This document is a real property outgrant opportunity presentation from NASA Langley Research Center describing seven available parcels for industry partnership and development.

NASA Langley is offering seven distinct parcels totaling approximately 388 acres across its Hampton, Virginia campus for outgrant arrangements with industry partners. Parcel 1 (North Campus–West, 55 acres) contains 9 facilities with 32,368 square feet available for outgrant, situated near The Gantry (a National Historic Landmark) with good utility access to electrical power (22kv), potable water, sanitary sewer, storm water, communications, and natural gas. Parcel 1a (Northwest Branch Back River–West, 75 acres) is predominantly undeveloped marshland with historical significance as the birthplace of George Wythe, offering 4 facilities totaling 1,882 square feet but requiring extensive environmental mitigation due to wetlands and tidal marsh restrictions. Parcel 2 (North Campus–East, 70 acres) provides 5 facilities with 18,159 square feet in a screened location with existing storage buildings available for repurposing, though development is restricted in the southeastern corner due to Air Force Base requirements and a protected archeological area. Parcel 2a (Northwest Branch Back River–East, 73 acres) consists entirely of marshland with direct river access to Chesapeake Bay, no existing facilities, no established utility service, and significant environmental constraints.

Parcels 3 and 4 are heavily wooded areas on the west side requiring partial clearing: Parcel 3 (Wythe Creek Woods–North, 63 acres) contains one facility with full utility access adjacent to the NASA/City of Hampton steam plant, while Parcel 4 (Wythe Creek Woods–South, 45 acres) offers controlled gated access with electrical power and potable water but lacks sanitary sewer and natural gas, and may contain archeological sites requiring tribal consultation. Parcel 5 (Mid-Campus New Development Area, 24 acres) is the most development-ready, offering 2 facilities with 34,749 square feet on previously developed cleared land with lower environmental complexity and comprehensive utility access including natural gas. Parcel 6 (Mid-Campus Motor-pool Block, 27 acres) provides 6 facilities with 39,890 square feet including Butler buildings with office space, existing NASA motor pool operations, and full utility infrastructure. Parcel 7 (NASA Drive Woods, 41 acres) contains 5 facilities with 19,838 square feet adjacent to NASA's hangar and taxiway, within walking distance to center campus, subject to Air Force Base bird-strike wildlife rules and fuel storage constraints. NASA intends to advance environmental compliance and site readiness preparations concurrently with partner proposal development across all parcels.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

National Aeronautics and Space Administration | Langley Industry Day

Total Acres

Parcel Description

Utility Infrastructure

Size

Unique Considerations

Total Facilities on Parcel

9 / 32,368 s.f.

Facilities Available for OutGrant

Parcel 1: North Campus – West Parcel 1 sits in the northwest corner of the campus along Wythe Creek Road, inside the security perimeter.

Proximity to The Gantry (Landing and Impact Research Facility)

Potential for an additional gate onto Wythe Creek Road

The Gantry is a National Historic Landmark. Alterations will require review

Good access to electrical power (22kv), potable water, sanitary sewer, storm water, communications, and natural gas.

Specific capacity and connection points will be confirmed during site planning.

Environmental Considerations

Portions of the parcel contain complex environmental areas. NASA intends to advance environmental compliance and site readiness preparations concurrently with the maturation of partner proposals.

Parcel 1 view from the west Parcel 1 view from the east

Parcel 1: North Campus – West

Parcel Description

Size

Unique Considerations

Parcel 1a: Northwest Branch Back River – West Parcel 1a is the northwest tip of the campus on mostly undeveloped marsh land, with open undeveloped fields along its southern edge.

Historic Chesterville Site (birthplace of George Wythe)

Natural waterfront setting: pond, wetlands, and tidal marsh

Land disturbance restricted by environmental and cultural sensitivities

Good access to electrical power (22kv) and potable water. Sanitary sewer and storm water limited. No communications or natural gas.

Specific availability, capacity, and extension requirements will be evaluated based on the proposed use.

Extensive environmental mitigation compared to other parcels

NASA invites ideas for low-impact uses of this historic property

Environmental Considerations

Utility Infrastructure

Total Facilities on Parcel

4 / 1,882 s.f.

Facilities Available for OutGrant

A large majority of the parcel contains complex environmental areas. NASA intends to advance environmental compliance and site readiness preparations concurrently with the maturation of partner proposals.

Total Acres

Parcel 1a view from the southeast

Parcel 1a: Northwest Branch Back River – West

Parcel Description

Size

Unique Considerations

Parcel 2: North Campus – East

Parcel 2 occupies the northeast corner of the campus.

Existing storage buildings on site potentially available for repurposing

Screened from public view

Southeast corner carries Air Force Base use restrictions (no occupied buildings)

One-acre archeological area on site that cannot be disturbed

Portions of the parcel contain complex environmental areas. NASA intends to advance environmental compliance and site readiness preparations concurrently with the maturation of partner proposals.

Environmental Considerations

Utility Infrastructure

Good access to electrical power (22kv), potable water, sanitary sewer, storm water, communications, and natural gas. Old, abandoned infrastructure is untested.

Specific capacity and connection points will be confirmed during site planning.

Total Facilities on Parcel

5 / 18,159 s.f.

Facilities Available for OutGrant

Parcel 2 view from the south

Parcel 2: North Campus – East

Parcel Description

Size

Unique Considerations

Parcel 2a: Northwest Branch Back River – East Parcel 2a is entirely marshland fronting the Northwest Branch Back River, which flows into Chesapeake Bay.

Waterfront property with direct river access

Extensive environmental mitigation compared to other parcels

Site contains scattered debris requiring assessment prior to site use

Land disturbance restricted by environmental and cultural sensitivities

Environmental Considerations

A large majority of the parcel contains complex environmental areas. NASA intends to advance environmental compliance and site readiness preparations concurrently with the maturation of partner proposals.

Utility Infrastructure

Utility service to the parcel has not yet been established.

Specific availability, capacity, and extension requirements will be evaluated based on the proposed use.

Total Facilities on Parcel

0 / 0 s.f.

Facilities Available for OutGrant

Parcel 2a view from the southwest

Parcel 2a: Northwest Branch Back River – East

Parcel Description

Size

Unique Considerations

Parcel 3: Wythe Creek Woods – North Parcel 3 is on the west side of the campus along Wythe Creek Road;

almost completely wooded, with full utility access.

Includes land next to the existing NASA/City of Hampton steam plant

Next to an operational security gate on Langley Boulevard

Almost entirely wooded, meaning a partial clearing is required to develop.

Environmental Considerations

Utility Infrastructure

Good access to electrical power (22kv), potable water, sanitary sewer, storm water, communications around perimeter. Primarily through Hampton Steam Plant property.

Specific capacity and connection points will be confirmed during site planning.

Facility on Parcel

0 / 0 s.f.

Facilities Available for OutGrant

Portions of the parcel contain complex environmental areas. NASA intends to advance environmental compliance and site readiness preparations concurrently with the maturation of partner proposals.

Parcel 3 view from the east (the wooded portion of the picture outlined in yellow)

Parcel 3: Wythe Creek Woods – North

Parcel Description

Size

Unique Considerations

Parcel 4: Wythe Creek Woods – South Parcel 4 is in the southwest of the campus at Wythe Creek Road and Commander Shepherd Boulevard; almost completely wooded, with controlled access and full utility access.

Proximity to NASA's environmental test and hypersonics capabilities

Existing road with a gated entrance at Wythe Creek / Commander Shepherd

Next to the operational security gate on Langley Boulevard

Almost entirely wooded (clearing required to develop)

Portions may contain an archeological site with Native American ties (tribal consultation required)

Environmental Considerations

Utility Infrastructure

Good access to electrical power (22kv) and potable water. Storm is available.

Communications infrastructure is old. No sanitary sewer or natural gas currently.

Specific capacity and connection points will be confirmed during site planning.

Total Acres

Total Facilities on Parcel

0 / 0 s.f.

Facilities Available for OutGrant

Portions of the parcel contain complex environmental areas. NASA intends to

Parcel 4 view from the east

Parcel 4: Wythe Creek Woods – South

Parcel Description

Size

Unique Considerations

Parcel 5: Mid-Campus New Development Area Parcel 5 is at the west end of center campus; most former buildings have been demolished, leaving a largely cleared site with controlled access and privacy from the public and other Langley users.

Facilities available for outgrant include office space and testing facilities

Previously developed (reduced environmental requirements expected)

Screened from public view

Isolated from other Langley campus activity

Environmental Considerations

Utility Infrastructure

Good access to electrical power (22kv), potable water, sanitary sewer, storm water, and communications. Natural gas about a block away.

Specific capacity and connection points will be confirmed during site planning.

Total Acres

Total Facilities on Parcel

2 / 34,749 s.f.

Facilities Available for OutGrant

Parcel 5 offers lower environmental complexity and requires fewer surveys, permits, and mitigations..

Parcel 5 view from the south

Parcel 5: Mid-Campus New Development Area

Parcel Description

Size

Unique Considerations

Parcel 6: Mid-Campus Motor-pool Block Parcel 6 is towards the west of center campus, directly adjacent to Langley Air Force Base, with controlled access and full utility access

Butler buildings already fitted out with office space

Screened from public view

Some previously developed areas (reduced environmental requirements expected)

NASA's motor pool is housed in the north section of the parcel.

Existing facilities support NASA vehicle-maintenance operations

Environmental Considerations

Utility Infrastructure

Good access to electrical power (22kv), potable water, sanitary sewer, storm water, communications, and natural gas.

Specific capacity and connection points will be confirmed during site planning.

Total Acres

Total Facilities on Parcel

6 / 39,890 s.f.

Facilities Available for OutGrant

Portions of the parcel contain complex environmental areas. NASA intends to

Parcel 6: Mid-Campus Motor-pool Block

Parcel 6 view from the southeast

Parcel Description

Utility Infrastructure

Size

Unique Considerations

Parcel 7: NASA Drive Woods Parcel 7 is the southern tip of the campus, directly adjacent to Langley Air Force Base and bordered by NASA Drive on its west; over half of the parcel is wooded.

Walking distance to center campus (next to the badge and pass office)

Alongside NASA's hangar and taxiway;

hangar office wing available for outgrant

Air Force Base bird-strike (wildlife) rules apply

Two fuel tanks and mobile refuelers in use on adjacent site

Good access to electrical power (22kv), potable water, sanitary sewer, storm water, and communications. All on North side only. No natural gas.

Availability, capacity, and extension requirements will be evaluated based on the proposed use.

Environmental Considerations

Total Acres

Total Facilities on Parcel

5 / 19,838 s.f.

Facilities Available for OutGrant

Portions of the parcel contain complex environmental areas. NASA intends to

Parcel 7 view from the east

Parcel 7: NASA Drive Woods

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14
Slide Number 15
Slide Number 16
Slide Number 17
Slide Number 18

File details come from the government source that posted it. Updated .