Layer_1_Pricing_Worksheet_Revised_11-5_Attachment_C.xlsx
XLSX spreadsheet 47 KB Posted
- Solicitation number
- 26-BM-045
- Issued by
- Pinellas County, Florida
About this file
This file is a pricing worksheet attachment for the Pinellas County School District's Layer 1 Network and Telecommunications Infrastructure Upgrade project in Florida. The procurement solicits sealed electronic bids from qualified contractors to furnish labor, materials, equipment, and services for network and telecommunications infrastructure upgrades across 98 school sites listed in Exhibit A. The work encompasses structured cabling, fiber optic backbone systems, horizontal copper cabling, telecommunications distribution frames, and associated pathways and support components. The project is structured in two phases: Phase 1 focuses on fiber optic infrastructure, while Phase 2 addresses horizontal Category 6/6A Ethernet cabling installation. Bids were due before 4:00 pm on Monday, January 4, 2027, submitted electronically via the District's e-Procurement Portal. Multiple vendors may be awarded contracts and participate in this multi-year project, which spans from April 1, 2027, through June 30, 2031.
The procurement is contingent upon E-Rate Category 2 funding, with a Form 470 submitted to USAC. The pricing worksheet serves as Attachment C to the bid package, establishing the framework for pricing submissions from prospective bidders. Contractors must provide comprehensive pricing for the structured cabling installation work across all 98 designated school sites. The worksheet enables standardized comparison of bids and ensures transparency in the pricing evaluation process. No specific set-asides, incumbent information, or award dates are indicated in the available documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Pinellas County School District — Layer 1 Network and Telecommunications Infrastructure Upgrade — Pricing Submittal Form Instructions |
| RFP No. 26-BM-045 — Form revised 11/5/2026 |
| # | Instruction |
| 1 | Enter pricing only in the entry columns: Price/Unit, Manufacturer, Part Number and E-Rate Eligibility %. Quantities, descriptions and formulas are locked. |
| 2 | All line items are furnished AND installed (materials, labor, labeling, testing and documentation) unless marked 'labor only'. |
| 3 | Subcontractors and partners: all pricing applies to work performed by subcontractors or partners, who must be identified in the proposal and are subject to all RFP requirements (RFP Section 4.1). |
| 4 | Unit pricing for all items includes labeling, testing, documentation, daily cleanup and site restoration per RFP Sections 3.9, 3.10, 6.3 and 8.3; no separate charges will be accepted for these items. |
| 5 | DROP PRICING RULE: Drop pricing shall be used for every new or replacement horizontal cable run. Component line items apply only to work that does not constitute a complete drop (repairs, moves/adds/changes, re-termination of existing cable) and require prior District approval. Where a drop line item applies, the District will not accept component or hourly pricing for that work. |
| 6 | FIBER: per-foot fiber pricing includes furnishing, pulling, pull string and labeling; each terminated strand end is priced under the per-strand-end termination lines. |
| 7 | Hybrid fiber optic cable (cable containing both single-mode and multi-mode strands) will not be accepted. |
| 8 | Armored fiber: where the District specifies armored fiber, price the per-foot fiber line for the strand count and type, plus the Armored Fiber Adder per foot and Bonding/Grounding Kits. No other armored fiber charges will be accepted. |
| 9 | Billable cable lengths: quoted and invoiced cable footage must correspond to the installed lengths shown in the certification test results for each run (including required service loops and slack). Cut-off, scrap, excess or unused cable, reel ends and waste may not be included in quoted or invoiced costs. Drop length ranges are determined by the tested length of each run (RFP Sections 7.3 and 8.10). |
| 10 | Matched system: all components within each cabling channel or link must be from a single manufacturer's matched system (or formally partnered manufacturers under one warranty program) so that the installed system qualifies for the required 25-year manufacturer warranty (RFP Section 3.3). The Manufacturer and Part Number columns must reflect the proposed matched system for copper and for fiber. |
| 11 | Removal and disposal of existing cabling being replaced is included in drop and fiber pricing; demolition of cabling not associated with new cable installation is District-directed only and is not E-Rate eligible. |
| 12 | Cabling installed in support of E-Rate ineligible devices or services (e.g., voice, fire alarm, HVAC/building automation, IP speakers/intercom, security cameras), and any materials, equipment or labor (including racks, cabinets, enclosures, pathways and cable management) installed in support of them, are NOT E-Rate eligible and shall be identified as ineligible and invoiced to the District separately (RFP Section 8.6). |
| 13 | Quantities are estimates for bid evaluation only (RFP Section 7.3). |
| 14 | Non-evaluated unit prices are binding for the contract term; the District reserves the right to reject materially unbalanced pricing. |
| 15 | All unit pricing is fixed for the contract term through June 30, 2031 (RFP Section 8.8). |
| 16 | The contingency fee (not to exceed 10% of base labor cost, RFP Section 5.3) and the percentage discount off published MSRP are not included in the total cost calculation. Identify the published MSRP price list/catalog source(s) and date in the space provided on the Pricing Submittal sheet. |
| Acknowledgement of Addenda | ||
| Bidder acknowledges receipt of the following addenda: | ||
| 1. | Addendum No. | Date |
| 2. | Addendum No. | Date |
| 3. | Addendum No. | Date |
Bidder Name:
Pricing Submittal
| Part/Service Description | Unit | Quantity | Price/Unit | Extended Price | Manufacturer | Part Number | E-Rate Eligibility % (enter 0-100) | E-Rate Discounted (85%) Extended Price | Phase |
| IMPORTANT: Read the Instructions tab before completing this form. All instructions are part of the pricing submittal and are binding. | |||||||||
| Category 6 Copper | |||||||||
| 4-Pair Category 6 U/UTP Plenum - repair/MAC use only; new runs priced under drop line items | $/foot | 2,000 | $ - 0 | $ - 0 | Phase 2 | ||||
| 4-Pair Category 6 U/UTP Riser (CMR) - repair/MAC use only; new runs priced under drop line items | $/foot | 1,000 | $ - 0 | $ - 0 | Phase 2 | ||||
| Single 4-Pair Category 6 Drop U/UTP Plenum - 0-149 feet [All components and labor included, from (and including) patch panel to finished drop] Includes four-port recessed faceplate with blank inserts in unused ports. Includes removal and disposal of the existing cabling being replaced by this drop. | ea. | 300 | $ - 0 | $ - 0 | Phase 2 | ||||
| Single 4-Pair Category 6 Drop U/UTP Plenum - 150-295 feet [All components and labor included, from (and including) patch panel to finished drop] Includes four-port recessed faceplate with blank inserts in unused ports. Includes removal and disposal of the existing cabling being replaced by this drop. | ea. | 150 | $ - 0 | $ - 0 | Phase 2 | ||||
| Dual 4-Pair Category 6 Drop U/UTP Plenum - 0-149 feet [All components and labor included, from (and including) patch panel to finished drop] Includes four-port recessed faceplate with blank inserts in unused ports. Includes removal and disposal of the existing cabling being replaced by this drop. | ea. | 450 | $ - 0 | $ - 0 | Phase 2 | ||||
| Dual 4-Pair Category 6 Drop U/UTP Plenum - 150-295 feet [All components and labor included, from (and including) patch panel to finished drop] Includes four-port recessed faceplate with blank inserts in unused ports. Includes removal and disposal of the existing cabling being replaced by this drop. | ea. | 225 | $ - 0 | $ - 0 | Phase 2 | ||||
| Quad 4-Pair Category 6 Drop U/UTP Plenum - 0-149 feet [All components and labor included, from (and including) patch panel to finished drop] Includes removal and disposal of the existing cabling being replaced by this drop. | ea. | 150 | $ - 0 | $ - 0 | Phase 2 | ||||
| Quad 4-Pair Category 6 Drop U/UTP Plenum - 150-295 feet [All components and labor included, from (and including) patch panel to finished drop] Includes removal and disposal of the existing cabling being replaced by this drop. | ea. | 75 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6 patch cable (1 ft) - color per RFP Section 2.8 | ea. | 560 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6 patch cable (3 ft) - color per RFP Section 2.8 | ea. | 70 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6 patch cable (5 ft) - color per RFP Section 2.8 | ea. | 35 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6 patch cable (7 ft) - color per RFP Section 2.8 | ea. | 35 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6 Patch Panel 24 port 110 Termination - for re-termination of existing cable or added capacity only; patch panel ports for new drops are included in drop pricing | ea. | 25 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6 Patch Panel 48 port 110 Termination - for re-termination of existing cable or added capacity only; patch panel ports for new drops are included in drop pricing | ea. | 25 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6 Jack, T568A, 110 IDC (furnished & installed) - for repair/MAC use only; new drops priced under drop line items | ea. | 200 | $ - 0 | $ - 0 | Phase 2 | ||||
| 4-Port Recessed Faceplate with Labels - for repair/MAC use only; new drops priced under drop line items | ea. | 100 | $ - 0 | $ - 0 | Phase 2 | ||||
| Blank Faceplate Insert - for repair/MAC use only; new drops priced under drop line items | ea. | 200 | $ - 0 | $ - 0 | Phase 2 | ||||
| Surface Mount Box, 2-Port - for repair/MAC use only; new drops priced under drop line items | ea. | 50 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6A Copper | |||||||||
| 4-Pair Category 6A U/UTP Plenum - repair/MAC use only; new runs priced under drop line items | $/foot | 2,000 | $ - 0 | $ - 0 | Phase 2 | ||||
| 4-Pair Category 6A U/UTP Riser (CMR) - repair/MAC use only; new runs priced under drop line items | $/foot | 1,000 | $ - 0 | $ - 0 | Phase 2 | ||||
| Single 4-Pair Category 6A Drop U/UTP Plenum - 0-149 feet [All components and labor included, from (and including) patch panel to finished drop] Includes four-port recessed faceplate with blank inserts in unused ports. Includes removal and disposal of the existing cabling being replaced by this drop. | ea. | 450 | $ - 0 | $ - 0 | Phase 2 | ||||
| Single 4-Pair Category 6A Drop U/UTP Plenum - 150-295 feet [All components and labor included, from (and including) patch panel to finished drop] Includes four-port recessed faceplate with blank inserts in unused ports. Includes removal and disposal of the existing cabling being replaced by this drop. | ea. | 225 | $ - 0 | $ - 0 | Phase 2 | ||||
| Dual 4-Pair Category 6A Drop U/UTP Plenum - 0-149 feet [All components and labor included, from (and including) patch panel to finished drop] Includes four-port recessed faceplate with blank inserts in unused ports. Includes removal and disposal of the existing cabling being replaced by this drop. | ea. | 750 | $ - 0 | $ - 0 | Phase 2 | ||||
| Dual 4-Pair Category 6A Drop U/UTP Plenum - 150-295 feet [All components and labor included, from (and including) patch panel to finished drop] Includes four-port recessed faceplate with blank inserts in unused ports. Includes removal and disposal of the existing cabling being replaced by this drop. | ea. | 350 | $ - 0 | $ - 0 | Phase 2 | ||||
| Quad 4-Pair Category 6A Drop U/UTP Plenum - 0-149 feet [All components and labor included, from (and including) patch panel to finished drop] Includes removal and disposal of the existing cabling being replaced by this drop. | ea. | 300 | $ - 0 | $ - 0 | Phase 2 | ||||
| Quad 4-Pair Category 6A Drop U/UTP Plenum - 150-295 feet [All components and labor included, from (and including) patch panel to finished drop] Includes removal and disposal of the existing cabling being replaced by this drop. | ea. | 150 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6A patch cable (1 ft) - color per RFP Section 2.8 | ea. | 560 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6A patch cable (3 ft) - color per RFP Section 2.8 | ea. | 70 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6A patch cable (5 ft) - color per RFP Section 2.8 | ea. | 35 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6A patch cable (7 ft) - color per RFP Section 2.8 | ea. | 35 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6A Patch Panel 24 port 110 Termination - for re-termination of existing cable or added capacity only; patch panel ports for new drops are included in drop pricing | ea. | 25 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6A Patch Panel 48 port 110 Termination - for re-termination of existing cable or added capacity only; patch panel ports for new drops are included in drop pricing | ea. | 25 | $ - 0 | $ - 0 | Phase 2 | ||||
| Category 6A Jack, T568A, 110 IDC (furnished & installed) - for repair/MAC use only; new drops priced under drop line items | ea. | 200 | $ - 0 | $ - 0 | Phase 2 | ||||
| OM4 Multimode Fiber | |||||||||
| 6-Strand OM4 Optical Fiber (50/125µm) Indoor/Outdoor Plenum (furnished and pulled, incl. pull string, labeling, and removal and disposal of existing fiber being replaced) | $/foot | 2,000 | $ - 0 | $ - 0 | Phase 1 | ||||
| 12-Strand OM4 Optical Fiber (50/125µm) Indoor/Outdoor Plenum (furnished and pulled, incl. pull string, labeling, and removal and disposal of existing fiber being replaced) | $/foot | 3,000 | $ - 0 | $ - 0 | Phase 1 | ||||
| 24-Strand OM4 Optical Fiber (50/125µm) Indoor/Outdoor Plenum (furnished and pulled, incl. pull string, labeling, and removal and disposal of existing fiber being replaced) | $/foot | 5,000 | $ - 0 | $ - 0 | Phase 1 | ||||
| 48-strand OM4 Optical Fiber (50/125µm) Indoor/Outdoor Plenum (furnished and pulled, incl. pull string, labeling, and removal and disposal of existing fiber being replaced) | $/foot | 2,000 | $ - 0 | $ - 0 | Phase 1 | ||||
| OM4 Optical Fiber Duplex Patch Cord LC/LC 50/125µm (2 meter) | ea. | 50 | $ - 0 | $ - 0 | Phase 1 | ||||
| OM4 Optical Fiber Duplex Patch Cord LC/LC 50/125µm (3 meter) | ea. | 200 | $ - 0 | $ - 0 | Phase 1 | ||||
| OM4 Optical Fiber Duplex Patch Cord LC/LC 50/125µm (5 meter) | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| OM4 Optical Fiber Duplex Patch Cord LC/ST 50/125µm (2 meter) | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| OM4 Optical Fiber Duplex Patch Cord LC/ST 50/125µm (3 meter) | ea. | 40 | $ - 0 | $ - 0 | Phase 1 | ||||
| OM4 Optical Fiber Duplex Patch Cord LC/ST 50/125µm (5 meter) | ea. | 5 | $ - 0 | $ - 0 | Phase 1 | ||||
| OM4 Optical Fiber LC Duplex Snap-in Adapter Plate 50/125µm 12 Fiber | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| OM4 Optical Fiber LC Duplex Snap-in Adapter Plate 50/125µm 24 Fiber | ea. | 20 | $ - 0 | $ - 0 | Phase 1 | ||||
| OS2 Single-mode Fiber | |||||||||
| 6-strand OS2 Optical Fiber (9/125µm) Indoor/Outdoor Plenum (furnished and pulled, incl. pull string, labeling, and removal and disposal of existing fiber being replaced) | $/foot | 5,000 | $ - 0 | $ - 0 | Phase 1 | ||||
| 12-strand OS2 Optical Fiber (9/125µm) Indoor/Outdoor Plenum (furnished and pulled, incl. pull string, labeling, and removal and disposal of existing fiber being replaced) | $/foot | 10,000 | $ - 0 | $ - 0 | Phase 1 | ||||
| 24-strand OS2 Optical Fiber (9/125µm) Indoor/Outdoor Plenum (furnished and pulled, incl. pull string, labeling, and removal and disposal of existing fiber being replaced) | $/foot | 25,000 | $ - 0 | $ - 0 | Phase 1 | ||||
| 48-strand OS2 Optical Fiber (9/125µm) Indoor/Outdoor Plenum (furnished and pulled, incl. pull string, labeling, and removal and disposal of existing fiber being replaced) | $/foot | 5,000 | $ - 0 | $ - 0 | Phase 1 | ||||
| 96-strand OS2 Optical Fiber (9/125µm) Indoor/Outdoor Plenum (furnished and pulled, incl. pull string, labeling, and removal and disposal of existing fiber being replaced) | $/foot | 5,000 | $ - 0 | $ - 0 | Phase 1 | ||||
| OS2 Optical Fiber Duplex Patch Cord LC/LC 9/125µm (2 meter) | ea. | 50 | $ - 0 | $ - 0 | Phase 1 | ||||
| OS2 Optical Fiber Duplex Patch Cord LC/LC 9/125µm (3 meter) | ea. | 200 | $ - 0 | $ - 0 | Phase 1 | ||||
| OS2 Optical Fiber Duplex Patch Cord LC/LC 9/125µm (5 meter) | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| OS2 Optical Fiber Duplex Patch Cord LC/ST 9/125µm (2 meter) | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| OS2 Optical Fiber Duplex Patch Cord LC/ST 9/125µm (3 meter) | ea. | 40 | $ - 0 | $ - 0 | Phase 1 | ||||
| OS2 Optical Fiber Duplex Patch Cord LC/ST 9/125µm (5 meter) | ea. | 5 | $ - 0 | $ - 0 | Phase 1 | ||||
| OS2 Optical Fiber LC Duplex Snap-in Adapter Plate 9/125µm 12 Fiber | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| OS2 Optical Fiber LC Duplex Snap-in Adapter Plate 9/125µm 24 Fiber | ea. | 20 | $ - 0 | $ - 0 | Phase 1 | ||||
| Armored Fiber (Adder) | |||||||||
| Armored Fiber Adder - interlocking aluminum armor, OM4 (any strand count; added to the corresponding OM4 per-foot fiber price) | $/foot | 500 | $ - 0 | $ - 0 | Phase 1 | ||||
| Armored Fiber Adder - interlocking aluminum armor, OS2 (any strand count; added to the corresponding OS2 per-foot fiber price) | $/foot | 2000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Armored Fiber Bonding/Grounding Kit (per cable end, incl. bonding to TGB/TMGB per ANSI/TIA-607-D) | ea. | 50 | $ - 0 | $ - 0 | Phase 1 | ||||
| Transceivers, Racks, Enclosures & Fiber Management | |||||||||
| Cisco compatible 1000BASE-LX SFP Transceiver | ea. | 25 | $ - 0 | $ - 0 | Phase 1 | ||||
| Cisco compatible 10GBASE-LR SFP+ Transceiver | ea. | 50 | $ - 0 | $ - 0 | Phase 1 | ||||
| Cisco compatible 25GBASE-LR SFP28 Transceiver | ea. | 25 | $ - 0 | $ - 0 | Phase 1 | ||||
| Cisco compatible 40GBASE-LR4 QSFP+ Transceiver | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Cisco compatible 100GBASE-LR4 QSFP28 Transceiver | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Server Cabinet (Approximate Dimensions: 84" H x 31.5" W x 48" D) | ea. | 1 | $ - 0 | $ - 0 | 1 & 2 | ||||
| EIA 19" Four Post Rack (Approximate Dimensions 84" H x 15-20" D) | ea. | 5 | $ - 0 | $ - 0 | 1 & 2 | ||||
| EIA 19" Four Post Rack (Approximate Dimensions 84" H x 21-32" D) | ea. | 5 | $ - 0 | $ - 0 | 1 & 2 | ||||
| EIA 19" Two Post Rack (Approximate Dimensions 84" H x 3" D) | ea. | 5 | $ - 0 | $ - 0 | 1 & 2 | ||||
| EIA 19" Two Post Rack (Approximate Dimensions 84" H x 6" D) | ea. | 5 | $ - 0 | $ - 0 | 1 & 2 | ||||
| EIA 19" Fixed Wall-Mount Enclosed Cabinet (Approximate Dimensions 24" H x 24" D) | ea. | 5 | $ - 0 | $ - 0 | 1 & 2 | ||||
| EIA 19" Fixed Wall-Mount Enclosed Cabinet (Approximate Dimensions 36" H x 24" D) | ea. | 5 | $ - 0 | $ - 0 | 1 & 2 | ||||
| EIA 19" Fixed Wall-Mount Enclosed Cabinet (Approximate Dimensions 48" H x 24" D) | ea. | 5 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rack Mount Fiber Optic Patch Panel For Cassettes or Snap-in's - 1RU | ea. | 25 | $ - 0 | $ - 0 | Phase 1 | ||||
| Rack Mount Fiber Optic Patch Panel For Cassettes or Snap-in's - 2RU | ea. | 25 | $ - 0 | $ - 0 | Phase 1 | ||||
| Angled Rack Mount Fiber Optic Patch Panel For Cassettes or Snap-in's - 1RU | ea. | 25 | $ - 0 | $ - 0 | Phase 1 | ||||
| Angled Rack Mount Fiber Optic Patch Panel For Cassettes or Snap-in's - 2RU | ea. | 25 | $ - 0 | $ - 0 | Phase 1 | ||||
| Unloaded Rack Mount Patch Standard Enclosure - 1RU | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Unloaded Rack Mount Patch Standard Enclosure - 2RU | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Unloaded Rack Mount Patch Standard Enclosure - 3RU | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Unloaded Rack Mount Patch Standard Enclosure - 4RU | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Unloaded Rack Mount Patch Armoured/Multiple Trunk Enclosure - 1RU | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Unloaded Rack Mount Patch Armoured/Multiple Trunk Enclosure - 2RU | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Unloaded Rack Mount Patch Armoured/Multiple Trunk Enclosure - 3RU | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Unloaded Rack Mount Patch Armoured/Multiple Trunk Enclosure - 4RU | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Rack Mount Optical Fiber Splice Enclosure - 3RU - repair/District-directed use only | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Rack Mount Optical Fiber Splice Enclosure - 4RU - repair/District-directed use only | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Wall Mount Fiber Optic Patch Enclosure 2 Slot / 1 Door | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Wall Mount Fiber Optic Patch Enclosure 2 Slot / 2 Door | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Wall Mount Fiber Optic Patch Enclosure 4 Slot / 1 Door | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Wall Mount Fiber Optic Patch Enclosure 4 Slot / 2 Door | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Buffer-tube Fan-out Kits - repair/District-directed use only | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| OM4 Strand Termination, per strand end (LC fusion splice-on connector, fusion, dust cap, labeling, bi-directional OLTS/OTDR testing) | ea. | 2000 | $ - 0 | $ - 0 | Phase 1 | ||||
| OS2 Strand Termination, per strand end (LC UPC fusion splice-on connector, fusion, dust cap, labeling, bi-directional OLTS/OTDR testing) | ea. | 10000 | $ - 0 | $ - 0 | Phase 1 | ||||
| NEMA 3R Enclosure 16" x 16" x 6" | ea. | 5 | $ - 0 | $ - 0 | 1 & 2 | ||||
| NEMA 3R Enclosure 24" x 24" x 8" | ea. | 5 | $ - 0 | $ - 0 | 1 & 2 | ||||
| NEMA 3R Enclosure 36" x 36" x 12" | ea. | 5 | $ - 0 | $ - 0 | 1 & 2 | ||||
| NEMA 3R Enclosure 48" x 36" x 16" | ea. | 5 | $ - 0 | $ - 0 | 1 & 2 | ||||
| EIA 19" Front Mount Shelf | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| EIA 19" Cantilevered Shelf (mounts to front and back of EIA racks) | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| EIA 19" Multi-Configuration Shelf | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rack Blanking Panel - 1 RU (1.8"H x 19.0"W) | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rack Blanking Panel - 2 RU (3.5"H x 19.0"W) | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rack Blanking Panel - 4 RU (7.0"H x 19.0"W) | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rack Blanking Panel - 8 RU (14.0"H x 19.0"W) | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Fiber Optic Cassette/Snap-in Blank Plate | ea. | 100 | $ - 0 | $ - 0 | Phase 1 | ||||
| Cable Management | |||||||||
| Horizontal Cable Manager Front and Rear 1 Rack Unit | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Horizontal Cable Manager Front and Rear 2 Rack Units | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Horizontal Cable Manager Front and Rear 3 Rack Units | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Horizontal Cable Manager Front Only 1 Rack Unit | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Horizontal Cable Manager Front Only 2 Rack Units | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Horizontal Cable Manager Front Only 3 Rack Units | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Horizontal Cable Manager Front Only 4 Rack Units | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Single Sided Vertical Manager - Approximately 3" deep | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Single Sided Vertical Manager - Approximately 6" deep | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Double Sided Vertical Manager - Approximately 3" deep | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Double Sided Vertical Manager - Approximately 6" deep | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Backboards, Grounding & Bonding | |||||||||
| Full Sheet Fire-Retardant Plywood Backboard 4' x 8' x ¾" | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Half Sheet Fire-Retardant Plywood Backboard 4' x 4' x ¾" | ea. | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| #6 AWG-Stranded copper wire cable | $/foot | 500 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Ground Termination | ea. | 100 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Ground Bus Bar | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Main Ground Bus Bar | ea. | 15 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Telecommunications Bonding Backbone Conductor, #3/0 AWG (sized per ANSI/TIA-607) | $/foot | 500 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rack Bonding Kit | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Cable Tray Bonding Jumper | ea. | 100 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rack - Anti-Static Pad | ea. | 10 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rack - Isolation Pad | ea. | 10 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Pathways (Conduit, Raceway, Innerduct, Tray, Supports) | |||||||||
| Electrical Metallic Tubing - 3/4" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Electrical Metallic Tubing - 1" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Electrical Metallic Tubing - 2" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Electrical Metallic Tubing - 4" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Electrical Metallic Tubing Pull Box 12" x 12" x 12" | ea. | 20 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Electrical Metallic Tubing Pull Box 24" x 24" x 6" | ea. | 20 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rigid Non-Metallic Conduit - 3/4" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rigid Non-Metallic Conduit - 1" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rigid Non-Metallic Conduit - 2" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rigid Non-Metallic Conduit - 4" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Galvanized Rigid Conduit - 3/4" | $/foot | 150 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Galvanized Rigid Conduit - 1" | $/foot | 150 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Galvanized Rigid Conduit - 2" | $/foot | 150 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Galvanized Rigid Conduit - 4" | $/foot | 150 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Intermediate Metallic Conduit - 3/4" | $/foot | 150 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Intermediate Metallic Conduit - 1" | $/foot | 150 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Intermediate Metallic Conduit - 2" | $/foot | 150 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Intermediate Metallic Conduit - 4" | $/foot | 150 | $ - 0 | $ - 0 | 1 & 2 | ||||
| 2" Galvanized Sleeve through block or concrete wall | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| 4" Galvanized Sleeve through block or concrete wall | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| 2" EMT sleeve through drywall | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| 4" EMT sleeve through drywall | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| 2" Schedule 40 PVC Conduit & Warning Tape at 24" Deep in Ground | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| 4" Schedule 40 PVC Conduit & Warning Tape at 24" Deep in Ground | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Long-Sweep 90° Elbow - 2" | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Long-Sweep 90° Elbow - 4" | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Rod Conduit and install mule tape | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Metallic Surface Raceway 1/2" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Metallic Surface Raceway 3/4" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Non-Metallic Surface Raceway 3/4" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Non-Metallic Surface Raceway 1 1/4" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Non-Metallic Surface Raceway 1 3/4" | $/foot | 1000 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Innerduct With Pull Tape - Riser Rated - 1" | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Innerduct With Pull Tape - Riser Rated - 1 1/2" | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Innerduct With Pull Tape - Riser Rated - 2" | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Innerduct With Pull Tape - Plenum Rated - 1" | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Innerduct With Pull Tape - Plenum Rated - 1 1/2" | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Innerduct With Pull Tape - Plenum Rated - 2" | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Innerduct With Pull Tape - Outdoor Rated - 1" | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Innerduct With Pull Tape - Outdoor Rated - 1 1/2" | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Innerduct With Pull Tape - Outdoor Rated - 2" | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Flexible Engineered Fabric Conduit - 1" - 3 Cell | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Flexible Engineered Fabric Conduit - 2" - 3 Cell | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Flexible Engineered Fabric Conduit - 3" - 3 Cell | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Flexible Engineered Fabric Conduit - 4" - 3 Cell | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Cable Support Hanger | ea. | 500 | $ - 0 | $ - 0 | 1 & 2 | ||||
| J-Hook, 2" (with beam clamp/hardware) | ea. | 2000 | $ - 0 | $ - 0 | Phase 2 | ||||
| J-Hook, 4" (with beam clamp/hardware) | ea. | 1000 | $ - 0 | $ - 0 | Phase 2 | ||||
| Threaded Rod Drop with Ceiling Anchor | ea. | 500 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Bridle Ring | ea. | 200 | $ - 0 | $ - 0 | Phase 2 | ||||
| Ladder Cable Tray with Ladder Attachment Kit - 12" W | $/foot | 300 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Ladder Cable Tray with Ladder Attachment Kit - 24" W | $/foot | 300 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Solid Bottom Cable Tray (Approximate Dimensions: 12" W x 4" D) | $/foot | 300 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Solid Bottom Cable Tray (Approximate Dimensions: 24" W x 4" D) | $/foot | 300 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Solid Bottom Cable Tray (Approximate Dimensions: 12" W x 6" D) | $/foot | 300 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Solid Bottom Cable Tray (Approximate Dimensions: 24" W x 6" D) | $/foot | 300 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Wire Mesh Cable Tray (Approximate Dimensions: 6" W x 2" D) | $/foot | 300 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Wire Mesh Cable Tray (Approximate Dimensions: 12" W x 2" D) | $/foot | 300 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Wire Mesh Cable Tray (Approximate Dimensions: 24" W x 2" D) | $/foot | 300 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Wire Mesh Cable Tray (Approximate Dimensions: 6" W x 4" D) | $/foot | 300 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Wire Mesh Cable Tray (Approximate Dimensions: 12" W x 4" D) | $/foot | 300 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Wire Mesh Cable Tray (Approximate Dimensions: 24" W x 4" D) | $/foot | 300 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Cable Tray Fitting (bend, tee, or drop-out) | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Core Drilling, Splicing & Underground | |||||||||
| 1"Conduit Core Drill | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| 1"Conduit Core Drill w/ X-RAY | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| 2" Conduit Core Drill | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| 2" Conduit Core Drill With X-RAY | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| 4" Conduit Core Drill | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| 4" Conduit Core Drill With X-RAY | ea. | 50 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Fiber Optic Fusion Splice - repair/District-directed use only | ea. | 50 | $ - 0 | $ - 0 | Phase 1 | ||||
| 2" Directional boring and trench | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| 4" Directional boring and trench | $/foot | 1000 | $ - 0 | $ - 0 | Phase 1 | ||||
| Fire Stopping | |||||||||
| Firestop Pathway Device, 2" (UL listed) | ea. | 200 | $ - 0 | $ - 0 | Phase 1 | ||||
| Firestop Pathway Device, 4" (UL listed) | ea. | 100 | $ - 0 | $ - 0 | Phase 1 | ||||
| Firestop Sealant/Putty - per penetration (UL listed system) | ea. | 300 | $ - 0 | $ - 0 | Phase 1 | ||||
| Underground & Site Work | |||||||||
| Jack-and-Bore under hardscape - 2" | $/foot | 300 | $ - 0 | $ - 0 | Phase 1 | ||||
| Jack-and-Bore under hardscape - 4" | $/foot | 300 | $ - 0 | $ - 0 | Phase 1 | ||||
| In-Ground Handhole/Pull Box, Tier 22 (approx. 17" x 30") | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| In-Ground Handhole/Pull Box, Tier 22 (approx. 24" x 36") | ea. | 10 | $ - 0 | $ - 0 | Phase 1 | ||||
| Repair of Damaged In-Ground Conduit | $/foot | 500 | $ - 0 | $ - 0 | Phase 1 | ||||
| Dewatering | $/day | 5 | $ - 0 | $ - 0 | Phase 1 | ||||
| Labor | |||||||||
| Rate per hour - labor only - for District-authorized work not covered by a unit-priced line item | $/hour | 100 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Overtime rate per hour - labor only (above 40 hours per week for the same Project) - for District-authorized work not covered by a unit-priced line item | $/hour | 25 | $ - 0 | $ - 0 | 1 & 2 | ||||
| Demolition of Existing Cabling NOT associated with new cable installation - labor only - District-directed only - E-Rate INELIGIBLE (removal of cabling being replaced is included in drop and fiber pricing) | $/hour | 50 | $ - 0 | 0.0% |
tc={81F88AB8-EC3F-4F3A-AD7D-5EE55EB007BF}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| Set by District: ineligible for E-Rate | $ - 0 | 1 & 2 | ||||
| Project Coordination - labor only - for District-authorized work not covered by a unit-priced line item | $/hour | 50 | $ - 0 | $ - 0 | 1 & 2 | |
| Rate per hour - Foreman - labor only - for District-authorized work not covered by a unit-priced line item | $/hour | 50 | $ - 0 | $ - 0 | 1 & 2 | |
| After-Hours/Weekend Rate per hour - labor only - for District-authorized work not covered by a unit-priced line item | $/hour | 50 | $ - 0 | $ - 0 | 1 & 2 | |
| Aerial/Scissor Lift Rental | $/day | 10 | $ - 0 | $ - 0 | 1 & 2 | |
| Contingency Fee (Percentage of base labor cost for any given school, NOT TO EXCEED 10% per RFP Section 5.3) (NOT TO BE INCLUDED IN PRICING CALCULATION) | % | 1 & 2 | ||||
| MSRP Discount (NOT TO BE INCLUDED IN PRICING CALCULATION) | ||||||
| Percentage discount off of published MSRP for items not identified above (NOT TO BE INCLUDED IN PRICING CALCULATION) | % | 1 & 2 | ||||
| Identify published MSRP price list/catalog source(s) and date: |
| Vendor Name | Total Cost | $ - 0 |
| Please provide your Service Provider Identification Number (SPIN) | Total District Share After E-Rate Discount | $ - 0 |
| Please provide your FCC Registration Number (FCC RN) | ||
| Date | ||
| Authorized Representative's Signature | ||
| Representative's Title |
Set by District: ineligible for E-Rate
File details come from the government source that posted it. Updated .