AR215033 Technical Memo_20210520.pdf

PDF 653 KB Posted

Attached to
TX FTNP LAMR10(3) ALFL106(1) LAMR & ALFL REHAB OF ROADS & PARKING
Solicitation number
6982AF22B000036
Issued by

About this file

This is a solicitation for the TX FTNP LAMR10(3) ALFL106(1), LAMR & ALFL Rehab of Roads & Parking project located at Lake Meredith National Park and Alibates Flint Quarries in northern Texas. The project involves rehabilitating approximately 7.75 miles of roadway across 6 sections of road, reconstructing approximately 0.25 miles of road, and rehabilitating 3 parking lots. Key work items include full depth reclamation of 140,000 square yards, asphalt concrete pavement, guardrail replacement, minor drainage improvements, and signing and striping. The purpose is to rehabilitate existing pavement at the end of its design life to improve safety and access for recreational users. The solicitation is broken into a base Schedule with 9 Options relating to specific roads and parking areas. Responses are due based on standard solicitation deadlines and procedures.

View the file

Other files

File Type Posted
Bid Opening Summary Lake Meredith.pdf PDF
QnA 11.2.22.pdf PDF
QnA 10.24.22.pdf PDF
6982AF22B000036.pdf PDF
LAMR 10(3)_ PLANS_Repackage_2022-09-07.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Terracon Consultants, Inc. 5847 50 t h Street Lubbock, TX 79424 P [806] 300-0140 F [806] 797-0947 terracon.com

Memo To: Dan Lautzenheiser, PE

DJ&A

From: Jerry T Sayson, PE Date: May 20, 2021 Re: TX FTNP LAMR 10(3) & ALFL 106(1), Lake Meredith & Alibates Various Routes

BACKGROUND

This memorandum provides the geotechnical and pavement structural recommendations for the TX FTNP LAMR 10(3) & ALFL 106(1), Lake Meredith & Alibates Various Routes project (Terracon Project No. AR215033) which consists of improvements to the following roads;

LAMR-0010 83127 Sanford Yake Road 1.39 Miles LAMR-0100 83128 Fritch Fortress Road 1.34 miles LAMR-0101 83129 Blue West Access Road 1.39 Miles LAMR-0104 Harbor Bay 0.54 Miles LAMR-0103 83131 Bates Canyon Road 0.74 Miles LAMR-0106 104720 Alibates Access Road 2.35 Miles

Two NPS Repair and Rehabilitation projects are also included under this SOW, for repairs of to the following routes;

LAMR-0913 Sanford Yake Lower Parking Area 19,918 SF ALFL-0402 Unpaved Alibates Tour Road 0.23 Miles ALFL-0900 Trailhead Parking

0900A Harbor bay Parking A 3,054 SF 0900B Harbor bay Parking B 57,218 SF

The roads are used primarily for recreational purposes with the vast majority of the vehicles being passenger cars, pickups, and SUVs except for a few three axle service trucks.

RECOMMENDATIONS

Inspection of the slope at the lower Sanford Yake reveal minor erosion and can be improved by seeding and mulching the slope surface with Bonded Fiber Matrix and placing existing concrete barrier at the base of the slope to buttress the material.

DJ&A provided estimated traffic counts and was translated into Equivalent Single Axle Loads (ESAL). The traffic load utilized for pavement thickness design is 30,000 ESALs. Based on results

Responsive ■ Resourceful ■ Reliable 2 of pavement coring and soil borings performed at the project, the thickness of the existing asphalt pavements ranges from about 1 inch to 4.5 inches and the subgrade soils in the area consists of lean clays, silty sands and clayey sands (refer to attachment 1 Boring logs). Laboratory CBR tests indicates that the CBR value of the subgrade soils ranges from 4 to 5.3 (Refer to attachment 2 CBR Test Results). Utilizing the CBR value of 4 for the project translates to Subgrade Resilient Modulus (Mr) of 6200 psi used for flexible pavement design. The following additional design parameters were utilized for pavement engineering analyses based on AASHTO Guide for Deign of Pavement Structures (1993);

Level of Reliability 85% Flexible Standard Deviation 0.45 Rigid Standard Deviation 0.35 Flexible Initial PSI 4.2 Flexible Terminal PSI 2.0

CBR 6.0

Correlated Resilient Modulus, Mr 6200 psi Asphalt Concrete (AC) Layer Coefficient 0.44

For the Unpaved Alibates Tour road, the following minimum pavement thickness is recommended;

3-inches HMAC 6-inches Aggregate Base 6-inches Compacted Subgrade

For the repair and improvements of the various routes and parking areas, the following minimum pavement thickness is recommended;

3-inches HMAC 6-inches Full Depth Reclamation

A PG 64-22 binder should be used for the project’s asphalt concrete pavement. This binder is readily available and commonly used by Texas DOT.

Please let us know if you have any questions.

ATTACHMENT 1

Contents:

Boring Logs (B1 through B20)

8-50/4"

10/0"

10/0"

8.7 5127-13-14

HOT MIX ASPHALT (HMA) COURSE, 3.5" in thickness AGGREGATE BASE COURSE, 10" in thickness

SANDY LEAN CLAY (CL), brown, hard

- Caliche from 2.5' to 5' bgs

Boring Terminated at 5 Feet

0.3

1.1

5.0 bgs - Blow Ground Surface

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.7061° Longitude: -101.5566°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings and/or Bentonite Surface Capped with Asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B1

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-20-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Sanford Yake Lower Parking AreaSITE:

Boring Started: 04-20-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

YP

E

12-11-15 N=26

6-9-17 N=26

HOT MIX ASPHALT (HMA) COURSE, 4.5" in thickness

AGGREGATE BASE COURSE, 10" in thickness

LEAN CLAY WITH SAND (CL), brown, very stiff

Boring Terminated at 5 Feet

0.4

1.2

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.6866° Longitude: -101.5947°

G R

AP

H

IC

L

O

G STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B2

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-19-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Fritch Fortress RoadSITE:

Boring Started: 04-19-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

9-9-12 N=21

9-16-16 N=32

38-17-21

HOT MIX ASPHALT (HMA) COURSE, 2.5" in thickness SANDY LEAN CLAY (CL), reddish brown, very stiff to hard

Boring Terminated at 5 Feet

0.2

5.0

6820.2

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.6804° Longitude: -101.5932°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

BORING LOG NO. B3

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-19-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Fritch Fortress RoadSITE:

Boring Started: 04-19-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

11-11-11 N=22

6-8-8 N=16

HOT MIX ASPHALT (HMA) COURSE, 4.5" in thickness

AGGREGATE BASE COURSE, 9" in thickness

SANDY LEAN CLAY (CL), reddish brown, very stiff

Boring Terminated at 5 Feet

0.4

1.1

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.6807° Longitude: -101.5931°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B4

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-19-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Fritch Fortress RoadSITE:

Boring Started: 04-19-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

3-3-2 N=5

2-1-2 N=3

7011.1 24-13-11

HOT MIX ASPHALT (HMA) COURSE, 2.5" in thickness AGGREGATE BASE COURSE, 8" in thickness

LEAN CLAY WITH SAND (CL), brown, soft to medium stiff

Boring Terminated at 5 Feet

0.2

0.9

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.6511° Longitude: -101.6288°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B5

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-19-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Harbor Bay Parking AreaSITE:

Boring Started: 04-19-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

7-10-13 N=23

6-10-11 N=21

HOT MIX ASPHALT (HMA) COURSE, 2.5" in thickness AGGREGATE BASE COURSE, 8" in thickness

LEAN CLAY WITH SAND (CL), brown, very stiff

Boring Terminated at 5 Feet

0.2

0.9

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.6503° Longitude: -101.6297°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B6

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-19-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Harbor BaySITE:

Boring Started: 04-19-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

6-8-7 N=15

5-8-7 N=15

8.8 7234-17-17

HOT MIX ASPHALT (HMA) COURSE, 2" in thickness AGGREGATE BASE COURSE, 6" in thickness

LEAN CLAY WITH SAND (CL), reddish brown, stiff

Boring Terminated at 5 Feet

0.2

0.7

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.6866° Longitude: -101.6318°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings and/or Bentonite Surface Capped with Asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B7

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-19-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Blue West Access RoadSITE:

Boring Started: 04-19-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

10-50/6"

7-50/6"

HOT MIX ASPHALT (HMA) COURSE, 1.75" in thickness AGGREGATE BASE COURSE, 10" in thickness

LEAN CLAY WITH SAND (CL), reddish brown, hard

Boring Terminated at 5 Feet

0.1

1.0

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.6850° Longitude: -101.6323°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B8

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-20-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Blue West Access RoadSITE:

Boring Started: 04-20-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

8-11-10 N=21

7-15-10 N=25

HOT MIX ASPHALT (HMA) COURSE, 2.5" in thickness AGGREGATE BASE COURSE, 8.5" in thickness

LEAN CLAY WITH SAND (CL), reddish brown, very stiff

Boring Terminated at 5 Feet

0.1

0.9

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.6832° Longitude: -101.6452°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B9

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-20-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Blue West Access RoadSITE:

Boring Started: 04-20-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

10-11-7 N=18

12-11-12 N=23

358.0 NP

HOT MIX ASPHALT (HMA) COURSE, 1.75" in thickness AGGREGATE BASE COURSE, 7.5" in thickness

SILTY SAND WITH GRAVEL (SM), brown, medium dense

Boring Terminated at 5 Feet

0.1

0.8

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.7052° Longitude: -101.5484°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B10

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-19-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Bates Canyon RoadSITE:

Boring Started: 04-19-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

8-8-6 N=14

4-3-2 N=5

HOT MIX ASPHALT (HMA) COURSE, 3.5" in thickness AGGREGATE BASE COURSE, 7" in thickness

CLAYEY SAND (SC), brown, loose to medium dense

Boring Terminated at 5 Feet

0.3

0.9

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.5790° Longitude: -101.7039°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B11

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-20-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Bates Canyon RoadSITE:

Boring Started: 04-20-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

6-14-12 N=26

9-11-10 N=21

HOT MIX ASPHALT (HMA) COURSE, 2.5" in thickness AGGREGATE BASE COURSE, 9.5" in thickness

CLAYEY SAND (SC), brown, medium dense

Boring Terminated at 5 Feet

0.2

1.0

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.5793° Longitude: -101.6982°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B12

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-20-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Alibates Access RoadSITE:

Boring Started: 04-20-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

6-6-6 N=12

3-3-3 N=6

HOT MIX ASPHALT (HMA) COURSE, 2" in thickness AGGREGATE BASE COURSE, 9" in thickness

CLAYEY SAND (SC), brown, loose to medium dense

Boring Terminated at 5 Feet

0.2

0.9

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.5873° Longitude: -101.6754°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B13

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-20-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Alibates Access RoadSITE:

Boring Started: 04-20-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

8-8-6

8-6-5 N=11

10.9 3624-16-8

AGGREGATE BASE COURSE, 12" in thickness

CLAYEY SAND (SC), reddish brown, medium dense

Boring Terminated at 5 Feet

1.0

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.5877° Longitude: -101.6747°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings and/or Bentonite

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B14

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-20-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Unpaved Alibates Tour RoadSITE:

Boring Started: 04-20-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

9-7-7

5-4-3 N=7

HOT MIX ASPHALT (HMA) COURSE, 1.75" in thickness AGGREGATE BASE COURSE, 9" in thickness

CLAYEY SAND (SC), reddish brown, loose to medium dense

Boring Terminated at 5 Feet

0.1

0.9

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.5796° Longitude: -101.7009°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B15

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-20-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Alibates Access RoadSITE:

Boring Started: 04-20-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

3-5-7 N=12

3-6-10 N=16

346.6 29-20-9

HOT MIX ASPHALT (HMA) COURSE, 3" in thickness AGGREGATE BASE COURSE, 8.5" in thickness

CLAYEY SAND WITH GRAVEL (SC), brown, medium dense

Boring Terminated at 5 Feet

0.3

1.0

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.5818° Longitude: -101.7023°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B16

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-20-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Bates Canyon RoadSITE:

Boring Started: 04-20-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

20-7-4 N=11

10-4-2 N=6

787.5 25-16-9

HOT MIX ASPHALT (HMA) COURSE, 4" in thickness

AGGREGATE BASE COURSE, 10" in thickness

LEAN CLAY WITH SAND (CL), brown, medium stiff to stiff

Boring Terminated at 5 Feet

0.3

1.2

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.6822° Longitude: -101.5979°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B17

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-19-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Fritch Fortress RoadSITE:

Boring Started: 04-19-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

14-19-21 N=40

8-17-19 N=36

HOT MIX ASPHALT (HMA) COURSE, 3" in thickness AGGREGATE BASE COURSE, 9" in thickness

LEAN CLAY (CL), reddish brown, hard

Boring Terminated at 5 Feet

0.3

1.0

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.7059° Longitude: -101.5572°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B18

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-19-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Sanford Yake Lower Parking AreaSITE:

Boring Started: 04-19-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

7-4-4 N=8

6-16-50/5"

9013.5 30-20-10

HOT MIX ASPHALT (HMA) COURSE, 2" in thickness AGGREGATE BASE COURSE, 9.5" in thickness

LEAN CLAY (CL), reddish brown, stiff to hard

Boring Terminated at 5 Feet

0.2

0.8

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.7065° Longitude: -101.5587°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B19

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-19-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Sanford Yake RoadSITE:

Boring Started: 04-19-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

10-14-9 N=23

6-6-6 N=12

474.9 25-17-8

HOT MIX ASPHALT (HMA) COURSE, 3" in thickness AGGREGATE BASE COURSE, 9" in thickness

CLAYEY SAND (SC), brown, medium dense

Boring Terminated at 5 Feet

0.3

1.0

5.0

Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.

TH

IS

B O

R

IN

G L

O G

IS

N

O T

VA

LI

D

IF

S

EP

AR

A

TE

D

F R

O M

O R

IG

IN

AL

R

E

PO

R T.

3B -C

U

ST

O M

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

9/

W

AT

ER

L

EV

EL

O

BS

ER

VA

TI

O

N S

D

EP

TH

(F t.)

STRENGTH TEST

FI

EL

D T

ES

T

R

ES

U

LT

S

C O

M P

R

ES

SI

V

E

ST

R

EN

G

TH

(ts f)

TE

ST

T

YP

E

ST

R

AI

N

PE

R

C

EN

T

FI

N

ES

W

AT

ER

C

O N

TE

N

T

D R

Y U

N

IT

W

EI

G H

T (p cf

ATTERBERG

LIMITS

LL-PL-PI

LOCATION See Exploration Plan

Latitude: 35.6910° Longitude: -101.5645°

G R

AP

H

IC

L

O G

M O

D

EL

L

AY

ER

DEPTH

Advancement Method:

Continuous flight auger

Abandonment Method:

Boring backfilled with Auger Cuttings Surface capped with asphalt

Notes:

Project No.: AR215033

Drill Rig: B-48

BORING LOG NO. B20

DJ&A PCCLIENT:

Missoula, MT

Driller: RC

Boring Completed: 04-19-2021

PROJECT: Lake Meredith CFLHD

See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).

See Supporting Information for explanation of symbols and abbreviations.

Sanford Yake RoadSITE:

Boring Started: 04-19-2021

5847 50th St Lubbock, TX

WATER LEVEL OBSERVATIONS

SA

M

P

LE

T

ATTACHMENT 2

Contents:

California Bearing Ratio (CBR) Test Results (3 pages)

110 114 118 122 126

112.6

118.8

125.1 pcf pcf pcf

Dry Density @ 90%

Dry Density @ 95%

Dry Density @ 100%

ASTM D1883-072

CALIFORNIA BEARING RATIO

SO

AK

ED

C

BR

C

O R

R

EC

TE

D

Pe ne tra tio n

R es is ta nc e

(p si

LL

DRY DENSITY (PCF)

Penetration (in)

Source of Material

Description of Material

Remarks:

%51.3 Percent Fines

SANDY LEAN CLAY(CL)

13 14 PIPLAtterberg Limits

B1 @ 1.0 feet bgs

CBR @ 90% Density

CBR @ 95% Density

CBR @ 100% Density

5.3

PROJECT NUMBER: AR215033

SITE: Main St Sanford, TX

PROJECT: Lake Meredith CFLHD

CLIENT: DJ&A PC

Missoula, MT

5847 50th St Lubbock, TX

LA

B

O R

AT

O

R Y

TE

S

TS

A

R E

N O

T

VA

LI

D

IF

S

EP

AR

A

TE

D F

R O

M O

R

IG

IN

AL

R E

PO

R

T.

C

BR

P

T R

EP

O

R T

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

3/

0 0.25

CBR @ 90% Density

CBR @ 95% Density

CBR @ 100% Density

112.6

118.8

125.1 pcf pcf pcf

Dry Density @ 90%

Dry Density @ 95%

Dry Density @ 100%

10.19.89.8After Compaction

10.00 10.00 10.00

13.915.5Top 1" After Soaking

Compaction Method

125.1 125.1 125.1Maximum Dry Density, (pcf)

10.2 10.2 10.2Optimum Moisture Content, (%)

118.02 123.02 125.01

5.1 6.2 6.7Bearing Ratio, (%)

0.68 0.68 0.61Swell, (%)

Surcharge,. (lbs)

15.5

Moisture Content, (%)

ASTM 698A

Sample Condition

Dry Density before Soaking, (pcf)

1 2 3

Soaked

Sample No.

110 114 118 122 126

106.4

112.3

118.2 pcf pcf pcf

Dry Density @ 90%

Dry Density @ 95%

Dry Density @ 100%

ASTM D1883-072

CALIFORNIA BEARING RATIO

SO

AK

ED

C

BR

C

O R

R

EC

TE

D

Pe ne tra tio n

R es is ta nc e

(p si

LL

DRY DENSITY (PCF)

Penetration (in)

Source of Material

Description of Material

Remarks:

%71.8 Percent Fines

LEAN CLAY with

SAND(CL)

17 17 PIPLAtterberg Limits

B7 @ 1.0 feet bgs

CBR @ 90% Density

CBR @ 95% Density

CBR @ 100% Density

4.2

5.9

PROJECT NUMBER: AR215033

SITE: Main St Sanford, TX

PROJECT: Lake Meredith CFLHD

CLIENT: DJ&A PC

Missoula, MT

5847 50th St Lubbock, TX

LA

B

O R

AT

O

R Y

TE

S

TS

A

R E

N O

T

VA

LI

D

IF

S

EP

AR

A

TE

D F

R O

M O

R

IG

IN

AL

R E

PO

P

T R

EP

O

R T

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

3/

0 0.25

CBR @ 90% Density

CBR @ 95% Density

CBR @ 100% Density

106.4

112.3

118.2 pcf pcf pcf

Dry Density @ 90%

Dry Density @ 95%

Dry Density @ 100%

11.911.911.7After Compaction

10.00 10.00 10.00

16.317Top 1" After Soaking

Compaction Method

118.2 118.2 118.2Maximum Dry Density, (pcf)

11.8 11.8 11.8Optimum Moisture Content, (%)

111.95 118.45 121.06

4.1 6.0 7.6Bearing Ratio, (%)

0.46 0.61 0.37Swell, (%)

Surcharge,. (lbs)

17.2

Moisture Content, (%)

ASTM 698A

Sample Condition

Dry Density before Soaking, (pcf)

1 2 3Sample No.

110 114 118 122 126

112.2

118.5

124.7 pcf pcf pcf

Dry Density @ 90%

Dry Density @ 95%

Dry Density @ 100%

ASTM D1883-072

CALIFORNIA BEARING RATIO

SO

AK

ED

C

BR

C

O R

R

EC

TE

D

Pe ne tra tio n

R es is ta nc e

(p si

LL

DRY DENSITY (PCF)

Penetration (in)

Source of Material

Description of Material

Remarks:

%35.8 Percent Fines

CLAYEY SAND(SC)

16 8 PIPLAtterberg Limits

B14 @1.0 feet bgs

CBR @ 90% Density

CBR @ 95% Density

CBR @ 100% Density

4.0

5.8

PROJECT NUMBER: AR215033

SITE: Main St Sanford, TX

PROJECT: Lake Meredith CFLHD

CLIENT: DJ&A PC

Missoula, MT

5847 50th St Lubbock, TX

LA

B

O R

AT

O

R Y

TE

S

TS

A

R E

N O

T

VA

LI

D

IF

S

EP

AR

A

TE

D F

R O

M O

R

IG

IN

AL

R E

PO

P

T R

EP

O

R T

A R

L

A

KE

M E

R

ED

IT

H

C

FL

.G

PJ

T

ER

R

AC

O N

_D

AT

AT

EM

P

LA

TE

.G

D T

/1

3/

0 0.25

CBR @ 90% Density

CBR @ 95% Density

CBR @ 100% Density

112.2

118.5

124.7 pcf pcf pcf

Dry Density @ 90%

Dry Density @ 95%

Dry Density @ 100%

1010.211.5After Compaction

10.00 10.00 10.00

11.111.6Top 1" After Soaking

Compaction Method

124.7 124.7 124.7Maximum Dry Density, (pcf)

9.6 9.6 9.6Optimum Moisture Content, (%)

114.77 122.54 126.20

3.3 5.0 6.4Bearing Ratio, (%)

0.04 0.02 0.02Swell, (%)

Surcharge,. (lbs)

11.5

Moisture Content, (%)

ASTM 698A

Sample Condition

Dry Density before Soaking, (pcf)

1 2 3

Soaked

Sample No.

File details come from the government source that posted it. Updated .