Layer_1_Network_and_Telecommunications_Infrastructure_Upgrade.pdf
PDF 490 KB Posted
- Solicitation number
- 26-BM-045
- Issued by
- Pinellas County, Florida
About this file
This is a Request for Proposals (RFP) issued by the Pinellas County School District for Layer 1 Network and Telecommunications Infrastructure Upgrade services. The District seeks qualified contractors to furnish labor, materials, equipment, and services for upgrading and modernizing network and telecommunications infrastructure across 98 school sites, including structured cabling, fiber optic backbone systems, horizontal copper cabling (Category 6/6A), telecommunications distribution frames, and associated pathways and support components. Proposals are due by 4:00 PM on January 4, 2027, submitted electronically through the District's OpenGov Procurement portal. Mandatory walk-throughs are required at three locations on November 19-20, 2026, with attendance at all three sessions mandatory for proposal eligibility. The District intends to award contracts to up to three highest-scoring vendors, with geographic school lists assigned based on award scenarios (South/Mid-County, North County, or three-vendor split). The project spans April 1, 2027, through June 30, 2031, structured in two phases: Phase 1 (fiber optic infrastructure) and Phase 2 (horizontal Ethernet cabling). The District may renew or extend the contract for up to four additional one-year periods by mutual agreement, plus three additional thirty-day unilateral renewal periods at the Director's discretion.
The estimated project cost is approximately $20,000,000, with the FCC E-Rate program expected to fund approximately 85% ($16,000,000) and the District funding the remainder. All work is dependent on E-Rate Category 2 funding availability; should funding be reduced, delayed, or unavailable, the District reserves the right to suspend or terminate the contract without penalty. Evaluation criteria include Technical Compliance and Approach (25%), Contractor Qualifications, Experience and Past Performance (25%), Cost Proposal (35%), and References (15%). Contractors must meet minimum qualifications including three completed similar-scope structured cabling projects within five years in Florida (with at least one K-12 school district project), valid Florida Low Voltage License, BICSI Registered Communications Distribution Designer (RCDD) on staff, manufacturer certification (Belden, Leviton, or approved equivalent), and demonstrated financial capability. Vendors must maintain valid SPIN and FCC Registration Numbers, comply with all USAC E-Rate rules including FCC Form 473 annual filing and Form 474 invoicing, and adhere to the Lowest Corresponding Price rule. All pricing must remain firm through the initial contract term with escalation/de-escalation at renewal periods not exceeding the previous year's Consumer Price Index for All Urban Consumers. Personnel background screening at Level 2 (fingerprinting and criminal records checks) is mandatory for all employees with access to school grounds or direct student contact.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Layer_1_Pricing_Worksheet_Revised_11-5_Attachment_C.xlsx | XLSX spreadsheet | |
| Layer_1_Vendor_Award_Scenarios_-_School_Lists_Updated_11-3_Attachment_B.xlsx | XLSX spreadsheet | |
| Protest_Procedures.pdf | ||
| Layer_1_Project_List_of_Schools.csv | CSV file | |
| Insurance_Specifications_for_Contractors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSALS
#26-BM-045
FOR
LAYER 1 NETWORK AND
TELECOMMUNICATIONS
INFRASTRUCTURE UPGRADE
RFP 26-BM-045 Posted
Thursday, November 5, 2026
Proposals Due
Before 4:00 pm on January 4, 2027
All submittals are due electronically through the District’s OpenGov Procurement portal:
https://procurement.opengov.com/portal/pcsb
TABLE OF CONTENTS
SECTION 1. INTRODUCTION AND BACKGROUND
SECTION 2. SCOPE OF WORK
SECTION 3. TECHNICAL REQUIREMENTS
SECTION 4. CONTRACTOR QUALIFICATIONS
SECTION 5. SUBMITTAL REQUIREMENTS
SECTION 6. SERVICE LEVEL AGREEMENT (SLA)
SECTION 7. EVALUATION CRITERIA
SECTION 8. TERMS AND CONDITIONS
SECTION 9. SPECIAL CONDITIONS
SECTION 10. PROPOSAL
Attachments:
A - Layer 1 Project List of Schools
B - Layer 1 Vendor Award Scenarios - School Lists_Updated_11-3_Attachment B
C - Layer_1_Pricing_Workbook_Revised_11-5_Attachment C
D - Protest Procedures
E - Insurance Specifications for Contractors
The School Board Of Pinellas County Prohibits Discrimination In All Purchasing And Contracting
RFP# 26-BM-045
INTRODUCTION AND BACKGROUND
1.1 PURPOSE
The Pinellas County School District (“District”) is soliciting competitive proposals from qualified contractors to furnish all labor, materials, equipment, and services necessary for the upgrade and modernization of Layer 1 network and telecommunications infrastructure throughout schools within the
District. This includes, but is not limited to, structured cabling, fiber optic backbone systems, horizontal copper cabling, telecommunications distribution frames and all associated pathways, support components and infrastructure materials. The District is seeking bids for Category 2 Internal Connections, specifically for structured cabling installation for 98 school sites, listed in Attachment A Layer 1 Project List of
Schools. This is intended to be a multi-year project from contract award through June 30th 2031, with no purchases before April 1, 2027. Multiple vendors may be awarded this contract and participation in the project. The work will be conducted in two phases: Phase 1 (fiber optic infrastructure) and Phase 2
(horizontal Category 6/6A Ethernet cabling), as described in Section 2.2. This procurement is dependent on E-Rate Category 2 funding, as described in Section 8.6. A Form 470 for this opportunity has been submitted to USAC, and is available on their website.
1.2 BACKGROUND
The District operates a large-scale enterprise network spanning multiple school campuses throughout
Pinellas County, Florida. The existing telecommunications infrastructure requires systematic upgrading to support current and future data and multimedia services. The District’s published Structured Cabling
Specification (Section 27 10 00, current revision July 7, 2026) governs all technical requirements (unless otherwise stated here within) and shall be incorporated by reference into this RFP and any resulting contract.
The intent of this upgrade is to install a fully standards-compliant, 10+ Gigabit Ethernet capable infrastructure using fiber optic backbone cabling (OS2 single-mode and/or OM4 multimode), Category 6 horizontal copper cabling, and/or Category 6A cabling — all backed by a 25-year manufacturer performance warranty.
1.3 PROJECT OBJECTIVES
The District’s primary objectives for this project are as follows:
• Replace and upgrade aging Layer 1 infrastructure across District school facilities
• Ensure compliance with current ANSI/TIA and IEEE standards
• Support 10 Gigabit fiber (IEEE 802.3ae) and up to 100 Gigabit fiber (IEEE 802.3ba) for single-mode and shorter multi-mode runs, 10 Gigabit Ethernet over copper (IEEE 802.3an) and/or 1
Gigabit Ethernet over copper (IEEE 802.3ab)
• Provide a minimum 25-year certified system performance warranty
• Standardize infrastructure across campuses consistent with District specifications
• Fully leverage available E-Rate Category 2 funding
• Minimize disruption to school operations during installation
1.4 MANDATORY WALK-THROUGHS
A mandatory walk-through will take place at the following locations/times:
RFP# 26-BM-045
• November 19th: Dunedin Elementary, 1:00 PM
• November 19th: Dunedin Highland Middle School, 2:45 PM
• November 20th: Dunedin High School, 9:00 AM
Vendors must sign in at each location upon arrival. Bids from vendors who do not attend all three walk-throughs will not be accepted.
1.5 DESIGN DOCUMENTS
FISH maps, as-builts, and other network and design related documents (as available) for all District schools can be made available to bidders by contacting Barbara Molfettamolfettab@pcsb.org. Upon award of contract, additional data will be provided to the vendor(s) to assist with quoting the 1st year schools, including OTDR shots and network closet photos.
1.6 CONTRACT AWARD STRUCTURE
The District (at its sole discretion) may award this contract to up to three of the highest scoring point vendors. Percentages are approximate shares of the District’s student population. The school lists for each award scenario are provided in Attachment B, Layer 1 Vendor Award Scenarios – School Lists, issued with this RFP. Lists are contiguous in geographic areas ordered south to north; the highest scored bidder receives the southernmost list. In the two-vendor scenario, the lists are South/Mid-County (approximately
60%) and North County (approximately 40%); in the three-vendor scenario, the lists are South County
(approximately 40%), Mid-County (approximately 35%) and North County (approximately 25%).
Attachment B also designates, for each award scenario, the fiscal year in which work at each school is planned: Year 1 (FY 2027-28), Year 2 (FY 2028-29), Year 3 (FY 2029-30) or Year 4 (FY 2030-31).
Because each awarded vendor list is scheduled across all four fiscal years, a school’s planned fiscal year may differ between award scenarios; the designations for the award scenario selected by the District will apply. School list assignments and fiscal year designations are subject to adjustment by the District, including under the Reassignment of Schools and the Removal, Deferral and Substitution of Schools provisions below.
• Reassignment of Schools: The District reserves the right to adjust the planned delegation of schools by reassigning one or more schools from an awarded vendor’s list to another awarded vendor in the event of delays in completion of any schools delegated to each vendor within any fiscal year of the contract term.
Reassignment will be made to the awarded vendor with the next highest scored bid response or, if no other awarded vendor is available or willing, to the next highest scored responsive bidder from the original evaluation, at that vendor’s awarded contract pricing. Reassignment will be made only as permitted by FCC and USAC E-Rate program rules, including, for any school with committed E-Rate funding, USAC operational SPIN change requirements, and the District will notify the original vendor in writing of its intent to reassign. The original vendor shall cooperate fully in the transition, including delivery of all documentation, test results and as-built information for work completed, and shall have no claim to compensation for work not performed.
• Removal, Deferral and Substitution of Schools: The District reserves the right, at its sole discretion and at any time during the contract term, to remove any school from the project, defer work at any school to a later fiscal year, or reduce the scope of work at any school, including, but not limited to, as a result of school closures, consolidations, relocations, repurposing, renovation or replacement projects, changes in enrollment, or facility planning decisions (such as those arising from the District’s Planning for Progress initiative). The District may also substitute a school or facility not listed in Attachment B (for example, a consolidated or receiving school), provided the work is within the scope of this RFP and is permitted by
FCC and USAC E-Rate program rules, at the vendor’s awarded contract pricing. The District will notify
RFP# 26-BM-045
the affected vendor in writing. Where a Notice to Proceed has already been issued for a removed school, the District will pay only for work completed and accepted, and for non-returnable materials ordered with the District’s written authorization, prior to the notice. The vendor shall have no claim for lost profits, unrealized revenue or other damages resulting from the removal, deferral, reduction or substitution of any school.
RFP# 26-BM-045
SCOPE OF WORK
2.1 GENERAL SCOPE
The Contractor shall provide a complete, fully functional, and tested structured cabling system at each designated school facility. The Contractor is responsible for all materials, equipment, and labor — including all incidental items — necessary to deliver a complete system, whether or not every component is individually itemized in this specification. The scope encompasses all work from the Main Distribution
Frame (MDF) through every Intermediate Distribution Frame (IDF) and out to each individual communications jack. The work shall be performed in two phases, as described in Section 2.2.
Unless specified by the owner, all existing raceway to be reused inclusive of all flex innerduct runs, cabinets and pull boxes, J Hooks, etc. (reuse all existing racks/cabinets). Some inground conduit paths may be damaged or lack available expansion space. Contractor will need to provide cost for repair/installation, see relevant line items in the Pricing Submittal Form. In certain MDF/IDF locations, additional cable management infrastructure may be needed, see relevant line items in the Pricing
Submittal Form. All equipment and materials must be new. Used, re-conditioned or refurbished equipment or materials will not be acceptable.
2.2 PROJECT PHASING
The project will be conducted in two separate phases. Each phase is described below, and the subsections of this Section 2 identify the phase in which each scope item falls.
Phase 1 — Fiber Optic Infrastructure. Phase 1 consists solely of fiber optic cabling and supporting equipment, components, and materials, together with the associated remediation necessary for the installation; meeting best practices and applicable standards. Phase 1 includes:
• Fiber optic backbone cabling (OS2 single-mode or OM4 multi-mode) as described in Section
2.3. Please note that the vendor will need to provide Cisco compatible LR transceivers in any event that single-mode fiber is specified or requested.
• Rack-mounted fiber interconnect cabinets, couplers, connectors, and fiber management, and the remediation of MDF and IDF spaces required to install the fiber in accordance with best practices and standards.
• Associated pathways, innerduct, conduit, pathway remediation, fire stopping, and any grounding and bonding required for the fiber installation.
• Labeling, testing, and documentation of the fiber optic plant.
Phase 2 — Horizontal Ethernet Cabling. Phase 2 consists of horizontal Category 6 or Category 6A
Ethernet cabling and supporting equipment, components, and materials, together with associated network closet remediation. Phase 2 includes:
• Horizontal Category 6 cabling or Category 6A cabling, as described below in Sections 2.5 through 2.9.
• Communications outlets, patch panels, patch cords, and associated cable pathways.
• Remediation of MDF and IDF network closets associated with the horizontal cabling, as described in Section 2.6.
• Labeling, testing, and documentation of the horizontal cabling.
RFP# 26-BM-045
General Requirements. Except where this RFP states otherwise, the requirements of this RFP (including testing, documentation, labeling, training, and warranty requirements) apply to each phase in accordance with its scope.
2.3 FIBER OPTIC BACKBONE CABLING (PHASE 1)
The Contractor shall furnish and install all inter-building and intra-building fiber optic cabling as follows:
• Fiber Types: The fiber optic backbone to be installed may be single-mode (OS2) or multi-mode
(OM4). Please note that the District may choose to generally standardize on single-mode fiber, rather than using multi-mode fiber for runs of 400 meters or less. Hybrid fiber optic cable (cable containing both single-mode and multi-mode strands) will not be accepted.
• Multimode OM4 Fiber: Where multimode fiber is installed, provide tight-buffered, indoor/outdoor plenum-rated, multi-strand 50/125 µm OM4 fiber optic cable for runs of 400 meters or less. Cable shall be VCSEL-optimized and shall exceed ANSI/TIA 568.3-E and IEEE
802.3ae specifications. All fiber strands shall be terminated with LC fusion splice-on connectors.
Pull strings shall be installed with all fiber for future use.
• Single Mode Fiber: Where single mode fiber is installed, provide indoor/outdoor plenum OS2
9/125 µm single mode fiber. Single mode fiber shall be installed for all runs exceeding 400 meters. Proposed single-mode product cut sheets must be submitted for review and approval prior to ordering. Cable shall exceed ANSI/TIA 568.3-E and IEEE 802.3ae specifications. All fiber strands shall be terminated with LC fusion splice-on connectors. Pull strings shall be installed with all fiber for future use.
• Armored Fiber: Where specified by the District (for example, in exposed or high-risk pathways, crawl spaces, or areas subject to physical damage or rodents), OS2 or OM4 fiber optic cable shall be furnished with interlocking aluminum armor, indoor/outdoor plenum-rated where required, and shall otherwise meet all requirements of this section. The armor shall be bonded and grounded at each end in accordance with the NEC and ANSI/TIA-607-D. Armored cable is priced as a per-foot adder to the corresponding per-foot fiber price, plus armor bonding kits, in the Pricing Submittal Form.
• Star Configuration: All backbone cables shall run in a star configuration from MDF to each
IDF. There shall be no intermediate splicing or bridging between backbone segments.
• Fiber Counts: As indicated on project drawings.
• Termination: All fiber strands shall be fusion-splice terminated and landed on rack-mounted fiber interconnect cabinets at both ends. The Contractor shall own fusion splicer equipment. The
Owner shall be notified at least 48 hours prior to connector installation and may elect to be present.
• Fiber Pricing: Per-foot fiber pricing in the Pricing Submittal Form includes furnishing and pulling the cable, pull string and labeling. Each terminated strand end shall be priced under the per-strand-end termination line items, which include the LC fusion splice-on connector, fusion, dust cap, labeling, and bi-directional OLTS/OTDR testing. Fusion splice, fan-out kit and splice enclosure line items are for repair or District-directed use only.
RFP# 26-BM-045
• Removal of Existing Fiber Cabling: Removal and disposal of existing fiber optic cabling being replaced by the new installation, including abandoned cable as required by the National Electrical
Code (NEC Article 800 / 770 as applicable), is included in the per-foot fiber pricing. Removal of cabling not associated with a new installation shall be performed only at the District’s direction under the ‘Demolition of Existing Cabling’ line item, is not E-Rate eligible, and shall be invoiced to the District separately as an ineligible cost.
Recommended Fiber Manufacturers:
• Belden FiberExpress OM4: FD4DxxxP9 / Single-mode: FDSDxxxP9
• Corning OM4: xxxT8P-31190-29 / Single-mode: xxxE8P-31131-29
Recommended Connector Manufacturers:
• Belden FX Fusion: OM4 FT4LC900FS01 / Single-mode FTSLC900FS01
• Corning FuseLite: OM4 SOC-LC-900-OM4 / Single-mode SOC-LCU-900-SM
Recommended Fiber Interconnect Cabinet Manufacturers:
• Belden: FiberExpress Ultra Cabinets, FX-FMT Series
• Leviton: SPBC2 Series
2.4 EXCAVATION AND UNDERGROUND PATHWAYS (PHASE 1)
Where underground cabling is required, the Contractor shall provide all excavation, backfill, and compaction per industry standards. Jack-and-bore methods are preferred beneath concrete slabs, sidewalks, and similar hardscape. Dewatering shall be provided as necessary. Restoration of all disturbed surfaces, including concrete, asphalt, sidewalks, sod, irrigation and landscaping, to pre-construction condition or better is included in the unit pricing for directional boring, trenching and conduit installation.
No separate charges will be accepted for surface restoration.
2.5 HORIZONTAL COPPER CABLING (CATEGORY 6 AND CATEGORY 6A) (PHASE 2)
The Contractor shall furnish and install Category 6 or Category 6A horizontal copper cabling, as specified by the District, from each IDF to all communications outlets throughout each facility, as follows:
• Cable Type: All horizontal cabling shall be Category 6 or Category 6A U/UTP, plenum-rated where required, and riser-rated in non-plenum spaces.
• Run Length: Maximum horizontal cable run length shall not exceed 90 meters from the IDF to the furthest workstation.
• Service Loop: Each cable run shall include five feet of slack service loop coiled above the ceiling directly above each communications outlet drop.
• Termination Sequence: Cables shall be terminated in sequential order (lowest room number first, Station A first, Ports 1–4 in order) on 48-port patch panels at the IDF end, and on Category
6 or Category 6A data jacks (matching the cable category) at the workstation end.
• Termination Method: All copper station cables shall be terminated using 110-type insulation displacement connectors (IDC) with T568A pin/pair assignment.
RFP# 26-BM-045
• Drop Pricing: Drop pricing shall be used for every new or replacement horizontal cable run.
Component line items apply only to work that does not constitute a complete drop (repairs, moves/adds/changes, re-termination of existing cable) and require prior District approval. Where a drop line item applies, the District will NOT accept component or hourly pricing for that work.
• Removal of Existing Copper Cabling: Removal and disposal of existing horizontal copper cabling being replaced by a new drop, including abandoned cable as required by the National
Electrical Code (NEC Article 800), is included in the drop pricing. Removal of cabling not associated with a new installation shall be performed only at the District’s direction under the
‘Demolition of Existing Cabling’ line item, is not E-Rate eligible, and shall be invoiced to the
District separately as an ineligible cost.
Recommended Category 6 and Category 6A Cable Manufacturers:
• Belden: Cat 6 2413; Cat 6A 10GXS12
• Berk-Tek: Cat 6 LANmark-1000 (10032093); Cat 6A LANmark-XTP
2.6 DISTRIBUTION FRAMES — MDF AND IDF BUILD-OUT (PHASES 1 AND 2)
The Contractor shall furnish and install complete Main Distribution Frame (MDF) and Intermediate
Distribution Frame (IDF) equipment rooms and closets, including the items below (where specific need is determined by the District). In Phase 1, this work is limited to the rack-mounted fiber interconnect cabinets and the remediation of MDF and IDF spaces required to install the fiber backbone in accordance with best practices and standards. All remaining items, and the associated network closet remediation for the horizontal cabling, are Phase 2.
• 19-inch EIA standard 42U-48U data racks and/or wall-mount enclosures (24, 36 or 48 inches tall).
• Rack-mounted fiber interconnect cabinets with LC duplex couplers, fiber storage management, and blank adapter panels for unused ports.
• 48-port Category 6 and Category 6A 110-termination patch panels with rear and horizontal cable management.
• A minimum 30-inch clear working space shall be maintained in front of and behind all equipment racks.
2.7 COMMUNICATIONS OUTLETS AND DATA JACK SYSTEM (PHASE 2)
The Contractor shall furnish and install all communications outlets as follows:
• Recessed-mount faceplates with four-port configurations. Single and dual drops shall include a four-port faceplate with blank inserts in unused ports.
• Category 6 or 6A jacks for all standard data outlets.
• Jacks shall comply with ANSI/TIA-568.0-E, 568.1-E, 568.2-E, and TIA-606-D with T568A pin/pair assignment and ETL verification.
RFP# 26-BM-045
Recommended Jack Manufacturers:
• Belden: Cat 6 AX101320; Cat 6A AX102282
• Leviton: Cat 6 61110-RW6; Cat 6A 6110G-RW6
2.8 PATCH CORDS (PHASE 2)
The Contractor shall furnish and deliver patch cords as follows, with all colors confirmed with the
Owner/Engineer prior to ordering:
Color coding by device type:
• Data: Blue
• WAPs: Yellow
• Voice: Orange – E-RATE INELIGIBLE, INVOICE ACCORDINGLY
• IP Speakers: Purple – E-RATE INELIGIBLE, INVOICE ACCORDINGLY
• Cameras: Green – E-RATE INELIGIBLE, INVOICE ACCORDINGLY
• Fire: Red – E-RATE INELIGIBLE, INVOICE ACCORDINGLY
• HVAC/BAS: White – E-RATE INELIGIBLE, INVOICE ACCORDINGLY
Cat6/Cat6A Patch Cable lengths per Network Closet:
• Patch Cords: 80% – 1 ft, 10% – 3 ft, 5% – 5 ft, 5% – 7 ft
Recommended Patch Cord Manufacturers:
• Belden: Cat 6 C6011 Series; Cat 6A CA211 Series
• Leviton: Cat 6 6D460-xxx Series; Cat 6A 6ASP0-xx Series
Fiber Patch Cables:
LC to LC, some LC to ST. Lengths and types are specified in the Pricing Submittal Form.
2.9 CABLE ROUTING INFRASTRUCTURE (PHASES 1 AND 2)
The Contractor shall provide complete cable pathway systems, including:
• J-Hook Systems: J-hooks shall be sized to accommodate all specified cabling plus 50% additional capacity. Spacing shall not exceed 4-foot intervals. J-hooks shall be positioned no closer than 18 inches from sources of electromagnetic interference (fluorescent lighting, etc.).
• Cable Trays: Sized to accommodate all specified cabling plus 50%. Minimum 18 inches from
EMI sources.
• Conduit: Required between buildings, in open exposed ceiling areas, and within walls.
RFP# 26-BM-045
• Fire Stop Penetrations: All penetrations through fire-rated or smoke walls shall be properly fire-stopped per UL Standards and ANSI/TIA-569-E.
RFP# 26-BM-045
TECHNICAL REQUIREMENTS
3.1 APPLICABLE STANDARDS
All work shall conform to the latest adopted versions of the following standards as of the bid opening date:
• ANSI/TIA-568.0-E, 568.1-E, 568.2-E, 568.3-E (or current edition) — Commercial Building
Telecommunications Cabling Standards
• ANSI/TIA-569-E (or current edition) — Telecommunications Pathways and Spaces
• ANSI/TIA-606-D (or current edition) — Administration Standard for Telecommunications
Infrastructure
• ANSI/TIA-607-D (or current edition) — Generic Telecommunications Bonding and Grounding
(Earthing) for Customer Premises
• BICSI Telecommunications Distribution Methods Manual
• IEEE 802.3ab — Gigabit Ethernet over UTP (1000BASE-T)
• IEEE 802.3ae — 10 Gigabit Ethernet over Fiber
• IEEE 802.3ba — 100 Gigabit Ethernet over Fiber
• IEEE 802.3an — 10GBASE-T
• National Electrical Code (NEC), current edition
• UL Standards for fire stop penetrations
• ANSI/TIA-1152-A (or current edition) — Measurement Procedures for Balanced Twisted-Pair
Transmission
• Florida Building Code, current edition
3.2 SYSTEM PERFORMANCE REQUIREMENTS
The installed system shall meet or exceed the following performance benchmarks:
• Fiber Optic Backbone: Capable of supporting 10 Gigabit Ethernet per IEEE 802.3ae. Maximum attenuation: 3.5 dB/km at 850 nm and 1.5 dB/km at 1300 nm for OM4 multimode. OS2 single-mode strands shall meet the attenuation limits of ANSI/TIA 568.3-E. Maximum supported distance: 400 meters for 10GBASE-SR applications on OM4.
• Fiber Optic Cabling Connectors: Provide Modular Fusion Splice Connectors at each end of all fibers installed. Ferrule material shall be zirconia ceramic and pre- radiused. Each installed connector shall not exceed –0.1 dB/0.5 dB per connector pair. Provide connector protectors at each connection point to prevent accidental damage to connectors (dust covers). Terminate fiber on “LC” duplex connectors appropriate to fiber type.
RFP# 26-BM-045
• Category 6 Horizontal Cabling: Capable of supporting 1 Gigabit Ethernet per IEEE 802.3ab.
Full channel compliance to TIA-568.2-E across the complete channel (patch cord – patch panel – horizontal cable – workstation jack – workstation cord). Maximum horizontal run: 90 meters.
• Category 6A Cabling: Full channel compliance to TIA-568.2-E for Category 6A, supporting
10GBASE-T per IEEE 802.3an. Test frequencies from 1 MHz to 500 MHz.
3.3 RECOMMENDED PRODUCTS AND MANUFACTURERS
The District has designated Corning, Belden, Berk-Tek and Leviton as recommended manufacturers for structured cabling components. The Installation Contractor shall be an authorized distributor and a certified installer/contractor for these manufacturers, or the same for any equivalent manufacturer proposed. The Installation Contractor must also be authorized to offer 25-year extended warranties.
Functionally equivalent solutions from alternative manufacturers will be accepted, as described below.
In accordance with E-Rate fair and open competitive bidding rules, any manufacturer names and part numbers identified within this solicitation or the District’s Section 27 10 00 (Structured
Cabling) specifications are used solely to establish a baseline standard of quality, performance, and configuration. Bids for all functionally equivalent solutions from alternative manufacturers will be accepted and evaluated fairly. Any bidder proposing an equivalent or alternative manufacturer must provide comprehensive supporting documentation with its bid response demonstrating functional equivalency, including technical specifications, component-level industry certifications and standards, and matching warranty terms. The alternative solution must integrate seamlessly and be fully compatible with the District’s existing network infrastructure.
Matched System: All components within each cabling channel or link, including cable, connectors, jacks, faceplate inserts, patch panels, patch cords, fiber connectors, adapter panels/plates, cassettes and fiber enclosures, shall be from a single manufacturer’s matched system, or from manufacturers formally partnered under a single manufacturer warranty program, so that the complete installed system qualifies for the required 25-year manufacturer warranty. Mixing components from different manufacturers within a cabling channel or link is not permitted unless the warranting manufacturer confirms in writing, with the bid response, that the combination is covered by its 25-year warranty. Each bid shall identify the matched system (manufacturer and product line) proposed for copper and for fiber cabling, and any proposed substitution during the contract shall maintain the matched system and warranty eligibility.
3.4 LABELING REQUIREMENTS
All network system components shall be labeled per ANSI/TIA-606-D and the District’s labeling standard, as follows:
Cable Labeling Format:
• Each cable shall be permanently labeled at both ends (within 6 inches of termination point).
• Format: BB-RRR (Building Number – Room Number of the communications closet serving that cable).
• Labels shall be produced by a thermal label printer (Brother P-Touch or equivalent). Handwritten labels are not acceptable.
Communications Outlet Labeling:
• Top label: BB-RRR (building and room number of the serving closet)
• Bottom label: P##-P##-P##-P## (Patch Panel ID and port number, left-to-right, top-to-bottom)
RFP# 26-BM-045
Patch Panel Labeling:
• Each panel labeled alphabetically from top to bottom (A, B, C, etc.)
• Each port labeled with building number, room number, and jack designation of the originating outlet
• The building and room number in which the patch panel resides shall be prominently displayed on the panel
Fiber Labeling:
• Each fiber identified at both ends on the interconnect cabinet with permanent plastic labels indicating building number and corresponding fiber number
3.5 GROUNDING AND BONDING
All metallic cable infrastructure and rack equipment shall be properly grounded and bonded per
ANSI/TIA-607-D and NEC Article 800.
3.6 FIRE AND SMOKE PENETRATIONS
All cable penetrations through fire-rated walls, floors, and smoke barriers shall be fire-stopped per UL
Standards and ANSI/TIA-569-E, using listed firestop materials and methods.
3.7 CABLE BEND RADIUS AND TENSION
Cable installation shall comply with manufacturer maximum pull tension and minimum bend radius requirements. Wide-sweep elbows shall be used at all right-angle transitions. Cables shall be free from tension at both ends and throughout each run.
3.8 ELECTROMAGNETIC INTERFERENCE (EMI) SEPARATION
All cable pathways (J-hooks, trays) shall maintain a minimum 18-inch separation from sources of electromagnetic interference including fluorescent lighting fixtures, motors, and electrical panels, unless shielded tray sections are employed.
3.9 TESTING REQUIREMENTS
Fiber Optic Testing
Each fiber strand shall be tested using OLTS (Optical Loss Test Set) and OTDR (Optical Time Domain
Reflectometer) in both directions with test results submitted at Substantial Completion. Testing shall include end-to-end attenuation, end-to-end insertion loss, length and polarity, and shall comply with
ANSI/TIA 568.3-E. Test results shall demonstrate compliance with acceptable insertion loss limits for the installed link distance. Photocopies of test results are not accepted; original signed reports only.
Category 6 Copper Testing
Each horizontal Category 6 cable run shall be tested as a complete channel (patch cord – patch panel – horizontal cable – workstation jack – workstation cord) for all frequencies from 1 MHz to 250 MHz using an AEM, Fluke, or pre-approved equivalent Level III or higher tester, compliant with ANSI/TIA-1152-A.
Tester shall have current factory calibration (within 12 months) — documentation of calibration shall be submitted upon request.
RFP# 26-BM-045
Required Category 6 test parameters include: Cable Length, Wire Map, Insertion Loss, Pair-to-Pair
NEXT Loss, Power Sum NEXT Loss, Pair-to-Pair ACR-F, PS ACR-F, Return Loss, Propagation Delay, Propagation Delay Skew, and LCL (Longitudinal Conversion Loss).
Category 6A Copper Testing
Each Category 6A cable run shall be tested as a complete channel for all frequencies from 1 MHz to 500
MHz using a Level IV or higher tester compliant with ANSI/TIA-1152-A and current Category 6A software. Tester factory calibration shall be current within 12 months.
Required Category 6A test parameters include: Wiremap, Length, Propagation Delay, Delay Skew, Loop
Resistance, DC Resistance Unbalance (Pair-to-Pair and Wire-to-Wire), Return Loss, Impedance, Insertion
Loss, NEXT, PSNEXT, ACRF, PSACRF, TCL, ELTCTL, and Cable Length.
All test results shall be in the form of original tester software printouts. Photocopies are not accepted.
Results shall be furnished to the District Engineer.
Testing Schedule
A testing schedule shall be planned and agreed upon with the Owner prior to commencing testing. The
Owner/Engineer reserves the right to have a representative present during all or any portion of testing.
3.10 DOCUMENTATION REQUIREMENTS
The Contractor shall provide full project documentation to the Owner, including cabling testing certification and as-built documentation for all work completed at each school, as follows:
• As-Built Drawings: Developed in AutoCAD 2021 or higher, submitted in .DWG or .DXF and
PDF formats on USB drive. Three sets of black-line hard copy as-built drawings shall also be provided.
• As-Built Drawing Content: All changes and deviations from construction documents; all communication outlet addresses and locations; horizontal and backbone cable routing; and revised rack/cabinet elevations showing serial numbers of all installed equipment.
• MDF/IDF Binders: A copy of each building’s as-built drawing affixed to an adjacent wall or stored in an interior pouch for quick reference in each MDF and IDF.
• Test Results: Provided on USB drive including all software tools needed to view, inspect, and print test reports. Additionally, one hard copy of fiber optic cabling test results and one hard copy of UTP cabling results shall be submitted prior to Substantial Completion inspection. Each communications room shall receive its own labeled binder (with clear front pocket) containing test reports for that room’s fiber and copper cabling.
• AutoCAD Jack Drawings: Provided to the Engineer at least three months prior to Substantial
Completion, showing jack numbers keyed to FISH room numbers.
• Bill of Materials: Complete bill of materials for all installed equipment and wiring, with model and serial numbers and rack/backboard layout diagrams.
• E-Rate Asset Inventory: For each school, a complete inventory of all installed equipment and materials, organized by FCC Form 471 Funding Request Number (FRN), including manufacturer, model/part number, quantity, serial number (where applicable), installed location (building and
RFP# 26-BM-045
room) and installation date, delivered in Microsoft Excel format. The District will retain this inventory for at least ten (10) years in accordance with E-Rate record retention requirements.
• Manufacturer Warranty Certificate: Copy of Manufacturer’s 25-year Cabling Plant
Performance Warranty.
RFP# 26-BM-045
CONTRACTOR QUALIFICATIONS
4.1 MINIMUM QUALIFICATIONS
Proposals will only be considered from contractors meeting all of the following minimum qualifications.
Proof of qualifications shall be submitted with the proposal and made available upon request.
Subcontractors and partners shall meet the requirements of this section that apply to the scope of work they will perform, as described under Subcontractors and Partners below; any subcontractor that installs, terminates or tests cabling shall hold the manufacturer certification required for the proposed matched system.
Performance History: The Contractor must have successfully completed at least three (3) structured cabling projects of similar scope and size within the past five (5) years in the State of Florida. For this requirement, a project of similar scope and size is one that included both fiber optic backbone and horizontal copper cabling, comprised of at least 300 horizontal drops or a contract value of at least
$200,000, was performed in occupied facilities, and has been completed and accepted by the owner. At least one (1) project shall have been performed for a K-12 school district or other public educational institution. References shall include a project description, contract value, number of drops, completion date, project superintendent name, and owner contact information.
Fiber Optics Experience: The Contractor must demonstrate significant proven experience in the installation of fiber optic cable systems, including cable installation, fusion splicing, connector termination, interconnect equipment, and testing.
Time in Business: The Contractor must have been continuously in business as a telecommunications systems installer for a minimum of three (3) years prior to the bid date, under its current name or under a predecessor entity. A bidder relying on a predecessor entity’s history must document the change in name or ownership (e.g., merger, acquisition or rebranding) and show continuity of licensure, key personnel and operations. Projects completed by a documented predecessor entity may be counted toward the
Performance History requirement.
Financial Capability: Within the “Vendor Qualifications and Experience” submittal, the bidder must describe its financial well-being as it relates to its ability to support multiple large-scale projects such as this one.
Licensure: The Contractor shall possess, at minimum, a valid State of Florida Low Voltage License.
RCDD: The Contractor shall have a BICSI Registered Communications Distribution Designer (RCDD) on staff. A valid copy of the RCDD certificate shall be submitted with the proposal.
Manufacturer Certification: The Contractor shall be a Belden Partner Alliance (PA) contractor, a
Leviton Network Solutions Certified Installer, or a certified installer for the approved equivalent manufacturer proposed under Section 3.3, authorized to offer 25-year extended warranties. Valid copies of the manufacturer certification and authorized distributor letter must be submitted with the proposal.
Key Personnel: The Contractor shall commit at least one qualified foreman and two journey-level installers or technicians to the project. The proposed Superintendent shall have directly supervised at least two projects of similar scope under the employment of the proposing Contractor.
Subcontractors and Partners: The bidder shall identify in its proposal every subcontractor, partner or other third party it intends to use to perform any part of the work, including for each: company name, address, scope of work to be performed, approximate percentage of the work, applicable licenses, and manufacturer installer certifications. All requirements of this RFP and the resulting contract apply equally to subcontractors and partners, including licensure, manufacturer certification for the installed system, RFP# 26-BM-045 personnel background screening and identification (Section 8.5), safety and site conduct, testing, labeling, documentation, warranty, E-Rate program compliance, record retention and audit requirements (Section
8.6). The awarded vendor remains fully responsible for the performance of all subcontractors and partners. No subcontractor or partner may be added, substituted or removed without the District’s prior written approval, and no subcontractor or partner may be used that is suspended or debarred from federal programs or the E-Rate program.
RFP# 26-BM-045
SUBMITTAL REQUIREMENTS
5.1 SHOP DRAWING SUBMITTALS
The Contractor shall submit complete shop drawings no later than two weeks before the individual start date of work at each school designated for completion during the current fiscal year. No work shall begin and no equipment shall be ordered until shop drawings have been accepted by the District’s Director of
Network and Telecommunications. Shop drawing submittals shall be submitted in PDF format with bookmarks to each section and product, and shall contain the following sections:
Section 1 — Index: Project title, project address, and firm name. Table of contents listing all sections.
Section 2 — Licenses and Testing Equipment: Copy of the Contractor’s valid State of Florida Low
Voltage License; RCDD certificate; list of all instrumentation to be used for system testing.
Section 3 — Product Specifications: Cover page listing manufacturer, part number, and description of each proposed product. Full product cut sheets for all major components.
Section 4 — Labeling Samples: Samples of proposed cable markers and labeling.
Section 5 — The contractor must provide a complete set of drawings, typically in both AutoCAD
(.dwg) format and high-resolution PDFs.
Floor Plans (Horizontal Distribution)
• Drop Locations: Exact placement of every RJ-45 data jack and Wi-Fi Access Point (AP).
• Cable Pathways: Marked routes of cable trays, J-hooks, conduit runs, and sleeves through walls/floors.
• Workstation IDs: Unique labeling codes next to every single drop location on the map matching the physical plate label.
Backbone & Riser Diagrams
• Logical Topology: A vertical schematic showing how the Main Distribution Frame (MDF) connects to all Intermediate Distribution Frames (IDFs).
• Pathway Media: Explicit labeling of backbone media (e.g., 12-strand OS2 single-mode fiber, Category 6A copper) and conduit sizes between closets.
• Rack Elevations: Scale drawings of every rack showing the exact physical layout of patch panels, wire managers, switches, UPS units, and fiber enclosures.
5.2 PROPOSAL CONTENT
Each proposal shall include, at a minimum:
• Vendor Qualifications and Experience submittal, including executive summary, firm qualifications, and a description of the bidder’s financial well-being as it relates to its ability to support multiple large-scale projects.
• Any vendor responding to this bid will be required to submit its assigned SPIN (Service Provider
Identification Number) and FCC Registration Number, as part of its response. Proposers without
RFP# 26-BM-045
a SLD SPIN number or FCC Registration Number MUST obtain one before responding to this bid. An FCC registration number can be obtained from the FCC web site. Proposers must also disclose in their bid response if they have been “red-lighted” by the FCC during the two-year period prior to the issuance of this bid. Proposers must also disclose whether they have been the subject of audits or investigations by USAC, the FCC, DOJ or any other investigator associated with the E-Rate program during the five years prior to the issuance of this bid.
• Completed RCDD certificate and Low Voltage License copies
• Manufacturer certification letter (Belden, Leviton, etc. or the equivalent manufacturer proposed)
• Manufacturer authorized distributor letter
• Project references – minimum three (3) completed projects meeting the Performance History requirements of Section 4.1, including at least one (1) K-12 or other public educational institution project
• Key personnel list with qualifications and roles
• List of all proposed subcontractors and partners with the information required in Section 4.1 (or a statement that none will be used)
• Detailed pricing submittal with a percentage discount off of published MSRP for any unlisted items, as well as any contingency fee shown as a separate line item (Section 5.3). The percentage discount off of published MSRP and the contingency fee will NOT be calculated for total cost, all other items will.
• Statement confirming compliance with all technical specifications including equivalency documentation for any alternative manufacturer. (Section 3.3)
5.3 CONTINGENCY FEE
Bidders may include a construction or installation contingency fee not to exceed 10% of the base labor cost to account for unforeseen structural anomalies during deployment. Any proposed contingency fee must be itemized as a separate, distinct line item in the pricing submittal. Speculative or hidden fees not explicitly structured as an independent line item will result in bid disqualification. Contingencies will only be billed if unforeseen work is authorized via a formal District change order and performed.
RFP# 26-BM-045
SERVICE LEVEL AGREEMENT (SLA)
6.1 PURPOSE
This Service Level Agreement (“SLA”) defines the performance standards, response obligations, documentation requirements, and warranty commitments the Contractor must meet throughout the project and the warranty period following Substantial Completion. This SLA is a contractual obligation and forms part of the resulting contract.
6.2 PRE-CONSTRUCTION SUBMITTALS
Milestone Required Timeline
Individual quotes for delegated schools to be completed within the
27-28 fiscal year to the District Director of Network and
Telecommunications
Within thirty (30) business days of
District School Board approval
District Director written approval of shop drawings Prior to any work commencing or equipment being ordered
Pre-construction meeting and site survey (with existing-condition photographs)
Prior to commencing work at each individual school
Cutover plan Prior to cutover at each individual school
Individual quotes for schools designated for each subsequent fiscal year (FY 2028-29 through FY 2030-31)
By March 1 preceding that fiscal year
District written Notice to Proceed for each school Prior to any work commencing or materials being ordered for that school
Master project schedule Within 15 days of each Notice to
Proceed
6.3 CONSTRUCTION PHASE PERFORMANCE STANDARDS
Pre-Construction Meeting and Site Survey
Before beginning work at each individual school, the Contractor shall attend a pre-construction meeting with the school’s administration and the District’s Technology and Information Systems staff, and shall complete a site survey of that school, including dated photographs of existing conditions in all areas where work will occur (ceilings, walls, floors, network closets and exterior areas to be disturbed). The photographs shall be submitted to the District before work begins at that school and will be used to resolve any questions regarding restoration under Section 8.3.
Work Hours, Scheduling and Cutover
Allowed work hours will vary from school to school and will depend on the type of work being performed (with regard to disruption of school operations) and on other school events. Work hours, including any after-hours, weekend or holiday work, shall be established for each school at its pre-construction meeting and may be adjusted by the District as needed. The District may restrict or suspend work during state testing windows, school events and other periods it designates. The Contractor shall
RFP# 26-BM-045
submit a cutover plan for each school; existing cabling shall remain in service until the replacement cabling has passed testing and the cutover has been approved by the District.
Cabling Completion
All new cabling shall be fully installed, terminated, and PASS-tested prior to Substantial Completion.
Progress Reporting
The Contractor shall provide written weekly progress reports to the District’s Director of Network and
Telecommunications. Reports shall include percentage completion by scope area, any identified issues or deviations, and updated schedule projections.
Daily Site Conditions
The Contractor shall ensure the site is cleaned of all construction debris prior to leaving each day. No cables, tools, or materials shall be left in an unsecured or hazardous condition. Contractor staff must sign-in at the school front office upon arrival and sign-out when leaving. Contractor staff shall wear State of
Florida school district issued identification badges which contain, Photo ID, individual’s name, and the company name. Additionally, a uniform shirt displaying the company name is required.
EMI and Fire Stop Compliance
The Contractor shall ensure all cable pathways maintain required 18-inch EMI separation throughout installation and that all fire stop penetrations are properly sealed before walls are closed. The District reserves the right to inspect and reject non-compliant work at any stage.
6.4 TESTING PERFORMANCE STANDARDS
Test Type Acceptance Criteria
Fiber Optic OTDR 100% of strands must PASS per ANSI/TIA 568.3-E attenuation limits for link distance
Category 6 Channel 100% of channels must PASS all TIA-568.2-E parameters at 1–250 MHz
Category 6A Channel 100% of channels must PASS all TIA-568.2-E parameters at 1–500 MHz
Any cable or fiber failing test requirements shall be replaced or re-terminated by the Contractor at no additional cost to the District. Re-testing shall be performed until 100% PASS is achieved. The
Contractor shall bear all costs for additional materials and re-testing.
6.5 DOCUMENTATION DELIVERY STANDARDS
Document Due Date
RFP# 26-BM-045
Shop drawings to Director of Network &
Telecommunications
No later than two weeks prior to start date of work at any individual school
Hard copy fiber and copper test results to Engineer Prior to Substantial Completion inspection
USB drive with all test results database At Substantial Completion
USB drive with as-built AutoCAD drawings
(.DWG/.DXF and PDF)
At Substantial Completion
Three sets of black-line hard copy as-built drawings At Substantial Completion
Bill of materials with model numbers At Substantial Completion
Binders with test reports installed in each communications room
At Substantial Completion
Copy of Manufacturer’s 25-year Warranty At Substantial Completion
E-Rate asset inventory (by FRN, Excel format) At Substantial Completion
6.6 WARRANTY TERMS
25-Year System Performance Warranty
As part of the manufacturer’s extended warranty program, the Contractor warrants all materials, equipment, and installation quality to be free from defects and to function satisfactorily for a period of no less than 25 years from Substantial Completion. This warranty is manufacturer-certified through the
Belden Partner Alliance, the Leviton Network Solutions Certified Installer program, or the equivalent program of an approved alternative manufacturer and shall be documented with a formal warranty certificate delivered to the District at Substantial Completion. The warranty shall cover the complete matched system as installed (Section 3.3); the Contractor shall not install any component that would void or limit the manufacturer’s warranty.
Workmanship Warranty
In addition to the manufacturer system warranty, the Contractor must provide a minimum two-year workmanship warranty covering all installation labor, terminations, and physical installation quality from Substantial Completion.
Warranty Response — Critical Facilities
Severity Level Definition Response Time Resolution Time
Critical Complete loss of network connectivity in a school building or MDF/IDF room
4 hours (business hours) /
8 hours (nights/weekends)
24 hours
RFP# 26-BM-045
High Loss of connectivity affecting 10 or more workstations or an entire
IDF
8 business hours 48 hours
Medium Loss of connectivity affecting fewer than 10 workstations
1 business day 5 business days
Low Labeling, documentation, or minor cosmetic issues
5 business days 10 business days
Business hours are defined as Monday through Friday, 7:00 AM to 5:00 PM Eastern Time, excluding
District-recognized holidays. The response and resolution times above apply during the two-year workmanship warranty period. Thereafter, warranty claims will be processed under the manufacturer’s
25-year warranty program, and the Contractor shall respond to District warranty claims within five (5) business days.
Warranty Service Process
A. The District shall submit warranty claims to the Contractor via email to a designated warranty service contact.
B. The Contractor shall acknowledge receipt of warranty claims within four (4) business hours.
C. Contractor shall dispatch a qualified technician within the timeframes specified above.
D. All warranty repairs shall be documented with a written service report delivered to the District within two business days of repair completion.
E. All warranty repairs shall be re-tested and PASS results provided to the District.
6.7 QUALITY ASSURANCE AND OWNER’S RIGHTS
The District reserves the following quality assurance rights throughout the project:
• The District’s Director of Network and Telecommunications and/or designated representative may inspect the work at any time.
• The Owner reserves the right to reject all or a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .