LBP Bldg. 633 (soffit & fascia).pdf

PDF 124 KB Posted

Attached to
Replace Roof at Building 633 Federal contract opportunity
Solicitation number
W911SG25BA025
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

About this file

This LBP Testing Data Sheet documents lead-based paint (LBP) testing for Building 633, which is part of a roof replacement project. The assessment was conducted on 4/9/2025 using a Viken/Pb200e XRF instrument (Serial Number 2759) by inspectors Frank Lujan and Paul Rodriguez. The testing revealed six sample locations (three wood fascia and three wood soffit areas) at the north, south, and west ends of the building, all of which tested positive for lead-based paint and were classified in "POOR" condition. The document notes that the testing conforms to the Texas Department of State Health Services lead measurement standard of 1.0 mg/cm² by X-ray fluorescence, with calibration readings confirming the testing equipment's accuracy.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Roof at Building 633, newest first.
File Type Posted
W911SG25BA025_Answers to Submitted RFI Questions.pdf PDF
Solicitation - W911SG25BA025.pdf PDF
19658 Cherokee Bldg. 633.pdf PDF
Drawings_FY25_633_FE 10094 5J_Roof Repairs at B633.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LBP TESTING DATA SHEET

Facility Information: Roof replacement

Facility Name: Building Number: 633

XRF Model and M/N:

Viken/Pb200e Date of Assessment: 4/9/2025

XRF Instrument S/N: 2759 Inspector Name(s): Frank Lujan/Paul Rodriguez

Data Sheet

SA

M

P

LE

I D

SU

B

ST

R

A

TE

C O

M P

N

EN

T

C O

LO

R

O F

C O

M P

O N

EN

T

TE

ST

L O

C A

TI

N

D

ES

C R

IP

TI

X R

F R

EA

D

IN

G

(m g/ cm

²)

LA

SS

IF

IC

A

TI

N D

IT

IO

N/A N/A N/A Green Calibration (< 0.00) .1 ACCEPTABLE N/A

N/A N/A N/A Green Calibration (0.8 to 1.2) 1.0 ACCEPTABLE N/A

LBP-01 Wood Fascia Green North end 19.8 POSITIVE POOR

LBP-02 Wood Soffit White North end 15.5 POSITIVE POOR

LBP-03 Wood Fascia Green South end 21.8 POSITIVE POOR

LBP-04 Wood Soffit White South end 17.9 POSITIVE POOR

LBP-05 Wood Fascia Green West end 18.0 POSITIVE POOR

LBP-06 Wood Soffit White West end 17.2 POSITIVE POOR

NOTES:

DPW-ED conforms to Texas Department of State Health Services lead measurement standard, 1.0mg/cm2 by X-ray fluorescence.

File details come from the government source that posted it. Updated .