LCS GC Bid Package - 26-03-30.pdf.crdownload
CRDOWNLOAD file 2 MB Posted
- Solicitation number
- 35886
- Issued by
- New London County, Connecticut
About this file
Lisbon Central School Science Lab Renovation - General Contractor Bid Package
This is an Invitation to Bid (ITB) issued by the Town of Lisbon, Connecticut Board of Education for general contractor services to renovate approximately 1,200 square feet of science laboratory space at Lisbon Central School located at 15 Newent Road, Lisbon, CT. The scope of work includes selective demolition, casework installation, interior finishes (acoustical ceiling, resilient flooring, painting, and resilient base installation), plumbing modifications, HVAC work, and electrical upgrades. A non-mandatory site walk-through was held on April 6, 2026, at 4:00 PM. Questions and requests for information were due by April 7, 2026, end of day. Sealed bids were due April 23, 2026, at 1:00 PM to the First Selectman's office at Lisbon Town Hall, with bid opening and public reading immediately following submission. The Notice to Proceed was anticipated for April 29, 2026, with construction commencing June 22, 2026 (or upon science wing vacancy), casework delivery on July 13, 2026, and project completion targeted for August 19, 2026, with science room occupancy on August 20, 2026.
This is designated as a prevailing wage municipal project requiring certified payroll documentation and standard AIA billing procedures. Bid surety of five percent of the bid amount is required in the form of a certified check or bid bond. The successful contractor must furnish a 100% Performance Bond and Payment Bond, proof of liability insurance with minimum limits of $1,000,000 per occurrence for bodily injury and property damage and $2,000,000 general aggregate, plus $5,000,000 excess umbrella liability coverage naming the Town of Lisbon and Lisbon Board of Education as additional insureds. Work must be performed between 7:00 AM and 7:00 PM, with CORI checks required for all workers and daily sign-in logs mandatory. Liquidated damages are anticipated at $1,000 per day for schedule delays. No estimated total contract value is identified in the solicitation documents. Bid documents are available for download at no charge from the Town of Lisbon website at https://www.lisbonct.gov/bids.aspx.
Text of this file
Town of Lisbon, CT – Lisbon Central School Science Room Renovations Page 1 of 11
Invitation to Bid 2026-01
General Contractor Services
Renovation of Science Lab at Lisbon Central School, Lisbon, CT
March 30, 2026
Site Walk Through: April 6, 2026
Questions Due: April 7, 2026
Sealed Bids Due: April 23, 2026 @ 1pm
All questions to be emailed to:
dave.w@river-electric.net
Copy the following:
athibeault@downesco.com raymond.joly860@gmail.com baah84@comcast.net mikezelasky@gmail.com
Town of Lisbon, CT – Lisbon Central School Science Room Renovations Page 2 of 11
Table of Contents
Division 0 – Procurement & Contract Requirements
1. Invitation to Bid
2. Schedule
3. Contract Documents
4. Wages & Invoices
5. Intent to Bid/Bid Forms
6. Equivalent Notice
Division 1 – Existing Conditions
1. Related Documents
2. Project Description
3. Contractor Use of Property
4. Special Requirements
Division 9 – Finishes 095113 Acoustical Panel Ceilings 096500 Resilient Flooring 096513 Resilient Base 099000 Interior Painting
Division 12 – Furnishing 123200 Casework
Division 22 – Plumbing
Division 23 – HVAC
Division 26 - Electrical
Appendix A1/A2/A3 – Sample Contracts, Insurance Requirements, Payment Schedule B – Intent to Bid C – Bid Form D – Existing Condition Photos / Casework documentation / Electrical Plan & Submittals
Town of Lisbon, CT – Lisbon Central School Science Room Renovations Page 3 of 11
Division 0 – Procurement & Contract Requirements
1. Invitation to Bid
Invitation to Bid 2026-01
General Contractor Services Renovation of Science Lab at Lisbon Central School, Lisbon, CT
March 30, 2026
The Town of Lisbon is accepting bids for a general contractor to support the renovations of an approximate 1,200 sf science room within the Lisbon Central School located at 15 Newent Rd, Lisbon, CT 06351.
Bid documents may be obtained at no charge by downloading from the Town of Lisbon’s website via the following link: https://www.lisbonct.gov/bids.aspx
Sealed bids will be accepted until April 23, 2026, at 1:00 pm at the First Selectman's office at Lisbon Town Hall, 1 Newent Road, Lisbon, CT 06351. A bid opening and reading will be held immediately following submission in the Town Hall meeting room. Bids received after the opening date and time will not be considered for award.
A non-mandatory bidder’s conference will be held on April 6, 2026 at 4:00pm at the project site located at 15 Newent Road, Lisbon, CT to review the scope of work. Existing conditions or drawings are not available; attendance is strongly encouraged for field measurements. Visitors must sign in at the main entrance and wait in the lobby. Any questions or RFI’s are to be submitted by April 7, 2026 end of day, with addenda issued as soon as possible.
Bid surety in the form of a certified check from any bank or bid bond in the amount of five percent 5% of this bid is required. If a certified check is provided, it should be written out to the Town of Lisbon.
Additionally, the successful bidder shall also furnish a 100% Performance Bond and Payment Bond as well as proof of liability insurance.
The Town reserves the right to waive any informalities in the bid, to reject any or all bids, and to accept the bid that in its judgment is in its best interest. Bids must be firm and may not be withdrawn for a period of 90 days following the bid opening.
The Contractor will take affirmative action to ensure that applicants are employed, and that employees are treated during employment without regard to their race, color, religion, gender, or national origin.
Town of Lisbon, CT – Lisbon Central School Science Room Renovations Page 4 of 11
2. Schedule The project will take place during the summer of 2026, when school is technically closed. However, faculty and students may be in the building as needed for possible events. Additionally, there may be work in other areas of the school, and the fields and playground may be in use. Below is the anticipated construction schedule:
Award / Notice to Proceed: April 29, 2026 Construction Start: June 22, 2026 or upon vacancy of the science wing Casework Delivery: July 13, 2026 Construction Complete: August 19, 2026 Science Room Occupancy: August 20, 2026
3. Contract Documents
A sample contract, which may be modified, is attached as Appendix A for review. Please note that at this time, we anticipate liquidated damages to be $1,000 per day. Also, the anticipated insurance requirements and payment schedule are outlined at the conclusion of the sample contract.
4. Wages and Invoicing The project is a municipal project and shall be prevailing wage. Certified payroll is required, and standard AIA billing is acceptable.
5. Intent to Bid and Bid Form
The intent to bid is attached as Appendix B. Please complete this form immediately and electronically submit it to dave.w@river-electric.net and athibeault@downesco.com to ensure all notifications of addenda are received. The bid form is also attached as Appendix C for completion. By submitting a proposal, the contractor accepts all terms and conditions, scope of work, and schedule requirements.
6. Equivalent Notice
Assume all materials (except paint) can be either specified or equivalent. If the items specified are not used within your bid and are equivalent, list substitution on a separate piece of paper and attach it to the bid form. Also, include submittals for each item.
Town of Lisbon, CT – Lisbon Central School Science Room Renovations Page 5 of 11
Division 1 – General Requirements
1. Related Documents
a. Existing conditions documents are not available. The documents available for review are the casework layout and specifications, the various scopes of work below, existing condition photos, and a sample contract.
2. Project Description
a. The project scope includes a classroom refresh of approximately 1,200 sf of academic space during the summer of 2026. The science room will require temporary protection, selective demolition, furnishing, interior finishes, electrical, plumbing, and minor HVAC installations.
3. Contractor Use of Property
a. Work hours will be between 7am to 7pm. The duration will be based on need to meet the schedule.
b. Limit use of the premises to the construction activity areas indicated. Do not disturb portions of the site beyond areas in which the work is indicated.
c. Keep driveways and entrances serving the premises clear and available to the Owner at all times. Do not use these areas for parking or storage of materials.
d. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site.
e. Dumpsters will be provided by the owner in close proximity to the area of work. The area around the dumpster must be kept clean and tidy. All debris must be within the confines of the dumpster. The dumpster will not be loaded to the point of overflow.
f. All areas of the site must be cleaned daily to avoid safety hazards and remain in compliance with OSHA standards.
g. Temporary protection and dust mitigation controls must be used to keep the remainder of the school free from debris and additional cleaning.
h. Security is essential. Contractor will maintain a daily log of all individuals entering the site. The log must include the date, full name, contractor, sign-in time, and sign-out time.
Contact with students, parents, or faculty not related to the project is prohibited.
Additionally, poor behavior, obscene actions, or language onsite will result in permanent removal from the project.
4. Special Requirements
a. The Contractor shall ensure that all work performed is done so in a safe manner and that all workers adhere to all applicable safety procedures and practices at all times. There may be children and staff in the vicinity of the work area during working hours.
b. The Contractor shall be aware at all times that additional safety considerations should be taken. Particular care shall be taken by the Contractor, Subcontractors and all those in their employ, that all tools, equipment, ladders, etc. are never left unsupervised.
Town of Lisbon, CT – Lisbon Central School Science Room Renovations Page 6 of 11
c. Use of tobacco products, alcoholic beverages, and other controlled substances inside the building or on the grounds is not permitted. Strict adherence to the regulations will be enforced for the entire duration of the construction.
d. CORI checks are required for all workers onsite as well as daily sign-in logs.
e. Daily cleaning and storage of equipment and materials is required.
f. Contractor will gently clean casework grids and clean radiators of all existing dust and construction debris.
g. Contractor responsible for temporary protection from the access point to the science room.
i. Use tack mats as appropriate
ii. Floor protection
iii. Corridor separation for dust control
h. A punch list will be required, and work must be completed prior to turnover.
i. General Contractor to provide any line drawings or documentation necessary to satisfy the needs of the Building Official, permitting, and Town policy.
j. General Contractor to acquire acceptance from all local, state, and federal codes as well as authorities having jurisdiction.
k. As-builts, in PDF format, are required at the completion of the project.
l. A final construction clean is required before turnover.
Division 2 – Existing Conditions 024113 Selective Demolition
1. Remove and store all casework top grills for reuse.
a. Storage will be on-site, location TBD.
2. Remove and dispose of all countertops.
3. Remove and dispose of all wall and base cabinets.
a. MEP make safe and additional detail under division 22 and division 23.
4. Remove and dispose of the veneer and bottom cabinet doors only on the fume hood.
5. Remove and salvage all HVAC ceiling registers/grills.
a. Storage will be on-site, location TBD.
6. Remove and dispose of all ceiling lighting and associated hanging wires.
a. Electrical and hanging wires in the storage room must remain.
b. Disconnect and make safe all electrical devices in the ceiling.
7. Remove and dispose of acoustical ceiling tiles and grid.
a. All ductwork is to remain for reuse. See division 23.
b. Ceiling grid in the storage room to remain. Tile disposal only.
8. Remove and dispose of all base resilient base molding.
9. Remove and dispose of all existing flooring and mastic.
Town of Lisbon, CT – Lisbon Central School Science Room Renovations Page 7 of 11
10. Remove and dispose of the single door leading into the small office area.
a. Door hardware to be salvaged and storage for future reuse
b. Door frame remains
11. Remove and dispose of all window treatments.
12. Remove and dispose of the eyewash station.
13. Remove and dispose of the abandoned and empty fuel line.
14. Exclusions:
a. All work in the large storage room adjacent to the small office with the exception of the acoustical ceiling tile and fixtures, flooring, and cove base.
b. Disposing of the existing chalkboard/whiteboard
c. Disposing of HVAC ceiling or base cabinet grills
d. Disposing of door hardware
e. Removal or disposal of all ductwork
f. Removal or disposal of any HVAC equipment, condensate lines, insulation, etc.
Division 9 – Finishes 095113 Acoustical Panel Ceilings
1. Supply and install new 24”x24” grid pattern
a. Armstrong PRELUDE Concealed in White
b. Item numbers ARM7300, ARM 7800, and ARMXL7328
2. Supply and install new 24"x24"x3/4" acoustical ceiling tiles
a. Armstrong Fine Fissured
b. Item number ARM 1713
3. Supply and install hanging wires for lighting fixtures.
a. Lights will be 2’-0” x 2’-0” LED fixtures.
b. Assume 14 fixtures. 12 in the classroom and 2 in the office.
c. Space in a uniform pattern
4. Replace all storage room acoustical tile only.
a. Replace in-kind.
5. Exclusions:
a. Storage room acoustical ceiling grid
096500 Resilient Flooring
1. Prep Floor for LVT plank
a. Prep per manufacturer's recommendations
2. Supply new 36” x 6” LVT plank flooring
a. Tarkett Commercial - Palladian PCPD PALAZZO 4662 SKU: 251105236
b. Color samples required before install
Town of Lisbon, CT – Lisbon Central School Science Room Renovations Page 8 of 11
3. Install new LVT Flooring
a. Use of Tarkett adhesive only. See the installation manual for adhesive options.
b. Install per manufacturer's recommendations
4. All flooring to be installed prior to casework installation.
a. General Contractor to provide and ensure that floor protection (e.g. rosin paper) is used.
096513 Resilient Base
1. Supply standard 4” cove base. Color to be gray or black.
2. Install cove base around:
a. All perimeter walls
b. All base fixed cabinets
c. Adhesive based on the manufacturer's recommendations
099000 Interior Painting
1. Paint all CMU block
a. Two coats. Sherwin-Williams SW7066 Gray Matter.
b. Protect and paint around chalk/whiteboard.
2. Paint steel door frames
a. Office frame
b. Interior classroom frame
c. Storage room frame
d. Two coats. Benjamin Moore & Co. HP25
3. Paint window frames
a. Two coats. Benjamin Moore & Co. HP25
4. Touch up paint prior to turnover
5. Exclusions:
a. Brickwork
b. Doors
c. Storage room
Town of Lisbon, CT – Lisbon Central School Science Room Renovations Page 9 of 11
Division 12 – Furnishing 123200 Casework
1. Casework to be provided under a separate proposal.
a. Drawings and specs attached for reference in Appendix D
2. General Contractor to receive and check-in material upon delivery
a. Casework will be stored at the old firehouse on 8 Newent Road until needed. There are no costs associated with storage at the firehouse. Billing for stored materials is not acceptable. The firehouse does not have climate controls.
3. General Contractor to coordinate installation date with the casework provider, school, and building committee.
4. General Contractor to ensure protection of casework through the project. Any protection materials to be removed and disposed of prior to final clean.
Division 22 – Plumbing
1. Make safe all plumbing. Cut and cap in the basement.
2. Eyewash station. Cut and cap.
3. Phase -1:
a. Perform demolition of existing natural gas piping to six student lab stations and existing instructor stations. Piping shall be removed from old mill work and appropriate cap/plug shall be installed in terminated basement gas header, and header shall be tested and verified tight witnessed by town Building Official.
b. Perform demo of all plumbing/waste drain (WD) tied to the existing Instructor lab station.
c. All plumbing/WD shall be removed and capped in basement area below lab. WD fitting should match Like and Kind to existing ENFIELD piping, and all plumbing connections shall be capped in accordance with (IAW) IPC standards and inspected by town Building Official.
d. Perform demo of all hot water piping to 6 student lab stations. All hot water piping shall be removed and capped in basement below IAW IPC standards and inspected by town Building Official.
e. Perform disconnect of all sinks to trap connections and cold-water connections of 6 student lab stations in current mill work to support removal of old mill work.
4. Phase-2
a. Perform installation of Like and Kind ENFIELD WD piping to support installation of 2 new instructor Lab Stations in new Mill Work attached to East facing external wall. All piping shall be tested IAW IPC standards and inspected by town Building Official.
b. Perform Installation of one cold water supply to left instructor Lab station and one cold/Hot water supply to Right hand instructor Lab Station IAW IPC.
Town of Lisbon, CT – Lisbon Central School Science Room Renovations Page 10 of 11
c. Perform installation of Hot Water supply and appropriately sized mixing valve connecting to existing Cold-Water supply to chemical deluge shower to convert system to a warm water deluge system IAW current IPC requirement.
d. Perform required finish work to all newly installed Mill Work lab stations and perform operational test of all sinks verifying proper flow and no leaks witnessed by town Building Official.
Division 23 – HVAC
1. Pin the ductwork to the roof deck. Keep proximity similar to the existing.
2. Supply and install all 2’x2’ ceiling registers.
a. Confirm fit in the ceiling grid
b. Provide all returns in the classroom.
c. Provide all registers in the classroom.
d. Reconnect ductwork.
3. Install one new flex duct to office.
a. Create small opening in CMU
b. Supply and install one register. Match existing.
4. Insulate the condensate line after repair work is complete.
5. Reinstall and connect the salvaged register in the storage room.
6. Reinstall the used ledge top grilles and wall cleating as appropriate.
7. Coordinate activities as needed and provide access.
8. Exclusions:
a. DDC controls are under a separate contract.
b. Repairs to the existing system are under a separate contract.
Division 26 – Electrical
1. Make safe above ceiling.
a. Lighting in storage room will remain in the same location.
2. Rewire power to rooftop unit.
3. Lighting controls
a. Install Keilton ceiling-mounted motion/daylight harvesting sensors with 12/2 luminary control cable with 16/2 0-10 dimming and modules specifying Keilton products
b. Install one module for the office, and two zones with two modules for the classroom.
c. Install an emergency lighting controller to bypass low-voltage controls during power failure.
d. Provide both QR codes after completion
4. Office:
a. Install one 2x2 RAB EZP2X2/LCBS
Town of Lisbon, CT – Lisbon Central School Science Room Renovations Page 11 of 11
b. Install one 2x2 RAB EZP2X2/LCBS/E
c. Install one ceiling-mounted motion sensor and one module
5. Classroom:
a. Install ten 2x2 RAB EZP2X2/LCBS
b. Install two 2x2 RAB EZP2X2/LCBS/E
c. Replace 16' of 120v track for lighting in the southwest corner parallel to cabinets in elevation 3B and C
d. Replace all station and countertop receptacles with Leviton T5633-W USB receptacles.
e. Replace all other receptacles in the classroom with Leviton TBR20-W.
f. Replace all circuit breakers with GFCI breakers that are compatible with the existing load center.
g. Install Uline H5643 power reel above the teacher's station.
6. Storage Room:
a. Install two RAB EZP2X4 lights.
7. Submittals and a power plan are included within Appendix D.
EZPAN Field-Adjustable Flat Panels
Page 5.
Lightcloud products offer integrated network lighting control for a truly wireless solution that allows you to manage RAB’s various compatible devices. With RAB’s patented Rapid Provisioning technology, devices can be quickly and easily commissioned for residential and commercial applications. Each device can communicate with other devices in the mesh network. With two Lightcloud systems to choose from, it’s easy to implement controls anywhere.
• Utilizes Bluetooth Mesh, eliminating the need for a Gateway or Hub
• Ideal for applications that need basic wireless control such as ON/OFF, dimming, color tuning, Schedules, and SmartShift
• Download the Lightcloud Blue mobile app for iOS or Android devices
• Add the XDIM/BRIDGE/LCB and LCGATEWAY to adopt premium Lightcloud Enterprise features
Design Lights Consortium Network Lighting Controls:
• Interior Applications: N1XMLOEATB
• Exterior Applications: NHCZ2BIA17L
• Utilizes a secure cellular and Zigbee mesh network that requires a Gateway or Hub (sold separately)
• Offers premium features like remote commissioning, demand response, BACnet integration, and more
• Download the Lightcloud Enterprise mobile app for iOS or Android devices
Learn more about Lightcloud Blue. Visit the Lightcloud Blue Resources page for more information on how to use the system.
Learn more about Lightcloud Enterprise. Visit the Lightcloud Enterprise Resources page for more information on how to use the system.
Learn more about Lightcloud wireless networked lighting controls.
Bluetooth® mesh connectivity
Download the app.
Download the app.
Connect product to power.
Complete the startup document.
Pair product to app.
Connect product to power.
Enjoy!
Contact RAB for Remote Commissioning.
Enjoy!
4 5
Cell Tower GatewayLightcloud Servers
Internet
Bluetooth® mesh connectivity
©2025 RAB Lighting Inc. 888 722-1000 rablighting.com
SIMPLE SETUP
SIMPLE SETUP
WIRELESS NETWORK LIGHTING CONTROLS
Products available with color tuning options offer endless possibilities to enhance any application. Create Scenes and Schedules from the Lightcloud interface and choose the desired color temperature (2200K-6500K*) or up to 16+ million colors*. Explore RGB color-tuning products.
SmartShift is the first lighting technology that can promote better sleep, health and happiness. Once installed alongside a Lightcloud control system, it automatically tunes the color and intensity of indoor lights throughout the day, mimicking the sun’s changing light as it rises and sets. Learn more about SmartShift.
*Color options may vary by product, see individual product specification sheet for more details.
COLOR TUNING
SmartShift™
2700K 2700K6500K
©2025 RAB Lighting Inc. 888 722-1000 rablighting.com Page 6.
DIMENSIONS
EZP2X4 / EZPHE2X4
Weight: 13.4 lbs
EZP2X2 / EZPHE2X2
Weight: 7.1 lbs
EZP1X4 / EZPHE1X4
Weight: 7.1 lbs
8 5�8"
21 5/8"
Page 7.
5�16"
23 ¾"
21 5�8"
15�8"
8 5�8"
3 5�16" 3 5�16"
5�16" 15�8"
23 ¾"21 5�8"
45 5�8"
47 ¾"
5/16"
3 5/16"
8 5/8"
15�8"
8 5�8"
3 5�16"
47 ¾"
45 5�8"
9 ¾" 11 15/16"
EZP2X2/RGB
Weight: 6.68 lbs
EZP1X4/RGB
Weight: 6.3 lbs
EZP2X4/RGB
Weight: 12.1 lbs
ORDERING MATRIX
ACCESSORIES
IMAGE CATALOG# UPC DESCRIPTION
PMKEZPAN2X2 019813598192 EZPAN 2X2 PENDANT MOUNTING KIT WHITE
PMKEZPAN1X4 019813598185 EZPAN 1X4 PENDANT MOUNTING KIT WHITE
PMKEZPAN2X4 019813598208 EZPAN 2X4 PENDANT MOUNTING KIT WHITE
RMKPANEL2X2 019813104966 LPANEL 2X2 RECESSED MOUNTING KIT WHITE
RMKPANEL1X4 019813104997 LPANEL 1X4 RECESSED MOUNTING KIT WHITE
RMKPANEL2X4 019813104980 LPANEL 2X4 RECESSED MOUNTING KIT WHITE
SMKEZPAN2X2 019813598161 EZPAN 2X2 SURFACE MOUNTING KIT WHITE
SMKEZPAN1X4 019813598154 EZPAN 1X4 SURFACE MOUNTING KIT WHITE
SMKEZPAN2X4 019813598178 EZPAN 2X4 SURFACE MOUNTING KIT WHITE
Page 8.
EZP with Lightcloud Blue - Tunable White
EZP Field-Adjustable
2X2 2'X2' / 40/30/25W 1X4 1'X4' / 40/30/25W 2X4 2'X2' / 50/40/30W
EZP
Family Size / Wattage*
BLANK None
Controls
BLANK 3500/4000/5000K
CCT Adjustable
Color Temperature
BLANK None HE High Efficacy *
Output
BLANK 120-277V,
0-10V Dimming
Driver
BLANK None /E Battery Backup
Battery Backup
EZP with Lightcloud Blue - RGBW
EZP
Family Size / Wattage
/LCBS Lightcloud Blue W/ PIR Sensor /LCBS/MVS Lightcloud Blue W/MVS Sensor
2X2 2'X2' / 40W 1X4 1'X4' / 40W 2X4 2'X2' / 50W
Controls
BLANK Tunable White 2700-6500K
Color Temperature
BLANK 120-277V
Driver
* When HE models are ordered, the 2'X2' and 1'X4' sizes offers selectable wattages of 36/30/25W, while 2'X4' size offers 50/40/30W.
EZP
Family Size / Wattage
/RGB Lightcloud Blue RGBCW 16+ Million Colors
2X2 2'X2' / 40W 1X4 1'X4' / 40W 2X4 2'X2' / 50W
RGB Color Tuning
BLANK Tunable White 2200-4000K
Color Temperature
BLANK 120-277V
Driver
/RGB
Specifications
Input Voltage DC 12V
Input Current 15mA Max
Input Power 0.18W
Output Current 10mA Max
Output Power 0.1W
Dimming Class 2, 0-10V DC 10mA Max
Sinking Current 10mA Max
Bluetooth Transmit 200ft Max
Radio Frequency 2.4GHz ± 75MHz
Bluetooth Version 5.0
Housing Material UL 94-V0
Indoor/Outdoor Use Indoor Use Only
Operating Temperature -30°C to 55°C, -22°F to 131°F
Storage Temperature -30°C to 85°C, -22°F to 185°F
IP Rating IP40
Color White
Warranty 5 year warranty
Compliance UL8750, UL1376, RoHs
Safety cULus Listed LED Controller E504054
FCC ID: 2A26YLTKTVT2023
DID: D061367
DLC: NLTRC5KL0TN
Description
The EFS107 is a Bluetooth ceiling mount wireless sensor with integrated daylight harvesting and PIR motion sensor technology. It is equipped with the AlgoH™ algorithm to maximize detection and reduce false triggers.
EFS107
Features
• 12VDC input
• PIR Bluetooth sensor with daylight harvesting
• Powered by power pack (PPA103S.B1/PPA103S.D1)
• Capable of ceiling mount with RC01 recessed ceiling adapter (not included)
• Lens included
EFS107 Series Low Voltage Ceiling Sensor Kit
Ordering Information
Model Description
EFS107.B1 Low Voltage Ceiling Sensor Kit
Requirements
• Requires either a PPA103S.B1 or PPA103S.D1 (not included)
• Requires a CL2P cable (not included)
Wiring
Dimensions
Socket Mounting Dimensions
Size T.P.I - inch Major Dia. - inch
R1/2 14 0.825 inch US standard knockout
Dimensions - Accessories
Socket Mounting Dimensions
Size T.P.I - inch Major Dia. - inch
R1/2 14 0.825 inch US standard knockout
Ordering Information - Accessories
Model Description
RC01 Ceiling Recessed Adapter
CL2P Power-limited Circuit Cable 22AWG Length 6.56ft
Product Label
The Bluetooth word mark and logos are registered trademarks owned by Bluetooth SIG, Inc. and any use of such marks by LiteTrace is under license.
Other trademarks and trade names are those of their respective owners.
App Download
Due to our continued efforts to improve our products, specifications are subject to change without notice.
Contact Us
7001 Columbia Gateway Drive, Suite 210, Columbia, MD 21046, USA
T: +1 443-320-2233 (M-F 9am-5pm ET)
E: support@autani.com
Revised on 12-08-2025
Dimensions - Accessories
PPA102S Series Line Voltage 6A BT Fixture Controller
Description
The PPA102S Bluetooth Fixture Controller enables seamless conversion of luminaires to wireless control for integration with the Keilton+autani system.
Device settings and commissioning are configured through the Keilton+autani mobile application. The PPA102S can be connected to Keilton+autani Eco Sensors by a PH2.0 port for plug-and-play, direct wire termination, or daisy-chain multiple sensors utilizing an RJ45 connector.
Input Voltage AC120-277V
Frequency 50/60Hz
Output Voltage AC120-277V , AC 120-347V
Output Current 6A Max
Output Power 720W Max @ 120V, 1662W Max @ 277V, 2082W Max @ 347V
Dimming Class 2, 0-10V DC 10mA Max
Sinking Current 10mA Max
Bluetooth Transmit 200ft Max
Radio Frequency 2.4GHz ± 75MHz
Bluetooth Version 5.0
Housing Material UL 94-5VA
Indoor/Outdoor Use Indoor Use
Operating Temperature -30°C to 65°C, -22°F to 149°F
Storage Temperature -30°C to 85°C, -22°F to 185°F
IP Rating IP20
Color White
Warranty 5 year warranty
Compliance UL8750, UL2043, UL1376, RoHS
Safety cULus Listed LED Controller E504054
FCC ID: 2A26YLTKTVT2022
DID: D061367
DLC: NLTRC5KL0TN
Specifications
Ordering Information
Model Voltage Relay Rating Line Voltage Wire Gauge
Dual 0-10V (CCT Tunable)
0-10V Wires PIR+DLH* PH2.0 Eco
Connector** RJ45 Eco***
PPA102S.C1
120-277V
6A 18 Gauge
X X X
PPA102S.C2 X X X X
PPA102S.E1
120-347V
X X X
PPA102S.F1 X X X
* PIR + DLH - PIR Occupancy Sensing and Daylight Harvesting ** PH2.0 Eco Connector - Used to plug directly into Eco Sensors ***RJ45 Eco - RJ45 jack provided for using CAT5 cable to connect one or daisy chain multiple Eco Sensor products (requires RTP splitter, sold separately)
PPA102S.C1
PPA102S.C2
PPA102S.E1
PPA102S.F1
Features
| • | 120-277VAC or 120-347VAC Input |
| • | Integrated 6A relay |
| • | Offers 12V, 200mA output power to sensors |
| • | Attaches with standard 1/2” knockout |
| • | Provides 0-10VDC dimmable single or dual channel output |
Dimensions
Socket Mounting Dimensions
Size T.P.I Major Dia.
inch inch
R1/2 14 0.825 inch US standard knockout
Product Label
The Bluetooth word mark and logos are registered trademarks owned by Bluetooth SIG, Inc. and any use of such marks by LiteTrace is under license.
Other trademarks and trade names are those of their respective owners.
App Download
Due to our continued efforts to improve our products, specifications are subject to change without notice.
Contact Us
7001 Columbia Gateway Drive, Suite 210, Columbia, MD 21046, USA
T: +1 443-320-2233 (M-F 9am-5pm ET)
E: support@autani.com
PPA109S instruction
Revised on 8-16-2024
EZP2X4
Need help? Tech help line: (888) 722-1000 Email: techsupport@rablighting.com Website: rablighting.com Copyright © 2026 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Color: White Weight: 12.2 lbs
Project: Type:
Prepared By: Date:
Driver Info
Type Constant Current
120V 0.42A/0.33A/0.25A
208V 0.24A/0.19A/0.14A
240V 0.21A/0.17A/0.13A
277V 0.18A/0.14A/0.11A
Input Watts 29.5-49.8W
LED Info
Watts 50/40/30W
Color Temp 3500/4000/5000K
Color Accuracy 83-85 CRI
L70 Lifespan 100,000 Hours
Lumens 3,961-6,352 lm
Efficacy 120.7-140 lm/W
Technical Specifications
Field Adjustability Field Adjustable:
Field Adjustable Light Output:
50W/40W/30W (factory default: 50W) Color Temperature Selectable:
3500K, 4000K and 5000K (factory default:4000K)
Compliance UL Listed:
Suitable for damp locations
IESNA LM-79 & LM-80 Testing:
RAB LED luminaires and LED components have been tested by an independent laboratory in accordance with IESNA LM-79 and LM-80.
IC Rated:
Suitable for direct contact with insulation
Trade Agreements Act Compliant:
This product is a product of Cambodia and a "designated country" end product that complies with the Trade Agreements Act
DLC Listed:
This product is on the Design Lights Consortium (DLC) Qualified Products List and is eligible for rebates from DLC Member Utilities.
DLC Product Code: S-4LR47P
Electrical Driver:
Constant Current, Class II, 120-277V, 50/60 Hz:
50W: 120V: 0.42A, 208V: 0.24A, 240V: 0.21A, 277V:
0.18A 40W: 120V: 0.33A, 208V: 0.19A, 240V: 0.17A, 277V:
0.14A 30W: 120V: 0.25A, 208V: 0.14A, 240V: 0.13A, 277V:
0.11A
Dimming Driver:
Driver includes dimming control wiring for 0-10V dimming systems. Requires separate 0-10V DC dimming circuit. Dims down to 10%.
Power Factor:
99.3% at 120V, 96.9% at 277V
Aux Power Supply:
No
Dim to Off:
Yes
Surge Protection:
2 kV + 4 kV
Construction Cold Weather Starting:
The minimum starting temperature is -22°F (-30°C)
Maximum Ambient Temperature:
Suitable for use in up to 104°F (40°C)
Lens:
Precision engineered polystyrene diffuser provides high uniformity, and reduced glare. No visible diodes, hot-spots, or shadows.
Housing:
Aluminum+Iron
Reflector:
TPET reflective paper
Finish:
Formulated for high durability and long-lasting color
Green Technology:
Mercury and UV free. RoHS-compliant components.
Installation Mounting:
Surface, suspended & recessed mounting. The mounting accessories sold separately.
Installation:
Standard integral T-bar clips secure the fixture to T-bars and prevent T-system separation
Need help? Tech help line: (888) 722-1000 Email: techsupport@rablighting.com Website: rablighting.com Copyright © 2026 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Technical Specifications (continued)
LED Characteristics LEDs:
Long-life, high-efficacy, surface-mount LEDs
Color Stability:
LED color temperature is warrantied to Shift no more than 200K in color temperature over a 5-year period
Color Uniformity:
RAB's range of Correlated Color Temperature follows the guidelines of the American National Standard for Specifications for the Chromaticity of Solid State Lighting (SSL) Products, ANSI C78.377-2017.
Performance Lifespan:
100,000-Hour LED lifespan based on IESlm-80 results and TM-21 calculations
THD:
10.89% at 120V, 12.29% at 277V
Other 5-Year, No-Compromise Warranty:
RAB warrants that our LED products will be free from defects in materials and workmanship for a period of five (5) years from the date of delivery to the end user, including coverage of light output, color stability, driver performance and fixture finish. RAB's warranty is subject to all terms and conditions found at rablighting.com/warranty.
Dimensions Features
100,000-hour LED Lifespan
DLC Standard Listed
5-Year, No-Compromise Warranty https://www.rablighting.com/legal#warranty
Need help? Tech help line: (888) 722-1000 Email: techsupport@rablighting.com Website: rablighting.com Copyright © 2026 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Ordering Matrix
Family Size Wattage Driver Color Temp Options Output
EZP 2X4
2X2 = 2' x 2' 2X4 = 2' x 4' 1X4 = 1' x 4'
2X4 = 50/40/30W 1X4 = 40/30/25W 2X2 = 40/30/25W
/D10 = 0-10V Dimming Blank = 120-277V, 0-10V
Dimming
Blank = 3500/4000/5000K CCT Adjustable
Blank = No Option /LC = Lightcloud
/LCS = Lightcloud Sensor /E2 = Battery Backup
Blank = Standard Efficacy
HE = High Efficacy
| LCS GC Appendix D2 - Electrical.pdf |
| Libson Central School - Nor'easter Installations Inc 3-3-26.pdf |
| Sheets and Views |
| 9550-Gen Notes-Model |
| 9550-00-Model |
| 9550-01-Model |
| 9550-02-Model |
| 9550-03-Model |
| 9550-04-Model |
| spec_project: |
| spec_type: |
| spec_preparedBy: |
| spec_date: |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .