This solicitation is for the TX FTNP LAMR10(3) ALFL106(1) LAMR & ALFL Rehab of Roads & Parking project located at Lake Meredith National Park and Alibates Flint Quarries in northern Texas. The purpose of the project is to rehabilitate approximately 7.75 miles of 6 sections of road, reconstruct approximately 0.25 miles of 1 road, and rehabilitate 3 parking lots. The work includes full depth reclamation, asphalt concrete pavement, guardrail replacement, minor drainage improvements, and signing and striping. There are no anticipated right of way or utility impacts. The solicitation is broken into a base Schedule with 9 Options for different sections of roadway and parking lots. The solicitation was issued by the Department of Transportation Federal Highway Administration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Summary Lake Meredith.pdf | ||
| QnA 11.2.22.pdf | ||
| QnA 10.24.22.pdf | ||
| AR215033 Technical Memo_20210520.pdf | ||
| 6982AF22B000036.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CURTIS R SCOTT Digitally signed by CURTIS R SCOTT Date: 2022.09.02 07:27:42 -06'00'
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
NPS PMIS No.: 190837 & 190835
:4
A
M
A u g u s t
B a s e .B
.U S
C
O R
D V
.1
\O p e n R o a d s D e s ig n e r
C E
\C o n fi g u ra ti o n \O rg a n iz a ti o n -C iv il
\F L
H S u rv
F t_
S ta n d a rd s -W
S .1
V \C e ll
\C F
L -B o rd e rs
.c e l
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
SHEET
TX FTNP LAMR 10(3) & ALFL 103(1) A.2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
36 31
36 31
6 1
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
NPS PMIS NO.: 190837 & 190835
:4
A u g u s t
B a s e .B
O
R D
V
.1
\O p e n R o a d s D e s ig n e r
C E
\C o n fi g u ra ti o n \O rg a n iz a ti o n -C iv il \F
L H
S u rv
F t_
S ta n d a rd s -W
S .1
V \C e ll \C
F L -B o rd e rs
.c e l
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) A.3
NPS PMIS NO.: 190837 & 190835
SURVEY CONTROL8
:3
J u ly
S u r v e y
C o n tr o l
F
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1 d g n
\C T
L (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) A.4
See key map, sheet A.6
& Parking Lot
Sanford Yake Road
Schedule A
See key map, sheet A.8
Fritch Fortress Road
Schedule A
See key map, sheet A.7
Blue West Access Road
Schedule A
See key map, sheet A.10
Alibates Auto Tour Road
Option Z
Alibates Access Roads
Bates Canyon &
Option Y
Scale in Miles
20 4
Optional hot plant site
Staging Area
See key map, sheet A.9
& Parking Lots
Harbor Bay
Schedule A
NPS PMIS NO.: 190837 & 190835
Staging Area
Staging Area
To Amarillo
Fritch
Borger
30 miles
:5
J u n e
V ic in it y
M a p
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S T
E (L
A M
R )F
T N
P .d g n
VICINITY MAP
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) A.5
KEY MAP
& PARKING AREA
SANFORD YAKE ROAD
SCHEDULE A
E = 637046.548
N = 3895963.575
16+40
Begin Sanford Yake
E = 639228.789
N = 3901772.485
89+73
End Sanford Yake
Parking Area
NPS PMIS NO.: 190837 & 190835
10+00
20+00
30+00
40+00
50+00
60+00
70+00
Optional Staging Area
:0
P e p te m b e r
S a n f o r d
Y a k e
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S T
E (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) A.6
ACCESS ROAD
BLUE WEST
SCHEDULE A
E = 612699.398
N = 3893655.536
200+40
Access Road
Begin Blue West
E = 617218.545
N = 3894931.081
274+02
Access Road
End Blue West
NPS PMIS NO.: 190837 & 190835
Staging Area
+00
260+00
:2
A u g u s t
B lu e W e s t
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1 d g n \S
T E
(L A
M R
)F T
N P
.d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) A.7
ROAD KEY MAP
FRITCH FORTRESS
SCHEDULE A
E = 629110.796
N = 3891577.241
100+30
Begin Fritch Fortress
E = 628107.847
N = 3894814.888
170+79
End Fritch Fortress
NPS PMIS NO.: 190837 & 190835
0+
120+00
130+00
150+00
160+00
Parking Lot
:1
J u n e
F r it c h F o r tr e
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S T
E (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) A.8
PARKING AREAS
HARBOR BAY &
SCHEDULE A
E = 618395.800
N = 3879588.030
303+50
Begin Harbor Bay
E = 617905.338
N = 3882009.172
332+05
End Harbor Bay
Parking Area A
Parking Area B
NPS PMIS NO.: 190837 & 190835
320+00
330+
:4
J u n e
H a r b o r B a y
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S T
E (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) A.9
E = 595284.294
N = 3855144.531
405+80
Begin Bates Canyon
E = 595164.069
N = 3858590.071
444+80
End Bates Canyon
E = 595826.624
N = 3856034.968
500+15
Begin Alibates Access
E = 604053.823
N = 3858487.303
624+00
End Alibates Access
E = 604011.252
N = 3858624.313
700+00
Begin Alibates Tour E = 604683.258
N = 3859518.343
712+19
End Alibates Tour
TOUR ROAD
OPTION Z - ALIBATES AUTO
& ALIBATES ACCESS ROADS
OPTION Y - BATES CANYON
NPS PMIS NO.: 190837 & 190835
Staging Area
410+
420+00
440+00
+00
560+00
570+00
710+00
Parking Lot
Alibates Visitor's Center
:2
A u g u s t
A li b a te
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1 d g n \S
T E
(L A
M R
)F T
N P
.d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) A.10
SAFETY EDGE DETAIL
pavement
Edge of proposed existing ground
Approximate
Full depth reclamation, method 2, 6-inch depth
Asphalt
Alibates Access Road
Bates Canyon Road
Harbor Bay
Blue West Access Road
Fritch Fortress Road
Sanford Yake Road
Varies, match existing Traveled way
MAINLINE TYPICAL SECTION 1
existing ground
Approximate
Match existingMatch existing ground existing
Approximate
Tack coat between lifts
Construction Limits
Traveled way
Varies
Shoulder structural section Section for pavement
See Mainline Typical
Existing ground
TYPICAL PAVED DITCH SECTION
protect in place
Existing curb, method 2, 6" depth
Full depth reclamation, Tack Coat t h ic k n e s s t h ic k n e s s
Fog Seal
6"
Varies, match existing Traveled way
6" 6"
Edge of existing pavement
Existing edge of asphalt
1' min
Varies, Shldr
1' min
Varies, Shldr
Bottom of existing asphalt pavement (depth varies) past existing edge of asphalt (typ. both sides)
Extend full depth reclamation 6"
Varies Varies
NPS PMIS NO.: 190837 & 190835
Aggregate, Method 2
Shoulder up with Roadway up.
the shoulder after shouldering off to the side. Re-lay over
Conserve topsoil - push
Top of existing asphalt pavement
Full depth reclamation, method 2, 6" depth
Prime Coat
4" compacted depth (Placed in 2 lifts) aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete Pavement, Gyratory mix, Varies
Varies
NOTE:
be varied by the CO.
2. Dimensions shown are approximate and may are not shown.
1. Existing superelevated and widened sections
Existing asphalt
Alibates Access Road
Bates Canyon Road
Harbor Bay
Blue West Access Road
Fritch Fortress Road
Sanford Yake Road
SAFETY EDGE DETAIL
method 2, 6-inch depth
Full depth reclamation, Asphalt
Alibates Auto Tour Road proposed pavement
Edge of
6" depth
Full depth reclamation, method 2, Prime Coat
4" compacted depth (Placed in 2 lifts) aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete Pavement, Gyratory mix, PARKING LOT SECTION pavement (depth varies)
Bottom of existing asphalt
Alibates Visitor Parking Lot
Bates Canyon Road
Harbor Bay Parking Areas
Fritch Fortress Parking Lot
Sanford Yake Parking Lot
TYPICAL SECTION
MAINLINE
:0 e p te m b e r
P la n
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\T Y
P (U
P A
T )F
T N
P .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) A.11
2% Typical
2H:1V
2H:
1V
ALIBATES AUTO TOUR ROAD SECTION 2
9' Traveled Way
2% Typical
Roadway Aggregate, Method 2, 6" compacted depth
Approximate existing ground
710+00 TO 712+19
9' Traveled Way
ALIBATES AUTO TOUR ROAD SECTION 1
709+50 to 710+00 Transition
700+00 TO 709+50
2H:
1V
2% Typical 2% Typical
Approximate existing ground
Prime coat
Tack coat between lifts
See detail sheet A.11
Safety edge (typ. both sides)
See detail sheet A.11
(typ. both sides)
Safety edge
Embankment construction
Embankment construction
Shldr 1'
4.5' Shldr 1'
4.5'
Shldr 1'
4.5' Shldr 1'
4.5'
Embankment only.
2. No excavation of existing ground from 706+00 to end.
1. See cross sections in section X for details.
Note:
NPS PMIS NO.: 190837 & 190835
3" compacted depth (Placed in 2 lifts).
aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete pavement, Gyratory mix, 3" compacted depth (Placed in 2 lifts).
aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete pavement, Gyratory mix, Roadway Aggregate, Method 2, 6" compacted depth
Tack coat between lifts
Prime coat
Slope stake limit
Slope stake limit
Slope stake limit
Slope stake limit
Seeding Limit .
Method 2 to tie into existing ground Extend Roadway Aggregate, Limit Seeding
Seeding Limit Seeding Limit
L im it s
C o n s tr u c ti o n
L im it s
C o n s tr u c ti o n
L im it s
C o n s tr u c ti o n
L im it s
C o n s tr u c ti o n
6" compacted depth
Roadway Aggregate, Method 2, 3" compacted depth (Placed in 2 lifts).
aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete pavement, Gyratory mix, construction
Embankment
PARKING LOT SECTION
ALIBATES AUTO TOUR PARKING LOT
existing ground
Approximate
TYPICAL SECTION
MAINLINE
:4 e p te m b e r
P la n
S h e t]
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\T Y
P (U
P A
T )F
T N
P .d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) A.12
PROFILE
NO SCALE
Existing pavement existing asphalt
Saw cut
Tack Coat
TYPICAL TRANSITION DETAIL
CONNECTION DETAILS
M a tc h e x is ti n g
M a tc h e x is ti n g method 2, 6" depth
Full depth reclamation (FDR), 4" compacted depth (Placed in 2 equal lifts) aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete Pavement, Gyratory mix, Finished pavement Tack coat gutter or ditch) also be existing concrete place (curb shown, could
Existing concrete, protect in
TYPICAL CONCRETE EDGE DETAIL
SECTION
NPS PMIS NO.: 190837 & 190835
Finished pavement
4" compacted depth (Placed in 2 equal lifts) aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete Pavement, Gyratory mix, method 2, 6" depth
Full depth reclamation (FDR), Traveled way
12'
Shoulder
F
D R
F
D R
:4
A u g u s t
C o n n e c ti o n s D e ta il
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1 d g n \T
Y P
(U P
A T
)F T
N P
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) A.13
Sheet and Description
B5-B10 B11-12 B13-B17 B18 B19-B21
SURFACING
APPROACH
ROADS
TABULATION
OF
QUANTITIES
TEMPORARY
TRAFFIC
CONTROL
SIGNING AND
PAVEMENT
MARKINGS
ALLOWANCES
Bid
Schedule
A0001 15101-0000 MOBILIZATION LPSM All ALL
A0002 15210-3000 CENTERLINE, VERIFICATION AND STAKING MILE 4.659 4.659
A0003 15214-3000 SURVEY AND STAKING, PARKING AREA LPSM All ALL
A0004 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0005 15401-0000 CONTRACTOR TESTING LPSM ALL
A0006 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0007 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 750 750
A0008 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 600 600
A0009 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM All ALL Contract Quantity
A0010 20301-2300 REMOVAL OF SIGN/MARKER EACH 2 2
A0011 20301-3300 REMOVAL OF VAULT EACH 1 1
A0012 20301-3400 REMOVAL OF WHEELSTOP EACH 15 15
A0013 20302-0500 REMOVAL OF CURB, CONCRETE LNFT 780 20 800
A0014 20302-1200 REMOVAL OF GUARDRAIL LNFT 3,815 205 4,020
A0015 20303-0300 REMOVAL OF CONCRETE SQYD 4 4
A0016 20303-0300 REMOVAL OF CONCRETE, CONCRETE DITCH SQYD 136 9 145
A0017 20401-0000 ROADWAY EXCAVATION CUYD 169 31 200
A0018 20402-0000 SUBEXCAVATION CUYD 611 59 670
A0019 25110-0200 GROUTED RIPRAP, METHOD A, CLASS 2 CUYD 38 7 45
A0020 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1,291 76 1,367
A0021 30302-1000 DITCH RECONDITIONING LNFT 200 200
A0022 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH SQYD 98,946 3,255 4,799 107,000
A0023 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 21,855 713 632 23,200
A0026 40601-0000 FOG SEAL TON 60.9 2.1 2.0 65.0
A0027 41101-1000 PRIME COAT, METHOD 1 TON 85.8 2.8 0.4 89.0
A0028 41201-0000 TACK COAT TON 40.1 1.4 4.5 46.0
A0029 41401-1000 CRACKS, ROUTING, CLEANING AND SEALING LNFT 750 750
A0030 50202-0000 SEALING JOINTS AND CRACKS LNFT 4,280 4,280
A0031 60901-1000 CURB, CONCRETE, 12-INCH DEPTH LNFT 460 50 510
A0032 60902-1000 CURB AND GUTTER, CONCRETE, 12-INCH DEPTH LNFT 45 45
A0033 60906-1000 GUTTER, CONCRETE SQYD 136 14 150
A0034 60920-0000 RESET WHEELSTOP EACH 15 15
A0035 61501-0100 SIDEWALK, CONCRETE SQYD 28 3 31
A0036 61701-5100 GUARDRAIL SYSTEM MGS, TYPE 4, CLASS B STEEL POSTS LNFT 4,025 150 4,175
A0037 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (STAINED) EACH 4 4
A0038 61702-1700 TERMINAL SECTION, TYPE MGS-BAT (STAINED) EACH 4 4
A0039 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 40 40
A0040 62201-0450 BACKHOE LOADER, 4 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
18-INCH WIDTH HOUR 40 40
MileStone: Repackage Date Completed: 07/12/22 Report Date: 07/12/22
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A -J u l-
:5 A
M
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities h tt p s:
d ja n d a .s h a re p o in t.
co m /s it es
/A ct iv eP ro je ct s/
S h a re d D o cu m en ts /7
.0
C
FL
H
D
T X F
TN
P L
A M
R
(3
A
LF
(1
R ep a ck a g e/
E n g in ee ri n g /D o cs
/C o st
E st im a te s/ [s u m m a ry xl sm
]S h ee t
STATE PROJECT
B.1
FTNP LAMR 10(3)
& ALFL 106(1)
TX
SHEET
NUMBER
SURFACING
APPROACH
ROADS
TABULATION
OF
QUANTITIES
TEMPORARY
TRAFFIC
CONTROL
SIGNING AND
PAVEMENT
MARKINGS
ALLOWANCES
Bid
Schedule
A0041 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 40 40
A0042 62201-3500 LOADER, WHEEL, SKID STEER, 40HP MINIMUM HOUR 40 40
A0043 62301-0000 GENERAL LABOR HOUR 100 100
A0044 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 40 40
A0045 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20 20
A0046 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 0.494 0.106 0.600
A0047 62515-2000 MULCHING, HYDRAULIC METHOD (BONDED FIBER MATRIX) ACRE 0.494 0.106 0.600
A0048 63301-0000 SIGN SYSTEM EACH 15 15
A0049 63308-2000 OBJECT MARKER, TYPE 2 EACH 7 7
A0050 63309-0200 DELINEATOR, TYPE 2 EACH 247 247
A0051 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (12" WHITE) LNFT 648 648
A0052 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID (6" WHITE) MILE 18.636 0.264 18.900
A0053 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID (4" WHITE) MILE 5.086 0.114 5.200
A0054 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID (4" YELLOW) MILE 18.636 0.264 18.900
A0055 63405-0050 PAVEMENT MARKINGS, SYMBOLS EACH 34 34
A0056 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR LPSM All ALL
A0057 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH EACH 10 10
A0058 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 100 100
A0059 63502-1400 TEMPORARY TRAFFIC CONTROL, VERTICAL PANEL EACH 100 100
A0060 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 8 8
A0061 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 4 4
A0062 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 LNFT 128 128
A0063 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 286 36 322
A0064 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS MILE 4.7 4.7
A0065 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 2,570 2,570
A0066 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 360 360
A0067 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP EACH 4 4
-S ep -2
:1 P
M
MileStone: Repackage Date Completed: 07/12/22 Report Date: 07/12/22 h tt p s:
d ja n d a .s h a re p o in t.
co m /s it es
/A ct iv eP ro je ct s/
S h a re d D o cu m en ts /7
.0
C
FL
H
D
T X F
TN
P L
A M
R
(3
A
LF
(1
R ep a ck a g e/
E n g in ee ri n g /D o cs
/C o st
E st im a te s/ [s u m m a ry xl sm
]S h ee t (2
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2
FTNP LAMR 10(3)
& ALFL 106(1)TX
SHEET
SURFACING
APPROACH
ROADS
TABULATION
OF
QUANTITIES
TEMPORARY
TRAFFIC
CONTROL
SIGNING AND
PAVEMENT
MARKINGS
ALLOWANCES
Bid
Schedule
Y0001 15101-0000 MOBILIZATION LPSM All ALL
Y0002 15210-3000 CENTERLINE, VERIFICATION AND STAKING MILE 3.085 3.085
Y0003 15214-3000 SURVEY AND STAKING, PARKING AREA LPSM All ALL
Y0004 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Y0005 15401-0000 CONTRACTOR TESTING LPSM ALL
Y0006 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 250 250
Y0007 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 200 200
Y0008 20302-1200 REMOVAL OF GUARDRAIL LNFT 300 15 315
Y0009 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 407 26 17 450
Y0010 30402-5300 FULL DEPTH RECLAMATION, METHOD 2, 6-INCH DEPTH SQYD 50,681 569 750 52,000
Y0012 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 10,795 130 575 11,500
Y0014 40601-0000 FOG SEAL TON 29.8 0.4 0.8 31.0
Y0015 41101-1000 PRIME COAT, METHOD 1 TON 42.3 0.6 0.1 43.0
Y0016 41201-0000 TACK COAT TON 19.8 0.3 0.9 21.0
Y0017 61701-5100 GUARDRAIL SYSTEM MGS, TYPE 4, CLASS B STEEL POSTS LNFT 450 10 460
Y0018 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT (STAINED) EACH 2 2
Y0019 62201-3500 LOADER, WHEEL, SKID STEER, 40HP MINIMUM HOUR 40 40
Y0020 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 40 40
Y0021 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20 20
Y0022 63301-0000 SIGN SYSTEM EACH 20 20
Y0023 63302-0000 SIGN SYSTEM SQFT 4.5 1.5 6.0
Y0024 63309-0200 DELINEATOR, TYPE 2 EACH 189 189
Y0025 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (12" WHITE) LNFT 120 120
Y0026 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID (6" WHITE) MILE 12.336 0.664 13.000
Y0027 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID (4" WHITE) MILE 0.8 0.8
Y0028 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID (4" YELLOW) MILE 12.336 0.664 13.000
Y0029 63405-0050 PAVEMENT MARKINGS, SYMBOLS EACH 8 8
Y0030 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR LPSM All ALL
Y0031 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 4 4
Y0032 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN EACH 2 2
Y0033 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 LNFT 64 64
Y0034 63505-1000 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS MILE 3.0 3.0
Y0035 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 310 310
Y0036 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 110 110
Y0037 63602-6020 SYSTEM INSTALLATION, TRAFFIC DETECTOR WIRE LOOP EACH 2 2
-J u l-
:5 A
M
MileStone: Repackage Date Completed: 07/12/22 Report Date: 07/12/22 h tt p s:
d ja n d a .s h a re p o in t.
co m /s it es
/A ct iv eP ro je ct s/
S h a re d D o cu m en ts /7
.0
C
FL
H
D
T X F
TN
P L
A M
R
(3
A
LF
(1
R ep a ck a g e/
E n g in ee ri n g /D o cs
/C o st
E st im a te s/ [s u m m a ry xl sm
]S h ee t (3
SUMMARY OF QUANTITIES - Option Y
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.3
FTNP LAMR 10(3)
& ALFL 106(1)
TX
SHEET
SURFACING
APPROACH
ROADS
TABULATION
OF
QUANTITIES
TEMPORARY
TRAFFIC
CONTROL
SIGNING AND
PAVEMENT
MARKINGS
ALLOWANCES
Bid
Schedule
Z0001 15101-0000 MOBILIZATION LPSM All ALL
Z0002 15216-2000 SURVEY AND STAKING, GRADE FINISHING STAKES MILE 0.462 0.462
Z0003 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL MILE 0.231 0.231
Z0004 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Z0005 15401-0000 CONTRACTOR TESTING LPSM ALL
Z0006 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 750 750
Z0007 20104-0000 CLEARING ACRE 0.534 0.066 0.600
Z0008 20301-3400 REMOVAL OF WHEELSTOP EACH 3 3
Z0009 20420-0000 EMBANKMENT CONSTRUCTION CUYD 140 20 160
Z0010 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 576 24 600
Z0012 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH
NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL TON 306 9 315
Z0014 40601-0000 FOG SEAL TON 0.9 0.9
Z0015 41101-1000 PRIME COAT, METHOD 1 TON 1.2 1.2
Z0016 41201-0000 TACK COAT TON 0.6 0.1 0.7
Z0017 60920-0000 RESET WHEELSTOP EACH 3 3
Z0018 61501-0100 SIDEWALK, CONCRETE SQYD 9 1 10
Z0019 62201-3500 LOADER, WHEEL, SKID STEER, 40HP MINIMUM HOUR 40 40
Z0020 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 40 40
Z0021 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20 20
Z0022 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 0.166 0.004 0.170
Z0023 62515-2000 MULCHING, HYDRAULIC METHOD (BONDED FIBER MATRIX) ACRE 0.166 0.004 0.170
Z0024 63309-0200 DELINEATOR, TYPE 2 EACH 9 9
Z0025 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR LPSM All ALL
-J u l-
:5 A
M
MileStone: Repackage Date Completed: 07/12/22 Report Date: 07/12/22 h tt p s:
d ja n d a .s h a re p o in t.
co m /s it es
/A ct iv eP ro je ct s/
S h a re d D o cu m en ts /7
.0
C
FL
H
D
T X F
TN
P L
A M
R
(3
A
LF
(1
R ep a ck a g e/
E n g in ee ri n g /D o cs
/C o st
E st im a te s/ [s u m m a ry xl sm
]S h ee t (4
SUMMARY OF QUANTITIES - Option Z
A M E N D
Line Item No.
Pay Item Number
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.4
FTNP LAMR 10(3)
& ALFL 106(1)TX
SHEET
SUMMARIES
MISCELLANEOUS
Sheet 1 of 17
NPS PMIS NO.: 190837 & 190835
0.2 gal/yd2 (233 gal/ton)Prime Coat
0.1 gal/yd2 (240 gal/ton)Tack Coat
0.15 gal/yd2 (240 gal/ton)Fog seal
1% of weight of mixAntistrip
145.2 lb/ft3Hot asphalt concrete pavement
139 lb/ft3Aggregate Base
Values used for estimating purposes:
:2
J u ly
A s p h a lt a n d F
D R
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.5
Sheet 2 of 17
NPS PMIS NO.: 190837 & 190835
:2
J u ly
A s p h a lt a n d F
D
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.6
Sheet 3 of 17
NPS PMIS NO.: 190837 & 190835
:3
J u ly
A s p h a lt a n d F
D
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.7
Sheet 4 of 17
NPS PMIS NO.: 190837 & 190835
:4
J u ly
A s p h a lt a n d F
D
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.8
Sheet 5 of 17
NPS PMIS NO.: 190837 & 190835
:4
J u ly
A s p h a lt a n d F
D
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.9
Sheet 6 of 17
NPS PMIS NO.: 190837 & 190835
:5
J u ly
A s p h a lt a n d F
D
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.10
Sheet 7 of 17
NPS PMIS NO.: 190837 & 190835
:5
J u ly
T u r n o u ts
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.13
Sheet 8 of 17
NPS PMIS NO.: 190837 & 190835
:2
J u ly
A p p r o a c h R o a d
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.11
Sheet 9 of 17
NPS PMIS NO.: 190837 & 190835
:5
J u ly
A p p r o a c h R o a d
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.12
Sheet 10 of 17
NPS PMIS NO.: 190837 & 190835
:0
J u ly
M is c e ll a n e o u
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.14
Sheet 11 of 17
NPS PMIS NO.: 190837 & 190835
:5
J u n e
M is c e ll a n e o u
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.15
Sheet 12 of 17
NPS PMIS NO.: 190837 & 190835
excavation quantity.
has been accounted for with the additional roadway
Construction are measured in place. Shrink/swell
2. Roadway Excavation and Embankment
Subexcavation not paid directly, but is subsidiary to 20402-0000
1. Unclassified borrow used in subexcavation is
Note:
:1
J u ly
M is c e ll a n e o u
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.16
Sheet 13 of 17
Connect to existing pull boxes.
2. Place Traffic Counters in locations directed by the CO.
as the rail to at least 6" below the finished ground surface.
1. All exposed guardrail posts are to be colored the same
Note:
NPS PMIS NO.: 190837 & 190835
:0
J u ly
M is c e ll a n e o u
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.17
Sheet 14 of 17
NPS PMIS NO.: 190837 & 190835
2. Use vehicle positioning guides per Detail 635-3.
schedule/options awarded.
for under Schedule A, but will be used for all barricades for closing up to 2 roads) will be paid
3 for road closures. The barricades (2 sets of 4
1. Use temporary traffic control, barricade type
Notes:
:3 e p te m b e r
M is c e ll a n e o u
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.18
Sheet 15 of 17
NPS PMIS NO.: 190837 & 190835
:1
J u ly
M is c e ll a n e o u
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.19
Sheet 16 of 17
NPS PMIS NO.: 190837 & 190835
:2
J u ly
M is c e ll a n e o u
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.20
Sheet 17 of 17
NPS PMIS NO.: 190837 & 190835
:5
J u n e
M is c e ll a n e o u
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S U
M (L
A M
R )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) B.21
N48°48 '38"E N67°50'41"E
.1
.6
.0
T
.0
P O
B
.7
K=13
168' VC
700+00 701+00 702+00 703+00 704+00 705+00
2,970 2,970
2,980 2,980
2,990 2,990
3,000 3,000
3,010 3,010
3,020 3,020
3,030 3,030
3,040 3,040
3,050 3,050
+5.397%
+2.980%
+18 .48
9%
.3
' VC50
21K =
'390.18SSD =
,9
.2
Approximate existing ground
Profile grade
N
Slope stake limits
Slope stake limits
Proposed edge of pavement
Proposed edge of pavement
Centerline
El. = 2,991.29
E = 604011.252
N = 3858624.313
700+00
AUTO TOUR ROAD
BEGIN ALIBATES
L = 66.44'
T = 33.53'
R = 200.00'
Δ = 19°02'03" (RT)
PI 700+41.17
L = 545.26' T = 278.09' R = 1,125.63'
Δ = 27°45'16" (LT)
PI 703+67.23
A lib a te s A cce ss R o a d of road Existing edge of asphalt Existing edge
AND PROFILE
MAINLINE PLAN
Existing drainage
NPS PMIS NO.: 190837 & 190835
Grade ditch to drain spaced per detail on C157-53 Place wattles in ditchline to prevent erosion, 80'40'0
Scale in Feet
'R
22'R
:1
O c to b e r
P la n
S h e e t]
F
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1 d g n
\P N
P (U
P A
T )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) C.1
N40°05'25"E
N00 °1
2'
"W
.4
.5
.4
706+00 707+00 708+00 709+00 710+00
3,010 3,010
3,020 3,020
3,030 3,030
3,040 3,040
3,050 3,050
3,060 3,060
3,070 3,070
3,080 3,080
3,090 3,090
.9
K=15
208' VC
K=18
60' VC
.0
.6
K=23
214' VC
+4.194%
+7.556
-1.611%
Approximate existing ground
Profile grade
N
Slope stake limits
Slope stake limits
Proposed edge of pavement
L = 182.89'
T = 95.41'
R = 260.00'
Δ = 40°18'10" (LT)
PI 708+92.00
AND PROFILE
MAINLINE PLAN
Existing drainage
Existing drainage
NPS PMIS NO.: 190837 & 190835
80'40'0
Scale in Feet
:1
A u g u s t
P la n
S h e
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1 d g n
\P N
P (U
P A
T )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) C.2
N00°12'45"W N07°08'47
"W N03°15'23"EN06°45'39"E
.3
.6
P
E
.3
.6
P
.6
K=48
136' VC
711+00 712+00
3,030
3,040
3,050
3,060
3,070
3,080
3,090
3,100
+1.213%+1.213%
,0
.7
3,030
3,040
3,050
3,060
3,070
3,080
3,090
3,100
.6
P
Approximate existing ground
Profile grade
N
Slope stake limits
Proposed edge of pavement
Proposed parking area
Existing shelter
Protect in place
Existing stairs
Protect in place
Existing vault toilet
El = 3,065.79
E = 604683.258
N = 3859518.343
STA 712+18.65
AUTO TOUR ROAD
END ALIBATES
Proposed edge of pavement
Existing stairs
Protect in place
Existing vault toilet
PARKING LOT DETAIL
N
AND PROFILE
MAINLINE PLAN
Pave up to stairs
See detail sheet T.5
Concrete sidewalk, Protect in place
Existing pavilion
NPS PMIS NO.: 190837 & 190835
80'40'0
Scale in Feet Scale in Feet
7.5'0 15' sheet A.12
See parking lot section, L = 36.31'
T = 18.18'
R = 300.00'
Δ = 06°56'03" (LT)
PI 711+00.24
24'
5'R 5' R
5' R
5'R
2.5'R 2.5 'R
7.5' R
2.
5'
R
:2 e p te m b e r
P la n
S h e
.0
C
F L H
D
T X
F T
N P
L A
M R
(3
A
L F
(1
R e p a c k a g e \D
G N
\P N
P (U
P A
T )F
T N
P .d g n
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) C.3
2. Final layout will be directed by CO.
1. See sheets T.14 and T.15 for pavement marking details
Notes:
Sidewalk, concrete
Place gutter, concrete (25 ft)
Removal of concrete, concrete ditch (25 ft)
Removal of guardrail, 100 ft
12-inch depth, 460 ft
Begin Curb, concrete, Removal of vault
12-inch depth
End Curb, concrete, Reset wheelstop (typ)
See detail this sheet
5 ft wide x 64 ft long x 2 ft depth asphalt may be required.
edge of water, removal of
Construct grouted riprap above
Seed eroded slope
Seeding, hydraulic method
Length varies, stripe to match existing
Seed eroded slope
Seeding, hydraulic method
Protect in place
Existing edge of concrete
(bonded fiber matrix)
Mulching, hydraulic method
(bonded fiber matrix)
Mulching, hydraulic method
NPS PMIS NO.: 190837 & 190835
(bonded fiber matrix)
Mulching, hydraulic method
Seed eroded slope
Seeding, hydraulic method
Pave over top after performing FDR grade (6" thickness)
Place base aggrerate to match existing fill material (6" depth)
Roadway excavation to remove existing
Place object markers (5)
See parking lot section, sheet A.11
Scale in Feet
0 30' 60'
GROUTED RIPRAP DETAIL
Existing ground parking lot section
Finished grade, during placement.
Use thick grout to minimize flow riprap to fill and match existing.
with riprap. Adjust quantity of
Place 1ft of grout before filling grout surface and minimize visibility of
Place riprap to show rock
9'
.5
5'
:4 e p te m b e r
S a n f o r d
Y a k
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S S
T (L
A M
R )F
T N
P .d g n
SANFORD YAKE PARKING LOT
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) C.4
Harbor Bay Road
2. Final layout will be directed by CO.
1. See sheets T.14 and T.15 for pavement marking details
Notes:
Parking Lot B lined ditch
Begin fog seal in asphalt ditch at culvert inlet
End fog seal in asphalt lined
12-inch depth
Curb and gutter, concrete, Removal of curb, concrete
Scale in Feet
0 30' 60' paved ditches prior to fogging
Perform crack seal operations in
Ditch Cleaning
Place accessibility signs
Parking Lot A accessible parking
Max 1.8% slope in
Remove and replace wheelstop
See parking lot section, sheet A.11
See parking lot section, sheet A.11
12' 2
9'
12'
:1 e p te m b e r
H a r b r
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S S
T (L
A M
R )F
T N
P .d g n
HARBOR BAY PARKING LOT
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) C.5
2. Final layout will be directed by CO.
1. See sheets T.14 and T.15 for pavement marking details
Notes:
Scale in Feet
80'40'0
Place accessibility signs
Protect in place
Concrete gutter, Reset wheelstop Protect in place
Drainage, 44 sign foundations (typ.)
Removal of concrete, Protect in place
Existing fence, Protect in place
Curb, gutter
Place One Way Sign
See parking lot section, sheet A.11
See parking lot section, sheet A.11
:1 e p te m b e r
F ri tc h
L
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S S
T (L
A M
R )F
T N
P .d g n
FRITCH FORTRESS PARKING LOT
STATE PROJECT
NUMBER
FTNP LAMR 10(3) & ALFL 106(1) C.6
Bates Canyon Road
Alibates Access Road
2. Final layout will be directed by CO.
1. See sheets T.14 and T.15 for pavement marking details
Notes:
Scale in Feet
40'20'0
Place accessibility signs Reset wheelstops (typ.)
See parking lot section, sheet A.11
9'
:2 e p te m b e r
A li b a te s
.0
C
F L
H D
T
X F
T N
P L
A M
R
(3
A
L F
(1
R e p a c k a g e \D
G N
\S S
T (L
A M
R )F
T N
P .d g n
ALIBATES PARKING LOT
STATE PROJECT
NUMBER
FTNP LAMR 10(3) & ALFL 106(1) C.7
b y t h e C o n tr a c ti n g
O f f ic e r
R ig h t-o f w a y o r a s s ta k d
NOTE:Paved length
(1:6 desirable)
1:4 or flatter base edge
Aggregate thicknesses and foreslopes.
Refer to mainline typical sections for structural section
Approach Road
TYPICAL PLAN
TYPES 1 & 2
APPROACH ROAD
TYPICAL PLAN
TYPE 3
APPROACH ROAD
base edge
Aggregate b y t h e C o n tr a c ti n g
O f f ic e r
R ig h t-o f w a y o r a s s ta k d
Approach Road
Flatten slope road connection on plan and profile sheet
Example of symbol showing standard approach shown may be varied ±20°.
Under special conditions, the approach road angle 8.
4.
3.
8.
2.
3.
1.
6.
2.
6.
2.
6.
7.
Typical culvert location edge subgrade
Normal
Aggregate base edge R
R1 with mainline roadway construction.
Construct cut and fill slopes for approach roads to match locations to be field verified.
Stations shown are approximate locations. Actual
8.
7.
6.
5.
4.
3.
2.
1.
maximum.
0% to -2% grade. Under special conditions, use 6% grades within ±2%. In snowy regions restrict this to a
Construct approach roads with landing areas having approach road centerline.
existing radii or widths. R is on the left side of the
Vary radii to fit unusual field conditions. Do not reduce
5. 5.
pavement edge
Asphalt concrete pavement edge
Asphalt concrete
Variable
V a ria b le
A s
B
A
B
M a in li
Mainline
±2%
TYPICAL PROFILE
SECTION B-B
Shoulder edge
A
V a ria b le
(1:6 desi rable )1:4 o r flat ter
TYPICAL SYMBOL
M a in li grade (optional)
Typical maximum design
A
A B
SECTION A-A
Standard Drawing 602-9).
roadway, use safety end sections (see placed within the clear zone of the mainline mainline recovery area. When a culvert must be radius to provide a flatter foreslope and increased
Place culverts at the end of the approach road
APPROACH ROADS
TYPICAL SECTIONS
widths greater than 15 feet.
Apply the normal crown to approach roads with
CLASSTYPE
APPLICATION
SAMPLE
Paved apron
ADT ≥ 200
100 ≤ ADT < 199
25 ≤ ADT < 100
ADT < 25
Minimum 2-Way Use
Logging Truck Use
Farm Equipment
Minimum 1-Way Use
Field Access
A
E
D
C
B
A
D
C
B
A
* Match existing
(ft) W
WIDTH
MIN.
(ft) R
RADIUS
MIN.
N/A
4' (typ.)
U
S E
R
4" Aggregate base s = 1:4 for type 2 approach s = 1:3 for type 1 approach d = 3' for type 2 approach d = 2' for type 1 approach x = 15' Minimum for type 2 approach x = 0' for type 1 approach
Subgrade edge
Aggregate base edge
End Section A-A
End Section A-A
Total length
Paved length
90° W
Type
Class
Mainline stationing
Typical maximum grade ±10%VPI
VPC
90°
Total length
WW
Variable
W
Variable
3' minimum
16'x
20' desired 15' min.
1.3'
W
1.3' d
4' (typ.)
4' (typ.)
:2
A u g u s t
T y p ic a l S e c ti o n s A p p ro a c h
R o a d s
F .0
C
F L H
D
T X
F T
N P
L A
M R
(3
A
L F
(1 d g n \T
Y P
(U P
A T
)F T
N P
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) D.1
SILT FENCE
6" min. trench
6" min.
18" min.
30" min.
24" min.
C157-50
NOTE:
DETAIL APPROVED FOR USE
REVISED: 08/2014 07/2020
A
M N C
F L D
P I T D r a w in g s F P F P
D e ta il s C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
U s e r A n g e la .J o h n s o n
STATE PROJECT
NUMBER
SHEET
5.
4.
3.
2.
1.
713.16(a).
Furnish geotextile conforming to subsection
6 ft. (max.)
fence support mesh = withoutPost spacing
10 ft. (max.)
fence support mesh =withPost spacing running around the ends.
fence up the slope to prevent water from
As the slope is constructed, curve the silt contours as closely as possible.
Install silt fence to follow the ground manufacturer's recommendations.
machine-sliced silt fence according to the slicing as approved by the CO. Install
Silt fence may be installed using machine
ELEVATION
PLAN
POST AND GEOTEXTILE INSTALLATION DETAIL
SILT FENCE INSTALLATION AT TOE OF FILL
Flow Fi ll slo pe
Flow
T o e o f s lo p e
Flow
(undisturbed)
Existing ground
END POSTS DETAIL
PLAN
PLAN
END DETAIL
ELEVATION
Fi ll sl op e
Steel or wood post
Backfilled and compacted soil
Limits of clearing
Steel or wood post
Varies
See Note 3 for spacing
See Note 4
NO SCALE
PLAN
T o e o f s lo
Note 3See
Staple or tie
Top of posts tied together.
Posts driven tightly together.
Steel or wood posts
POSTS AT JOINTS
See End Posts Detail
End posts
Staple or tie
SILT FENCE AS PERIMETER CONTROL
Fill
Existing ground
Sheet flow Silt fence
PLAN
SECTION A-A
A
A
Roadway
Edge of shoulder
Edge of shoulder
Toe of slope
Toe of slope
Posts Detail
See End
End posts
Silt fence
Fence support mesh (optional) See Typical Section Sheet
See note 5
Geotextile
See note 5
Geotextile
See note 5
Section A
Geotextile
Fasten fabric to posts.
each post one full turn.
Fold geotextile around
See note 5
Section B
Geotextile
TX
FTNP LAMR 10(3) & ALFL 106(1) E.1
CHECK DAM
6"
6''
(ft) (ft)
12" (min.)
DETAIL APPROVED FOR USE 01/2011
C157-53
(ft)
12'' (typ.)
6'' min
6" min.
16" min
Trench 2" min.
12" (min.)
7.
6.
5.
4.
3.
2.
1.
Adjust check dam spacing based on site-specific conditions.
around the ends of the fiber roll.
Provide sufficient length to prevent water from flowing
Expose stakes 2" (min.) above top of fiber roll.
Drive stakes into undisturbed soil of trench bottom 16" (min).
2' (max) spacing.
Drive stakes at each end of the fiber roll and at
Stake fiber rolls in place with 1⅛" x 1⅛" wood stakes.
Install check dams in ditches perpendicular to the flowline.
Repair all rills or gullies and properly compact prior to installation.
requirements of the check dam device.
may be used as approved by the CO, to meet the functional
Check dams of fiber rolls, riprap, or gravel bags
9" Ø min.
Fiber roll
Trench 2" min.
REVISED: 08/2014
STATE PROJECT
NUMBER
SHEET
P
M N C
F L D
P I T D r a w in g s F P F P
D e ta il s C .d g n
U s e r A n g e la .J o h n s o n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
dams on ditch grades steeper than 5%.
fiber roll. Do not use fiber roll check
* Spacing calculated based on 9" Ø min
6%
5%
4%
3%
2%
RIPRAP CHECK DAM
CROSS SECTION
PLAN
NO SCALE
Flow
Flow
Se e
Not e
GRADE
DITCH
6%
5%
4%
3%
2%
CROSS SECTION CROSS SECTION
V-DITCH
Class 1 riprap on ditch grades steeper than 6%
* Do not use gravel bag check dams
GRAVEL BAG CHECK DAM
See Note 6 the ends to prevent flow around
Curve ends upstream similar for flat-bottom ditches.
Check dam installation details are
V-ditch design shown.
5%
4%
3%
2%
See Note 5
Flow Line Class 1 riprap
Gravel bag
STAKING DETAIL
FIBER ROLL
uphill side of fiber roll
Place excavated material on
(See Note 7)
CHECK DAM SPACING*
FIBER ROLL
(See Note 7)
CHECK DAM SPACING*
GRAVEL BAG
(See Note 7)
CHECK DAM SPACING
RIPRAP
FIBER ROLL CHECK DAM
CROSS SECTION
FLAT-BOTTOM DITCH
SPACING (max.)
CHECK DAM
SPACING (max.)
CHECK DAM
SPACING (max.)
CHECK DAM
GRADE
DITCH
GRADE
DITCH
TX FTNP LAMR 10(3) & ALFL 106(1) E.2
NPS PMIIS NO.: 190837 & 190835
12" min.
DETAIL APPROVED FOR USE 01/2011
FIBER ROLL
Maximum spacing (ft)
9" Ø Fiber Roll
Flow
12" min.
L im it
C le a r in g
S ta k e
S lo
INSTALLATION DETAIL
FIBER ROLL AS PERIMETER CONTROL
uphill side of fiber roll
Place excavated material on
STATE PROJECT
NUMBER
SHEET
A
M N C
F L D
P I T D r a w in g s F P F P
D e ta il s C .d g n
U s e r A n g e la .J o h n s o n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
U.S. CUSTOMARY DETAIL
DETAIL
AT CULVERT OUTLET
FIBER ROLL
flared end section
Culvert inlet with
AT CULVERT INLET
FIBER ROLL
flared end section
Culvert outlet with Flow
D ire c tio n o f ru n o ff
Flow
FIBER ROLL LAPPING DETAIL
Stagger joints (typ.)
FIBER ROLL JOINT DETAIL
FIBER ROLL SLOPE LAYOUT
spacing table See Fiber Roll along contours
Install fiber rollsWood stakes
Fiber Roll
Slope
Fiber Roll
Pay Limits
Pay Limits overlap 12" (min.)
Fill slope
C157-55 side of fiber roll material on uphill
Place excavated
Flow Flow
54" or larger
Culvert Size
24" or smaller
30" to 48"
9" Ø Fiber Roll length (ft)
FIBER ROLLS AT CULVERTS*
needed due to project-specific conditions.
top of the culvert inlet only. Adjust length as
*Approximate length shown for rolls across the
See note 6 control runoff culvert as needed to
Install fiber rolls below
6.
5.
4.
3.
2.
1.
disturbance.
and all water entering the culvert is crossing the disturbance is on both the road and around the culvert
Place fiber rolls all the way around the inlet when the under it.
water is forced to flow through fiber roll rather than against upstream side of fiber roll to ensure storm with trench bottom and sides. Tamp soil backfill to the contour. Place fiber rolls in continuous contact
For fiber rolls on bare soil, construct trenches parallel
Expose stakes 2" above top of fiber roll.
Drive stakes into undisturbed soil at least 12" deep.
from each end.
2' o.c. max. culverts. Stake fiber rolls 6-inches stakes. Space stakes 4' o.c. max. on slopes and
Stake fiber rolls in place with 1" x 1" or 1" Ø wood vary more than 5% from level.
section of fiber roll, do not allow the fiber roll to
Install fiber rolls along slope contours. For any 20' to installation.
Repair all rills or gullies and properly compact prior
A A
Trench 2" min.
See no te 3
See no te 3
2" min.
Trench table for length requirements
See Fiber Rolls at Culverts culvert inlet
Install fiber rolls around table for length requirements
See Fiber Rolls at Culverts culvert outlet
Install fiber rolls around
Flow
Fiber roll roll 2" min.
Trench fiber
SECTION A-A
REVISED: 12/2017
Flow
NO SCALE
1V:4H or flatter
Slope Gradient
1V:2H or steeper
STAKE DETAIL
uphill side of fiber roll
Place excavated material on
Fill or cut slope
FIBER ROLL SPACING TABLE*
project-specific conditions.
*Approximate spacing shown. Adjust spacing as needed due to
Between 1V:4H and 1V:3H
Between 1V:3H and 1V:2H
E.3TX FTNP LAMR 10(3) & ALFL 106(1)
204-A to Subsection 418.03
Remove pavement according
6" Aggregate base to a depth of 24" base and subgrade material
Remove damaged pavement, pavement
Existing base course
Existing
NOTE:
1.
conditions encountered at time of construction.
Extent of patch to be determined by the CO based on
2.
3.
4.
material.
Asphalt millings can be used as acceptable crushed aggregate
SUBEXCAVATION DETAIL
SUBEXCAVATION
NO SCALE
item. See Section 204.
All items shown within the pay limits are included in the pay
714.03.
Install stabilization geogrid layer according to Subsection select granular
18" Unclassified borrow or
Stabilization geogrid
5.
prior to paving.
Complete full-depth reclamation after completing patch and
A.12).
lifts, see mainline typical section sheets A.11-
3" or 4" compacted depth (Placed in 2 equal aggregate, 0.3 to <3 million ESAL, 1/2-inch or 3/4-inch nominal maximum size
Asphalt Concrete pavement, Gyratory mix, NPS PMIS NO.: 190837 & 190835
Native subgrade
V a r ie s
Pay Limits
:4
A u g u s t
B a s e .B
O R
D V
.1
\O p e n R o a d s D e s ig n e r
C E
\C o n fi g u ra ti o n \O rg a n iz a ti o n -C iv il
\F L
H S u rv
F t_
S ta n d a rd s -W
S .1
V \C e ll
\C F
L -B o rd e rs
.c e l
DETAIL
STATE PROJECT
NUMBER
TX FTNP LAMR 10(3) & ALFL 106(1) T.1
501-1
STANDARD APPROVED FOR USE --/----
REVISED: 9/2016
MINOR CONCRETE PAVEMENT
STATE PROJECT
NUMBER
SHEET
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
U S
C c m y fi le s p w p r o d u c ti o n d m s S td
.d g n
S e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
PAVEMENT
THICKNESS
TRANSVERSE
JOINT SPACING
(in) (ft)
6 ≤ T <12
T < 6
NOTE:
1.
2.
3.
PLAN PLAN
PROFILE PROFILE
REINFORCED MINOR CONCRETE PAVEMENTPLAIN MINOR CONCRETE PAVEMENT
Traffic Traffic
Transverse contraction joint
See Note 2See Note 2
Provide the same type of dowel assemblies and tie bars for joints in plain portland cement concrete pavement as shown for joints in reinforced pavement.
Lap longitudinal and transverse reinforcement not
Transverse joint
Longitudinal joint
Tie bar
Dowel bar Dowel bar
See Standard 501-2 for joint and joint sealing details.
less than 15 inches.
(typ.)
24" ty p typ.
2" clear ty p c le a r ty p c le a r typ.
2" clear welded wire reinforcement or No. 4 bars
Slab reinforcement 4" x 4" - W6 x W6 reinforcement or No. 4 bars
W6 x W6 welded wire
Slab reinforcement 4" x 4" -
TX FTNP LAMR 10(3) & ALFL 106(1) T.2
501-2
STANDARD APPROVED FOR USE --/----
REVISED: 9/2016
PAVEMENT JOINTS
MINOR CONCRETE
STATE PROJECT
U S
C c m y fi le s p w p r o d u c ti o n d m s S td
.d g n
S e p te m b e r
FEDERAL LANDS HIGHWAY
U.S. CUSTOMARY STANDARD
STANDARD
BAR SIZES
PAVEMENT
THICKNESS (T) TIE BAR
DOWEL BAR
DIAMETER
10 < T ≤ 12
8 < T ≤ 10
T ≤ 8 1
#6
#5
#5
(in) (in)
T/3 T/3 T/3
NOTE:
1.
2.
3.
4.
5.
6.
7.
8.
9.
PLAIN - TRANSVERSE or LONGITUDINAL
CONTRACTION JOINT CONSTRUCTION JOINT
UNDOWELED - TRANSVERSE and
UNTIED - LONGITUDINAL
CONTRACTION JOINT
DOWELED - TRANSVERSE
CONTRACTION JOINT
TIED - LONGITUDINAL
CONSTRUCTION JOINT
TIED BUTT - LONGITUDINAL
ISOLATION/EXPANSION JOINT
DOWELED - TRANSVERSE TIED BUTT - TRANSVERSE
CONSTRUCTION JOINT
CONSTRUCTION JOINT
DOWEL BUTT - TRANSVERSE
MINOR CONCRETE PAVEMENT JOINT SEALING DETAILS
ISOLATION JOINT CONSTRUCTION JOINT SAWED OR FORMED JOINT
UNDOWELED - LONGITUDINAL
ISOLATION JOINT
T/2
T/2 T/2
T/2T/2
Fixture or structure
T
T
T
TT
T
T
T
T joint filler
Preformed
Joint sealant
Joint sealant
Backer rod
Fixed endGrease free end
T/2
KEYWAY - LONGITUDINAL
CONSTRUCTION JOINT
T/2 piece connectors)
(or approved two-sealing details
See sawed or formed joint joint sealing details
See sawed or formed joint sealing details
See sawed or formed
See isolation joint sealing details
See isolation joint sealing details joint sealing details
See construction joint sealing details
See construction joint sealing details
See construction joint sealing details
See construction joint sealing details
See construction
T
Dowel cap
Use epoxy-coated material for all tie bars, dowels, and other steel used in the construction of concrete pavement.
Deformed reinforcing bars or hook bolts may be used for tie bars.
Install isolation joints when abutting a fixed structure.
Use expansion joint material extending the full depth and length of the concrete surface.
Transverse and longitudinal construction joints are not included in the joint layout plan. Use transverse and longitudinal construction joints sparingly. Submit planned construction joint locations for approval.
For construction joints, if tie bars and dowels are not set into concrete during placement, drill and anchor the tie bars and dowels into the existing concrete construction with epoxy resin.
Maintain joint sealant shape factor of 1:1; except when silicone sealant is used maintain the width to depth shape factor of 2:1 or as recommended by sealant manufacturer.
See Section 712 for joint material requirements.
See Standards 501-1 or 502-1 for reinforcement details.
9"9" 9"9"
18"18" 18"18"
9"9" 18"18"
Tie bar @ 30" c-c Tie bar @ 30" c-c
" keyway2 1T/3 x 1
18"18" Tie bar @ 30" c-c
#8 Tie bar @ 12" c-c
" typ.8 1" typ.8
1" typ.2
Do not place tie bars within 15 inches of transverse joints.
Dowel bar @ 12" c-c Dowel bar @ 12" c-c
Dowel bar @ 12" c-c
TX FTNP LAMR 10(3) & ALFL 106(1) T.3
CURB DETAILS
No Scale
LF
Pay limits
Pavement
6" Pulverized
6"
Pavement
This is the start of the file's text. The full file is on GovTribe.