LH_VOLUME 03_Revised_RTA_2023-03-01.pdf
PDF 23 MB Posted
- Attached to
- LINCOLN HALL RENOVATION, BLDG. 607 Federal contract opportunity
- Solicitation number
- W912DS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DS23R0009.pdf | ||
| Vol 3 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf | ||
| LH_VOLUME 01_Revised_RTA_2023-03-01.pdf | ||
| LH_VOLUME 02_Revised_RTA_2023-03-01.pdf | ||
| JA 009-23 Avaya Switch.pdf | ||
| JA 011-23 Ventrol AHU.pdf | ||
| JA 012-23 Identiv Card Access System.pdf | ||
| JA 013-23 Monaco.pdf | ||
| JA 014-23 Shark Meter.pdf | ||
| JA 006-23 Belden Brick.pdf | ||
| Vol 1 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf | ||
| Vol 2 WP Lincoln Hall Revised RTA Specifications 1 MAR 2023.pdf | ||
| LH_VOLUME 04_Revised_RTA_2023-03-01.pdf | ||
| JA 007-23 Distributed Antenna System.pdf | ||
| JA 010-23 Best Hardware Lock Cylinders and Cores.pdf | ||
| JA 008-23-Ruabon Quarry Tile.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5
D
C
B
A
US Army Corps of Engineers ®
USMA BUILDING 607 LINCOLN HALL RENOVATION
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
CIVIL LANDSCAPE STRUCTURAL ARCHITECTURE INTERIORS
FIRE PROTECTION
LIFE SAFTEY
PLUMBING
MECHANICAL
ELECTRICAL
TELECOM
SECURITY
HAZMAT
NO SEAL
SHEETS ARE FOR
BIDDING AND
INFORMATION
ONLY
D3296400
REVISED RTA SUBMISSION
03/01/2023
ISSUE DATE: 01 MARCH 2023
WEST POINT, NY
CONTRACT NUMBER : W912DS-19-C-0031-L
SOLICITATION NUMBER : W912DS-19-R-0014
G-031
C O
V E
R S
H E
E T
V
O L U
M E
T H
R E
E
B U
IL
D
IN
G
S
/6
R
E N
O V
A T
IO
N
L
IN
C O
L N
H A
L L
L
IN
C O
L N
H A
L L
W E
S T
P O
IN
T
N
E W
Y O
R K
A F
L O
R A
A F
L O
R A
D M
A N
T Y
M
A R
C H
W D
S -1
-R
-0
W D
S -1
-C
-0 -L
VOLUME THREE
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
G-032
IN
D
E X
O F
D R
A W
IN
G
S
V O
L U
M E
O N
E A
N D
T W
O
B U
IL
D
IN
G
S
/6
R
E N
O V
A T
IO
N
L
IN
C O
L N
H A
L L
L
IN
C O
L N
H A
L L
W E
S T
P O
IN
T
N
E W
Y O
R K
A F
L O
R A
A F
L O
R A
D M
A N
T Y
M
A R
C H
W D
S -1
-R
-0
W D
S -1
-C
-0 -L
REVISED RTA SUBMISSION 03/01/2023
NUMBER DRAWING NAME
LIFE SAFETY
LS001 LIFE SAFETY CODE SUMMARY
LS101 LEVEL B3 FLOOR PLAN - LIFE SAFETY
LS102 LEVEL B2 FLOOR PLAN - LIFE SAFETY
LS103 LEVEL B1 FLOOR PLAN - LIFE SAFETY
LS104 LEVEL 1 FLOOR PLAN - LIFE SAFETY
LS105 LEVEL 2 FLOOR PLAN - LIFE SAFETY
LS106 LEVEL 3 FLOOR PLAN - LIFE SAFETY
LS107 LEVEL 4 FLOOR PLAN - LIFE SAFETY
HAZARDOUS
H-101 LEVEL B3 HAZMAT PLAN
H-102 LEVEL B2 HAZMAT PLAN
H-103 LEVEL B1 HAZMAT PLAN
H-104 LEVEL 1 HAZMAT PLAN
H-105 LEVEL 2 HAZMAT PLAN
H-106 LEVEL 3 HAZMAT PLAN
H-107 LEVEL 4 HAZMAT PLAN
CIVIL
C-001 GENERAL NOTES
C-002 GENERAL NOTES, LEGEND, AND ABBREVIATIONS
BB501 SOIL BORING LOG
C-101 EXISTING CONDITIONS PLAN
CD101 DEMOLITION PLAN
CS101 SITE PLAN
CS102 TRUCK ACCESS PLAN
CS103 CONSTRUCTION LOGISTICS PLAN
CG101 GRADING AND DRAINAGE PLAN
CG102 SOIL EROSION PLAN
CU101 UTILITY PLAN
C-201 DRAINAGE PROFILE
C-501 CONSTRUCTION DETAILS
C-502 CONSTRUCTION DETAILS
C-503 CONSTRUCTION DETAILS
C-504 CONSTRUCTION DETAILS
C-505 CONSTRUCTION DETAILS
C-506 CONSTRUCTION DETAILS
LANDSCAPE
L-101 LANDSCAPE PLAN
L-501 LANDSCAPE DETAILS
L-502 LANDSCAPE DETAILS
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 STRUCTURAL ABBREVIATIONS, SYMBOLS, LEGEND
S-010 LOAD PLANS
S-011 SNOW AND WIND LOADING PLANS
SD101 LEVEL B3 DEMOLITION PLAN
SD102 LEVEL B2 DEMOLITION PLAN
SD103 LEVEL B1 DEMOLITION PLAN
SD104 LEVEL 1 DEMOLITION PLAN
SD105 LEVEL 2 DEMOLITION PLAN
SD106 LEVEL 3 DEMOLITION PLAN
SD107 LEVEL 4/ROOF DEMOLITION PLAN - SOUTH WING
SD108 ROOF DEMOLITION PLAN - NORTH WING AND TOWER
SD401 LARGE SCALE VIEWS
SD402 LARGE SCALE VIEWS
S-101 LEVEL B3 FLOOR PLAN
S-102 LEVEL B2 FLOOR PLAN
S-103 LEVEL B1 FLOOR PLAN
S-104 LEVEL1 FLOOR PLAN
S-105 LEVEL2 FLOOR PLAN
S-106 LEVEL3 FLOOR PLAN
S-107 LEVEL 4/ROOF PLAN - SOUTH WING
S-108 ROOF PLAN - NORTH WING AND TOWER
S-201 ELEVATIONS
S-401 LARGE SCALE VIEWS
S-402 LARGE SCALE VIEWS
S-403 LARGE SCALE VIEWS
S-404 LARGE SCALE VIEWS
S-501 TYPICAL DETAILS - FOUNDATIONS, WALLS, SLABS-ON-GRADE, SLABS
S-502 TYPICAL DETAILS - DEVELOPMENT LENGTHS, POST-INSTALLED ANCHORS, STEEL BEAMS
S-503 TYPICAL DETAILS - STEEL BEAMS AND LINTELS
S-504 TYPICAL DETAILS - STEEL BEAMS AND LINTELS
S-505 TYPICAL DETAILS - STEEL DETAILS
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
INDEX OF DRAWINGS - VOLUME ONE INDEX OF DRAWINGS - VOLUME TWO
NUMBER DRAWING NAME
A-511 EXTERIOR DETAILS
A-512 EXTERIOR DETAILS
A-513 EXTERIOR DETAILS
A-514 EXTERIOR DETAILS
A-521 WINDOW DETAILS
A-522 WINDOW DETAILS
A-523 WINDOW DETAILS
A-531 ROOF DETAILS
A-532 ROOF DETAILS
A-533 STAIR TOWER ATTIC ACCESS DETAILS
A-541 EXTERIOR GUARDRAIL AND HANDRAIL DETAILS
A-542 RETAIL STORE STAIR DETAILS
A-543 RETAIL STORE STAIR DETAILS
A-545 INTERIOR STAIR DETAILS
A-546 INTERIOR STAIR DETAILS
A-551 CEILING DETAILS
A-552 TV STUDIO CEILING AND PARTITION DETAILS
A-553 TV STUDIO CEILING DETAILS
A-554 TV STUDIO CEILING DETAILS
A-561 MILLWORK DETAILS - CAFE
A-562 MILLWORK DETAILS - BRIEFING ROOM
A-563 MILLWORK DETAILS - TYPICAL
A-564 MILLWORK DETAILS - TYPICAL
A-601 PARTITION TYPES
A-602 PARTITION TYPES
A-604 DOOR SCHEDULE AND DETAILS
A-605 DOOR SCHEDULE AND DETAILS
A-606 GLAZED PARTITION AND DOOR DETAILS
A-607 DOOR DETAILS
A-608 DOOR DETAILS
A-609 EXTERIOR DOOR DETAILS
A-610 EXTERIOR DOOR DETAILS
A-615 WINDOW TYPES AND SCHEDULE
A-620 INTERIOR ALUMINUM FRAME SYSTEM
A-621 INTERIOR ALUMINUM FRAME SYSTEM
A-901 EXTERIOR RESTORATION ELEVATIONS
A-902 EXTERIOR RESTORATION ELEVATIONS
A-903 EXTERIOR RESTORATION ELEVATIONS
A-904 EXTERIOR RESTORATION ELEVATIONS
A-905 EXTERIOR RESTORATION ELEVATIONS
A-906 EXTERIOR RESTORATION ELEVATIONS
A-907 EXTERIOR RESTORATION ELEVATIONS
ARCHITECTURAL SIGNAGE
AG001 SITE SIGNAGE PLAN
AG101 LEVEL B3 FLOOR PLAN -SIGNAGE
AG102 LEVEL B2 FLOOR PLAN - SIGNAGE
AG103 LEVEL B1 FLOOR PLAN - SIGNAGE
AG104 LEVEL 1 FLOOR PLAN - SIGNAGE
AG105 LEVEL 2 FLOOR PLAN - SIGNAGE
AG106 LEVEL 3 FLOOR PLAN - SIGNAGE
AG107 LEVEL 4 FLOOR PLAN - SIGNAGE
AG201 SIGNAGE - EXTERIOR SIGN ELEVATIONS
AG202 SIGNAGE - INTERIOR SIGN ELEVATIONS
AG203 SIGNAGE - INTERIOR SIGN ELEVATIONS
AG501 SIGNAGE LAYOUTS
AG502 SIGNAGE LAYOUTS
AG601 SIGNAGE SCHEDULE
INTERIOR
I-101 LEVEL B3 FLOOR PLAN - FINISH
I-102 LEVEL B2 FLOOR PLAN - FINISH
I-103 LEVEL B1 FLOOR PLAN - FINISH
I-104 LEVEL 1 FLOOR PLAN - FINISH
I-105 LEVEL 2 FLOOR PLAN - FINISH
I-106 LEVEL 3 FLOOR PLAN - FINISH
I-107 LEVEL 4 FLOOR PLAN - FINISH
I-111 LEVEL B3 FLOOR PLAN - FURNITURE
I-112 LEVEL B2 FLOOR PLAN - FURNITURE
I-113 LEVEL B1 FLOOR PLAN - FURNITURE
I-114 LEVEL 1 FLOOR PLAN - FURNITURE
I-115 LEVEL 2 FLOOR PLAN - FURNITURE
I-116 LEVEL 3 FLOOR PLAN - FURNITURE
I-117 LEVEL 4 FLOOR PLAN - FURNITURE
I-400 ENLARGED FINISH FLOOR PLANS - CORRIDORS
I-401 ENLARGED FINISH FLOOR PLANS - CORRIDORS, CAFE, RESTROOMS
I-402 ENLARGED FINISH FLOOR PLANS - RETAIL STORE, CORRIDOR
I-403 ENLARGED FINISH FLOOR PLANS - CORRIDORS
I-404 ENLARGED FINISH FLOOR PLANS - CENTRAL STAIR
I-405 ENLARGED FINISH FLOOR PLANS - CENTRAL STAIR, BREAK ROOMS
I-406 ENLARGED FINISH FLOOR PLANS - PHOTO STUDIO
I-500 INTERIOR DETAILS
I-501 INTERIOR DETAILS
I-600 COLOR MATERIAL LEGEND
I-601 COLOR MATERIAL LEGEND
I-602 FINISH MATERIAL SCHEDULE
I-603 FINISH MATERIAL SCHEDULE
I-604 FINISH MATERIAL SCHEDULE
NUMBER DRAWING NAME
ARCHITECTURAL
A-001 ABBREVIATIONS, MOUNTING HEIGHTS, AND SYMBOLS
AD101 LEVEL B3 DEMOLITION PLAN
AD102 LEVEL B2 DEMOLITION PLAN
AD103 LEVEL B1 DEMOLITION PLAN
AD104 LEVEL 1 DEMOLITION PLAN
AD105 LEVEL 2 DEMOLITION PLAN
AD106 LEVEL 3 DEMOLITION PLAN
AD107 LEVEL 4 DEMOLITION PLAN
AD108 ROOF DEMOLITION PLAN
A-101 LEVEL B3 FLOOR PLAN
A-102 LEVEL B2 FLOOR PLAN
A-103 LEVEL B1 FLOOR PLAN
A-104 LEVEL 1 FLOOR PLAN
A-105 LEVEL 2 FLOOR PLAN
A-106 LEVEL 3 FLOOR PLAN
A-107 LEVEL 4 FLOOR PLAN
A-108 ROOF PLAN
A-111 LEVEL B3 REFLECTED CEILING PLAN
A-112 LEVEL B2 REFLECTED CEILING PLAN
A-113 LEVEL B1 REFLECTED CEILING PLAN
A-114 LEVEL 1 REFLECTED CEILING PLAN
A-115 LEVEL 2 REFLECTED CEILING PLAN
A-116 LEVEL 3 REFLECTED CEILING PLAN
A-117 LEVEL 4 REFLECTED CEILING PLAN
A-201 SOUTH WING ELEVATIONS
A-202 SOUTH WING ELEVATIONS
A-203 NORTH WING AND TOWER ELEVATIONS
A-204 NORTH WING AND TOWER ELEVATIONS
A-205 ENLARGED ELEVATIONS - PENTHOUSE AND SALLY PORT
A-206 ENLARGED EXTERIOR ELEVATIONS, RETAINING WALLS
A-211 EXTERIOR WALL TYPICAL CONDITION PHOTOS
A-212 EXTERIOR WALL TYPICAL CONDITIONS PHOTOS
A-301 SOUTH WING BUILDING SECTION
A-302 SOUTH AND NORTH WING BUILDING SECTIONS
A-303 NORTH WING BUILDING SECTIONS
A-311 PARTIAL BUILDING SECTIONS
A-321 EXTERIOR WALL/ROOF SECTIONS PENTHOUSE
A-322 SHAFT SECTIONS
A-401 ENLARGED RESTROOM FLOOR PLANS
A-402 LEVEL B2 - ENLARGED CENTRAL STAIR FLOOR PLANS
A-403 LEVEL 1 AND 2 - ENLARGED CENTRAL STAIR FLOOR PLANS
A-404 LEVEL 3 AND 4 - ENLARGED CENTRAL STAIR FLOOR PLANS
A-405 ENLARGED CENTRAL STAIR RCPS
A-406 INTERIOR STAIRS ENLARGED PLANS & SECTIONS
A-407 ELEVATOR FLOOR PLANS, SECTIONS AND ELEVATIONS
A-411 CENTRAL STAIR TOWER SECTIONS/ELEVATIONS
A-412 CENTRAL STAIR LOBBY ELEVATIONS
A-413 CENTRAL STAIR LOBBY ELEVATIONS
A-414 CENTRAL STAIR LOBBY ELEVATIONS
A-415 CENTRAL STAIR LOBBY ELEVATIONS
A-421 CAFE ENLARGED PLANS AND ELEVATIONS
A-423 RETAIL STORE ENLARGED PLANS
A-424 RETAIL STORE ENLARGED PLANS
A-425 RETAIL STORE ELEVATIONS
A-426 RETAIL STORE ELEVATIONS AND DETAILS
A-427 RETAIL STORE DISPLAY WINDOW ELEVATIONS
A-428 RETAIL STORE PERSPECTIVE VIEWS AND DETAILS
A-429 ENLARGED BRIEFING ROOM PLANS AND ELEVATIONS
A-430 ENLARGED TV STUDIO PLANS
A-431 ENLARGED TV STUDIO SECTIONS/ELEVATIONS
A-432 INTERIOR ELEVATIONS - TV STUDIO
A-433 ENLARGED BREAK ROOM PLANS AND ELEVATIONS
A-434 ENLARGED CONFERENCE ROOM PLANS AND ELEVATIONS
A-435 ENLARGED CONFERENCE ROOM PLANS AND ELEVATIONS
A-436 OPEN OFFICE ENLARGED EXTERIOR WALL ELEVATIONS
A-437 OPEN OFFICE ENLARGED EXTERIOR WALL ELEVATIONS
A-439 ENLARGED PHOTO STUDIO PLANS AND ELEVATIONS
A-440 ENLARGED CHANGING ROOM PLANS AND ELEVATIONS
NUMBER DRAWING NAME
GENERAL
G-011 COVER SHEET - VOLUME ONE
G-012 INDEX OF DRAWINGS - VOLUME ONE AND TWO
G-013 INDEX OF DRAWINGS - VOLUME THREE AND FOUR
NUMBER DRAWING NAME
GENERAL
G-021 COVER SHEET - VOLUME TWO
G-022 INDEX OF DRAWINGS - VOLUME ONE AND TWO
G-023 INDEX OF DRAWINGS - VOLUME THREE AND FOUR
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
G-033
IN
D
E X
O F
D R
A W
IN
G
S
V O
L U
M E
T H
R E
E A
N D
F O
U R
B U
IL
D
IN
G
S
/6
R
E N
O V
A T
IO
N
L
IN
C O
L N
H A
L L
L
IN
C O
L N
H A
L L
W E
S T
P O
IN
T
N
E W
Y O
R K
A F
L O
R A
A F
L O
R A
D M
A N
T Y
M
A R
C H
W D
S -1
-R
-0
W D
S -1
-C
-0 -L
REVISED RTA SUBMISSION 03/01/2023
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
NUMBER DRAWING NAME
MECHANICAL
M-001 HVAC LEGEND
M-002 HVAC LEGEND
MD101 LEVEL B3 DEMOLITION PLAN - HVAC
MD102 LEVEL B2 DEMOLITION PLAN - HVAC
MD103 LEVEL B1 DEMOLITION PLAN - HVAC
MD104 LEVEL 1 DEMOLITION PLAN - HVAC
MD105 LEVEL 2 DEMOLITION PLAN - HVAC
MD106 LEVEL 3 DEMOLITION PLAN - HVAC
MD107 LEVEL 4 DEMOLITION PLAN - HVAC
MD108 ROOF DEMOLITION PLAN - HVAC
MH101 LEVEL B3 FLOOR PLAN - DUCTWORK
MH102 LEVEL B2 FLOOR PLAN - DUCTWORK
MH103 LEVEL B1 FLOOR PLAN - DUCTWORK
MH104 LEVEL 1 FLOOR PLAN - DUCTWORK
MH105 LEVEL 2 FLOOR PLAN - DUCTWORK
MH106 LEVEL 3 FLOOR PLAN - DUCTWORK
MH107 LEVEL 4 FLOOR PLAN - DUCTWORK
MH108 ROOF PLAN - DUCTWORK
MP101 LEVEL B3 FLOOR PLAN - PIPING
MP102 LEVEL B2 FLOOR PLAN - PIPING
MP103 LEVEL B1 FLOOR PLAN - PIPING
MP104 LEVEL 1 FLOOR PLAN - PIPING
MP105 LEVEL 2 FLOOR PLAN - PIPING
MP106 LEVEL 3 FLOOR PLAN - PIPING
MP107 LEVEL 4 FLOOR PLAN - PIPING
MP108 ROOF PLAN - PIPING
M-301 MECHANICAL SECTIONS - HVAC SHAFTS
M-302 MECHANICAL SECTIONS
M-303 MECHANICAL SECTIONS
M-401 HVAC ENLARGED PLANS
M-402 HVAC ENLARGED PLANS
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-503 HVAC DETAILS
M-504 HVAC DETAILS
M-505 HVAC DETAILS
M-506 HVAC DETAILS
M-507 HVAC DETAILS
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
M-603 HVAC SCHEDULES
M-604 HVAC SCHEDULES
M-605 HVAC SCHEDULES
M-701 STEAM AND HOT WATER FLOW DIAGRAM
M-702 CHILLED WATER FLOW DIAGRAMS - CAMPUS CHW AND CHILLED BEAM LOOP
M-703 HYDRONIC FLOW DIAGRAM - LEVEL B2 AND B3
M-704 HYDRONIC FLOW DIAGRAM - LEVEL B1
M-705 HYDRONIC FLOW DIAGRAM - LEVEL 1
M-706 HYDRONIC FLOW DIAGRAM - LEVEL 2
M-707 HYDRONIC FLOW DIAGRAM - LEVEL 3
M-708 HYDRONIC FLOW DIAGRAM - LEVEL 4 AND ROOF
M-709 AIRFLOW RISER DIAGRAM - DOAS-1
M-710 AIRFLOW RISER DIAGRAM - DOAS-2
M-711 AIRFLOW RISER DIAGRAM - MAU-1
M-801 CONTROL SCHEMATIC SYMBOLS, ABBREVIATIONS AND ACRONYMS
M-802 HVAC CONTROL DIAGRAM
M-803 HVAC CONTROL DIAGRAM
M-804 HVAC CONTROL DIAGRAM
M-805 HVAC CONTROL DIAGRAM
M-806 HVAC CONTROL DIAGRAM
M-807 HVAC CONTROL DIAGRAM
M-808 HVAC CONTROL DIAGRAM
M-809 HVAC CONTROL DIAGRAM
M-810 HVAC CONTROL DIAGRAM
M-811 HVAC CONTROL DIAGRAM
M-812 HVAC CONTROL DIAGRAM
M-813 HVAC CONTROL DIAGRAM
M-814 HVAC CONTROL DIAGRAM
M-815 HVAC CONTROL DIAGRAM
M-816 HVAC CONTROL DIAGRAM
M-817 HVAC CONTROL DIAGRAM
M-818 HVAC CONTROL DIAGRAM
M-819 HVAC CONTROL DIAGRAM
M-820 HVAC CONTROL DIAGRAM
M-821 HVAC CONTROL DIAGRAM
M-822 HVAC CONTROL DIAGRAM
M-823 HVAC CONTROL DIAGRAM
M-824 HVAC CONTROL POINTS SCHEDULE
M-825 HVAC CONTROL POINTS SCHEDULE
M-826 HVAC CONTROL POINTS SCHEDULE
M-827 HVAC CONTROL POINTS SCHEDULE
M-828 HVAC CONTROL POINTS SCHEDULE
M-829 HVAC CONTROL POINTS SCHEDULE
M-830 HVAC CONTROL POINTS SCHEDULE
M-831 HVAC CONTROL POINTS SCHEDULE
M-832 HVAC CONTROL POINTS SCHEDULE
M-833 HVAC CONTROL POINTS SCHEDULE
M-834 HVAC CONTROL POINTS SCHEDULE
M-835 HVAC CONTROL POINTS SCHEDULE
M-836 HVAC CONTROL POINTS SCHEDULE
M-837 HVAC CONTROL POINTS SCHEDULE
M-838 HVAC CONTROL POINTS SCHEDULE
M-839 HVAC CONTROL POINTS SCHEDULE
M-840 HVAC CONTROL POINTS SCHEDULE
M-841 HVAC CONTROL POINTS SCHEDULE
M-842 HVAC CONTROL POINTS SCHEDULE
M-843 HVAC CONTROL POINTS SCHEDULE
M-844 HVAC CONTROL POINTS SCHEDULE
M-845 UMCS SCHEDULES
M-846 THERMOSTAT SCHEDULE
M-847 THERMOSTAT SCHEDULE
M-848 VALVE & DAMPER SCHEDULES
NUMBER DRAWING NAME
FIRE ALARM
FA001 FIRE ALARM - SYMBOLS, ABBREVIATIONS, GENERAL NOTES, AND MASS NOTIFICATION
FD101 LEVEL B3 DEMOLITION PLAN - FIRE ALARM
FD102 LEVEL B2 DEMOLITION PLAN - FIRE ALARM
FD103 LEVEL B1 DEMOLITION PLAN - FIRE ALARM
FD104 LEVEL 1 DEMOLITION PLAN - FIRE ALARM
FD105 LEVEL 2 DEMOLITION PLAN - FIRE ALARM
FD106 LEVEL 3 DEMOLITION PLAN - FIRE ALARM
FD107 LEVEL 4 DEMOLITION PLAN - FIRE ALARM
FA101 LEVEL B3 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION
FA102 LEVEL B2 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION
FA103 LEVEL B1 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION
FA104 LEVEL 1 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION
FA105 LEVEL 2 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION
FA106 LEVEL 3 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION
FA107 LEVEL 4 FLOOR PLAN - FIRE ALARM AND MASS NOTIFICATION
FA108 ROOF PLAN - FIRE ALARM PLAN AND MASS NOTIFICATION
FA701 FIRE ALARM AND MASS NOTIFICATION DETAILS
FA702 FIRE ALARM AND MASS NOTIFICATION DETAILS
FA703 FIRE ALARM AND MASS NOTIFICATION DETAILS
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION - SYMBOLS, ABBREVIATIONS, AND GENERAL NOTES
FD111 LEVEL B3 DEMOLITION PLAN - FIRE SUPPRESSION
FD112 LEVEL B2 DEMOLITION PLAN - FIRE SUPPRESSION
FD113 LEVEL B1 DEMOLITION PLAN - FIRE SUPPRESSION
FD114 LEVEL 1 DEMOLITION PLAN - FIRE SUPPRESSION
FD115 LEVEL 2 DEMOLITION PLAN - FIRE SUPPRESSION
FD116 LEVEL 3 DEMOLITION PLAN - FIRE SUPPRESSION
FD117 LEVEL 4 DEMOLITION PLAN - FIRE SUPRESSION
FX101 LEVEL B3 FLOOR PLAN - FIRE SUPPRESSION
FX102 LEVEL B2 FLOOR PLAN - FIRE SUPPRESSION
FX103 LEVEL B1 FLOOR PLAN - FIRE SUPPRESSION
FX104 LEVEL 1 FLOOR PLAN - FIRE SUPPRESSION
FX105 LEVEL 2 FLOOR PLAN - FIRE SUPPRESSION
FX106 LEVEL 3 FLOOR PLAN - FIRE SUPPRESSION
FX107 LEVEL 4 FLOOR PLAN - FIRE SUPPRESSION
FX108 ROOF PLAN - FIRE SUPPRESSION PLAN
FX501 FIRE SUPPRESSION DETAILS
FX502 FIRE SUPPRESSION DETAILS
PLUMBING
P-001 PLUMBING ABBREVIATIONS, SYMBOLS AND GENERAL NOTES
PD101 LEVEL B3 DEMOLITION PLAN - PLUMBING
PD102 LEVEL B2 DEMOLITION PLAN - PLUMBING
PD103 LEVEL B1 DEMOLITION PLAN - PLUMBING
PD104 LEVEL 1 DEMOLITION PLAN - PLUMBING
PD105 LEVEL 2 DEMOLITION PLAN - PLUMBING
PD106 LEVEL 3 DEMOLITION PLAN - PLUMBING
PD107 LEVEL 4 DEMOLITION PLAN - PLUMBING
PD108 ROOF DEMOLITION PLAN - PLUMBING
P-101 LEVEL B3 FLOOR PLAN - PLUMBING
P-102 LEVEL B2 FLOOR PLAN - PLUMBING
P-103 LEVEL B1 FLOOR PLAN - PLUMBING
P-104 LEVEL 1 FLOOR PLAN - PLUMBING
P-105 LEVEL 2 FLOOR PLAN - PLUMBING
P-106 LEVEL 3 FLOOR PLAN - PLUMBING
P-107 LEVEL 4 FLOOR PLAN - PLUMBING
P-108 ROOF PLAN - PLUMBING
P-401 TOILET ENLARGED PLANS
P-402 TOILET ENLARGED PLANS
P-403 ENLARGED PLANS
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-503 PLUMBING DETAILS
P-604 SCHEDULES
P-701 DOMESTIC WATER RISER DIAGRAMS
P-702 SANITARY AND VENT RISER DIAGRAMS
P-703 STORM WATER RISER DIAGRAMS
INDEX OF DRAWINGS - VOLUME THREE INDEX OF DRAWINGS - VOLUME FOUR
NUMBER DRAWING NAME
TELECOMMUNICATIONS
T-001 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
TD101 LEVEL B3 COMMUNICATION DEMOLITION PLAN
TD102 LEVEL B2 COMMUNICATIONS DEMOLITION PLAN
TD103 LEVEL B1 COMMUNICATIONS DEMOLITION PLAN
TD104 LEVEL 1 - COMMUNICATIONS DEMOLITION PLAN
TD105 LEVEL 2 - COMMUNICATIONS DEMOLITION PLAN
TD106 LEVEL 3 - COMMUNICATIONS DEMOLITION PLAN
TD107 LEVEL 4 - COMMUNICATIONS DEMOLITION PLAN
TS101 PARTIAL TELECOM SITE PLAN
TS102 PARTIAL TELECOM SITE PLAN
T-101 LEVEL B3 FLOOR PLAN - COMMUNICATIONS
T-102 LEVEL B2 FLOOR PLAN - COMMUNICATIONS
T-103 LEVEL B1 FLOOR PLAN - COMMUNICATIONS
T-104 LEVEL 1 FLOOR PLAN - COMMUNICATIONS
T-105 LEVEL 2 FLOOR PLAN - COMMUNICATIONS
T-106 LEVEL 3 FLOOR PLAN - COMMUNICATIONS
T-107 LEVEL 4 FLOOR PLAN - COMMUNICATIONS
TY101 LEVEL B3 FLOOR PLAN - SECURITY
TY102 LEVEL B2 FLOOR PLAN - SECURITY
TY103 LEVEL B1 FLOOR PLAN - SECURITY
TY104 LEVEL 1 FLOOR PLAN - SECURITY
TY105 LEVEL 2 FLOOR PLAN - SECURITY
TY106 LEVEL 3 FLOOR PLAN - SECURITY
TY107 LEVEL 4 FLOOR PLAN - SECURITY
TY501 SECURITY DOOR AND CAMERA DETAILS
TY601 SECURITY PATHWAY DIAGRAM
T-201 RACK ELEVATIONS
T-202 RACK ELEVATIONS
T-203 RACK ELEVATIONS
T-204 RACK ELEVATIONS
T-401 ENLARGED TELECOM ROOM PLANS
T-402 ENLARGED TELECOM ROOM PLANS
T-403 ENLARGED TELECOM ROOM PLANS
T-404 ENLARGED TELECOM ROOM PLANS
T-501 COMMUNICATIONS OUTLET DETAILS
T-502 COMMUNICATIONS DETAILS
T-503 GROUNDING AND BONDING DETAILS
T-504 CABLE TRAY DETAILS
T-600 VOICE AND DATA OSP ONE-LINE DIAGRAM
T-601 NIPR VOICE AND DATA ONE-LINE DIAGRAM
T-602 WREN AND WAP DATA ONE-LINE DIAGRAM
T-603 F-DAS, C-DAS AND CLOCK ONE-LINE DIAGRAM
T-604 TELECOM BONDING AND GROUNDING ONE-LINE DIAGRAM
NUMBER DRAWING NAME
ELECTRICAL
E-001 GENERAL NOTES, AND ABBREVIATIONS
E-002 SYMBOLS
ED100 SITE DEMOLITION PLAN
ED101 LEVEL B3 DEMOLITION PLAN
ED102 LEVEL B2 DEMOLITION PLAN
ED103 LEVEL B1 DEMOLITION PLAN
ED104 LEVEL 1 DEMOLITION PLAN
ED105 LEVEL 2 DEMOLITION PLAN
ED106 LEVEL 3 DEMOLITION PLAN
ED107 LEVEL 4 DEMOLITION PLAN
ED108 ROOF DEMOLITION PLAN
ED601 DEMOLITION - RISER DIAGRAM
EL101 LEVEL B3 LIGHTING PLAN
EL102 LEVEL B2 LIGHTING PLAN
EL103 LEVEL B1 LIGHTING PLAN
EL104 LEVEL 1 LIGHTING PLAN
EL105 LEVEL 2 LIGHTING PLAN
EL106 LEVEL 3 LIGHTING PLAN
EL107 LEVEL 4 LIGHTING PLAN
EL108 ROOF LIGHTING PLAN
EL701 LUMINAIRE SCHEDULE
EL702 LIGHTING CONTROL SCHEDULES
EL703 LIGHTING CONTROL SCHEDULES
ES100 SITE PLAN
EP101 LEVEL B3 POWER PLAN
EP102 LEVEL B2 POWER PLAN
EP103 LEVEL B1 POWER PLAN
EP104 LEVEL 1 POWER PLAN
EP105 LEVEL 2 POWER PLAN
EP106 LEVEL 3 POWER PLAN
EP107 LEVEL 4 POWER PLAN
EP108 ELECTRICAL ROOF POWER PLAN
EP401 ELARGED POWER PLANS
EP402 ENLARGED POWER PLANS
EM101 ELECTRICAL LEVEL B3 EQUIPMENT PLAN
EM102 ELECTRICAL LEVEL B2 EQUIPMENT PLAN
EM103 ELECTRICAL LEVEL B1 EQUIPMENT PLAN
EM104 ELECTRICAL LEVEL 1 EQUIPMENT PLAN
EM105 ELECTRICAL LEVEL 2 EQUIPMENT PLAN
EM106 ELECTRICAL LEVEL 3 EQUIPMENT PLAN
EM107 ELECTRICAL LEVEL 4 EQUIPMENT PLAN
EM108 ELECTRICAL ROOF EQUIPMENT PLAN
EM701 MECHANICAL EQUIPMENT SCHEDULE
EG101 LEVEL B1 GROUNDING PLAN
EG102 ROOF LIGHTNING PROTECTION PLAN
EG601 GROUNDING RISER DIAGRAM
E-501 DETAILS
E-502 DETAILS
E-503 DETAILS
E-504 DETAILS
E-505 DETAILS
E-601 SINGLE LINE DIAGRAM
E-602 POWER RISER DIAGRAM
E-700 ELECTRICAL PANEL SCHEDULE INDEX
E-701 ELECTRICAL PANEL SCHEDULES
E-702 ELECTRICAL PANEL SCHEDULES
E-703 ELECTRICAL PANEL SCHEDULES
E-704 ELECTRICAL PANEL SCHEDULES
E-705 ELECTRICAL PANEL SCHEDULES
E-706 ELECTRICAL PANEL SCHEDULES
E-707 ELECTRICAL PANEL SCHEDULES
E-708 ELECTRICAL PANEL SCHEDULES
E-709 ELECTRICAL PANEL SCHEDULES
E-710 ELECTRICAL PANEL SCHEDULES
E-711 ELECTRICAL PANEL SCHEDULES
E-712 ELECTRICAL PANEL SCHEDULES
E-713 ELECTRICAL PANEL SCHEDULES
E-714 ELECTRICAL PANEL SCHEDULES
NUMBER DRAWING NAME
GENERAL
G-031 COVER SHEET - VOLUME THREE
G-032 INDEX OF DRAWINGS - VOLUME ONE AND TWO
G-033 INDEX OF DRAWINGS - VOLUME THREE AND FOUR
NUMBER DRAWING NAME
GENERAL
G-041 COVER SHEET - VOLUME FOUR
G-042 INDEX OF DRAWINGS - VOLUME ONE AND TWO
G-043 INDEX OF DRAWINGS - VOLUME THREE AND FOUR
P
V
SYMBOL ABBREVIATION DESCRIPTION
COMBINATION WASTE & VENT ABOVE FLOOR OR GRADECW&V
SANITARY SEWER/WASTE ABOVE FLOOR OR GRADE
RL RAIN LEADER ABOVE FLOOR OR GRADE
STORM DRAIN ABOVE FLOOR OR GRADESD
CW&V
SD
COMBINATION WASTE & VENT BELOW FLOOR OR GRADE
SANITARY SEWER/WASTE BELOW FLOOR OR GRADE
STORM DRAIN BELOW FLOOR OR GRADE
V SANITARY VENT
F
CV
FIRE LINE
G FUEL GAS (LOW PRESSURE)
MPG MEDIUM PRESSURE FUEL GAS
SSD SUB-SOIL DRAIN
INDIRECT DRAIN
INDUSTRIAL COLD WATER
VACUUM CLEANING BELOW FLOOR
CV
ID
IW
ANCHOR
WATER HAMMER ARRESTOR
REDUCED PRESSURE BACKFLOW ASSEMBLY
BFP
FLUID FLOW DIRECTION
RPBP
VACUUM CLEANING ABOVE FLOOR OR GRADE
WHA
A COMPRESSED AIR LINE
CW
OFD
OFD
OVERFLOW RAIN LEADER ABOVE FLOOR OR GRADE
OVERFLOW RAIN LEADER BELOW FLOOR OR GRADE
RL RAIN LEADER BELOW FLOOR OR GRADE
UO
UO
USED OIL ABOVE FLOOR OR GRADE
USED OIL BELOW FLOOR OR GRADE
CONDENSATE RETURN PUMP DISCHARGECRPD
A
CRPD
F
G
IW
MPG
OFD
OFD
RL
RL
SD
SD
SSD
UO
UO
CV
CV
GAS COCK
GW GW GREASE WASTE BELOW FLOOR OR GRADE
DOMESTIC COLD WATER SUPPLY
DOUBLE CHECK BACKFLOW PREVENTER
GV GREASE VENT BELOW AND ABOVE FLOORGV
RPBP REDUCED PRESSURE BACKFLOW WITHOUT
SHUT-OFF VALVES ASSEMBLY
PIPE TURNING UP
PIPE TURNING DOWN
PLUGGED PIPE/OUTLET
CONCENTRIC REDUCER
ECCENTRIC REDUCER
CAPPED PIPE/OUTLET
RUNNING TRAP
GATE VALVE
ANGLE VALVE
GLOBE VALVE
CHECK VALVE
BALANCING VALVE
UNION
FS
EWS
BV
GV
GLV
CV
PRV
P/TRV
U
PRESSURE REDUCING VALVE
PRESSURE/TEMPERATURE RELIEF VALVE
FD FLOOR DRAIN
BACKWATER VALVEBWV
DIRECTION OF FLOW
PS GAS SOLENOID VALVE PULL STATION
EMERGENCY SHOWER/EYE WASH
FLOOR SINK
VACUUM SYSTEM
ANV
HB HOSE BIBB
VAC
DOMESTIC HOT WATER RETURN LINEHWR
DOMESTIC HOT WATER SUPPLYHW
SS SS
SS
BV BALL VALVE
SD SHOWER DRAIN (GANG)
CO FLOOR CLEANOUT
GPR GAS PRESSURE REGULATOR
WCO WALL AND ABOVE CEILING CLEANOUT
SOV OS & Y/SHUT-OFF VALVE
WCO WALL OR PLUGGET CLEANOUT
W WASTE
DESCRIPTIONABBREVIATIONSYMBOL
PUMP DISCHARGE
SUMP PUMP
TANK
PD
TK
VLV VALVE
PSIG
FL FLOOR
GCO
GPH
GPM
GV
GRADE CLEANOUT
HEATER
GALLONS PER HOUR
GALLONS PER MINUTE
GATE VALVE
HTR
ID INDIRECT DRAIN
RD ROOF DRAIN
RL RAINLEADER
RPBP
RPM
REDUCED PRESSURE BACKFLOW PREVENTER
REVOLUTIONS PER MINUTE
SANITARY
STORM DRAIN
V VENT
POUNDS PER SQUARE INCH GAUGE
DISP
HP
GALS
IN. HG
TDH
SOV
NFWH
DISPLACEMENT
HORSEPOWER
GALLONS
INCHES OF MERCURY
TOTAL DYNAMIC HEAD
SOLENOID VALVE
NON-FREEZE WALL HYDRANT
OFD OVERFLOW DRAIN (ROOF)
SD
FS FLOOR SINK
NG NATURAL GAS
SS
DIAM. DIAMETER
HB HOSE BIBB
P PLUMBING (FIXTURE)
F.F.E. FINISHED FLOOR ELEVATION
F.G.E. FINISHED GRADE ELEVATION
I.E. INVERT ELEVATION
(NO) NORMALY OPEN
UNIT HEATER
MBH THOUSAND BRITISH THERMAL UNITS
HWB SEMI-CIRCULAR WASHFOUNTAIN
EWS EMERGENCY EYEWASH/SHOWER
HW HOT WATER (POTABLE DOMESTIC)
UH
SP
PD PD PUMP DISCHARGE
S
W
SD
S SANITARY AND VENT RISER
W DOMESTIC WATER RISER
SD STORM RAINLEADER RISER
TW TW TEMPERED WATER
NPW NPW NON-POTABLE WATER
CD CD CONDENSATE DRAIN PIPE
TP TP TRAP PRIMER LINE
OF OF OVERFLOW (WATER
RECLAMATION DEVICES)
SEWAGE EJECTOR PUMPSE
CA
CI
CO
COMPRESSED AIR
CAST IRON
CLEANOUT
ABBREVIATION DESCRIPTION
CFM
CW
AP
CUBIC FEET PER MINUTE
COLD WATER (POTABLE DOMESTIC)
ACCESS PANEL
CFH CUBIC FEET PER HOUR
AFG ABOVE FINISH GRADE
DEMOLITION LEGENDS & SYMBOLS
DESCRIPTIONABBREVIATIONSYMBOL
DOMESTIC COLD WATER
SUPPLY TO BE REMOVED
CWCW
DOMESTIC HOT WATER SUPPLY TO
BE REMOVED
HWHW
DOMESTIC HOT WATER RETURN
TO BE REMOVED
HWRHWR
ENDING POINT OF DEMOLITION
SANITARY SEWER ABOVE AND BELOW
GROUND TO BE REMOVEDSS
CONNECT NEW TO EXISTING
SS
STORM WATER ABOVE AND BELOW
GROUND TO REMAINSDSD
TPV TRAP PRIMER VALVE
UTILITY SINKUS
FCO FLOOR CLEANOUT
DFU DRAIN FIXTURE UNITS
EWH ELECTRIC WATER HEATER
FT WC FEET WATER COLUMN (GAUGE)
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
MS MOP SINK
PLUMBING AND DRAINAGE INSTITUTEPDI
SQUARE FOOTSQ FT
TMV THERMAL MIXING VALVE
WHA WATER HAMMER ARRESTOR
WSFU WASTE SANITARY FIXTURE UNITS
GENERAL NOTESPLUMBING LEGENDS & SYMBOLSPLUMBING ABBREVIATIONS
NOTE: NOT ALL SYMBOLS AND
ABBREVIATIONS MAY BE USED.
1. CONTRACTOR MUST COORDINATE PROJECT WITH CHILLED WATER UTILITY PROJECT
OCCURRING IN PARALLEL WITH THIS PROJECT. CULLUM HALL PROJECT ALSO OCCURRING IN
PARALLEL WITH THESES PROJECTS AND CONNECTED TO CHILLED WATER SITE UTILITY
SYSTEM AND STEAM/CONDENSATE RETURN SITE UTILITY SYSTEM AHEAD OF LINCOLN HALL.
2. PLUMBING DRAWINGS ARE IN PART DIAGRAMMATIC AND INTENDED TO SHOW THE SCOPE
AND GENERAL ARRANGEMENT OF THE WORK UNDER THIS CONTRACT. FOLLOW THESE
DRAWINGS IN LAYING OUT THE EQUIPMENT AND PIPING. DRAWINGS ARE NOT INTENDED TO
BE SCALED FOR ROUGHING IN MEASUREMENTS NOR TO SERVE AS SHOP DRAWINGS. WHERE
JOB CONDITIONS REQUIRE MINOR CHANGES OR ADJUSTMENTS IN THE INDICATED LOCATIONS
OR ARRANGEMENT OF THE WORK, SUCH CHANGES MUST BE MADE WITHOUT CHANGE IN THE
CONTRACT AMOUNT.
3. THE CONTRACTOR MUST VISIT THE JOB SITE TO FAMILIARIZE HIMSELF WITH ALL CONDITIONS
AFFECTING THE WORK AND TO COORDINATE THE WORK WITH OTHER CONTRACTORS ON THE
PROJECT. VERIFY DIMENSIONS PRIOR TO FABRICATION AND INSTALLATION OF DUCTWORK
AND EQUIPMENT.
4. THE INTENT OF THESE DRAWINGS IS TO PROVIDE COMPLETE AND PROPERLY FUNCTIONING
PLUMBING SYSTEMS. CONTRACTOR MUST PROVIDE LABOR AND MATERIALS. UNLESS
OTHERWISE SHOWN ON DRAWINGS OR SPECIFIED HEREIN, PRODUCTS USED IN THE WORK
MUST BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS
AND RECOMMENDATIONS. ANY CHANGES OR MODIFICATIONS PROPOSED BY CONTRACTOR
WHICH HE BELIEVES IMPROVE THE INSTALLATION MUST BE APPROVED BY THE CONTRACTING
OFFICER'S REPRESENTATIVE.
5. EQUIPMENT INDICATED IN THE DRAWINGS, TOGETHER WITH ITS BASE AND/OR SUPPORT,
DUCTWORK, WALL, FLOOR AND ROOF OPENINGS AND ELECTRICAL SERVICE ARE BASED ON
THE EQUIPMENT SCHEDULE OR SPECIFICATIONS. SHOULD CONTRACTOR SELECT AN
EQUIVALENT ALTERNATE, EVEN IF APPROVED BY THE OWNER AS EQUAL, CONTRACTOR MUST
COORDINATE AND MAKE THE MODIFICATIONS IN THE WORK WITHOUT CHANGE IN CONTRACT
AMOUNT.
6. PLUMBING WORK ON THIS PROJECT MUST BE INSTALLED IN ACCORDANCE WITH THE 2018
INTERNATIONAL PLUMBING CODES AND APPLICABLE LOCAL CODES.
7. COORDINATE PLUMBING WORK WITH SITE CONDITIONS AND THE WORK OF OTHER TRADES.
PIPING MUST BE FIELD ROUTED IN ACCORDANCE WITH APPROPRIATE ENGINEERING
PRACTICES, INDUSTRY STANDARDS, AND GOVERNING CODES/REGULATIONS. ROUTE OF
PIPING, INCLUDING CLEARANCE, IS THE RESPONSIBILITY OF THE CONTRACTOR. UNIONS,
BUSHINGS, AND REDUCING INSERTS, NOT SHOWN ON THE DRAWINGS BUT REQUIRED FOR
INSTALLATION, MUST BE PROVIDED BY THE CONTRACTOR.
8. VERIFY EXISTING SLOPES AND INVERT ELEVATIONS PRIOR TO COMMENCEMENT OF WORK.
9. THE WORK REQUIRED MUST INCLUDE THE FURNISHING OF MATERIALS, CUTTING, PATCHING, ADAPTING AND OTHER INCIDENTAL WORK, TOGETHER WITH SUCH TEMPORARY
CONNECTIONS AS MAY BE REQUIRED.
10. HORIZONTAL VENT PIPING MUST RUN ABOVE CEILING AND HORIZONTAL SANITARY PIPING
MUST ROUTE BELOW SLAB UNLESS OTHERWISE NOTED. PROVIDE LOW POINT HOSE END PIPE
DRAINS TO COMPLETELY DRAIN RENOVATION WORK SYSTEMS.
11. PIPE PENETRATIONS THROUGH RATED SLAB AND WALLS SHALL HAVE PIPE SLEEVES WITH
FIRE PROOF MATERIAL. CAULK ANNULAR SPACE BETWEEN PIPE AND SLEEVE. PIPES THRU
INTERIOR WALLS SHALL HAVE ESCUTCHEONS.
12. PROVIDE ACCESS PANELS FOR VALVES, WATER HAMMER ARRESTORS AND OTHER PLUMBING
SPECIALTIES LOCATED INSIDE CHASES, BEHIND WALLS OR ABOVE INACCESSIBLE CEILINGS.
13. INDIVIDUAL SHUTOFF VALVES (STOP VALVES) MUST BE INSTALLED AT WATER SUPPLY LINES
SERVING THE PLUMBING FIXTURES. WATER RISER DIAGRAMS ARE SHOWING THE LOCATION
OF THE STOP VALVE IN THE WATER PIPING.
14. PAINT VENT THROUGH ROOF (VTR) TO MATCH THE ADJACENT ROOF. TO PRESERVE
WARRANTY, ROOF WORK MUST BE COMPLETED BY THE ROOFER HOLDING THE WARRANTY
ON THE EXISTING ROOF.
15. EXISTING WATER PIPES, SANITARY, STORM PIPING ARE UNKNOWN AND ARE SHOWN FOR
INFORMATION PURPOSES ONLY BASED ON EXISTING DOCUMENTS AND FIELD SURVEY,
CONTRACTOR MUST VERIFY EXACT LOCATIONS PRIOR TO ANY BELOW FLOOR SLAB
DEMOLITION AND NEW WORK. IF DISCREPANCY OCCURS, CONSULT WITH THE
CONSTRUCTION MANAGER.
16. THE CONTRACTOR MUST TAKE ALL PRECAUTIONARY STEPS TO PROTECT THE SURROUNDING
EXISTING FACILITIES. ANY DAMAGE OR LOSS OF PROPERTY OCCASIONED BY OR ARISING
FROM ACTS OF THE CONTRACTOR MUST BE THE RESPONSIBILITY OF THE CONTRACTOR.
17. COORDINATE DEMOLITION WORK WITH RENOVATION WORK CONSTRUCTION. CONTRACTOR
MUST REMOVE PIPES AND REPAIR CONCRETE FLOOR SLAB AS REQUIRED. SEE STRUCTURAL
DRAWINGS FOR MORE INFORMATION ON FLOOR SLAB REPAIRS.
18. PIPING FOREIGN TO ELECTRICAL EQUIPMENT ROOM, OR SIMILAR ROOM HOUSING
ELECTRICAL EQUIPMENT(TELEPHONE/DATA, ELEVATOR MACHINE ROOM) MUST NOT
PERMITTED TO BE INSTALLED IN THESE SPACES.
19. PROVIDE FIRE STOPPING AT PENETRATIONS THRU RATED PARTITIONS WITHIN SCOPE OF
WORK. THIS INCLUDES PENETRATIONS THROUGH WALLS, PARTITIONS, BARRIERS, CEILINGS,
ROOFS OR FLOORS - WHETHER EXISTING, CREATED THROUGH DEMOLITION OR CAUSED
DURING CONSTRUCTION. PROVIDE MANUFACTURER'S STANDARD FIRE STOPPING SEALANT,
WITH ACCESSORY MATERIALS, HAVING MINIMUM 1 HOUR FIRE RESISTANCE RATINGS AS
ESTABLISHED BY TESTING IDENTICAL ASSEMBLIES PER ASTM E 814 AND BY UNDERWRITERS
LABORATORY, INC. UL 1479 OR OTHER TESTING AND INSPECTION AGENCY ACCEPTABLE TO
AUTHORITIES HAVING JURISDICTION,
20. INDICATED EXISTING CONDITIONS (E.G. SIZE/LOCATION OF PIPING, EQUIPMENT, AND BUILDING
ELEMENTS) ARE BASED ON INFORMATION OBTAINED FROM AVAILABLE RECORD DRAWINGS
AND/OR FIELD SURVEYS. EXISTING CONDITIONS NOT RELATED TO THE WORK MAY NOT BE
SHOWN. EXISTING CONDITIONS ARE PROVIDED FOR THE CONVENIENCE OF THE
CONTRACTOR ONLY AND ARE NOT GUARANTEED TO BE COMPLETE OR CORRECT. PLANNING
AND CHECKING HAS BEEN DONE BY THE ENGINEER TO MINIMIZE INTERFERENCES. PRIOR TO
START OF EFFORT, FIELD VERIFY EXACT LOCATION AND SIZES OF ALL ELEMENTS RELATED TO
THE WORK. ROUTING OF PIPING AND DUCTWORK SHOWN ON DRAWINGS IS DIAGRAMMATIC.
ASCERTAIN THAT INTERFERENCES WILL NOT BE ENCOUNTERED, PREVENTING THE
DISASSEMBLY OF PARTIALLY OR COMPLETELY ERECTED SYSTEMS FOR RE-ROUTING TO
CLEAR OBSTRUCTIONS WHICH MAY EXIST.
21. DO NOT ASSUME THAT EXISTING VALVES PROVIDE POSITIVE SHUT-OFF. CONTRACTOR MUST
TEST EACH EXISTING VALVE REQUIRED FOR SYSTEM ISOLATION IN ADVANCE SO THAT
PROPER PLANNING AND WORK SEQUENCING CAN BE PERFORMED. COORDINATE VALVE
TESTING WITH CONTRACTING OFFICER. IMMEDIATELY NOTIFY COR OF ALL VALVES THAT FAIL
TO PROVIDE POSITIVE SHUT-OFF.
22. REMOVE HANGERS, SUPPORTS, MISCELLANEOUS STRUCTURAL STEEL, SPECIALTIES, VENTS
AND DRAINS, ELECTRICAL POWER, AND OTHER ASSOCIATED ACCESSORIES IN THE PROCESS
OF PIPE AND EQUIPMENT DEMOLITION. SUPPORTS FOR PIPE SHOWN TO BE DEMOLISHED
THAT PENETRATE THROUGH THE INTERIOR ROOF INSULATION MUST BE CUT 3" ABOVE
INSULATION AND COVERED WITH A PROTECTIVE PLASTIC CAP (BRIGHT ORANGE). BEFORE
DISCONNECTING PIPE, VERIFY THAT PIPING HAS BEEN ISOLATED, VENTED, AND DRAINED.
23. PATCH, SEAL AND FINISH OPENINGS FROM REMOVAL OF PIPING OR EQUIPMENT USING
MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING ASSEMBLIES IN A
WORKMANLIKE MANNER.
24. TAKE PRECAUTION AND USE CARE WHEN REMOVING PIPING WITH HAZARDOUS INSULATION.
COORDINATE WITH HAZARDOUS MATERIALS ABATEMENT REQUIREMENTS. REFER TO
HAZMAT REPORT CONTENTS.
PIPES PIPES TO BE REMOVED
DEMOLITION AREAS OF DEMOLITION
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
P-001
P L U
M B
IN
G
A B
B R
E V
IA
T
IO
N
S
S Y
M B
O L S
A N
D G
E N
E R
A L N
O T
E S
B U
IL
D
IN
G
S
/6
R
E N
O V
A T
IO
N
L
IN
C O
L N
H A
L L
L
IN
C O
L N
H A
L L
W E
S T
P O
IN
T
N
E W
Y O
R K
B H
A M
L
IN
B H
A M
L
IN
D B
A T
T
M
A R
C H
W D
S -1
-R
-0
W D
S -1
-C
-0 -L
REVISED RTA SUBMISSION 03/01/2023
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
6 3/4" CW DN TO
HOSE BIB
3/4" CW DN TO
HOSE BIB
12 12 12
REMOVE 6" AND 4"
SANITARY LINES FROM
CEILING SPACE
CO REMOVE SANITARY DRAIN PIPE
BETWEEN COOLING TOWER
LOCATED TO NORTH OF LINCOLN
HALL BACK TO PIPING ENTRANCE
LOCATION AT LEVEL B3 INTO
MECHANICAL ROOM XB301
REMOVE STORM
WATER PIPING
5'-0" AWAY FROM
BUILDING
REMOVE STORM
WATER PIPING
5'-0" AWAY FROM
BUILDING
REMOVE STORM
WATER PIPING
5'-0" AWAY FROM
BUILDING
13 PIPE
BELOW
FLOOR
PIPE
BELOW
FLOOR
PIPE
BELOW
FLOOR
PIPE
BELOW
FLOOR
PIPE
BELOW
FLOOR
GENERAL NOTES
1. REFER TO THE PLUMBING ABBREVIATIONS, SYMBOLS AND
GENERAL NOTES ON SHEET P-001.
2. CONTRACTOR MUST LOCATE EXACTLY WHERE THE
EXISTING PLUMBING EQUIPMENT AND ABOVE AND
UNDERGROUND PIPING BEFORE ANY DEMOLITION WORK
STARTS.
3. SAW CUT FLOOR SLAB TO REMOVE EXISTING
UNDERGROUND PIPES. SEE STRUCTURAL DRAWINGS FOR
MORE INFORMATION.
4. STORM WATER ROOF DRAINS AND PIPES MUST REMAIN IN
PLACE UNTIL THE NEW PIPING CAN BE INSTALLED ON THE
SAME DAY. THE CONTRACTOR MUST MAKE SURE A CLEAR
DAY OF WHETHER, BEFORE STARTING REMOVAL AND
INSTALLATION OF REPLACEMENT STORM WATER PIPING
CAN BE DONE.
5. GOVERNMENT IS RESPONSIBLE FOR REMOVING ANY
COMPONENTS DESIRED FOR SPARE PARTS OR REUSE
PRIOR TO CONSTRUCTION DEMOLITION. CONTRACTOR
MUST OFFER REMOVED EQUIPMENT TO GOVERNMENT AND
DELIVER TO A LOCATION AS DIRECTED BY GOVERNMENT.
6. PATCH, SEAL AND FINISH OPENING FROM REMOVAL OF PIPING OR EQUIPMENT
USING MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING
ASSEMBLIES IN A WORMANLIKE MANNER. OPENING BEING REUTILIZED BY
REPLACEMENT PLUMBING SYSTEMS MUST BE PROTECTED DURING
CONSTRUCTION.
7. REMOVE DEMOLISHED PIPING, EQUIPMENT (REFUSED BY GOVERNMENT) AND
ACCESSORIES FROM SITE AND PROPERLY DISPOSE OF MATERIALS IN
ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDENANCES.
8. LINCOLN HALL PLUMBING SANITARY WASTE/VENT, STORM AND DOMESTIC POTABLE
WATER PIPING AND EQUIPMENT MUST BE REMOVED IN THEIR ENTIRETY AND
COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT
FOR AVAILABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS.
9. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING
MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE
PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.
N
8'4' 16'0
SCALE: 1/8"=1'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
PD101
L E
V E
L B
D
E M
O L
IT
IO
N
P L A
N
P L U
M B
IN
G
B U
IL
D
IN
G
S
/6
R
E N
O V
A T
IO
N
L
IN
C O
L N
H A
L L
L
IN
C O
L N
H A
L L
W E
S T
P O
IN
T
N
E W
Y O
R K
B H
A M
L
IN
B H
A M
L
IN
D B
A T
T
M
A R
C H
W D
S -1
-R
-0
W D
S -1
-C
-0 -L
REVISED RTA SUBMISSION 03/01/2023
1/8" = 1'-0" C1
LEVEL B3 - PLUMBING DEMOLITION
KEYNOTES
1 REMOVE BACKFLOW PREVENTER AND ASSOCIATED PIPING FROM CEILING SPACE.
2 REMOVE 1" CW LINE AND ASSOCIATED VALVES FROM CEILING SPACE.
3 REMOVE 3/4" CW LINE AND ASSOCIATED VALVES FROM CEILING SPACE.
4 REMOVE 3" VENT PIPING FROM CEILING SPACE.
5 REMOVE 3" SEWAGE EJECTOR DISCHARGE SANITARY LINE FROM CEILING SPACE.
6 REMOVE CW, SANITARY AND PIPES THAT PENETRATE UPPER FLOOR SLAB.
7 REMOVE EXISTING 6" SANITARY SEWAGE LINE FROM TUNNEL SPACE.
8 REMOVE 4" SANITARY UNDERGROUND PIPING.
9 REMOVE 4" HORIZONTAL STORM WATER PIPE.
10 REMOVE 6" HORIZONTAL STORM WATER PIPING.
11 REMOVE 8" HORIZONTAL STORM WATER PIPE.
12 REMOVE 4" VERTICAL STORM WATER PIPE THAT IS NOT ENCASED IN CONCRETE.
13 LINCOLN HALL PLUMBING EQUIPMENT AND PIPING SYSTEMS MUST BE REMOVED IN
THEIR ENTIRETY AND COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS
PROVIDED BY GOVERNMENT FOR VIABLE RECORD DRAWINGS DOCUMENTATION FOR
EXISTING CONDITIONS. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS
THROUGHOUT THE BUILDING MUST BE VERIFIED BY THE CONTRACTOR. THE
CONTRACTOR MUST VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY
EXISTING CONDITIONS.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
REMOVE 4" AND
6" SAN. PIPES
6 6 6
6 6 6
GENERAL NOTES
1. REFER TO THE PLUMBING ABBREVIATIONS, SYMBOLS AND
GENERAL NOTES ON SHEET P-001.
2. CONTRACTOR MUST LOCATE EXACTLY WHERE THE
EXISTING PLUMBING EQUIPMENT AND ABOVE AND
UNDERGROUND PIPING BEFORE ANY DEMOLITION WORK
STARTS.
3. SAW CUT FLOOR SLAB TO REMOVE EXISTING
UNDERGROUND PIPES. SEE STRUCTURAL DRAWINGS FOR
MORE INFORMATION.
4. STORM WATER ROOF DRAINS AND PIPES MUST REMAIN IN
PLACE UNTIL THE NEW PIPING CAN BE INSTALLED ON THE
SAME DAY. THE CONTRACTOR MUST MAKE SURE A CLEAR
DAY OF WHETHER, BEFORE STARTING REMOVAL AND
INSTALLATION OF REPLACEMENT STORM WATER PIPING
CAN BE DONE.
5. GOVERNMENT IS RESPONSIBLE FOR REMOVING ANY
COMPONENTS DESIRED FOR SPARE PARTS OR REUSE
PRIOR TO CONSTRUCTION DEMOLITION. CONTRACTOR
MUST OFFER REMOVED EQUIPMENT TO GOVERNMENT AND
DELIVER TO A LOCATION AS DIRECTED BY GOVERNMENT.
KEYNOTES
1 REMOVE WATER CLOSETS AND ASSOCIATED VALVES AND PIPING.
2 REMOVE LAVATORY AND ASSOCIATED VALVES AND PIPING.
3 REMOVE MOP SINK AND ASSOCIATED VALVES AND PIPING
4 REMOVE EXISTING 3" INCOMING MAIN WATER LINE AND ASSOCIATED VALVES.
5 REMOVE EXISTING 1 1/2" WATER LINE AND ASSOCIATED VALVES.
6 SOME EXISTING 4" VERTICAL STORM WATER PIPES ARE ENCASED IN CONCRETE, THESE PIPES SHOULD BE
ABANDON IN PLACE AND CAP AT BOTH END OF THE VERTICAL PIPE.
7. REMOVE URINAL AND ASSOCIATED VALVES AND PIPING.
8. LINCOLN HALL PLUMBING EQUIPMENT AND PIPING SYSTEMS MUST BE REMOVED IN THEIR ENTIRETY AND
COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS ROVIDED BY GOVERNMENT FOR VIABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS. LINCOLN HALL PLUMBING EQUIPMENT AND PIPING SYSTEMS MUST BE REMOVED IN THEIR ENTIRETY AND COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT FOR VIABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.
9. CAP GAS LINE BEFORE MAIN GAS SHUT-OFF VALVE. EXISTING TO REMAIN 2 INCH NATURAL GAS LINE THIS LOCATION AS IDENTIFIED PER RECORD 1986 DRAWINGS. CONTRACTOR MUST IDENTIFY PIPE PRIOR TO START OF DEMOLITION
AND PROTECT PIPE FOR DURATION OF CONSTRUCTION.
6. PATCH, SEAL AND FINISH OPENING FROM REMOVAL OF PIPING OR EQUIPMENT
USING MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING
ASSEMBLIES IN A WORMANLIKE MANNER. OPENING BEING REUTILIZED BY
REPLACEMENT PLUMBING SYSTEMS MUST BE PROTECTED DURING
CONSTRUCTION.
7. REMOVE DEMOLISHED PIPING, EQUIPMENT (REFUSED BY GOVERNMENT) AND
ACCESSORIES FROM SITE AND PROPERLY DISPOSE OF MATERIALS IN
ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDENANCES.
8. LINCOLN HALL PLUMBING SANITARY WASTE/VENT, STORM AND DOMESTIC POTABLE
WATER PIPING AND EQUIPMENT MUST BE REMOVED IN THEIR ENTIRETY AND
COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT
FOR AVAILABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS.
9. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING
MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE
PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.
N
8'4' 16'0
SCALE: 1/8"=1'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
PD102
L E
V E
L B
D
E M
O L
IT
IO
N
P L A
N
P L U
M B
IN
G
B U
IL
D
IN
G
S
/6
R
E N
O V
A T
IO
N
L
IN
C O
L N
H A
L L
L
IN
C O
L N
H A
L L
W E
S T
P O
IN
T
N
E W
Y O
R K
B H
A M
L
IN
B H
A M
L
IN
D B
A T
T
M
A R
C H
W D
S -1
-R
-0
W D
S -1
-C
-0 -L
REVISED RTA SUBMISSION 03/01/2023
1/8" = 1'-0" C1
LEVEL B2 - PLUMBING DEMOLITION
M A
R K
D E
S C
R
IP
T
IO
N D
A T
2" GAS
DN
3 3
3 3
4 4
1 1 1
7 7 7 7 7 1
GENERAL NOTES
1. REFER TO THE PLUMBING ABBREVIATIONS, SYMBOLS AND
GENERAL NOTES ON SHEET P-001.
2. CONTRACTOR MUST LOCATE EXACTLY WHERE THE
EXISTING PLUMBING EQUIPMENT AND ABOVE AND
UNDERGROUND PIPING BEFORE ANY DEMOLITION WORK
STARTS.
3. SAW CUT FLOOR SLAB TO REMOVE EXISTING
UNDERGROUND PIPES. SEE STRUCTURAL DRAWINGS FOR
MORE INFORMATION.
4. STORM WATER ROOF DRAINS AND PIPES MUST REMAIN IN
PLACE UNTIL THE NEW PIPING CAN BE INSTALLED ON THE
SAME DAY. THE CONTRACTOR MUST MAKE SURE A CLEAR
DAY OF WHETHER, BEFORE STARTING REMOVAL AND
INSTALLATION OF REPLACEMENT STORM WATER PIPING
CAN BE DONE.
5. GOVERNMENT IS RESPONSIBLE FOR REMOVING ANY
COMPONENTS DESIRED FOR SPARE PARTS OR REUSE
PRIOR TO CONSTRUCTION DEMOLITION. CONTRACTOR
MUST OFFER REMOVED EQUIPMENT TO GOVERNMENT AND
DELIVER TO A LOCATION AS DIRECTED BY GOVERNMENT.
6. PATCH, SEAL AND FINISH OPENING FROM REMOVAL OF PIPING OR EQUIPMENT
USING MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING
ASSEMBLIES IN A WORMANLIKE MANNER. OPENING BEING REUTILIZED BY
REPLACEMENT PLUMBING SYSTEMS MUST BE PROTECTED DURING
CONSTRUCTION.
7. REMOVE DEMOLISHED PIPING, EQUIPMENT (REFUSED BY GOVERNMENT) AND
ACCESSORIES FROM SITE AND PROPERLY DISPOSE OF MATERIALS IN
ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDENANCES.
8. LINCOLN HALL PLUMBING SANITARY WASTE/VENT, STORM AND DOMESTIC POTABLE
WATER PIPING AND EQUIPMENT MUST BE REMOVED IN THEIR ENTIRETY AND
COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT
FOR AVAILABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS.
9. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING
MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE
PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.
N
8'4' 16'0
SCALE: 1/8"=1'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
PD103
L E
V E
L B
D
E M
O L
IT
IO
N
P L A
N
P L U
M B
IN
G
B U
IL
D
IN
G
S
/6
R
E N
O V
A T
IO
N
L
IN
C O
L N
H A
L L
L
IN
C O
L N
H A
L L
W E
S T
P O
IN
T
N
E W
Y O
R K
B H
A M
L
IN
B H
A M
L
IN
D B
A T
T
M
A R
C H
W D
S -1
-R
-0
W D
S -1
-C
-0 -L
REVISED RTA SUBMISSION 03/01/2023
1/8" = 1'-0" C1
LEVEL B1 - PLUMBING DEMOLITION
KEYNOTES
1 REMOVE LAVATORY AND ASSOCIATED VALVES AND PIPING.
2 EXISTING 4" VERTICAL STORM PIPE TO BE REMOVED AND OR
CAPPED AT BOTH ENDS IF LOCATED INSIDE CONCRETE WALLS.
3 REMOVE EXPOSE 4" STORM WATER PIPING.
4 REMOVE WATER CLOSETS AND ASSOCIATED VALVES AND PIPING.
5 REMOVE MOP SINK AND ASSOCIATED VALVES AND PIPING.
6 LINCOLN HALL PLUMBING EQUIPMENT AND PIPING SYSTEMS MUST
BE REMOVED IN THEIR ENTIRETY AND COMPLETELY. REFER TO
1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT FOR
VIABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING
CONDITIONS. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS
THROUGHOUT THE BUILDING MUST BE VERIFIED BY THE
CONTRACTOR. THE CONTRACTOR MUST VISIT THE PROJECT SITE
PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.
7 REMOVE URINAL AND ASSOCIATED VALVES AND PIPING.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
1 1 1
3 3
4 4 4
7 7
GENERAL NOTES
1. REFER TO THE PLUMBING ABBREVIATIONS, SYMBOLS AND
GENERAL NOTES ON SHEET P-001.
2. CONTRACTOR MUST LOCATE EXACTLY WHERE THE
EXISTING PLUMBING EQUIPMENT AND ABOVE AND
UNDERGROUND PIPING BEFORE ANY DEMOLITION WORK
STARTS.
3. SAW CUT FLOOR SLAB TO REMOVE EXISTING
UNDERGROUND PIPES. SEE STRUCTURAL DRAWINGS FOR
MORE INFORMATION.
4. STORM WATER ROOF DRAINS AND PIPES MUST REMAIN IN
PLACE UNTIL THE NEW PIPING CAN BE INSTALLED ON THE
SAME DAY. THE CONTRACTOR MUST MAKE SURE A CLEAR
DAY OF WHETHER, BEFORE STARTING REMOVAL AND
INSTALLATION OF REPLACEMENT STORM WATER PIPING
CAN BE DONE.
5. GOVERNMENT IS RESPONSIBLE FOR REMOVING ANY
COMPONENTS DESIRED FOR SPARE PARTS OR REUSE
PRIOR TO CONSTRUCTION DEMOLITION. CONTRACTOR
MUST OFFER REMOVED EQUIPMENT TO GOVERNMENT AND
DELIVER TO A LOCATION AS DIRECTED BY GOVERNMENT.
6. PATCH, SEAL AND FINISH OPENING FROM REMOVAL OF PIPING OR EQUIPMENT
USING MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING
ASSEMBLIES IN A WORMANLIKE MANNER. OPENING BEING REUTILIZED BY
REPLACEMENT PLUMBING SYSTEMS MUST BE PROTECTED DURING
CONSTRUCTION.
7. REMOVE DEMOLISHED PIPING, EQUIPMENT (REFUSED BY GOVERNMENT) AND
ACCESSORIES FROM SITE AND PROPERLY DISPOSE OF MATERIALS IN
ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDENANCES.
8. LINCOLN HALL PLUMBING SANITARY WASTE/VENT, STORM AND DOMESTIC POTABLE
WATER PIPING AND EQUIPMENT MUST BE REMOVED IN THEIR ENTIRETY AND
COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT
FOR AVAILABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS.
9. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING
MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE
PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.
N
8'4' 16'0
SCALE: 1/8"=1'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
PD104
L E
V E
L
D E
M O
L
IT
IO
N
P L A
N
P L U
M B
IN
G
B U
IL
D
IN
G
S
/6
R
E N
O V
A T
IO
N
L
IN
C O
L N
H A
L L
L
IN
C O
L N
H A
L L
W E
S T
P O
IN
T
N
E W
Y O
R K
B H
A M
L
IN
B H
A M
L
IN
D B
A T
T
M
A R
C H
W D
S -1
-R
-0
W D
S -1
-C
-0 -L
REVISED RTA SUBMISSION 03/01/2023
1/8" = 1'-0" C1
LEVEL 1 - PLUMBING DEMOLITION
KEYNOTES
1 REMOVE EXPOSE 4" STORM WATER PIPING.
2 EXISTING 4" VERTICAL STORM PIPE TO BE REMOVED AND OR
CAPPED AT BOTH ENDS IF LOCATED INSIDE CONCRETE WALLS.
3 REMOVE WATER CLOSETS AND ASSOCIATED VALVES AND PIPING.
4 REMOVE LAVATORY AND ASSOCIATED VALVES AND PIPING.
5 REMOVE MOP SINK AND ASSOCIATED VALVES AND PIPING.
6 LINCOLN HALL PLUMBING EQUIPMENT AND PIPING SYSTEMS MUST
BE REMOVED IN THEIR ENTIRETY AND COMPLETELY. REFER TO
1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT FOR
VIABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING
CONDITIONS. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS
THROUGHOUT THE BUILDING MUST BE VERIFIED BY THE
CONTRACTOR. THE CONTRACTOR MUST VISIT THE PROJECT SITE
PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.
7 REMOVE URINAL AND ASSOCIATED VALVES AND PIPING.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
2 2
2 2 2
4 5
5 5 5
7 7
GENERAL NOTES
1. REFER TO THE PLUMBING ABBREVIATIONS, SYMBOLS AND
GENERAL NOTES ON SHEET P-001.
2. CONTRACTOR MUST LOCATE EXACTLY WHERE THE
EXISTING PLUMBING EQUIPMENT AND ABOVE AND
UNDERGROUND PIPING BEFORE ANY DEMOLITION WORK
STARTS.
3. SAW CUT FLOOR SLAB TO REMOVE EXISTING
UNDERGROUND PIPES. SEE STRUCTURAL DRAWINGS FOR
MORE INFORMATION.
4. STORM WATER ROOF DRAINS AND PIPES MUST REMAIN IN
PLACE UNTIL THE NEW PIPING CAN BE INSTALLED ON THE
SAME DAY. THE CONTRACTOR MUST MAKE SURE A CLEAR
DAY OF WHETHER, BEFORE STARTING REMOVAL AND
INSTALLATION OF REPLACEMENT STORM WATER PIPING
CAN BE DONE.
5. GOVERNMENT IS RESPONSIBLE FOR REMOVING ANY
COMPONENTS DESIRED FOR SPARE PARTS OR REUSE
PRIOR TO CONSTRUCTION DEMOLITION. CONTRACTOR
MUST OFFER REMOVED EQUIPMENT TO GOVERNMENT AND
DELIVER TO A LOCATION AS DIRECTED BY GOVERNMENT.
6. PATCH, SEAL AND FINISH OPENING FROM REMOVAL OF PIPING OR EQUIPMENT
USING MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING
ASSEMBLIES IN A WORMANLIKE MANNER. OPENING BEING REUTILIZED BY
REPLACEMENT PLUMBING SYSTEMS MUST BE PROTECTED DURING
CONSTRUCTION.
7. REMOVE DEMOLISHED PIPING, EQUIPMENT (REFUSED BY GOVERNMENT) AND
ACCESSORIES FROM SITE AND PROPERLY DISPOSE OF MATERIALS IN
ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDENANCES.
8. LINCOLN HALL PLUMBING SANITARY WASTE/VENT, STORM AND DOMESTIC POTABLE
WATER PIPING AND EQUIPMENT MUST BE REMOVED IN THEIR ENTIRETY AND
COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT
FOR AVAILABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS.
9. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING
MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE
PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.
N
8'4' 16'0
SCALE: 1/8"=1'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
PD105
L E
V E
L
D E
M O
L
IT
IO
N
P L A
N
P L U
M B
IN
G
B U
IL
D
IN
G
S
/6
R
E N
O V
A T
IO
N
L
IN
C O
L N
H A
L L
L
IN
C O
L N
H A
L L
W E
S T
P O
IN
T
N
E W
Y O
R K
B H
A M
L
IN
B H
A M
L
IN
D B
A T
T
M
A R
C H
W D
S -1
-R
-0
W D
S -1
-C
-0 -L
REVISED RTA SUBMISSION 03/01/2023
1/8" = 1'-0" C1
LEVEL 2 - PLUMBING DEMOLITION
KEYNOTES
1 REMOVE MOP SINK AND ASSOCIATED VALVES AND PIPING.
2 REMOVE EXPOSE 4" STORM WATER PIPING.
3 EXISTING 4" VERTICAL STORM PIPE TO BE REMOVED AND OR
CAPPED AT BOTH ENDS IF LOCATED INSIDE CONCRETE WALLS.
4 REMOVE WATER CLOSETS AND ASSOCIATED VALVES AND PIPING.
5 REMOVE LAVATORY AND ASSOCIATED VALVES AND PIPING.
6 LINCOLN HALL PLUMBING EQUIPMENT AND PIPING SYSTEMS MUST
BE REMOVED IN THEIR ENTIRETY AND COMPLETELY. REFER TO
1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT FOR
VIABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING
CONDITIONS. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS
THROUGHOUT THE BUILDING MUST BE VERIFIED BY THE
CONTRACTOR. THE CONTRACTOR MUST VISIT THE PROJECT SITE
PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.
7 REMOVE URINAL AND ASSOCIATED VALVES AND PIPING.
M A
R K
D E
S C
R
IP
T
IO
N D
A T
2 2
4 4 5
5 6
6 6 6
2 2
7 7
7 7 7
GENERAL NOTES
1. REFER TO THE PLUMBING ABBREVIATIONS, SYMBOLS AND
GENERAL NOTES ON SHEET P-001.
2. CONTRACTOR MUST LOCATE EXACTLY WHERE THE
EXISTING PLUMBING EQUIPMENT AND ABOVE AND
UNDERGROUND PIPING BEFORE ANY DEMOLITION WORK
STARTS.
3. SAW CUT FLOOR SLAB TO REMOVE EXISTING
UNDERGROUND PIPES. SEE STRUCTURAL DRAWINGS FOR
MORE INFORMATION.
4. STORM WATER ROOF DRAINS AND PIPES MUST REMAIN IN
PLACE UNTIL THE NEW PIPING CAN BE INSTALLED ON THE
SAME DAY. THE CONTRACTOR MUST MAKE SURE A CLEAR
DAY OF WHETHER, BEFORE STARTING REMOVAL AND
INSTALLATION OF REPLACEMENT STORM WATER PIPING
CAN BE DONE.
5. GOVERNMENT IS RESPONSIBLE FOR REMOVING ANY
COMPONENTS DESIRED FOR SPARE PARTS OR REUSE
PRIOR TO CONSTRUCTION DEMOLITION. CONTRACTOR
MUST OFFER REMOVED EQUIPMENT TO GOVERNMENT AND
DELIVER TO A LOCATION AS DIRECTED BY GOVERNMENT.
6. PATCH, SEAL AND FINISH OPENING FROM REMOVAL OF PIPING OR EQUIPMENT
USING MATERIALS AND CONSTRUCTION MATCHING OR EXCEEDING EXISTING
ASSEMBLIES IN A WORMANLIKE MANNER. OPENING BEING REUTILIZED BY
REPLACEMENT PLUMBING SYSTEMS MUST BE PROTECTED DURING
CONSTRUCTION.
7. REMOVE DEMOLISHED PIPING, EQUIPMENT (REFUSED BY GOVERNMENT) AND
ACCESSORIES FROM SITE AND PROPERLY DISPOSE OF MATERIALS IN
ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL CODES AND ORDENANCES.
8. LINCOLN HALL PLUMBING SANITARY WASTE/VENT, STORM AND DOMESTIC POTABLE
WATER PIPING AND EQUIPMENT MUST BE REMOVED IN THEIR ENTIRETY AND
COMPLETELY. REFER TO 1986 DESIGN PDF DRAWINGS PROVIDED BY GOVERNMENT
FOR AVAILABLE RECORD DRAWINGS DOCUMENTATION FOR EXISTING CONDITIONS.
9. THE DISTRIBUTION OF PLUMBING PIPING SYSTEMS THROUGHOUT THE BUILDING
MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR MUST VISIT THE
PROJECT SITE PRIOR TO BIDDING AND VERIFY EXISTING CONDITIONS.
N
8'4' 16'0
SCALE: 1/8"=1'-0"
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
F
IL
E
N A
M E
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
PD106
L E
V E
L
D E
M O
L
IT
IO
N
P L A
N
P L U
M B
IN
G
B U
IL
D
IN
G
S
/6
R
E N
O V
A T
IO
N
L
IN
C O
L N
H A
L L
L
IN
C O
L N
H A
L L
W E
S T
P O
IN
T
N
E W
Y O
R K
B H
A M
L
IN
B H
A M
L
IN
D B
A T
T
M
A R
C H
W D
S -1
-R
-0
W D
S -1
-C
-0 -L
REVISED RTA SUBMISSION 03/01/2023
1/8" = 1'-0" C1
LEVEL 3 - PLUMBING DEMOLITION
KEYNOTES
1 REMOVE MOP SINK AND ASSOCIATED VALVES AND PIPING.
2 REMOVE 4" STORM WATER PIPE AS IT ENTER THE INTERIOR WALL
SPACE. CONTRACTOR MUST INVESTIGATE LOCATION OF THE
STORM PIPE FROM GUTTER SYSTEM.
3 EXISTING 4" VERTICAL STORM PIPE TO BE REMOVED AND OR
CAPPED AT BOTH ENDS IF LOCATED INSIDE CONCRETE WALLS.
4 REMOVE URINAL AND ASSOCIATED VALVES…
This is the start of the file's text. The full file is on GovTribe.