Lamar EV Charging - Documented Quote - Appendix F - Scope of Work.pdf
PDF 109 KB Posted
- Solicitation number
- 0002
- Issued by
- Pitkin County, Colorado
About this file
The document is an Electrical Scope of Work for the Lamar EV Charger Project (#24485) issued by the Colorado Department of Transportation (CDOT) on September 25, 2024. The project involves electrical infrastructure improvements for installing two new electric vehicle (EV) chargers at the existing maintenance site located at 2402 S. Main St. in Lamar, Colorado. The scope includes providing electrical panel, conduit, wiring, and associated equipment for the EV charging infrastructure. Specifically, the project requires installing underground and overhead conduit, a new secondary utility transformer, a Unistrut structure with concrete piers, a 240/120V single-phase 600A panelboard, CT cabinet, and meter. The electrical chargers (Chargepoint CP6011X-80A-L7, 80A Dual Port, Pedestal Mount) will be procured and installed under a separate contract.
The existing electric service will be provided by Lamar Light and Power, and the contractor will be responsible for coordinating transformer and meter installation with the utility. The contractor must obtain and pay for permits and inspections from the State Electrical Inspector, with CDOT covering the initial code review and final code inspection. Additional code review inspections resulting from a failed initial inspection will be the contractor's responsibility. Prior to site work, the contractor must locate all utilities through the Utility Notification Center of Colorado (UNCC) and a private locating service. Safety measures include installing 4-foot impact-resistant yellow bollards in front of each charging station and electrical equipment structure. The project requires precise coordination with the owner to verify charger locations and final electrical connections.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical Scope of Work – Lamar EV Charger
Project #24485
September 25, 2024
PROJECT LOCATION:
2402 S. Main St.
Lamar, CO 80152
PROJECT DESCRIPTION:
CDOT is requesting proposals from Qualified contractors and/or electricians on the installation of electrical improvements for two new EV chargers (procured and installed under a separate contract) for the existing maintenance site in Lamar, CO. Scope includes providing the panel, conduit, wiring and other equipment as needed for the electrical infrastructure required for two new chargers.
Existing electric service is provided by Lamar Light and Power. Coordinate new transformer and meter installation with utility.
SCOPE OF SERVICES:
Refer to drawings by the contracted Electrical Engineer Farnsworth Group for additional requirements.
The Contractor is responsible for obtaining (and paying for) Permits and inspections from the State Electrical Inspector. By Statute, local building permits are not required. Code reviews (including one final code inspection) shall be paid for by CDOT. Any additional code review inspections due to the original inspection not passing will be paid for by the Contractor.
Site Work:
Prior to any site-disturbing activities, the Contractor will be responsible for locating all utilities. The Contractor shall notify the Utility Notification Center of Colorado (UNCC) to conduct locates for buried utilities. A private locating service shall also be contacted to mark any privately-owned buried utilities that were not identified by the UNCC One-Call system.
1. Provide and install underground conduit from new panel location to new EV charging locations. Verify exact location of chargers with owner in the field.
2. Provide and install overhead conduit from new utility transformer to new meter, CT cabinet, and panel.
3. Provide 4 foot x 6 inch impact resistant bolt down bollard, prefinished safety yellow, in front of each EV charging station and Unistrut structure with electrical equipment.
Specialty Equipment:
4. 2 Chargepoint chargers, basis of design: CP6011X-80A-L7, 80A Dual Port, Pedestal Mount, 23 ft cable are to be provided and installed by a separate contract. This project shall stub out the electrical to the future location of the new chargers. Coordinate final location with owner on site.
Electrical:
5. Provide new secondary utility transformer. Coordinate location with utility and owner.
6. Provide new Unistrut structure and concrete piers for new meter, CT cabinet, and panel.
7. Provide new 240/120V, single phase, 600A Panelboard L1 per drawings.
8. Provide new CT cabinet and meter per drawings. Coordinate installation with utility.
End of Scope of Work