 ELECTRICAL LEVEL B2 EQUIPMENT PLAN

EM103 ELECTRICAL LEVEL B1 EQUIPMENT PLAN

EM104 ELECTRICAL LEVEL 1 EQUIPMENT PLAN

EM105 ELECTRICAL LEVEL 2 EQUIPMENT PLAN

EM106 ELECTRICAL LEVEL 3 EQUIPMENT PLAN

EM107 ELECTRICAL LEVEL 4 EQUIPMENT PLAN

EM108 ELECTRICAL ROOF EQUIPMENT PLAN

EM701 MECHANICAL EQUIPMENT SCHEDULE

EG101 LEVEL B1 GROUNDING PLAN

EG102 ROOF LIGHTNING PROTECTION PLAN

EG601 GROUNDING RISER DIAGRAM

E-501 DETAILS

E-502 DETAILS

E-503 DETAILS

E-504 DETAILS

E-505 DETAILS

E-601 SINGLE LINE DIAGRAM

E-602 POWER RISER DIAGRAM

E-700 ELECTRICAL PANEL SCHEDULE INDEX

E-701 ELECTRICAL PANEL SCHEDULES

E-702 ELECTRICAL PANEL SCHEDULES

E-703 ELECTRICAL PANEL SCHEDULES

E-704 ELECTRICAL PANEL SCHEDULES

E-705 ELECTRICAL PANEL SCHEDULES

E-706 ELECTRICAL PANEL SCHEDULES

E-707 ELECTRICAL PANEL SCHEDULES

E-708 ELECTRICAL PANEL SCHEDULES

E-709 ELECTRICAL PANEL SCHEDULES

E-710 ELECTRICAL PANEL SCHEDULES

E-711 ELECTRICAL PANEL SCHEDULES

E-712 ELECTRICAL PANEL SCHEDULES

E-713 ELECTRICAL PANEL SCHEDULES

E-714 ELECTRICAL PANEL SCHEDULES

NUMBER DRAWING NAME

GENERAL

G-031 COVER SHEET - VOLUME THREE

G-032 INDEX OF DRAWINGS - VOLUME ONE AND TWO

G-033 INDEX OF DRAWINGS - VOLUME THREE AND FOUR

NUMBER DRAWING NAME

GENERAL

G-041 COVER SHEET - VOLUME FOUR

G-042 INDEX OF DRAWINGS - VOLUME ONE AND TWO

G-043 INDEX OF DRAWINGS - VOLUME THREE AND FOUR

P

V

SYMBOL ABBREVIATION DESCRIPTION

COMBINATION WASTE & VENT ABOVE FLOOR OR GRADECW&V

SANITARY SEWER/WASTE ABOVE FLOOR OR GRADE

RL RAIN LEADER ABOVE FLOOR OR GRADE

STORM DRAIN ABOVE FLOOR OR GRADESD

CW&V

SD

COMBINATION WASTE & VENT BELOW FLOOR OR GRADE

SANITARY SEWER/WASTE BELOW FLOOR OR GRADE

STORM DRAIN BELOW FLOOR OR GRADE

V SANITARY VENT

F

CV

FIRE LINE

G FUEL GAS (LOW PRESSURE)

MPG MEDIUM PRESSURE FUEL GAS

SSD SUB-SOIL DRAIN

INDIRECT DRAIN

INDUSTRIAL COLD WATER

VACUUM CLEANING BELOW FLOOR

CV

ID

IW

ANCHOR

WATER HAMMER ARRESTOR

REDUCED PRESSURE BACKFLOW ASSEMBLY

BFP

FLUID FLOW DIRECTION

RPBP

VACUUM CLEANING ABOVE FLOOR OR GRADE

WHA

A COMPRESSED AIR LINE

CW

OFD

OFD

OVERFLOW RAIN LEADER ABOVE FLOOR OR GRADE

OVERFLOW RAIN LEADER BELOW FLOOR OR GRADE

RL RAIN LEADER BELOW FLOOR OR GRADE

UO

UO

USED OIL ABOVE FLOOR OR GRADE

USED OIL BELOW FLOOR OR GRADE

CONDENSATE RETURN PUMP DISCHARGECRPD

A

CRPD

F

G

IW

MPG

OFD

OFD

RL

RL

SD

SD

SSD

UO

UO

CV

CV

GAS COCK

GW GW GREASE WASTE BELOW FLOOR OR GRADE

DOMESTIC COLD WATER SUPPLY

DOUBLE CHECK BACKFLOW PREVENTER

GV GREASE VENT BELOW AND ABOVE FLOORGV

RPBP REDUCED PRESSURE BACKFLOW WITHOUT

SHUT-OFF VALVES ASSEMBLY

PIPE TURNING UP

PIPE TURNING DOWN

PLUGGED PIPE/OUTLET

CONCENTRIC REDUCER

ECCENTRIC REDUCER

CAPPED PIPE/OUTLET

RUNNING TRAP

GATE VALVE

ANGLE VALVE

GLOBE VALVE

CHECK VALVE

BALANCING VALVE

UNION

FS

EWS

BV

GV

GLV

CV

PRV

P/TRV

U

PRESSURE REDUCING VALVE

PRESSURE/TEMPERATURE RELIEF VALVE

FD FLOOR DRAIN

BACKWATER VALVEBWV

DIRECTION OF FLOW

PS GAS SOLENOID VALVE PULL STATION

EMERGENCY SHOWER/EYE WASH

FLOOR SINK

VACUUM SYSTEM

ANV

HB HOSE BIBB

VAC

DOMESTIC HOT WATER RETURN LINEHWR

DOMESTIC HOT WATER SUPPLYHW

SS SS

SS

BV BALL VALVE

SD SHOWER DRAIN (GANG)

CO FLOOR CLEANOUT

GPR GAS PRESSURE REGULATOR

WCO WALL AND ABOVE CEILING CLEANOUT

SOV OS & Y/SHUT-OFF VALVE

WCO WALL OR PLUGGET CLEANOUT

W WASTE

DESCRIPTIONABBREVIATIONSYMBOL

PUMP DISCHARGE

SUMP PUMP

TANK

PD

TK

VLV VALVE

PSIG

FL FLOOR

GCO

GPH

GPM

GV

GRADE CLEANOUT

HEATER

GALLONS PER HOUR

GALLONS PER MINUTE

GATE VALVE

HTR

ID INDIRECT DRAIN

RD ROOF DRAIN

RL RAINLEADER

RPBP

RPM

REDUCED PRESSURE BACKFLOW PREVENTER

REVOLUTIONS PER MINUTE

SANITARY

STORM DRAIN

V VENT

POUNDS PER SQUARE INCH GAUGE

DISP

HP

GALS

IN. HG

TDH

SOV

NFWH

DISPLACEMENT

HORSEPOWER

GALLONS

INCHES OF MERCURY

TOTAL DYNAMIC HEAD

SOLENOID VALVE

NON-FREEZE WALL HYDRANT

OFD OVERFLOW DRAIN (ROOF)

SD

FS FLOOR SINK

NG NATURAL GAS

SS

DIAM. DIAMETER

HB HOSE BIBB

P PLUMBING (FIXTURE)

F.F.E. FINISHED FLOOR ELEVATION

F.G.E. FINISHED GRADE ELEVATION

I.E. INVERT ELEVATION

(NO) NORMALY OPEN

UNIT HEATER

MBH THOUSAND BRITISH THERMAL UNITS

HWB SEMI-CIRCULAR WASHFOUNTAIN

EWS EMERGENCY EYEWASH/SHOWER

HW HOT WATER (POTABLE DOMESTIC)

UH

SP

PD PD PUMP DISCHARGE

S

W

SD

S SANITARY AND VENT RISER

W DOMESTIC WATER RISER

SD STORM RAINLEADER RISER

TW TW TEMPERED WATER

NPW NPW NON-POTABLE WATER

CD CD CONDENSATE DRAIN PIPE

TP TP TRAP PRIMER LINE

OF OF OVERFLOW (WATER

RECLAMATION DEVICES)

SEWAGE EJECTOR PUMPSE

CA

CI

CO

COMPRESSED AIR

CAST IRON

CLEANOUT

ABBREVIATION DESCRIPTION

CFM

CW

AP

CUBIC FEET PER MINUTE

COLD WATER (POTABLE DOMESTIC)

ACCESS PANEL

CFH CUBIC FEET PER HOUR

AFG ABOVE FINISH GRADE

DEMOLITION LEGENDS & SYMBOLS

DESCRIPTIONABBREVIATIONSYMBOL

DOMESTIC COLD WATER

SUPPLY TO BE REMOVED

CWCW

DOMESTIC HOT WATER SUPPLY TO

BE REMOVED

HWHW

DOMESTIC HOT WATER RETURN

TO BE REMOVED

HWRHWR

ENDING POINT OF DEMOLITION

SANITARY SEWER ABOVE AND BELOW

GROUND TO BE REMOVEDSS

CONNECT NEW TO EXISTING

SS

STORM WATER ABOVE AND BELOW

GROUND TO REMAINSDSD

TPV TRAP PRIMER VALVE

UTILITY SINKUS

FCO FLOOR CLEANOUT

DFU DRAIN FIXTURE UNITS

EWH ELECTRIC WATER HEATER

FT WC FEET WATER COLUMN (GAUGE)

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

MS MOP SINK

PLUMBING AND DRAINAGE INSTITUTEPDI

SQUARE FOOTSQ FT

TMV THERMAL MIXING VALVE

WHA WATER HAMMER ARRESTOR

WSFU WASTE SANITARY FIXTURE UNITS

GENERAL NOTESPLUMBING LEGENDS & SYMBOLSPLUMBING ABBREVIATIONS

NOTE: NOT ALL SYMBOLS AND

ABBREVIATIONS MAY BE USED.

1. CONTRACTOR MUST COORDINATE PROJECT WITH CHILLED WATER UTILITY PROJECT

OCCURRING IN PARALLEL WITH THIS PROJECT. CULLUM HALL PROJECT ALSO OCCURRING IN

PARALLEL WITH THESES PROJECTS AND CONNECTED TO CHILLED WATER SITE UTILITY

SYSTEM AND STEAM/CONDENSATE RETURN SITE UTILITY SYSTEM AHEAD OF LINCOLN HALL.

2. PLUMBING DRAWINGS ARE IN PART DIAGRAMMATIC AND INTENDED TO SHOW THE SCOPE

AND GENERAL ARRANGEMENT OF THE WORK UNDER THIS CONTRACT. FOLLOW THESE

DRAWINGS IN LAYING OUT THE EQUIPMENT AND PIPING. DRAWINGS ARE NOT INTENDED TO

BE SCALED FOR ROUGHING IN MEASUREMENTS NOR TO SERVE AS SHOP DRAWINGS. WHERE

JOB CONDITIONS REQUIRE MINOR CHANGES OR ADJUSTMENTS IN THE INDICATED LOCATIONS

OR ARRANGEMENT OF THE WORK, SUCH CHANGES MUST BE MADE WITHOUT CHANGE IN THE

CONTRACT AMOUNT.

3. THE CONTRACTOR MUST VISIT THE JOB SITE TO FAMILIARIZE HIMSELF WITH ALL CONDITIONS

AFFECTING THE WORK AND TO COORDINATE THE WORK WITH OTHER CONTRACTORS ON THE

PROJECT. VERIFY DIMENSIONS PRIOR TO FABRICATION AND INSTALLATION OF DUCTWORK

AND EQUIPMENT.

4. THE INTENT OF THESE DRAWINGS IS TO PROVIDE COMPLETE AND PROPERLY FUNCTIONING

PLUMBING SYSTEMS. CONTRACTOR MUST PROVIDE LABOR AND MATERIALS. UNLESS

OTHERWISE SHOWN ON DRAWINGS OR SPECIFIED HEREIN, PRODUCTS USED IN THE WORK

MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS

AND RECOMMENDATIONS. ANY CHANGES OR MODIFICATIONS PROPOSED BY CONTRACTOR

WHICH HE BELIEVES IMPROVE THE INSTALLATION MUST BE APPROVED BY THE CONTRACTING

OFFICER'S REPRESENTATIVE.

5. EQUIPMENT INDICATED IN THE DRAWINGS, TOGETHER WITH ITS BASE AND/OR SUPPORT,

DUCTWORK, WALL, FLOOR AND ROOF OPENINGS AND ELECTRICAL SERVICE ARE BASED ON

THE EQUIPMENT SCHEDULE OR SPECIFICATIONS. SHOULD CONTRACTOR SELECT AN

EQUIVALENT ALTERNATE, EVEN IF APPROVED BY THE OWNER AS EQUAL, CONTRACTOR MUST

COORDINATE AND MAKE THE MODIFICATIONS IN THE WORK WITHOUT CHANGE IN CONTRACT

AMOUNT.

6. PLUMBING WORK ON THIS PROJECT MUST BE INSTALLED IN ACCORDANCE WITH THE 2018

INTERNATIONAL PLUMBING CODES AND APPLICABLE LOCAL CODES.

7. COORDINATE PLUMBING WORK WITH SITE CONDITIONS AND THE WORK OF OTHER TRADES.

PIPING MUST BE FIELD ROUTED IN ACCORDANCE WITH APPROPRIATE ENGINEERING

PRACTICES, INDUSTRY STANDARDS, AND GOVERNING CODES/REGULATIONS. ROUTE OF

PIPING, INCLUDING CLEARANCE, IS THE RESPONSIBILITY OF THE CONTRACTOR. UNIONS,

BUSHINGS, AND REDUCING INSERTS, NOT SHOWN ON THE DRAWINGS BUT REQUIRED FOR

INSTALLATION, MUST BE PROVIDED BY THE CONTRACTOR.

8. VERIFY EXISTING SLOPES AND INVERT ELEVATIONS PRIOR TO COMMENCEMENT OF WORK.

9. THE WORK REQUIRED MUST INCLUDE THE FURNISHING OF MATERIALS, CUTTING, PATCHING, ADAPTING AND OTHER INCIDENTAL WORK, TOGETHER WITH SUCH TEMPORARY

CONNECTIONS AS MAY BE REQUIRED.

10. HORIZONTAL VENT PIPING MUST RUN ABOVE CEILING AND HORIZONTAL SANITARY PIPING

MUST ROUTE BELOW SLAB UNLESS OTHERWISE NOTED. PROVIDE LOW POINT HOSE END PIPE

DRAINS TO COMPLETELY DRAIN RENOVATION WORK SYSTEMS.

11. PIPE PENETRATIONS THROUGH RATED SLAB AND WALLS SHALL HAVE PIPE SLEEVES WITH

FIRE PROOF MATERIAL. CAULK ANNULAR SPACE BETWEEN PIPE AND SLEEVE. PIPES THRU

INTERIOR WALLS SHALL HAVE ESCUTCHEONS.

12. PROVIDE ACCESS PANELS FOR VALVES, WATER HAMMER ARRESTORS AND OTHER PLUMBING

SPECIALTIES LOCATED INSIDE CHASES, BEHIND WALLS OR ABOVE INACCESSIBLE CEILINGS.

13. INDIVIDUAL SHUTOFF VALVES (STOP VALVES) MUST BE INSTALLED AT WATER SUPPLY LINES

SERVING THE PLUMBING FIXTURES. WATER RISER DIAGRAMS ARE SHOWING THE LOCATION

OF THE STOP VALVE IN THE WATER PIPING.

14. PAINT VENT THROUGH ROOF (VTR) TO MATCH THE ADJACENT ROOF. TO PRESERVE

WARRANTY, ROOF WORK MUST BE COMPLETED BY THE ROOFER HOLDING THE WARRANTY

ON THE EXISTING ROOF.

15. EXISTING WATER PIPES, SANITARY, STORM PIPING ARE UNKNOWN AND ARE SHOWN FOR

INFORMATION PURPOSES ONLY BASED ON EXISTING DOCUMENTS AND FIELD SURVEY,

CONTRACTOR MUST VERIFY EXACT LOCATIONS PRIOR TO ANY BELOW FLOOR SLAB

DEMOLITION AND NEW WORK. IF DISCREPANCY OCCURS, CONSULT WITH THE

CONSTRUCTION MANAGER.

16. THE CONTRACTOR MUST TAKE ALL PRECAUTIONARY STEPS TO PROTECT THE SURROUNDING

EXISTING FACILITIES. ANY DAMAGE OR LOSS OF PROPERTY OCCASIONED BY OR ARISING

FROM ACTS OF THE CONTRACTOR MUST BE THE RESPONSIBILITY OF THE CONTRACTOR.

17. COORDINATE DEMOLITION WORK WITH RENOVATION WORK CONSTRUCTION. CONTRACTOR

MUST REMOVE PIPES AND REPAIR CONCRETE FLOOR SLAB AS REQUIRED. SEE STRUCTURAL

DRAWINGS FOR MORE INFORMATION ON FLOOR SLAB REPAIRS.

18. PIPING FOREIGN TO ELECTRICAL EQUIPMENT ROOM, OR SIMILAR ROOM HOUSING

ELECTRICAL EQUIPMENT(TELEPHONE/DATA, ELEVATOR MACHINE ROOM) MUST NOT

PERMITTED TO BE INSTALLED IN THESE SPACES.

19. PROVIDE FIRE STOPPING AT PENETRATIONS THRU RATED PARTITIONS WITHIN SCOPE OF

WORK. THIS INCLUDES PENETRATIONS THROUGH WALLS, PARTITIONS, BARRIERS, CEILINGS,

ROOFS OR FLOORS - WHETHER EXISTING, CREATED THROUGH DEMOLITION OR CAUSED

DURING CONSTRUCTION. PROVIDE MANUFACTURER'S STANDARD FIRE STOPPING SEALANT,

WITH ACCESSORY MATERIALS, HAVING MINIMUM 1 HOUR FIRE RESISTANCE RATINGS AS

ESTABLISHED BY TESTING IDENTICAL ASSEMBLIES PER ASTM E 814 AND BY UNDERWRITERS

LABORATORY, INC. UL 1479 OR OTHER TESTING AND INSPECTION AGENCY ACCEPTABLE TO

AUTHORITIES HAVING JURISDICTION,

20. INDICATED EXISTING CONDITIONS (E.G. SIZE/LOCATION OF PIPING, EQUIPMENT, AND BUILDING

ELEMENTS) ARE BASED ON INFORMATION OBTAINED FROM AVAILABLE RECORD DRAWINGS

AND/OR FIELD SURVEYS. EXISTING CONDITIONS NOT RELATED TO THE WORK MAY NOT BE

SHOWN. EXISTING CONDITIONS ARE PROVIDED FOR THE CONVENIENCE OF THE

CONTRACTOR ONLY AND ARE NOT GUARANTEED TO BE COMPLETE OR CORRECT. PLANNING

AND CHECKING HAS BEEN DONE BY THE ENGINEER TO MINIMIZE INTERFERENCES. PRIOR TO

START OF EFFORT, FIELD VERIFY EXACT LOCATION AND SIZES OF ALL ELEMENTS RELATED TO

THE WORK. ROUTING OF PIPING AND DUCTWORK SHOWN ON DRAWINGS IS DIAGRAMMATIC.

ASCERTAIN THAT INTERFERENCES WILL NOT BE ENCOUNTERED, PREVENTING THE

DISASSEMBLY OF PARTIALLY OR COMPLETELY ERECTED SYSTEMS FOR RE-ROUTING TO

CLEAR OBSTRUCTIONS WHICH MAY EXIST.

21. DO NOT ASSUME THAT EXISTING VALVES PROVIDE POSITIVE SHUT-OFF. CONTRACTOR MUST

TEST EACH EXISTING VALVE REQUIRED FOR SYSTEM ISOLATION IN ADVANCE SO THAT

PROPER PLANNING AND WORK SEQUENCING CAN BE PERFORMED. COORDINATE VALVE

TESTING WITH CONTRACTING OFFICER. IMMEDIATELY NOTIFY COR OF ALL VALVES THAT FAIL

TO PROVIDE POSITIVE SHUT-OFF.

22. REMOVE HANGERS, SUPPORTS, MISCELLANEOUS STRUCTURAL STEEL, SPECIALTIES, VENTS

AND DRAINS, ELECTRICAL POWER, AND OTHER ASSOCIATED ACCESSORIES IN THE PROCESS

OF PIPE AND EQUIPMENT DEMOLITION. SUPPORTS FOR PIPE SHOWN TO BE DEMOLISHED

THAT PENETRATE THROUGH THE INTERIOR ROOF INSULATION MUST BE CUT 3" ABOVE

INSULATION AND COVERED WITH A PROTECTIVE PLASTIC CAP (BRIGHT ORANGE). BEFORE

DISCONNECTING PIPE, VERIFY THAT PIPING HAS BEEN ISOLATED, VENTED, AND DRAINED.

23. PATCH, SEAL AND FINISH OPENINGS FROM REMOVAL OF PIPING OR EQUIPMENT USING

MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING ASSEMBLIES IN A

WORKMANLIKE MANNER.

24. TAKE PRECAUTION AND USE CARE WHEN REMOVING PIPING WITH HAZARDOUS INSULATION.

COORDINATE WITH HAZARDOUS MATERIALS ABATEMENT REQUIREMENTS. REFER TO

HAZMAT REPORT CONTENTS.

PIPES PIPES TO BE REMOVED

DEMOLITION AREAS OF DEMOLITION

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

P-001

P L U

M B

IN

G

A B

B R

E V

IA

T

IO

N

S

S Y

M B

O L S

A N

D G

E N

E R

A L N

O T

E S

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

B H

A M

L

IN

B H

A M

L

IN

D B

A T

T

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

REVISED RTA SUBMISSION 03/01/2023

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

6 3/4" CW DN TO

HOSE BIB

3/4" CW DN TO

HOSE BIB

12 12 12

REMOVE 6" AND 4"

SANITARY LINES FROM

CEILING SPACE

CO REMOVE SANITARY DRAIN PIPE

BETWEEN COOLING TOWER

LOCATED TO NORTH OF LINCOLN

HALL BACK TO PIPING ENTRANCE

LOCATION AT LEVEL B3 INTO

MECHANICAL ROOM XB301

REMOVE STORM

WATER PIPING

5'-0" AWAY FROM

BUILDING

REMOVE STORM

WATER PIPING

5'-0" AWAY FROM

BUILDING

REMOVE STORM

WATER PIPING

5'-0" AWAY FROM

BUILDING

13 PIPE

BELOW

FLOOR

PIPE

BELOW

FLOOR

PIPE

BELOW

FLOOR

PIPE

BELOW

FLOOR

PIPE

BELOW

FLOOR

GENERAL NOTES

1. REFER TO THE PLUMBING ABBREVIATIONS, SYMBOLS AND

GENERAL NOTES ON SHEET P-001.

2. CONTRACTOR MUST LOCATE EXACTLY WHERE THE

EXISTING PLUMBING EQUIPMENT AND ABOVE AND

UNDERGROUND PIPING BEFORE ANY DEMOLITION WORK

STARTS.

3. SAW CUT FLOOR SLAB TO REMOVE EXISTING

UNDERGROUND PIPES. SEE STRUCTURAL DRAWINGS FOR

MORE INFORMATION.

4. STORM WATER ROOF DRAINS AND PIPES MUST REMAIN IN

PLACE UNTIL THE NEW PIPING CAN BE INSTALLED ON THE

SAME DAY. THE CONTRACTOR MUST MAKE SURE A CLEAR

DAY OF WHETHER, BEFORE STARTING REMOVAL AND

INSTALLATION OF REPLACEMENT STORM WATER PIPING

CAN BE DONE.

5. GOVERNMENT IS RESPONSIBLE FOR REMOVING ANY

COMPONENTS DESIRED FOR SPARE PARTS OR REUSE

PRIOR TO CONSTRUCTION DEMOLITION. CONTRACTOR

MUST OFFER REMOVED EQUIPMENT TO GOVERNMENT AND

DELIVER TO A LOCATION AS DIRECTED BY GOVERNMENT.

6. PATCH, SEAL AND FINISH OPENING FROM REMOVAL OF PIPING OR EQUIPMENT

USING MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING

ASSEMBLIES IN A WORMANLIKE MANNER. OPENING BEING REUTILIZED BY

REPLACEMENT PLUMBING SYSTEMS MUST BE PROTECTED DURING

CONSTRUCTION.

7. REMOVE DEMOLISHED PIPING, EQUIPMENT (REFUSED BY GOVERNMENT) AND

ACCESSORIES FROM SITE AND PROPERLY DISPOSE OF MATERIALS IN

ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDENANCES.

8. LINCOLN HALL PLUMBING SANITARY WASTE/VENT, STORM AND DOMESTIC POTABLE

WATER PIPING AND EQUIPMENT MUST BE REMOVED IN THEIR ENTIRETY AND

COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT

FOR AVAILABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS.

9. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING

MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE

PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.

N

8'4' 16'0

SCALE: 1/8"=1'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

PD101

L E

V E

L B

D

E M

O L

IT

IO

N

P L A

N

P L U

M B

IN

G

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

B H

A M

L

IN

B H

A M

L

IN

D B

A T

T

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

REVISED RTA SUBMISSION 03/01/2023

1/8" = 1'-0" C1

LEVEL B3 - PLUMBING DEMOLITION

KEYNOTES

1 REMOVE BACKFLOW PREVENTER AND ASSOCIATED PIPING FROM CEILING SPACE.

2 REMOVE 1" CW LINE AND ASSOCIATED VALVES FROM CEILING SPACE.

3 REMOVE 3/4" CW LINE AND ASSOCIATED VALVES FROM CEILING SPACE.

4 REMOVE 3" VENT PIPING FROM CEILING SPACE.

5 REMOVE 3" SEWAGE EJECTOR DISCHARGE SANITARY LINE FROM CEILING SPACE.

6 REMOVE CW, SANITARY AND PIPES THAT PENETRATE UPPER FLOOR SLAB.

7 REMOVE EXISTING 6" SANITARY SEWAGE LINE FROM TUNNEL SPACE.

8 REMOVE 4" SANITARY UNDERGROUND PIPING.

9 REMOVE 4" HORIZONTAL STORM WATER PIPE.

10 REMOVE 6" HORIZONTAL STORM WATER PIPING.

11 REMOVE 8" HORIZONTAL STORM WATER PIPE.

12 REMOVE 4" VERTICAL STORM WATER PIPE THAT IS NOT ENCASED IN CONCRETE.

13 LINCOLN HALL PLUMBING EQUIPMENT AND PIPING SYSTEMS MUST BE REMOVED IN

THEIR ENTIRETY AND COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS

PROVIDED BY GOVERNMENT FOR VIABLE RECORD DRAWINGS DOCUMENTATION FOR

EXISTING CONDITIONS. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS

THROUGHOUT THE BUILDING MUST BE VERIFIED BY THE CONTRACTOR. THE

CONTRACTOR MUST VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY

EXISTING CONDITIONS.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

REMOVE 4" AND

6" SAN. PIPES

6 6 6

6 6 6

GENERAL NOTES

1. REFER TO THE PLUMBING ABBREVIATIONS, SYMBOLS AND

GENERAL NOTES ON SHEET P-001.

2. CONTRACTOR MUST LOCATE EXACTLY WHERE THE

EXISTING PLUMBING EQUIPMENT AND ABOVE AND

UNDERGROUND PIPING BEFORE ANY DEMOLITION WORK

STARTS.

3. SAW CUT FLOOR SLAB TO REMOVE EXISTING

UNDERGROUND PIPES. SEE STRUCTURAL DRAWINGS FOR

MORE INFORMATION.

4. STORM WATER ROOF DRAINS AND PIPES MUST REMAIN IN

PLACE UNTIL THE NEW PIPING CAN BE INSTALLED ON THE

SAME DAY. THE CONTRACTOR MUST MAKE SURE A CLEAR

DAY OF WHETHER, BEFORE STARTING REMOVAL AND

INSTALLATION OF REPLACEMENT STORM WATER PIPING

CAN BE DONE.

5. GOVERNMENT IS RESPONSIBLE FOR REMOVING ANY

COMPONENTS DESIRED FOR SPARE PARTS OR REUSE

PRIOR TO CONSTRUCTION DEMOLITION. CONTRACTOR

MUST OFFER REMOVED EQUIPMENT TO GOVERNMENT AND

DELIVER TO A LOCATION AS DIRECTED BY GOVERNMENT.

KEYNOTES

1 REMOVE WATER CLOSETS AND ASSOCIATED VALVES AND PIPING.

2 REMOVE LAVATORY AND ASSOCIATED VALVES AND PIPING.

3 REMOVE MOP SINK AND ASSOCIATED VALVES AND PIPING

4 REMOVE EXISTING 3" INCOMING MAIN WATER LINE AND ASSOCIATED VALVES.

5 REMOVE EXISTING 1 1/2" WATER LINE AND ASSOCIATED VALVES.

6 SOME EXISTING 4" VERTICAL STORM WATER PIPES ARE ENCASED IN CONCRETE, THESE PIPES SHOULD BE

ABANDON IN PLACE AND CAP AT BOTH END OF THE VERTICAL PIPE.

7. REMOVE URINAL AND ASSOCIATED VALVES AND PIPING.

8. LINCOLN HALL PLUMBING EQUIPMENT AND PIPING SYSTEMS MUST BE REMOVED IN THEIR ENTIRETY AND

COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS ROVIDED BY GOVERNMENT FOR VIABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS. LINCOLN HALL PLUMBING EQUIPMENT AND PIPING SYSTEMS MUST BE REMOVED IN THEIR ENTIRETY AND COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT FOR VIABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.

9. CAP GAS LINE BEFORE MAIN GAS SHUT-OFF VALVE. EXISTING TO REMAIN 2 INCH NATURAL GAS LINE THIS LOCATION AS IDENTIFIED PER RECORD 1986 DRAWINGS. CONTRACTOR MUST IDENTIFY PIPE PRIOR TO START OF DEMOLITION

AND PROTECT PIPE FOR DURATION OF CONSTRUCTION.

6. PATCH, SEAL AND FINISH OPENING FROM REMOVAL OF PIPING OR EQUIPMENT

USING MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING

ASSEMBLIES IN A WORMANLIKE MANNER. OPENING BEING REUTILIZED BY

REPLACEMENT PLUMBING SYSTEMS MUST BE PROTECTED DURING

CONSTRUCTION.

7. REMOVE DEMOLISHED PIPING, EQUIPMENT (REFUSED BY GOVERNMENT) AND

ACCESSORIES FROM SITE AND PROPERLY DISPOSE OF MATERIALS IN

ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDENANCES.

8. LINCOLN HALL PLUMBING SANITARY WASTE/VENT, STORM AND DOMESTIC POTABLE

WATER PIPING AND EQUIPMENT MUST BE REMOVED IN THEIR ENTIRETY AND

COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT

FOR AVAILABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS.

9. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING

MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE

PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.

N

8'4' 16'0

SCALE: 1/8"=1'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

PD102

L E

V E

L B

D

E M

O L

IT

IO

N

P L A

N

P L U

M B

IN

G

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

B H

A M

L

IN

B H

A M

L

IN

D B

A T

T

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

REVISED RTA SUBMISSION 03/01/2023

1/8" = 1'-0" C1

LEVEL B2 - PLUMBING DEMOLITION

M A

R K

D E

S C

R

IP

T

IO

N D

A T

2" GAS

DN

3 3

3 3

4 4

1 1 1

7 7 7 7 7 1

GENERAL NOTES

1. REFER TO THE PLUMBING ABBREVIATIONS, SYMBOLS AND

GENERAL NOTES ON SHEET P-001.

2. CONTRACTOR MUST LOCATE EXACTLY WHERE THE

EXISTING PLUMBING EQUIPMENT AND ABOVE AND

UNDERGROUND PIPING BEFORE ANY DEMOLITION WORK

STARTS.

3. SAW CUT FLOOR SLAB TO REMOVE EXISTING

UNDERGROUND PIPES. SEE STRUCTURAL DRAWINGS FOR

MORE INFORMATION.

4. STORM WATER ROOF DRAINS AND PIPES MUST REMAIN IN

PLACE UNTIL THE NEW PIPING CAN BE INSTALLED ON THE

SAME DAY. THE CONTRACTOR MUST MAKE SURE A CLEAR

DAY OF WHETHER, BEFORE STARTING REMOVAL AND

INSTALLATION OF REPLACEMENT STORM WATER PIPING

CAN BE DONE.

5. GOVERNMENT IS RESPONSIBLE FOR REMOVING ANY

COMPONENTS DESIRED FOR SPARE PARTS OR REUSE

PRIOR TO CONSTRUCTION DEMOLITION. CONTRACTOR

MUST OFFER REMOVED EQUIPMENT TO GOVERNMENT AND

DELIVER TO A LOCATION AS DIRECTED BY GOVERNMENT.

6. PATCH, SEAL AND FINISH OPENING FROM REMOVAL OF PIPING OR EQUIPMENT

USING MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING

ASSEMBLIES IN A WORMANLIKE MANNER. OPENING BEING REUTILIZED BY

REPLACEMENT PLUMBING SYSTEMS MUST BE PROTECTED DURING

CONSTRUCTION.

7. REMOVE DEMOLISHED PIPING, EQUIPMENT (REFUSED BY GOVERNMENT) AND

ACCESSORIES FROM SITE AND PROPERLY DISPOSE OF MATERIALS IN

ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDENANCES.

8. LINCOLN HALL PLUMBING SANITARY WASTE/VENT, STORM AND DOMESTIC POTABLE

WATER PIPING AND EQUIPMENT MUST BE REMOVED IN THEIR ENTIRETY AND

COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT

FOR AVAILABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS.

9. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING

MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE

PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.

N

8'4' 16'0

SCALE: 1/8"=1'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

PD103

L E

V E

L B

D

E M

O L

IT

IO

N

P L A

N

P L U

M B

IN

G

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

B H

A M

L

IN

B H

A M

L

IN

D B

A T

T

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

REVISED RTA SUBMISSION 03/01/2023

1/8" = 1'-0" C1

LEVEL B1 - PLUMBING DEMOLITION

KEYNOTES

1 REMOVE LAVATORY AND ASSOCIATED VALVES AND PIPING.

2 EXISTING 4" VERTICAL STORM PIPE TO BE REMOVED AND OR

CAPPED AT BOTH ENDS IF LOCATED INSIDE CONCRETE WALLS.

3 REMOVE EXPOSE 4" STORM WATER PIPING.

4 REMOVE WATER CLOSETS AND ASSOCIATED VALVES AND PIPING.

5 REMOVE MOP SINK AND ASSOCIATED VALVES AND PIPING.

6 LINCOLN HALL PLUMBING EQUIPMENT AND PIPING SYSTEMS MUST

BE REMOVED IN THEIR ENTIRETY AND COMPLETELY. REFER TO

1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT FOR

VIABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING

CONDITIONS. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS

THROUGHOUT THE BUILDING MUST BE VERIFIED BY THE

CONTRACTOR. THE CONTRACTOR MUST VISIT THE PROJECT SITE

PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.

7 REMOVE URINAL AND ASSOCIATED VALVES AND PIPING.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

1 1 1

3 3

4 4 4

7 7

GENERAL NOTES

1. REFER TO THE PLUMBING ABBREVIATIONS, SYMBOLS AND

GENERAL NOTES ON SHEET P-001.

2. CONTRACTOR MUST LOCATE EXACTLY WHERE THE

EXISTING PLUMBING EQUIPMENT AND ABOVE AND

UNDERGROUND PIPING BEFORE ANY DEMOLITION WORK

STARTS.

3. SAW CUT FLOOR SLAB TO REMOVE EXISTING

UNDERGROUND PIPES. SEE STRUCTURAL DRAWINGS FOR

MORE INFORMATION.

4. STORM WATER ROOF DRAINS AND PIPES MUST REMAIN IN

PLACE UNTIL THE NEW PIPING CAN BE INSTALLED ON THE

SAME DAY. THE CONTRACTOR MUST MAKE SURE A CLEAR

DAY OF WHETHER, BEFORE STARTING REMOVAL AND

INSTALLATION OF REPLACEMENT STORM WATER PIPING

CAN BE DONE.

5. GOVERNMENT IS RESPONSIBLE FOR REMOVING ANY

COMPONENTS DESIRED FOR SPARE PARTS OR REUSE

PRIOR TO CONSTRUCTION DEMOLITION. CONTRACTOR

MUST OFFER REMOVED EQUIPMENT TO GOVERNMENT AND

DELIVER TO A LOCATION AS DIRECTED BY GOVERNMENT.

6. PATCH, SEAL AND FINISH OPENING FROM REMOVAL OF PIPING OR EQUIPMENT

USING MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING

ASSEMBLIES IN A WORMANLIKE MANNER. OPENING BEING REUTILIZED BY

REPLACEMENT PLUMBING SYSTEMS MUST BE PROTECTED DURING

CONSTRUCTION.

7. REMOVE DEMOLISHED PIPING, EQUIPMENT (REFUSED BY GOVERNMENT) AND

ACCESSORIES FROM SITE AND PROPERLY DISPOSE OF MATERIALS IN

ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDENANCES.

8. LINCOLN HALL PLUMBING SANITARY WASTE/VENT, STORM AND DOMESTIC POTABLE

WATER PIPING AND EQUIPMENT MUST BE REMOVED IN THEIR ENTIRETY AND

COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT

FOR AVAILABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS.

9. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING

MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE

PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.

N

8'4' 16'0

SCALE: 1/8"=1'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

PD104

L E

V E

L

D E

M O

L

IT

IO

N

P L A

N

P L U

M B

IN

G

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

B H

A M

L

IN

B H

A M

L

IN

D B

A T

T

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

REVISED RTA SUBMISSION 03/01/2023

1/8" = 1'-0" C1

LEVEL 1 - PLUMBING DEMOLITION

KEYNOTES

1 REMOVE EXPOSE 4" STORM WATER PIPING.

2 EXISTING 4" VERTICAL STORM PIPE TO BE REMOVED AND OR

CAPPED AT BOTH ENDS IF LOCATED INSIDE CONCRETE WALLS.

3 REMOVE WATER CLOSETS AND ASSOCIATED VALVES AND PIPING.

4 REMOVE LAVATORY AND ASSOCIATED VALVES AND PIPING.

5 REMOVE MOP SINK AND ASSOCIATED VALVES AND PIPING.

6 LINCOLN HALL PLUMBING EQUIPMENT AND PIPING SYSTEMS MUST

BE REMOVED IN THEIR ENTIRETY AND COMPLETELY. REFER TO

1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT FOR

VIABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING

CONDITIONS. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS

THROUGHOUT THE BUILDING MUST BE VERIFIED BY THE

CONTRACTOR. THE CONTRACTOR MUST VISIT THE PROJECT SITE

PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.

7 REMOVE URINAL AND ASSOCIATED VALVES AND PIPING.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

2 2

2 2 2

4 5

5 5 5

7 7

GENERAL NOTES

1. REFER TO THE PLUMBING ABBREVIATIONS, SYMBOLS AND

GENERAL NOTES ON SHEET P-001.

2. CONTRACTOR MUST LOCATE EXACTLY WHERE THE

EXISTING PLUMBING EQUIPMENT AND ABOVE AND

UNDERGROUND PIPING BEFORE ANY DEMOLITION WORK

STARTS.

3. SAW CUT FLOOR SLAB TO REMOVE EXISTING

UNDERGROUND PIPES. SEE STRUCTURAL DRAWINGS FOR

MORE INFORMATION.

4. STORM WATER ROOF DRAINS AND PIPES MUST REMAIN IN

PLACE UNTIL THE NEW PIPING CAN BE INSTALLED ON THE

SAME DAY. THE CONTRACTOR MUST MAKE SURE A CLEAR

DAY OF WHETHER, BEFORE STARTING REMOVAL AND

INSTALLATION OF REPLACEMENT STORM WATER PIPING

CAN BE DONE.

5. GOVERNMENT IS RESPONSIBLE FOR REMOVING ANY

COMPONENTS DESIRED FOR SPARE PARTS OR REUSE

PRIOR TO CONSTRUCTION DEMOLITION. CONTRACTOR

MUST OFFER REMOVED EQUIPMENT TO GOVERNMENT AND

DELIVER TO A LOCATION AS DIRECTED BY GOVERNMENT.

6. PATCH, SEAL AND FINISH OPENING FROM REMOVAL OF PIPING OR EQUIPMENT

USING MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING

ASSEMBLIES IN A WORMANLIKE MANNER. OPENING BEING REUTILIZED BY

REPLACEMENT PLUMBING SYSTEMS MUST BE PROTECTED DURING

CONSTRUCTION.

7. REMOVE DEMOLISHED PIPING, EQUIPMENT (REFUSED BY GOVERNMENT) AND

ACCESSORIES FROM SITE AND PROPERLY DISPOSE OF MATERIALS IN

ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDENANCES.

8. LINCOLN HALL PLUMBING SANITARY WASTE/VENT, STORM AND DOMESTIC POTABLE

WATER PIPING AND EQUIPMENT MUST BE REMOVED IN THEIR ENTIRETY AND

COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT

FOR AVAILABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS.

9. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING

MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE

PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.

N

8'4' 16'0

SCALE: 1/8"=1'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

PD105

L E

V E

L

D E

M O

L

IT

IO

N

P L A

N

P L U

M B

IN

G

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

B H

A M

L

IN

B H

A M

L

IN

D B

A T

T

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

REVISED RTA SUBMISSION 03/01/2023

1/8" = 1'-0" C1

LEVEL 2 - PLUMBING DEMOLITION

KEYNOTES

1 REMOVE MOP SINK AND ASSOCIATED VALVES AND PIPING.

2 REMOVE EXPOSE 4" STORM WATER PIPING.

3 EXISTING 4" VERTICAL STORM PIPE TO BE REMOVED AND OR

CAPPED AT BOTH ENDS IF LOCATED INSIDE CONCRETE WALLS.

4 REMOVE WATER CLOSETS AND ASSOCIATED VALVES AND PIPING.

5 REMOVE LAVATORY AND ASSOCIATED VALVES AND PIPING.

6 LINCOLN HALL PLUMBING EQUIPMENT AND PIPING SYSTEMS MUST

BE REMOVED IN THEIR ENTIRETY AND COMPLETELY. REFER TO

1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT FOR

VIABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING

CONDITIONS. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS

THROUGHOUT THE BUILDING MUST BE VERIFIED BY THE

CONTRACTOR. THE CONTRACTOR MUST VISIT THE PROJECT SITE

PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.

7 REMOVE URINAL AND ASSOCIATED VALVES AND PIPING.

M A

R K

D E

S C

R

IP

T

IO

N D

A T

2 2

4 4 5

5 6

6 6 6

2 2

7 7

7 7 7

GENERAL NOTES

1. REFER TO THE PLUMBING ABBREVIATIONS, SYMBOLS AND

GENERAL NOTES ON SHEET P-001.

2. CONTRACTOR MUST LOCATE EXACTLY WHERE THE

EXISTING PLUMBING EQUIPMENT AND ABOVE AND

UNDERGROUND PIPING BEFORE ANY DEMOLITION WORK

STARTS.

3. SAW CUT FLOOR SLAB TO REMOVE EXISTING

UNDERGROUND PIPES. SEE STRUCTURAL DRAWINGS FOR

MORE INFORMATION.

4. STORM WATER ROOF DRAINS AND PIPES MUST REMAIN IN

PLACE UNTIL THE NEW PIPING CAN BE INSTALLED ON THE

SAME DAY. THE CONTRACTOR MUST MAKE SURE A CLEAR

DAY OF WHETHER, BEFORE STARTING REMOVAL AND

INSTALLATION OF REPLACEMENT STORM WATER PIPING

CAN BE DONE.

5. GOVERNMENT IS RESPONSIBLE FOR REMOVING ANY

COMPONENTS DESIRED FOR SPARE PARTS OR REUSE

PRIOR TO CONSTRUCTION DEMOLITION. CONTRACTOR

MUST OFFER REMOVED EQUIPMENT TO GOVERNMENT AND

DELIVER TO A LOCATION AS DIRECTED BY GOVERNMENT.

6. PATCH, SEAL AND FINISH OPENING FROM REMOVAL OF PIPING OR EQUIPMENT

USING MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING

ASSEMBLIES IN A WORMANLIKE MANNER. OPENING BEING REUTILIZED BY

REPLACEMENT PLUMBING SYSTEMS MUST BE PROTECTED DURING

CONSTRUCTION.

7. REMOVE DEMOLISHED PIPING, EQUIPMENT (REFUSED BY GOVERNMENT) AND

ACCESSORIES FROM SITE AND PROPERLY DISPOSE OF MATERIALS IN

ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDENANCES.

8. LINCOLN HALL PLUMBING SANITARY WASTE/VENT, STORM AND DOMESTIC POTABLE

WATER PIPING AND EQUIPMENT MUST BE REMOVED IN THEIR ENTIRETY AND

COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT

FOR AVAILABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS.

9. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING

MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE

PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.

N

8'4' 16'0

SCALE: 1/8"=1'-0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

PD106

L E

V E

L

D E

M O

L

IT

IO

N

P L A

N

P L U

M B

IN

G

B U

IL

D

IN

G

S

/6

R

E N

O V

A T

IO

N

L

IN

C O

L N

H A

L L

L

IN

C O

L N

H A

L L

W E

S T

P O

IN

T

N

E W

Y O

R K

B H

A M

L

IN

B H

A M

L

IN

D B

A T

T

M

A R

C H

W D

S -1

-R

-0

W D

S -1

-C

-0 -L

REVISED RTA SUBMISSION 03/01/2023

1/8" = 1'-0" C1

LEVEL 3 - PLUMBING DEMOLITION

KEYNOTES

1 REMOVE MOP SINK AND ASSOCIATED VALVES AND PIPING.

2 REMOVE 4" STORM WATER PIPE AS IT ENTER THE INTERIOR WALL

SPACE. CONTRACTOR MUST INVESTIGATE LOCATION OF THE

STORM PIPE FROM GUTTER SYSTEM.

3 EXISTING 4" VERTICAL STORM PIPE TO BE REMOVED AND OR

CAPPED AT BOTH ENDS IF LOCATED INSIDE CONCRETE WALLS.

4 REMOVE URINAL AND ASSOCIATED VALVES…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .