Lake_Apopka_Connector_Trail_Structure_Plans.pdf
PDF 8 MB Posted
- Attached to
- Lake Apopka Trail Connector
- Solicitation number
- Y23-706
- Issued by
- Orange County, Orlando City, Florida
About this file
These construction plans are for the Lake Apopka Connector Trail project, prepared by Dyer, Riddle, Mills & Precourt, Inc. for Orange County, Florida's Department of Public Works, Engineering Division. The project involves constructing a 3.230-mile trail connector with a boardwalk section spanning approximately 1,000 linear feet, located in Orange County. The design includes a prestressed concrete pile foundation system, steel pedestrian/bicycle railing, and follows Florida Department of Transportation (FDOT) standards for road and bridge construction. The project is identified by Financial Project ID 441447-1-58-01 and Contract No. Y23-706-CC, with a design that accommodates trail users and considers environmental conditions like seasonal high water elevations.
The construction plans detail specific technical specifications, including 14-inch square prestressed concrete piles, boardwalk deck planks with a sandblast texture, and steel railings meeting AASHTO and FDOT design guidelines. The estimated project cost is $7,449,065.96, with funding likely coming from county and potentially state transportation infrastructure budgets. The design incorporates environmental considerations, such as maintaining a slightly aggressive environmental classification for concrete and steel structures, and includes provisions for flood resistance, thermal movement, and specific material requirements. The project aims to create a connector trail with considerations for accessibility, durability, and environmental adaptation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSTRUCTION PLANS FOR
PREPARED BY:
SHEET
OF
DATE BYREVISIONS
LOCATION MAP
CHRISTMAS
SEMINOLE COUNTY
OSCEOLA COUNTY
ORLANDO
INTERNATIONAL
AIRPORT
L A
K E C
O U
N T
Y
WINTER
GARDEN
ORLANDO
LAKE COUNTY
B R
E V
A R
D C
O U
N T
Y
OSCEOLA COUNTY
LAKE APOPKA
GALLOWAY DR.
1-4
I-4
FLORIDA
TPK
E-W
E
W
N.T.S.
SEC. TWP. RGE. E.29248
B-01
B-05
DESCRIPTION
INDEX OF SHEETS
SHEET
B-02
DESIGNED BY: JMHL
DRAWN BY : EFW
CHECKED BY: KJW
APPROVED BY: JMHL DATE: 03/2022
DATE: 03/2022
DATE: 03/2022
DATE: 03/2022
VICINITY MAP
N.T.S.
N.T.S.
R E
R E
T-21 S
T-22 S
R E
R E
T-21 S
T-22 S
L.
Sims
24 19
32 34
MAGNOLIA
PARK
MitchellL.
L.
Lee
Marden
L.
Cora
Trout
.dR eneeK d
R n e dr a M
L.Apopka
L.
PROJECT
LOCATION
ORANGE COUNTY, FLORIDA
LAKE APOPKA CONNECTOR TRAIL
FINANCIAL PROJECT ID: 441447-1-58-01
CONTRACT NO. : Y23-706-CC
DISTRICT NO: 2
I HEREBY CERTIFY THAT THE DESIGN FOR THIS PROJECT AND THE ATTACHED CONSTRUCTION
PLANS COMPLY WITH THE REQUIREMENTS OF SECTION 336.045 OF THE FLORIDA STATUTES
AND ARE IN SUBSTANTIAL CONFORMANCE WITH THE STANDARDS CONTAINED IN THE EDITION
OF THE "MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN, CONSTRUCTION AND
MAINTENANCE FOR STREETS AND HIGHWAYS" IN EFFECT ON THIS DATE AS ADOPTED BY
THE FLORIDA DEPARTMENT OF TRANSPORTATION PURSUANT TO SUBSECTION 336.045(1)
ENGINEER:DATE:
OF THE FLORIDA STATUTES.
CHANGED DUE TO REPRODUCTION.
NOTE: THE SCALE OF THESE PLANS MAY HAVE
CERTIFICATION TO PLANS
DISTRICT 2
DISTRICT 3
DISTRICT 4
DISTRICT 5
DISTRICT 6
MAYRA URIBE
VICTORIA P. SIPLIN
MARIBEL GOMEZ CORDERO
CHRISTINE MOORE
EMILY BONILLA
JERRY L. DEMINGS, COUNTY MAYOR
JOE KUNKEL PUBLIC WORKS DIRECTOR
BOARD OF COUNTY COMMISSIONERS
NICOLE WILSON DISTRICT 1
FOURTH EDITION
AASHTO 2012 GUIDE FOR THE DEVELOPMENT OF BICYCLE FACILITIES,
SOURCE OF BENCHMARK DATUM
BENCHMARKS
ROADWAY:
BRIDGES:
TOTAL LENGTH:
PROJECT LENGTH: FEET MILES
17,056
N/A
3.230
N/A
3.23017,056
MCCORMICK RD.
30' +/- W. OF CONCRETE DRIVEWAY TO ADDRESS 106
RD. AND 20' +/- S. OF C/L OF MCCORMICK RD.;
CONCRETE RETAINING WALL ON S. SIDE OF MCCORMICK
3.5" O.C. ALUMINUM DISC IN E. END OF 0.5' X 300'
ORANGE COUNTY BENCHMARK A1571007.
OF MCCORMICK RD. AT C/L OF DAMON RD.
MCCORMICK RD. AND DAMON RD.; 20' +/- S. OF THE C/L
SIDEWALK AT S. SIDE OF "T" INTERSECTION OF
3.5" O.C. ALUMINUM DISC IN C/L OF 5' CONCRETE
ORANGE COUNTY BENCHMARK A1571003.
PLANS WERE PREPARED ACCORDING TO AVAILABLE INFORMATION TO ADEQUATELY
ADDRESS CONDITIONS AS THEY EXISTED AT THE TIME OF PLANS PREPARATION.
NEEDS, CONDITIONS AND OWNERSHIP OF PROPERTIES MAY HAVE CHANGED SINCE
PROJECT DESIGN. THE COUNTY'S REPRESENTATIVE WILL ADDRESS CHANGES AND
NEEDS WITH THE PROPERTY OWNER OR THEIR REPRESENTATIVES. CONTRACTOR
SHALL WORK WITH THE COUNTY'S REPRESENTATIVE IN ADDRESSING AND MEETING
NEEDS AND CONDITIONS THAT MAY HAVE CHANGED SINCE PLANS PREPARATION.
NOTE
407-905-3376
407-532-8509
972-729-6322
407-836-7900
CHARTER COMMUNICATIONS
DUKE ENERGY
ORANGE COUNTY PUBLIC WORKS
407-656-2734
561-683-2729AT&T
352-516-3824
850-599-1444
COMCAST CABLE COMMUNICATIONS
CENTURY LINK
407-836-6850
407-690-5337CENTRAL FLORIDA EXPRESSWAY
407-703-1731
407-554-7238
CITY OF APOPKA
CITY OF OCOEE
LAKE APOPKA NATURAL GAS DISTRICT
ORANGE COUNTY UTILITIES
MCI COMMUNICATIONS
UTILITIES ENCOUNTERED
CONTRACT NO: Y20-828-EB
LEGEND
OVERHEAD POWER LINES
ASPHALT
FENCE
CONCRETE
RIGHT OF WAY LINE
BRICK WALL
POWER POLES
WATER VALVE
PALM TREES
MISCELLANEOUS BOXES
OAK TREES
HEDGES
POWER POLE WITH LAMP
CORRUGATED METAL PIPE
REINFORCED CONCRETE PIPE
CMP
RCP
ASPHALT C/L
POWER POLEP.P.
TRAFFIC MARKINGS
WATER METER
SECTION LINE
CURB
STATION POINT
ALUMINUM HAND RAIL
WETLANDS
FIRE HYDRANT
SANITARY SEWER
BARRIER WALL
WV
MONUMENT
BENCHMARK
S
W
M
SIGNS
BID PLAN SUBMITTAL
T H
E
O F
F I
C I
A L
R
C O
D
T
I
S
E E
T
E C
T R
O N
C
G I
T A
L
Y
G N
N
A L
U
D
L E
G
A
C
Structures Plans Component.
Standard Plans for Bridge Construction are included in the
APPLICABLE IRs: IR536-001-01, IR521-001-01 http://www.fdot.gov/design/standardplans are available at the following website:
Standard Plans for Road Construction and associated IRs and applicable Interim Revisions (IRs).
Standard Plans for Road and Bridge Construction
Florida Department of Transportation, FY2023-24
GOVERNING STANDARD PLANS:
http://www.fdot.gov/programmanagement/Implemented/SpecBooks following website:
Specifications for Road and Bridge Construction at the
Florida Department of Transportation, FY2023-24 Standard
GOVERNING STANDARD SPECIFICATIONS:
FAN : D522-090-B
} BASELINE
CCR CERTIFIED CORNER RECORD
CONC CONCRETE
COR. CORNER
E EAST/EASTING
EL ELEVATION
EP EDGE OF PAVEMENT
INV INVERT (ELEVATION)
IR(C) IRON ROD (WITH CAP)
IRRIG IRRIGATION LINE
LT. LEFT
MES MITERED END SECTION
N NORTH/NORTHING
PC POINT OF CURVATURE
PI POINT OF INTERSECTION
PIP POURED-IN-PLACE
POC POINT ON CURVE
POT POINT ON TANGENT
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE PIPE
R RANGE
RCP REINFORCED CONCRETE PIPE
RT. RIGHT
R/W RIGHT-OF-WAY
S SOUTH
SEC. SECTION
STA. STATION
T TOWNSHIP
TEL TELEPHONE
UTIL UTILITY
VVH/TH TEST HOLE (UTILITY)
W WEST
° DEGREES
SHWE SEASONAL HIGH WATER EL.
B-01 KEY SHEET
B-03
B-04
B-05
B01-01
B1-01
B1-02
B1-03
B1-04
B1-05
SIGNATURE SHEET
INDEX OF SHEETS
SUMMARY OF STRUCTURES QUANTITIES
GENERAL NOTES (1 OF 2)
GENERAL NOTES (2 OF 2)
GENERAL PLAN STA. 2021+79.78 TO
STA. 2022+79.28
TYPICAL SECTION
STA. 2022+79.28
REPORT OF BOARDWALK BORINGS
FOUNDATION LAYOUT STA. 2021+79.78 TO
PILE DATA TABLE AND NOTES
STA. 1001+43.65
BEGIN PROJECT
STA. 3067+28.05
END PROJECT
STA. 2002+01.00
BEGIN TRAIL
STA. 1053+65.13
END TRAIL
STA. 2021+79.78
BEGIN BOARDWALK
STA. 2022+79.28
END BOARDWALK
STA. 3036+44.00
STA. 2089+51.77 =
P lo t t e d
B y J
A r n e m a n n
:1
:4
M
P
P r o j e c t s .0
O r a n g e
C o L a k e
A p o p k a
T r a il
C o n n e c t o r S
U S t r u c t
K e y S h e e t .D
G N
.0
SCIENTISTSENGINEERS SURVEYORS PLANNERS
CERTIFICATE OF AUTHORIZATION NO. 2648
PHONE: (407) 896-0594 FAX: (407) 896-4836
941 LAKE BALDWIN LANE, ORLANDO, FLORIDA 32814
DYER, RIDDLE, MILLS & PRECOURT, INC.
JOCELYN M. HAISCH-LINN, P.E. LICENSE NO. 60103
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
4200 SOUTH JOHN YOUNG PARKWAY
ORLANDO, FLORIDA 32839
(407) 836-7900
ORANGE COUNTY
FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE
STATE OF
R E
E
NI
G
NE LANOI
S S
E
F O
R P
ESNECI
L
A
DIROL
F
No 60103
N
NI
L-
HCSIAH .M NYL
E C
O J
FOLLOWING SHEETS IN ACCORDANCE WITH RULE 61G15-23.004, F.A.C.
THE ABOVE NAMED PROFESSIONAL ENGINEER SHALL BE RESPONSIBLE FOR THE
STATE OF
R E
E
NI
G
NE LANOI
S S
E
F O
R P
ESNECI
L
A
DIROL
F
No 50637
I
D
ANN .N NIWD
O G
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
REVISIONS
DATE BY DESCRIPTION DATE BY DESCRIPTION
Plotted By: JHaisch-Linn 7/7/2023 3:59:51 PM P:\Projects20\20-0318.000_Orange_Co-Lake_Apopka_Trail_Connector_SU\Struct\SignSt01.dgn
DRMP, INC.
Certificate Of Authorization No. 2648
941 Lake Baldwin Lane, Orlando, FL 32814
Phone: (407) 896-0594 Fax: (407) 896-4836
LICENSE No. 60103
JOCELYN M. HAISCH-LINN, P.E.
SIGNATURE SHEET
B-02
EFW 03-22
JMHL 03-22
SHEET DESCRIPTIONSHEET NO.
STRUCTURE PLANS
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL.
SIGNED AND SEALED BY
THIS ITEM HAS BEEN DIGITALLY
B1-05
B1-04
B1-02
B1-01
B-05
B-04
BQ1-01
B-03
B-02
B-01
PILE DATA TABLE AND NOTES
STA. 2021+79.78 TO STA. 2022+79.28
FOUNDATION LAYOUT
TYPICAL SECTION
STA. 2021+79.78 TO STA. 2022+79.28
GENERAL PLAN
GENERAL NOTES (2 OF 2)
GENERAL NOTES (1 OF 2)
SUMMARY OF STRUCTURES QUANTITIES
INDEX OF SHEETS
SIGNATURE SHEET
KEY SHEET
SHEET DESCRIPTIONSHEET NO.
STRUCTURE PLANS
ON ANY ELECTRONIC COPIES.
AND THE SIGNATURE MUST BE VERIFIED
NOT CONSIDERED SIGNED AND SEALED
PRINTED COPIES OF THIS DOCUMENT ARE
ON THE DATE ADJACENT TO THE SEAL.
SIGNED AND SEALED BY
THIS ITEM HAS BEEN DIGITALLY
CERTIFICATE OF AUTHORIZATION NO. XXXX
ORLANDO, FL 32818
601 N. HART BOULEVARD
P.E. LICENSE NUMBER 50637
GODWIN N. NNADI, P.E.
DRMP, INC.
B1-03
B-02
REPORT OF BOARDWALK BORINGS
SIGNATURE SHEET
CERTIFICATE OF AUTHORIZATION NO. 2648
ORLANDO, FL 32814
941 LAKE BALDWIN LANE
P.E. LICENSE NUMBER 60103
JOCELYN M. HAISCH-LINN, P.E.
LAKE APOPKA CONNECTOR TRAIL
4200 SOUTH JOHN YOUNG PARKWAY
ORLANDO, FLORIDA 32839
(407) 836-7900
ORANGE COUNTY
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
Plotted By: JArnemann 4/17/2023 10:52:35 AM P:\Projects20\20-0318.000_Orange_Co-Lake_Apopka_Trail_Connector_SU\Struct\Index01.dgn
941 Lake Baldwin Lane, Orlando, FL 32814
Phone: (407) 896-0594 Fax: (407) 896-4836
LICENSE No. 60103
STRUCTURE PLANS
INDEX OF SHEETS
B-03
GENERAL SHEETS STANDARD PLANS FOR BRIDGE CONSTRUCTION
EFW 03-22
JMHL 03-22
B1-05
B1-04
B1-03
B1-02
B1-01
LAKE APOPKA CONNECTOR TRAIL
PILE DATA TABLE AND NOTES
STA. 2021+79.78 TO STA. 2022+79.28
FOUNDATION LAYOUT
REPORT OF BOARDWALK BORINGS
TYPICAL SECTION
STA. 2021+79.78 TO STA. 2022+79.28
GENERAL PLAN
B-05
B-04
BQ1-01
B-03
B-02
B-01
GENERAL NOTES (2 OF 2)
GENERAL NOTES (1 OF 2)
SUMMARY OF STRUCTURES QUANTITIES
INDEX OF SHEETS
SIGNATURE SHEET
KEY SHEET
515-052
515-051
455-014
455-002
455-001
PEDESTRIAN/BICYCLE RAILING (STEEL)
BRIDGE PEDESTRIAN/BICYCLE RAILING (STEEL)
14" SQUARE PRESTRESSED CONCRETE PILE
SQUARE PRESTRESSED CONCRETE PILE SPLICES
DETAILS AND NOTES
SQUARE PRESTRESSED CONCRETE PILES - TYPICAL
4200 SOUTH JOHN YOUNG PARKWAY
ORLANDO, FLORIDA 32839
(407) 836-7900
ORANGE COUNTY
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
SECTION ITEM NO. ITEM DESCRIPTION LOCATION UNIT
QUANTITY TOTAL
NOTES
DESIGN
REMARKS
CONSTRUCTION
P F P F
LUMP SUM ITEMS 999-3 BOARDWALK LUMP SUM STA. 2021+79.78 TO STA. 2022+79.28 LS 1 1
ITEM NOTE:
FOUNDATION
0455- 34- 2 PRESTRESSED CONCRETE PILING, 14" SQ. LF
0455-143- 2 TEST PILES- PRESTRESSED CONCRETE, 14" SQ. LF
BARRIERS
RAILING/
0515- 2-211 LF
GALVANIZED STEEL, 42" TYPE 1
PEDESTRIAN/BICYCLE RAILING,
STA. 2021+79.78 TO STA. 2022+79.28
STA. 2021+79.78 TO STA. 2022+79.28
STA. 2021+79.78 TO STA. 2022+79.28
SUMMARY OF QUANTITIES - LAKE APOPKA TRAIL CONNECTOR
SEE "GENERAL NOTES (2 OF 2)", MEASUREMENT AND PAYMENT SECTION.999-3
FOR TEST PILES AND PILES
BOARDWALK INSTALLATION METHOD. THESE ITEMS SHALL BE FULL PAYMENT
TEST PILE AND PILE LENGTHS ARE APPROXIMATE AND MAY VARY WITH
455-34-2 AND 455-143-2
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
Plotted By: JHaisch-Linn 4/17/2023 3:01:29 PM P:\Projects20\20-0318.000_Orange_Co-Lake_Apopka_Trail_Connector_SU\Struct\SumOfQuantities01.DGN
941 Lake Baldwin Lane, Orlando, FL 32814
Phone: (407) 896-0594 Fax: (407) 896-4836
LICENSE No. 60103
BQ1-01
SUMMARY OF STRUCTURES QUANTITIES
EFW 03-22
JMHL 03-22
4200 SOUTH JOHN YOUNG PARKWAY
ORLANDO, FLORIDA 32839
(407) 836-7900
ORANGE COUNTY
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
Plotted By: JHaisch-Linn 6/26/2023 2:11:07 PM P:\Projects20\20-0318.000_Orange_Co-Lake_Apopka_Trail_Connector_SU\Struct\GeneralNotes01.dgn
941 Lake Baldwin Lane, Orlando, FL 32814
Phone: (407) 896-0594 Fax: (407) 896-4836
LICENSE No. 60103
B-04
GENERAL NOTES (1 OF 2)
G E N E R A L N O T E S
PLAN DIMENSIONS
FRONT FACE OF BACKWALL STATIONING IS BASED ON AN ASSUMED 9" BACKWALL WIDTH.3.
ALL DIMENSIONS AND JOINT OPENINGS IN THE STRUCTURES ARE MEASURED AT A MEAN TEMPERATURE OF 70°F.2.
OTHERWISE NOTED.
ALL DIMENSIONS IN THESE PLANS ARE MEASURED IN FEET AND INCHES EITHER HORIZONTALLY OR VERTICALLY UNLESS 1.
BFBW DENOTES "BACK FACE OF BACKWALL"
ABBREVIATIONS
CONTRACTOR IS TO FURNISH AND INSTALL NEOPRENE BEARING PADS AT ALL BEARING LOCATIONS.
BEARINGS
SUBSTRUCTURE
SHALL BE PRESTRESSED CONCRETE PILES.
PLAN ELEVATIONS ARE IN FEET AND REFER TO NAVD 1988 DATUM.
VERTICAL DATUM
DESIGN METHOD
LOAD AND RESISTANCE FACTOR DESIGN (LRFD) METHOD USING STRENGTH AND SERVICE LIMIT STATES.
2"
2"
3"
SHOWN AS MINIMUM COVER. SEE SPECIFICATIONS SECTION 415 FOR ALLOWABLE TOLERANCES.
CONCRETE COVERS SHOWN IN THE PLANS DO NOT INCLUDE PLACEMENT AND FABRICATION TOLERANCES UNLESS
CONCRETE COVER
UTILITIES
3. NOTIFY ALL INVOLVED UTILITY COMPANIES TO VERIFY EXACT LOCATIONS PRIOR TO START OF CONSTRUCTION.
TYPE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE.
ACCURATE OR ALL INCLUSIVE. CONTRACTOR IS RESPONSIBLE FOR MAKING ITS OWN DETERMINATION AS TO THE
2. DATA CONCERNING TYPE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES IS NOT GUARANTEED TO BE
1. FOR DETAILS REGARDING UTILITIES, SEE UTILITY ADJUSTMENT SHEETS IN THE ROADWAY PLANS.
FFBW DENOTES "FRONT FACE OF BACKWALL"
UNO DENOTES "UNLESS NOTED OTHERWISE"
SITE ACCESS
LIMITS SHOWN IN THE PLANS.
CONTRACTOR SHALL OBTAIN HIS OWN CONSTRUCTION ACESS AND OTHERWISE STAY WITHIN THE CONSTRUCTION
MATERIALS
1. CONCRETE:
f'c = 4,500 BOARDWALK DECK (PLANKS)
GALVANIZED IN ACCORDANCE WITH ASTM F2329.
A) ALL TIE-DOWN BOLTS ARE TO BE ASTM F1554, GRADE 55 STEEL,
3. TIE-DOWN BOLTS:
A) ALL REINFORCING STEEL IS TO BE GRADE 60 CARBON STEEL PER SPECIFICATIONS SECTION 931.
2. REINFORCING STEEL:
A) ALL CONCRETE IS TO BE IN ACCORDANCE WITH SPECIFICATIONS SECTION 346.
V (SPECIAL)
IV
III
(BRIDGE DECK)
II
CLASS
CONCRETE
f'c = 6,000 f'c = 5,500 f'c = 5,000
STRENGTH (PSI)
COMPRESSIVE
MINIMUM 28-DAY
PRESTRESSED PILING
PRECAST PEDESTAL CAP
PRECAST BEAMS
STRUCTURE
CONCRETE IN
LOCATION OF
ALL
SUPERSTRUCTUREBRIDGE NUMBER
SUBSTRUCTURE
CONCRETE STEEL
DESIGN LOADINGS
DESIGN TO RESIST LATERAL AND UPLIFT LOADS FROM A 3.50 FT/SEC. FLOOD.
6. FLOOD LOADS:
DESIGNED IN ACCORDANCE WITH SDG SECTION 2.3 AND AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS SECTION 4.7.4.
5. SEISMIC:
CONCRETE = 6x10�⁶ PER DEGREE F
B) THERMAL COEFFICIENT:
70°F NORMAL TEMPERATURE:
-35°F TEMPERATURE FALL:
+35°F TEMPERATURE RISE:
CONCRETE:
A) SEASONAL VARIATION FOR DESIGN (SDG TABLE 2.7.1-1):
4. THERMAL FORCES:
AND AS MODIFIED BY SDG SECTION 10.5.
DESIGN GUIDELINES (SDG) SECTION 2.4 AND LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES
DESIGNED IN ACCORDANCE WITH AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS AND AS MODIFIED BY STRUCTURES
3. WIND LOADS:
C) RAILING LOADING: AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 13.8.2.
B) VEHICLE LOADING: H-10 TRUCK
A) PEDESTRIAN LOADING: 90 PSF
2. LIVE LOADS:
B) BRIDGE PEDESTRIAN/BICYCLE RAILING (STEEL): 30 PLF
A) UNIT WEIGHT OF REINFORCED CONCRETE: 150 PCF
1. DEAD LOADS:
PRECAST PEDESTAL CAP AND PRESTRESSED PILING
SUBSTRUCTURE (PRECAST)
BOARDWALK DECK (PLANKS)
ALL SURFACES OF PRECAST BEAMS
SUPERSTRUCTURE (PRECAST)
EFW 03-22
JMHL 03-22
GEOTECHNICAL INFORMATION AND SOIL INVESTIGATION
A GEOTECHNICAL INVESTIGATION REPORT HAS BEEN PREPARED AND IS AVAILABLE FOR REFERENCE.
SLIGHTLY SLIGHTLY
RESISTIVITY
MODERATELY
SUBSTRUCTURE: SLIGHTLY AGRESSIVE (CONCRETE) / MODERATELY AGGRESSIVE (STEEL)
SUPERSTRUCTURE: SLIGHTLY AGGRESSIVE
ENVIRONMENTAL CLASSIFICATION
BOLTS ARE STRUCTURALLY ADEQUATE SHALL BE INCLUDED IN THE FABRICATOR'S DESIGN CALCULATIONS SUBMTTAL.
FLOOD UPLIFT AND LATERAL FORCES. CALCALATIONS AND/OR DOCUMENTATION SHOWING THAT TIE-DOWN
TIE-DOWN BOLTS SHALL BE USED AND SHALL BE STRUCTURALLY ADEQUATE TO RESIST8.
EACH PLANK JOINT WIDTH SHALL MEET ADA REQUIREMENTS AND ALLOW DRAINAGE OF RAINWATER.7.
ALIGNMENT SHALL FOLLOW THE HORIZONTAL AND VERTICAL ALIGNMENT SHOWN ON THE CONTRACT PLANS.6.
DIRECTION OF TRAVEL.
HAVE A LENGTH OF 1'-0" MINIMUM TO 3'-6" MAXIMUM MEASURED ALONG THE LONGEST EDGE IN THE
PLANKS SHALL MAINTAIN A “BOARDWALK APPEARANCE”, SPECIFICALLY MEANING EACH PLANK SHALL5.
ELEMENTS.
EQUIVALENT. SAMPLES SHALL BE SUBMITTED FOR OWNER APPROVAL PRIOR TO FABRICATION OF ANY PREACAST
ALL PRECAST SHALL CONSIST OF INTEGRALLY COLORED CONCRETE IN PERMATRAK MELBOURNE TAN COLOR OR4.
SHALL INTERLOCK WITH ONE ANOTHER VIA A “TONGUE AND GROOVE” CONNECTION.
PRECAST REINFORCED CONCRETE PLANKS SHALL BE STRUCTURAL LOAD BEARING ELEMENTS AND3.
TEXTURE MUST BE INTEGRAL WITH THE CONCRETE AND SHALL NOT BE AN APPLIED POST POUR WEARING SURFACE.
WALKING SURFACE OF PLANKS SHALL HAVE A FORMLINER FINISH WITH SANDBLAST TEXTURE. 2.
PRECAST REINFORCED CONCRETE BEAMS AND 14" SQUARE PRESTRESSED CONCRETE PILES.
WALKING SURFACE (PLANKS) SHALL BE MADE OF PRECAST REINFORCED CONCRETE, AND SUPPORTED BY1.
BOARDWALK SUPERSTRUCTURE
SHALL NOT ALLOW A FOUR (4) INCH SPHERE TO PASS THROUGH.
RAILINGS
SPECIFICATIONS
FLORIDA BUILDING CODE 7TH EDITION (2020) SHALL BE USED FOR RAILINGS.E)
LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES, 2ND EDITION, WITH 2015 INTERIM REVISIONS.D)
FDOT DESIGN MANUAL DATED JANUARY 2022.C)
FDOT STRUCTURES MANUAL DATED JANUARY 2022.B)
IN THE FDOT STRUCTURES MANUAL.
FACTOR (LRFD) BRIDGE DESIGN SPECIFICATIONS, 7TH EDITION AND APPROVED REVISIONS AND INTERIMS AS SPECIFIED
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO) LOAD AND RESISTANCEA)
2. DESIGN SPECIFICATIONS:
FY 2023-24 EDITION, AS AMENDED BY CONTRACT DOCUMENTS.
FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION
1. CONSTRUCTION SPECIFICATIONS:
4200 SOUTH JOHN YOUNG PARKWAY
ORLANDO, FLORIDA 32839
(407) 836-7900
ORANGE COUNTY
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
Plotted By: JArnemann 4/17/2023 11:00:09 AM P:\Projects20\20-0318.000_Orange_Co-Lake_Apopka_Trail_Connector_SU\Struct\GeneralNotes01.dgn
941 Lake Baldwin Lane, Orlando, FL 32814
Phone: (407) 896-0594 Fax: (407) 896-4836
LICENSE No. 60103
B-05
GENERAL NOTES (2 OF 2)
G E N E R A L N O T E S ( C O N T I N U E D )
WARRANTY:
IN MATERIAL AND WORKMANSHIP FOR A PERIOD OF TEN (10) YEARS.
BOARDWALK MANUFACTURER SHALL WARRANTY ALL PRECAST CONCRETE COMPONENTS AGAINST DEFECTS2.
MONTHS FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER.
AND ABUTMENT COMPONENTS, FOUNDATION SYSTEM, AND RAILINGS FOR A PERIOD OF TWELVE (12) CALENDAR
CONTRACTOR WILL BE RESPONSIBLE FOR INSTALLATION DEFECTS ASSOCIATED WITH THE BOARDWALK1.
QUALITY ASSURANCE
REFINISH MOCK-UP AREA AS REQUIRED TO PRODUCE ACCEPTABLE WORK.C.
DO NOT PROCEED WITH REMAINING WORK UNTIL MOCKUP IS ACCEPTED BY ARCHITECT / ENGINEER.B.
FINISH AREAS DESIGNATED BY ARCHITECT / ENGINEER.A.
AND WORKMANSHIP.
PROVIDE A MOCKUP FOR EVALUATION OF THE BOARDWALK SHOWING THE SURFACE PREPARATION TECHNIQUES4.
COMPLEXITY TO THOSE REQUIRED FOR THIS PROJECT.
INSTALLER QUALIFICATIONS: FIRM WITH FIVE (5) YEARS EXPERIENCE IN INSTALLATION OF SYSTEMS SIMILAR IN3.
PRECASTER MUST BE CERTIFIED BY PCI OR NPCA.D.
OF ABOVE GROUND PRECAST PRODUCTS OR BOARDWALK STRUCTURES.
PRECASTER SHALL HAVE A MINIMUM OF FIVE (5) YEARS EXPERIENCE IN THE PRODUCTIONC.
AND SHALL USE DYES FOR COLOR PIGMENTATION.
PRECASTER FOR THE BOARDWALK SHALL HAVE ON SITE COLOR MIXING FACILITIESB.
COMPONENTS SHALL BE FACTORY ENGINEERED AND FABRICATED BY SINGLE ENTITY.A.
OF PRECAST PRODUCTS AS DESCRIBED BELOW.
MANUFACTURER QUALIFICATIONS: A MINIMUM OF TEN (10) YEARS EXPERIENCE IN THE ACTUAL PRODUCTION2.
PREQUALIFIED PILE DRIVING CONTRACTOR.
THE CONTRACTOR PERFORMING THE INSTALLATION OF THE PILE FOUNDATIONS SHALL BE A FDOT 1.
MANUFACTURER’S INSTRUCTIONS.
AND TO CERTIFY THAT THE INSTALLATION HAS BEEN PERFORMED ACCORDING TO THE APPROVED DRAWINGS AND
PROVIDE A FIELD REPRESENTATIVE TO REVIEW INSTALLATION INSTRUCTIONS WITH THE CONTRACTOR AND ENGINEER
TO THE APPROVED PLANS AND MANUFACTURERS INSTALLATION INSTRUCTIONS. BOARDWALK MANUFACTURER SHALL
INSTALLATION OF THE PRECAST CONCRETE BOARDWALK SYSTEM AND RAILINGS SHALL BE PERFORMED IN ACCORDANCE
INSTALLATION
ACCEPTABILITY CRITERIA FOR CONCRETE:
CRACKS: DISPOSITION AS SPECIFIED IN FDOT SPECIFICATION SECTION 400-21.M.
REINFORCEMENT SHADOW LINES.L.
FOREIGN MATERIAL EMBEDDED IN THE SURFACE.J.
AREAS OF BACKUP CONCRETE BLEEDING THROUGH THE FACING CONCRETE.I.
BLOCKING STAINS EVIDENT ON EXPOSED SURFACES.H.
OR COMPARED WITH ADJACENT UNITS.
UNITS WITH EXCESSIVE VARIATION IN TEXTURE AND/OR COLOR FROM THE APPROVED MOCKUPS, WITHIN THE UNIT G.
RUST STAINS ON EXPOSED SURFACES.F.
VISIBLE MOLD JOINTS OR IRREGULAR SURFACES.E.
CONSOLIDATION.
CASTING AND/OR AGGREGATE SEGREGATION LINES EVIDENT FROM DIFFERENT CONCRETE PLACEMENT LIFTS AND D.
MOCKUPS.
ADJACENT FLAT AND RETURN SURFACES WITH GREATER TEXTURE AND/OR COLOR DIFFERENCES THAN THE APPROVEDC.
THE TREAD.
EXCESSIVE AIR VOIDS (COMMONLY CALLED BUG HOLES) LARGER THAN ¼ IN. EVIDENT ON THE TOP SURFACE OFB.
RAGGED OR IRREGULAR SURFACES.A.
PATCHING (BY A TRAINED SKILLED CONCRETE REPAIR PERSON) IS AN ACCEPTABLE REPAIR METHOD.
OF REPAIRS. THE FOLLOWING IS A LIST OF FINISH DEFECTS THAT SHALL BE PROPERLY REPAIRED.
OTHER THAN MINIMAL COLOR OR TEXTURE VARIATIONS FROM THE APPROVED MOCKUP OR EVIDENCE
THE FINISHED VISIBLE (IN THE FINAL INSTALLED POSITION) SURFACE SHALL HAVE NO OBVIOUS IMPERFECTIONS 1.
A. PROVIDE AS-BUILT BOARDWALK DRAWINGS SHOWING ALL CHANGES OR DEVIATIONS FROM FINAL PLANS.
5. AS-BUILT DRAWINGS:
D. PROVIDE WARRANTY DOCUMENTATION. SEE WARRANTY SECTION.
C. PROVIDE DOCUMENTATION OF QUALIFICATIONS. SEE QUALITY ASSURANCE SECTION.
B. PROVIDE SHOP DRAWINGS FOR ALL PRECAST BEAMS, PLANKS, END BENTS AND BENTS FOR APPROVAL.
FDOT 2010 DESIGN STANDARDS 850 AND 851 INCLUDING MOUNTING METHOD.
PROVIDE SHOP DRAWINGS FOR RAILING COMPONENTS FOR APPROVAL TO INCLUDE ALL ITEMS REQUIRED BY A.
SHOP DRAWINGS:4.
SUBMITTED TO THE OWNER'S PERMANENT RECORDS.
THE CONTRACTOR SHALL SUBMIT THE FINAL PLANS. ONE SET OF ALL APPROVED SHOP DRAWINGS SHALL BE
ONCE A BOARDWALK AND RAILING SYSTEM DESIGN HAS BEEN REVIEWED AND ACCEPTED BY THE OWNER, FINAL SUBMITTAL:3.
DOCUMENTATION OF COMPUTER PROGRAMS INCLUDING ALL DESIGN PARAMETERS.4.
CALCULATIONS SHALL INCLUDE A LATERAL STABILITY ANALYSIS PER FDOT STRUCTURES MANUAL, SECTION 3.5.83.
CALCULATIONS SHALL CLEARLY REFER TO THE APPLICABLE AASHTO PROVISIONS.2.
BE SIGNED AND SEALED BY A LICENSED PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF FLORIDA.1.
DESIGN CALCULATIONS SHALL:B.
DESIGN PARAMETERS USED ALONG WITH AASHTO REFERENCES.5.
THEIR CONNECTIONS SUCH AS THE LENGTH, SIZE AND WHERE CHANGES OCCUR; CONNECTIONS; ETC.
DETAILS OF ALL BOARDWALK, RAILING, BEAM, END BENTS, BENTS AND FOUNDATION SYSTEM COMPONENTS AND 4.
HORIZONTAL AND VERTICAL BREAK POINTS, AND LOCATION OF THE FINISHED GRADE.
INDICATE THE ELEVATION AT THE TOP AND BOTTOM OF THE BOARDWALK AND FOUNDATION SYSTEM COMPONENTS, REFLECTS THE PROPOSED VERTICAL ALIGNMENT AS SHOWN ON THE DESIGN PLANS. ELEVATION VIEWS SHALL
FULL ELEVATION VIEW OF THE BOARDWALK, RAILING AND FOUNDATION SYSTEM DRAWN TO SCALE WHICH 3.
THE PROPOSED HORIZONTAL ALIGNMENT AS SHOWN ON THE DESIGN PLANS.
FULL PLAN VIEW OF THE BOARDWALK AND RAILING SYSTEM DRAWN TO SCALE. THE PLAN VIEW MUST REFLECT 2.
SIGNED AND SEALED BY A LICENSED PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF FLORIDA.1.
DETAILED PLANS:A.
FOLLOWING:
SHALL SUBMIT TO THE ENGINEER A DESIGN PACKAGE, WHICH SHALL INCLUDE, BUT IS NOT LIMITED TO, THE
PRELIMINARY SUBMITTALS: PRIOR TO THE START OF FABRICATION OR CONSTRUCTION, THE CONTRACTOR 2.
VIEW, TYPICAL SECTION, FOUNDATION LAYOUT AND CONNECTION DETAILS FOR A TYPICAL SPAN.
1. PRELIMINARY PLANS SHALL BE SUBMITTED WITH THE BID PACKAGE SHOWING A PLAN AND ELEVATION
SUBMITTALS
EFW 03-22
JMHL 03-22
MEASUREMENT AND PAYMENT
ENGINEER PRIOR TO CONSTRUCTION. RAILING, PILES AND TEST PILES ARE NOT INCLUDED IN THE LUMP SUM PRICE.
COMPONENTS AS SHOWN IN THE CONTRACT PLANS. CONTRACTOR SHALL PROVIDE A SCHEDULE OF VALUES TO THE
UNLOADING, ASSEMBLY, AND PLACEMENT OF THE BOARDWALK, BEAMS, SUBSTRUCTURE, AND ALL ASSOCIATED
EQUIPMENT, LABOR AND WORK NECESSARY FOR AND INCIDENTAL TO THE DESIGN, CONSTRUCTION, DELIVERY, SHALL INCLUDE ALL DESIGN, PLANS, SPECIFICATION, SHOP DRAWINGS, CONSTRUCTION PERMITS, MATERIALS, AT THE CONTRACT LUMP SUM PRICE AS LISTED IN THE BID PROPOSAL FOR “BOARDWALK LUMP SUM”. THIS PRICE
PRECAST CONCRETE BOARDWALK, BEAMS, SUBSTRUCTURE, AND ALL ASSOCIATED COMPONENTS SHALL BE PAID FOR
4200 SOUTH JOHN YOUNG PARKWAY
ORLANDO, FLORIDA 32839
(407) 836-7900
ORANGE COUNTY
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
Plotted By: JArnemann 4/17/2023 11:10:24 AM P:\Projects20\20-0318.000_Orange_Co-Lake_Apopka_Trail_Connector_SU\Struct\PlanElev01.DGN
941 Lake Baldwin Lane, Orlando, FL 32814
Phone: (407) 896-0594 Fax: (407) 896-4836
JOCELYN M. HAISCH-LINN, P.E. LAKE APOPKA CONNECTOR TRAIL
STA. 5008+05.00 SHEET FOR MORE DETAILS.
FOUNDATION LAYOUT STA. 5002+67.86 TO
SHALL BE DESIGNED BY PERMATRAK. SEE
*BOARDWALK END BENT/RETAINING WALL
EXIST. FENCE
SEGMENT 2
14'-3"
90°00'00"C L E
A R
¡ PILES (TYP.)
PROFILE GRADE LINE
£ CONSTRUCTION &
PILES (TYP.)
DIMENSION BETWEEN
LONGEST STRAIGHT LINE
T.C. (TYP.)
90°00'00"
BICYCLE RAILING
BRIDGE PEDESTRIAN
SEGMENT 3
4 EQUAL SPACES = 57'-0"
SEGMENT 414'-
6ƅ"
EL. 92.00
STA. 2021+79.78
W/ RAILING - FFBW
BEGIN BOARDWALK
T.C. (TYP.)
90°00'00"
CURVE BL_OCRWF_14
SEGMENT 1
"8 312'-8
EL. 92.00
STA. 2022+79.28
W/ RAILING - FFBW
END BOARDWALK
PT STA. = 2023+01.41
PC STA. = 2022+07.23
R = 134.00
L = 94.18
T = 49.13
D = 42° 45' 29"
Δ = 40° 16' 15" (LT)
PI STA. = 2022+56.36
EFW 03-22
PLAN
B1-01
GENERAL PLAN
STA. 2021+79.78 TO STA. 2022+79.28
LEGEND:
TEST (SPT) SOIL BORING LOCATION
APPROXIMATE STANDARD PENETRATION
NOTES:
DIRECTION OF STATIONING
BFBW LOCATION SHALL BE MAINTAINED.
A BACKWALL WIDTH OF 9 INCHES HAS BEEN ASSUMED. IF OTHER BACKWALL WIDTHS ARE USED, 5.
PILE SPACING MEASURED ALONG £ CONSTRUCTION (UNO).4.
FOR DETAILS REGARDING CONSTRUCTION LIMITS, SEE ROADWAY PLANS.3.
FOR DETAILS REGARDING TRAIL, INCLUDING BOARDWALK VERTICAL PROFILE, SEE ROADWAY PLANS.2.
ELEVATIONS NEAR BEGIN BOARDWALK.
ELEVATIONS PROVIDED ARE AT THE PROFILE GRADE LINE. SEE ROADWAY PLANS FOR ADDITIONAL 1.
S 29°12'25" E
(CURVE BL_OCRWF_14)
HORIZONTAL CURVE DATA
B-1 B-2
P C
S
T A
.2
4200 SOUTH JOHN YOUNG PARKWAY
ORLANDO, FLORIDA 32839
(407) 836-7900
ORANGE COUNTY
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
GROUND LINE
EXISTING
¡ BEAM/PEDESTAL
"2 16"2
10'-0"
& PROFILE GRADE LINE
£ CONSTRUCTION
14'-0" CLEAR
2'-9"2'-9"
9" 9"
15'-6"
PILE (INDEX 455-014) (TYP.)
14" SQ. PRESTRESSED CONCRETE
(APPROXIMATELY 11"x1'-2")
PROPRIETARY BEAM (TYP.)
(APPROXIMATELY 1'-6" DIA. BY 9" TALL)
PROPRIETARY PEDESTAL CAP (TYP.)
(APPROXIMATELY 5ƀ" THICK)
PROPRIETARY CONCRETE DECK
INDEX 515-051)
(GALVANIZED STEEL) (INDEX 515-052 INSTALLED PER
¡ 42" BRIDGE PEDESTRIAN/BICYCLE TYPE 1 PICKET RAILING
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
Plotted By: JArnemann 4/17/2023 11:28:21 AM P:\Projects20\20-0318.000_Orange_Co-Lake_Apopka_Trail_Connector_SU\Struct\TypicalSection01.DGN
941 Lake Baldwin Lane, Orlando, FL 32814
Phone: (407) 896-0594 Fax: (407) 896-4836
LICENSE No. 60103
JOCELYN M. HAISCH-LINN, P.E.
NOTES:
TYPICAL SECTION
B1-02
TYPICAL SECTION
SLOPE: 0.01 UNO FT/FT
CHANGED BY THE CONTRACTOR AND FABRICATOR.
DIMENSIONS PROVIDED ARE APPROXIMATE, AND MAY BE2.
DATA AND EXISTING GROUND LINE PROFILE.
SEE ROADWAY PLANS FOR BOARDWALK VERTICAL PROFILE1.
JMHL 03-22
EFW 03-22
4200 SOUTH JOHN YOUNG PARKWAY
ORLANDO, FLORIDA 32839
(407) 836-7900
ORANGE COUNTY
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
C
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
Plotted By: JArnemann 4/10/2023 8:12:36 AM P:\Projects20\20-0318.000_Orange_Co-Lake_Apopka_Trail_Connector_SU\Struct\FoundLay02.DGN
941 Lake Baldwin Lane, Orlando, FL 32814
Phone: (407) 896-0594 Fax: (407) 896-4836
EXIST. FENCE
(T Y P
(T Y P
PROFILE GRADE LINE
£ CONSTRUCTION &
EL. 92.00
STA. 2022+79.28
W/ RAILING - FFBW
END BOARDWALK
EL. 92.00
STA. 2021+79.78
W/ RAILING - FFBW
BEGIN BOARDWALK
SEGMENT 2
14'-3"
SEGMENT 3
4 EQUAL SPACES = 57'-0"
SEGMENT 414'-
6ƅ"
CURVE BL_OCRWF_14
SEGMENT 1
"8 312'-8
T.C. (TYP.)
90°00'00"
90°00'00"
T.C. (TYP.)
90°00'00"
¡ PILES (TYP.)
PILE (INDEX 455-014) (TYP.)
14" SQ. PRESTRESSED CONCRETE
PT STA. = 2023+01.41
PC STA. = 2022+07.23
R = 134.00
L = 94.18
T = 49.13
D = 42° 45' 29"
Δ = 40° 16' 15" (LT)
PI STA. = 2022+56.36
B1-04
EFW 03-22 FOUNDATION LAYOUT
STA. 2021+79.78 TO STA. 2022+79.28
PLAN LEGEND
14" SQUARE PRESTRESSD CONCRETE TEST PILE
(INDEX 455-014) (TYP.)
14" SQ. PRESTRESSED CONCRETE PILE
TEST (SPT) SOIL BORING LOCATION
APPROXIMATE STANDARD PENETRATION
DIRECTION OF STATIONING
S 29°12'25" E
(CURVE BL_OCRWF_14)
HORIZONTAL CURVE DATA
B-1 B-2
P C
S
T A
.2
4200 SOUTH JOHN YOUNG PARKWAY
ORLANDO, FLORIDA 32839
(407) 836-7900
ORANGE COUNTY
T
F I
C I
C O
E E
T
E C
T R
O N
G I
T A
L
G N
A L
D
L E
G
A
PILE DATA TABLE AND NOTES
B1-05
EFW 03-22
PILE DATA TABLE
DESIGN CRITERIAINSTALLATION CRITERIA
(TONS)
RESISTANCE
BEARING
NOMINAL
(FT)
ELEVATION
TIP
MINIMUM
(TONS)
DRAG
DOWN
(TONS)
RESISTANCE
SCOUR
TOTAL
(TONS)
RESISTANCE
SCOUR
NET
(TONS)
LOAD
UPLIFT
DESIGN
FACTORED
Ø
M P
R E
S S I O
N
TABLE DATE 01/01/16
(TONS)
RESISTANCE
UPLIFT
NOMINAL
Ø
P
L I F
T
(IN)
SIZE
PILE
(FT)
LENGTH
PILE
TEST
(FT)
ELEVATION
JET
REQUIRED
(FT)
ELEVATION
PREFORM
REQUIRED
(FT)
ELEVATION
SCOUR
100-YEAR
(TONS)
LOAD
DESIGN
FACTORED
STATIONING
BENT
14 31 N/A (SEE NOTE 3) 38 N/A N/A 20 N/A N/A N/A N/A N/A N/A
NOTES
Ø
FACTORED DESIGN LOAD + NET SCOUR RESISTANCE + DOWN DRAG ≤ NOMINAL BEARING RESISTANCE
FOR DETAILS REGARDING DRAINAGE, SEE ROADWAY PLANS. 14.
FOR DETAILS REGARDING UTILITIES, SEE UTILITY ADJUSTMENT SHEETS IN THE ROADWAY PLANS.13.
PILES AND NO ADDITIONAL PAYMENT WILL BE PROVIDED.
ALL COSTS ASSOCIATED WITH ALTERNATE DESIGNS, FABRICATION, AND INSTALLATION, SHALL BE INCIDENTAL TO THE COST OF THE PILES AND TEST 12.
DRAWINGS SHALL INCLUDE AN UPDATED FOUNDATION LAYOUT.
PROFESSIONAL ENGINEER FOR REVIEW AND APPROVAL PRIOR TO FABRICATION. IF PILE LOCATIONS OR SPACING ARE CHANGED, THE SHOP
ALTERNATIVE CONCRETE PILING DESIGNS ARE ALLOWED. SUBMIT CALCULATIONS AND SHOP DRAWINGS SIGNED AND SEALED BY A LICENSED FLORIDA11.
ENSURE THAT ACTIVE UTILITIES ARE PROPERLY MAINTAINED DURING CONSTRUCTION.
CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATION TO AVOID DAMAGE. THE CONTRACTOR IS TO
THE CONTRACTOR IS TO VERIFY ALL UTILITIES AND NOTIFY ALL INVOLVED UTILITY COMPANIES PRIOR TO EXCAVATION, PILE DRIVING OR10.
FOR DETAILS REGARDING SPT SOIL BORINGS, SEE "REPORT OF SPT BORINGS" SHEETS. 9.
NO JETTING WILL BE ALLOWED WITHOUT APPROVAL FROM THE ENGINEER.8.
MONITORING IS TO BE INCLUDED IN THE CONTRACT UNIT COST FOR PAY ITEM 999-2, BOARDWALK LUMP SUM.
SPECIFICATIONS SECTION 108. THE COST OF ALL MATERIAL, LABOR, EQUIPMENT AND TIME ASSOCIATED WITH SUCH PROTECTION AND
DURING PILE DRIVING ACTIVITIES, THE CONTRACTOR IS TO PROTECT AND MONITOR EXISTING STRUCTURES IN ACCORDANCE WITH 7.
RESISTANCE. SET CHECK AND RE-DRIVES ARE TO BE CONDUCTED IN ACCORDANCE WITH SPECIFICATIONS SECTION 455-5.11.4.
THE CONTRACTOR IS TO ANTICIPATE SET CHECKS AND RE-DRIVES WILL BE REQUIRED TO ACHIEVE THE REQUIRED NOMINAL BEARING 6.
ELEVATIONS, AND INCLUDE PILE CUT-OFF ELEVATIONS IN SHOP DRAWINGS.
SUPERSTRUCTURE DEPTHS VARY BASED ON PROPRIETARY BOARDWALK SYSTEM USED. CONTRACTOR TO CALCULATE PILE CUT-OFF 5.
PERFORMED ON ALL TEST PILES WITH A PILE DRIVING ANALYZER (PDA) OR APPROVED EQUAL PER SPECIFICATIONS SECTION 455-5.13.
DRIVE TEST PILES IN THE POSITION OF A PERMANENT PILE OR AS DIRECTED BY THE ENGINEER. A DYNAMIC LOAD TEST IS TO BE 4.
MINIMUM TIP ELEVATION IS TO BE IN ACCORDANCE WITH SPECIFICATIONS SECTION 455-5.9.3.
DRIVE PILES TO THE NOMINAL BEARING RESISTANCE IN ACCORDANCE WITH SPECIFICATIONS SECTION 455 AND AS FOLLOWS:2.
ALL PILES ARE TO BE 14" SQUARE PRESTRESSED CONCRETE IN ACCORDANCE WITH STANDARD PLANS INDEXES 455-001, 455-002 AND 455-014.1.
JMHL 03-22
STA. 2022+79.28
STA. 2021+79.78 TO
0.65
REF. DWG. NO.
SHEET NO.
SHEET TITLE:
PROJECT NAME:
DRAWN BY:
CHECKED BY:
DESIGNED BY:
CHECKED BY:
Plotted By: JArnemann 4/10/2023 8:16:40 AM P:\Projects20\20-0318.000_Orange_Co-Lake_Apopka_Trail_Connector_SU\Struct\PileData01.dgn
941 Lake Baldwin Lane, Orlando, FL 32814
Phone: (407) 896-0594 Fax: (407) 896-4836
/6 /2
:0
:0
A
M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2023-24 SHEETINDEX
SQUARE PRESTRESSED CONCRETE PILES
- TYPICAL DETAILS & NOTES
1 1 455-00111/01/22
W3.4 (All others)
W4.0 (30" Piles)
Spiral Ties -
C o v e r
Cover
3"
(Feet)
Length
Pile
Maximum
Transportation Detail
Required Storage and
TYPICAL COVER
DETAIL SHOWING
FOR MOLD FORMS
TYPICAL PILE SHAPE
Compound or an Epoxy Mortar as recommended by the Manufacturer.
Epoxy Compound in accordance with Specification Section 962. Use an Epoxy Bonding
6. Pile Splices: Fill dowel holes and form the joint between pile sections with a Type AB
B. One full turn required for spiral splices.
A. Tie each wrap of the spiral strand to a minimum of two corner strands.
5. Spiral Ties:
under final conditions in accordance with Specification Section 450.
C. Protect all strands permanently exposed to the environment and not embedded
B. Prestressing Strands: Meet the requirements of Specification Section 933.
A. Bars: Meet the requirements of Specification Section 415.
4. Carbon-Steel Reinforcing:
B. High Moment Capacity Piles: 6,500 psi minimum.
A. Piles: 4,000 psi minimum.
3. Concrete strength at time of prestress transfer:
the use of Highly Reactive Pozzolans is required.
C. See “GENERAL NOTES” in the Structures Plans for locations where
B. High Capacity Splice Collar: Class V.
(Index 455-031).
A. Piles: Class V, except use Class VI for High Moment Capacity Pile
2. Concrete:
the Structures Plans.
Capacity Square Prestressed Concrete Pile (Index 455-031) and the Pile Data Table in
Prestressed Concrete Pile Standards (Index 455-012 thru 455-030), the High Moment
1. Work this Index with the Square Prestressed Concrete Pile Splices (Index 455-002), the
L
Chamfer (Typ.)
" 4
31" Rad. or
" Max.4
D
" Max.4
D
" Max.4
D
" Max.4
48 52
107 121
68 87
2, 3, or 4 point
2, 3, or 4 point
3 or 4 point 3 Point
2 Point
1 Point
Support Points
Tie Down and0.21L0.58L
L
0.21L
0.145L 0.355L
L
0.355L 0.145L Tie Down and
Support Points
Tie Down and
Support Points
0.107L0.262L0.262L0.262L0.107L
Pick-up Points
0.145L
L
0.355L0.355L0.145L
L
Pick-up Points
0.21L0.58L0.21L
L
Pick-up Point
0.3L0.7L
PRESTRESSED CONCRETE PILE NOTES:
2-POINT SUPPORT
3-POINT SUPPORT
4-POINT SUPPORT
STORAGE AND TRANSPORTATION SUPPORT DETAILSPILE PICK-UP DETAILS
3-POINT PICK-UP
2-POINT PICK-UP
1-POINT PICK-UP
TABLE OF MAXIMUM PILE PICK-UP AND SUPPORT LENGTHS
D = Square Pile Size (inches)
24 30181412 Pick-Up Detail
/6 /2
:0
:1
A
M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
SQUARE PRESTRESSED CONCRETE PILE SPLICES
11/01/22 1 1 455-002 dowels in place to fill hole with
Epoxy compound
(see Splice Details) preformed holes
" Ø Drilled orƂ1
Dowels
No. 10 epoxy compound
Form to retain
Full epoxy compound joint
See Section F-F.
steel cast with pile.
Auxiliary reinforcing
Detail A
See
Dowels
No. 10
Detail A
See
Dowels
No. 10
Build-up
Full length of
No. 10 Dowels
Detail A
See
BEFORE BONDING
SPLICE
PILE SPLICE DETAIL
PRESTRESSED PRECAST
DRIVABLE PLANNED
PILE SPLICE DETAIL
PRESTRESSED PRECAST
DRIVABLE UNPLANNED
pile (see Note No. 4)
4'-2" long, in driven
Preformed holes, required flat surface
No chamfer, compound joint
Full epoxy
PILE BUILD-UP DETAIL
REINFORCED C-I-P
UNPLANNED
or Footing
Bent Cap, Pile Cap
C-I-P Concrete
Elevation
Pile Cut-off
See Note 5.
Elevation;
Pile cut-off
Cap/ Footing to
Extended into
No. 10 Dowels
-0
M a x development as approved by the Engineer.
5. For tension piles where top of Prestressed Pile is less than 3 feet below Pile Cut-off Elevation, extend No. 10 Dowels into cap beyond Pile Cut-off Elevation to achieve
Use 2" diameter ducts with a minimum corrugation (rib) height of 0.12 in. fabricated with either welded or interlocked seams. Galvanizing of welded seams is not required.
holes; use either removable preforming material or stay-in-place corrugated galvanized steel ducts meeting ASTM Specification A653, Coating Designation G90, 26 gauge.
4. When preformed dowel holes are used, continue the 1" spiral tie pitch to 4'-0" below the head of the pile, See Index 455-018, 455-020 & 455-024. For preformed
Mechanical Pile Splices on the Approved Products List (APL).
3. When pile splices are necessary due to shipping and handling limitations, use the "Drivable Planned Prestressed Precast Splice Detail" or
2. Prestressing strands, spiral ties and/or reinforcement are not shown for clarity.
1. For Sections D-D, E-E, & F-F see Index 455-012 thru 455-030 for applicable concrete pile size and Pile Splice Reinforcement Details.
NOTES:
PILE BUILD-UP DETAIL
REINFORCED PRECAST
NON-DRIVABLE UNPLANNED
AFTER BONDING
SPLICE
D ri v e n p re s tr e s s e d p il e
D o w e l E x te n s io n
P lu s ƅ
D o w e l e x te n s io n
B u il d
-u p s e c ti o n
S p li c e o r
Gasket ƀ
(f in a l th ic k n e s s ƅ
(a p p li e d
D o w e l e x te n s io n
D ri v e n p re s tr e s s e d p il e
M in im u m
S p li c e S e c ti o n
S p li c e s e c ti o n
D o w e l e x te n s io n
D ri v e n p re s tr e s s e d p il e
(T y p
S p li c e s e c ti o n
M in im u m
S p li c e S e c ti o n
1" Cover at End
P il e
B u il d
-u p
D ri v e n p re s tr e s s e d p il e
(T y p
D o w e l e x te n s io n
DETAIL A
E
FF
E
EEDD
M in im u m
M a x im u m
P il e B u il d -u p
(T y p
D o w e l E m b e d m e n t
DD
Build-up
C-I-P Pile
Prestressed Pile
Top of
/1
/2
:4
:5
A
M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
14" SQUARE PRESTRESSED CONCRETE PILE
01/01/12 1 1 455-014
(Typ.)
3" Cover
(Full Length)
4 ~ No. 8 Bars
Dowels
4 ~ No. 10
Spiral Ties
W3.4
(Typ.)
3" Cover
Strands
Prestressing
Dowels
4 ~ No. 10
(Typ.)
3" Cover
Spiral Ties
W3.4
Strand Patterns
See Alternate
Spacing
Spiral Tie
" Ø, Grade 270 LRS, at 16 kips8
16 ~
" Ø, Grade 270 LRS, at 21 kips16
12 ~
" Ø, Grade 270 LRS, at 31 kips2
8 ~
" Ø (Special), Grade 270 LRS, at 31 kips2
8 ~
8 ~ 0.6" Ø, Grade 270 LRS, at 33 kips
6" pitch, full length
W3.4 Spiral Ties @ concrete section of the pile.
The total strand pattern shall be concentric with the nominal strands equally spaced between the corner strands.
Place one strand at each corner and place the remaining
The strands shall be located as follows:
2. Any of the given Alternate Strand Patterns may be utilized.
Prestressed Concrete Pile Splices.
Square Prestressed Concrete Piles and Index 455-002 - Square
1. Work this Index with Index 455-001 - Typical Details and Notes for
NOTES:
14"
"4
1"4
(See Non-Drivable Unforeseen Reinforced Precast Splice Detail)
14"
"4
1"4
(See Drivable Unforeseen Prestressed Precast Splice Detail)
14"
W3.4 Spiral Ties
16 Turns @ 3" Pitch
5 Turns @ 1" Pitch
1" 6" Pitch 16 Turns @ 3" Pitch
5 Turns @ 1" Pitch
1"
A
A
ELEVATION
ALTERNATE STRAND PATTERNS
SECTION A-A
PILE SPLICE REINFORCEMENT DETAILS
SECTION E-E
SECTION D-D" x 3" Chamfer (Typ.)4
� Pile
� Pile
� Pile
� Pile
/1
/2
:2
:5
A
M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
BRIDGE PEDESTRIAN/BICYCLE RAILING
(STEEL)
1 3 11/01/17 515-051 spaced between open joints) top of Concrete Curb (Equally
" V-Groove in both faces &2
Open Joint
� Intermediate
Curb
Concrete
� Post� Post
6" Max.
7" Min.6" Min.See Detail "B", Sheet 3
Rail Field Splice Joint (Typ.)
Post (Typ.)
(Scheme 2 shown with Post "A", other Schemes similar, Reinforcing Steel not shown for clarity)
ELEVATION OF INSIDE FACE OF RAILING
4ƃ" Max. Gap
Type 1 - Picket Infill Panel shown
Varies (See Plans)
Infill Panel Type
See Detail "B", Sheet 3
Rail Expansion Joint (Typ.)
5'-7" (Max.) ~ Type "B" Post Only
7'-3" (Max.) ~ Type "B" Post
5'-7" (Max.) ~ Type "A" Post or
Approach Slab
& Begin or End Bridge
Front Face of Backwall 1'-0"
Min.Bridge Deck/Sidewalk
Deck Joint *
Open Joint (6)
" Intermediate4
1'-0"
Min. Min. 6"
" V-Groove2 1Spacing
Begin or End Approach Slab
Edge of Approach Slab (Coping)
Approach Slab Concrete Curb
Inside face of spaced between open joints) top of Concrete Curb (Equally " V-Groove in both faces and2
Coping (Typ.)
Bridge Deck/Sidewalk
" Intermediate 4
(Scheme 2 shown, other Schemes similar, Reinforcing Steel not shown for clarity)
PLAN
Approach Slab
Begin or End
@ 70°F
30'-0" (Maximum)
48" SHBR**
42" PBR**
Silicone Sealant for Pre-cured
See Sheet 3
Deck Joint (5) *
Open Joint (6C) railing continuation or termination see Contract Plans for actual
Index 515-052 Railing shown, and reinforcing steel (Scheme 2) are included in the bridge deck quantities.
7. Payment: Support bracket (Scheme 3) is incidental to the cost of railing. Curb concrete traffic railing.
C. Provide ¾” Intermediate open joints in curbs coinciding with the ¾” joints in the level transversely. See Concrete Curb Details Sheet 3.
B. Construct Concrete Curb (Scheme 2) vertical with the top surface finished
A. Match open curb joints at Deck Expansion Joint locations to the deck joint dimension.
6. Curbs:
B. For treatment of railings on skewed bridges see Index 521-427.
must be reduced to 3½”.
between adjacent pickets, or panels at Rail Expansion Joints above Deck Joints
A. For thermal movement greater than 4” (up to a maximum of 5”), clear opening
5. Railings:
concrete type, deck expansion joint locations and orientations, and thermal movement.
4. See Structures Plans, Superstructure Sheets for bridge information including pads that meet the requirements of Specification Section 932 for Ancillary Structures.
D. Bearing Pads: Provide ƃ” Plain, Fabric Reinforced or Fabric Laminated bearing
C. Pre-cured Silicone Sealant: Specification Section 932
B. Concrete: Same as bridge deck
c. Bottle-guard (Schemes 1 & 3) L-shape: ASTM A36
b. Support Bracket (Scheme 3) L-shape and Stiffener Plate: ASTM A36
a. Fasteners: Hex Head Bolt ASTM A307, Hex Nuts ASTM A563, Washers ASTM F436
A. Steel: Galvanized after fabrication
3. Materials:
Specification Section 515. Refer to the SPI for Design Criteria and Limits of Use.
2. Work this Index with Index 515-052 Bicycle/Pedestrian Railing Details (Steel) and
1. Shop Drawings are required.
NOTES:
PBR~Pedestrian/Bicycle Rail
** SHBR~Special Height Bicycle Rail
Deck Joint at � Pier or Intermediate Bent similar.
* Deck Joint at Begin Bridge or End Bridge shown;
/1
/2
:2
:5
A
M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
11/01/17 2 3 515-051
"8
"8
Embedment
1'-0" Min.
" Cope2
Termination (Typ.)
" (Max.) Weld2
1"
"2
L8 x 6 x
" ℅ StiffenerƁ
Bridge Deck non-shrink grout
Fill void with
� Bolt & Post
" ℅16
4"4"
"2 12 "2 for Anchor Bolts " Ø Holes16
� Bolt & Post
" ℅ Stiffener4
Angle Assembly "2
1� L8 x 6 x
Angle Assembly
� Bolt, Rail Post &
"2 114"
3""2 12"2
4""2
3"
(Typ.)
" ℅ Stiffener4
SCHEME 3 - SIDE-MOUNTED SUPPORT BRACKET DETAILS
ELEVATION VIEW TYPICAL SECTION
PLAN VIEW
PLATE WASHER DETAIL
Long Slotted Hole
" ƈƎ" x 2
(Centered)
" Ø HoleƎ
Drilled Hole
Ɔ" Ø Core
2" (Typ.)
(Typ.)
Bottle Guard
3"
11"
Anchor Hex Nut & Flat Washer " Ø x 1'-2" Adhesive4
32 ~
Pad (8" x 11") " Thick Bearing8
E m b e d
@ 1'-0" sp.
Bars 4P
4" 4" "2
Const. Joint permitted
(away from Coping) Slope 2% Max.
V a ri e s th ic k n e s s
D e c k
(D e c k
M in
Embedment
1'-0" Min.
(M in
Bars 4S
8"
C o v e r (T y p
"4
Bridge Coping
(See Plans) to be removed
Existing railing
� Bolts & Post � Bolts & Post
Hole
Drilled
Core
1" Ø chamfers
Curb with Ƃ"xƂ"
� Bolts & Post
"2
Bridge Deck Sidewalk le n g th
B o lt from drop-off) Slope 2% Max. (away
(centered) " Ø Hole16
Coping
Bridge
M in
M in
6"
T h ru
-B o lt
O p ti o n B
A d h e s iv e A n c h o r
(O p ti o n A
E m b e d
Detail on Sheet 3)
Bottle-Guard (See ƃ" Thick Bearing Pad (Typ.)
S
H B
R
P
B R ƃ" Thick Bearing Pad (Typ.)
WASHER DETAIL
THRU-BOLT PLATE
Ɖ" ℅
P
B R
S
H B
R fo r
S H
B R fo r P
B R
CURB MOUNTED RAILING
TYPICAL SECTION THROUGH
SCHEME 2 -
ƃ" Thick Bearing Pad (Typ.)
& Plate Washer under Head
Hex Nuts, Flat Washer under Nut
Ɔ" Ø Hex Head Bolt with double
SIDE MOUNTED RAILING (RETROFIT)
TYPICAL SECTION THROUGH
SCHEME 3 -
S
H B
R
P
B R
Section
See Typical
Detail on Sheet 3)
Bottle-Guard (See
Flat Washer
SCHEME 1 - TYPICAL SECTION THROUGH DECK MOUNTED RAILING
(Thru-Bolt Option)
SCHEME 1B - DETAILS
(Adhesive Anchor Option shown)
SCHEME 1A - DETAILS
Plate Washer
Thru-Bolt
Nut & Plate Washer under Head
Hex Nut, Flat Washer under
Ɔ" Ø Hex Head Bolt with and Plate Washer under Head
Hex Nut, Flat Washer under Nut
1 ~ Ɔ" Ø x 3" Hex Head Bolt with
Single-Slope shown, see Plans)
Schemes (Type Varies, 36"
Traffic Railing required for all
Index 515-052 Railing
Pedestrian/Bicycle Railing
Index 515-052, Bicycle Railing
515-052, Pedestrian/
Modified height Index Railing
Pedestrian/Bicycle
Index 515-052, /1
/2
:2
:5
A
M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
11/01/16 3 3 515-051
2"±
1'-2"
2"
6" Min.
T y p
S lo t
8" Top Rail or
Curb Intermediate Open Joint
") ~ Field Splice Slip Joint or4
" (± 4
Bottom Rail section
Intermediate or
Handrail Section
Top Rail or
Pickets (Typ.)
DETAIL "B" EXPANSION JOINT (FIELD SPLICE SIMILAR)
ROUND RAILS - TOP RAIL OR HANDRAIL
1"
SQUARE RAILS - INTERMEDIATE OR BOTTOM RAIL
"3
Set Screws *
2"
Posts
Posts
Expansion Joint
Connection
Field Splice & Typ. Post
Deck Expansion Joint
Field Splice Slip Joint ƀ"R (Typ.)
6Ƃ"
1'-5"
3" Min.
3" Min.6Ƃ"
6" Min.
3" Min.
(bottom only)
Ƈ" Slit
1" NPS (Sch. 40) for handrails
2.50 OD x 0.125 Wall for top rail
Steel Sleeve:
and bottom rails for intermediate
1.50 OD x 0.125 Wall
Steel Sleeve:
SLEEVE DETAIL (Bottom Side Shown)
INTERMEDIATE OR BOTTOM RAIL - STEEL
but not greater than 3".
**** Expansion Joint opening shall match the clear opening in the deck joint greater than 2".
*** Increase handrail sleeve embedment to 8" for Expansion Joint openings
** Embedded length may be 4" for plug welded connection.
substituted for the two set screws at expansion joints.
set flush against the rail surface. A Ƃ" Ø plug weld may be
Set Screws along outside face of railing. Set screws must be
* Ɓ" Ø x Ƃ" Pan Head Stainless Steel (Type 316 or 18-8 Alloy)
(Expansion sides only)
1" Picket Slot movement
6" Max. @ maximum
6" **
6" **
6" *** Handrail
Varies **** ~ Deck Expansion Joint
Sealant (4" wide)
Pre-cured Silicone
AT INTERMEDIATE OPEN JOINT
DETAIL "A" - SECTION
SCHEME 3 - BOTTLE GUARD DETAIL
Bottom Rail
@ 2'-0" sp.
Screws (18-8 SS)
#10 x ƅ" Pan Head
(Post Not Shown for Clarity)
TYPICAL SECTION THROUGH BOTTOM RAIL
Ɓ"
Ɓ"
SCHEME 1 - BOTTLE GUARD DETAIL
(Post Not Shown for Clarity)
TYPICAL SECTION THROUGH BOTTOM RAIL
Bottom Rail
@ 2'-0" sp.
Screws (18-8 SS)
#10 x ƅ" Pan Head
Ɓ" Ɓ" and Screws
� Rail, Bottle-Guard
1ƀ" x 2ƀ" x ƃ" �
Bottle Guard
1ƀ" x 1ƀ" x ƃ" �
Bottle Guard
Guard and Screws
� Rail, Bottle-
See Sheet 1 for Bridge Railing Notes.
CROSS REFERENCE:
CY/LF
LB/LF
As Reqd.
As Reqd.
SCHEME 2 - CONCRETE CURB DETAILS
CURB REINFORCING STEEL NOTES:
INTERMEDIATE JOINT SEAL NOTE:
Concrete
Reinforcing Steel 4.01
0.0124
D19.7 (Horizontal) (Typ.)
D19.7 (Vertical)
Lap
1'-9" Min.
Splice Each Longitudinal Wire)
D19.7 or #4 Bar (Lap
(Typ.)
1'-0" 4"
D19.7 (Typ.)
" are not permitted.4 3 greater than 4
NOTE: Place wire panels to minimize the end overhang. End Overhangs
4"
2'-0"4
4S
P
QUANTITYUNIT
QUANTITIES (SCHEME 2)
ESTIMATED CONCRETE CURB
ITEM
BAR 4SBAR 4P
MARK SIZE LENGTH
BILL OF REINFORCING STEEL
STEEL BENDING DIAGRAMS
CONVENTIONAL REINFORCING
(Between WWR Sections)
SPLICE DETAIL
ALTERNATE REINFORCING (WWR) DETAILS
application of bonding agent.
and remove all curing compound and loose material from the surface prior to
Pre-cured Silicone Sealant. Apply sealant prior to any Class V finish coating
At Intermediate Open Joints, seal the lower 6" portion of the open joint with of Specification Section 931 may be used in lieu of all Bars 4P and 4S.
5. Deformed Welded Wire Reinforcement (WWR) meeting the requirements
Bar splices for Bars 4S shall be a minimum of 1'-8".
4. Bars 4S may be continuous or spliced at the construction joints.
3. All reinforcing steel at the open joints shall have a 2" minimum cover.
the same as detailed for an 8" deck.
2. The reinforcement for the curb on a retaining wall shall be
1. All bar dimensions in the bending diagrams are out to out. Ƃ" Chamfer (Typ.)
sharp edges (Typ.)
of rails to remove
Round over both ends
WWR SECTION DETAIL
/6 /2
:0
:3
P M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2023-24 SHEETINDEX
81515-052
PEDESTRIAN/BICYCLE RAILING (STEEL)
11/01/18
NOTES
MEMBER DESIGNATION
DIMENSION
OUTSIDE
THICKNESS
WALL
Top Rail
Top Rail Joint/Splice Sleeves
Intermediate & Bottom Rail
Int. & Bottom Rail Post Connection Sleeve
Handrail Joint/Splice Sleeves
Handrails
Handrail Support Bar
1ƀ" NPS (Sch. 40)
Ƃ" Ø Round Bar
2.50" x 1.50"
2.00" x 2.00"
1.500"
1.900"
0.750"
0.750"
0.125"
0.145"
0.125"
0.188"
N/A
N/A
Ƃ" Ø Round Bar
TABLE 1 - RAILING MEMBERS
(1)
VariesVaries (See Details) VariesInfill Panel Members (Types 2 - 5)
Pickets (Type 1 Infill Panel)
(42" Height shown, 48" Height Similar)
3D VIEW OF RAILING WITH TYPE 1 - PICKET INFILL PANEL
2.500" 0.125"
3.000"
2.875"
0.120"
0.120"
(1)
2.50" x 1.50" 0.188"Post "B"
Post "A"
End Hoops 3.000"
2.875"
0.120"
0.120" except that Post Connection Sleeve must be 1Ɓ" NPS (Sch. 40).
(1) 0.125" wall thickness permitted for rails with post spacings less than 5'-8", TABLE 1 NOTES:
1.500"
1.315"
0.125"
0.133"
Detail “K”, Sheet 3
Detail “B”, Sheet 4
CROSS REFERENCES: Detail “A”, Sheet 4
HSS 1.500 x 0.125
1" NPS (Sch. 40)
HSS 1.500 x 0.125
HSS 2 x 2 x ƈ
HSS 2.500 x 0.125
HSS 3.000 x 0.120
2ƀ" NPS (Sch. 10)
HSS 3.000 x 0.120
2ƀ" NPS (Sch. 10)
HSS 2ƀ x 1ƀ xƈ
HSS 2ƀ x 1ƀ xƃ
12. Installation: Cutting of reinforcing steel is permitted for post installed anchors.
B. Three or more steps
A. Grades Steeper than 5%,
11. Handrails are required and must be continuous at landings for:
10. For curved longitudinal alignments, shop bend the top and bottom rails and handrails to match the alignment radius.
corner but not at the corner apex.
, position posts a maximum of 2’-0” each side of the o
9. For changes in tangential longitudinal alignment greater than 45 mitered end sections when handrails are not required.
8. Make corners and changes in tangential longitudinal alignment with a 9” bend radius or terminate adjoining sections with
7. For intermediate and bottom horizontal rails, the screwed joints shown may be substituted with alternate joints shown in detail “K”.
top rail must be continuous across a minimum of two posts.
6. Field splices are similar to the Expansion Joint Detail and may be approved by the Engineer to facilitate handling; but the
Expansion Joint.
5. Maximum spacing between expansion joints is 40’-0”. Locate an Expansion Joint between the posts on either side of the Deck
4” sphere requirement is indicated in the Data Tables.
parallel to the longitudinal grade. Maintain a maximum clear opening of 5Ɔ” for standard installations and 3Ɔ” when a
4. Fabricate pickets and vertical panel elements parallel to the posts; except Type 2, 3 and 5 panel infills may be fabricated requirements of Specification Section 932 for Ancillary Structures.
Bearing Pads: ƃ” Plain, Fabric Reinforced or Fabric Laminated pads that meet the H.
G. Shims: ASTM B209 Alloy 6061
e. Plate Washers: ASTM A36 or ASTM A706 Grade 36.
d. Flat Washers: ASTM F436
c. Hex Nuts: ASTM A563
b. Adhesive Anchors: ASTM F1554 fully threaded rods, Grade 55
2. Ɗ” four bolt option, Grade 55
1. Ɔ” diameter single bolt option, Grade 36
a. Hex Head Bolts: ASTM A 307
F. Galvanized Steel Fasteners: coated in accordance with Specification Section 962.
E. Stainless steel (SS) screws: Type 316 or 18-8 Alloy
D. U-Channels and filler plates: ASTM A36 or ASTM A1011 (Grade 36).
C. Steel Plate: ASTM A36 or ASTM A709 Grade 36
B. Structural Tube: ASTM A500 Grade A, B, C, or D or ASTM A501 and ASTM A36 for bars.
A. Pipe Rails and Pickets: ASTM A500 Grade B, C or D, or ASTM A53 Grade B for standard weight pipe (Schedule 40)
3. Materials:
2. For bridge mounted railings work this Index with Index 515-051 Bridge Bicycle/Pedestrian Railing
1. Shop Drawings are required; see Specification Section 515
Notes:
/6 /2
:0
:3
P M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2023-24 SHEETINDEX
82515-052
PEDESTRIAN/BICYCLE RAILING (STEEL)
11/01/16
6"
9"R
5"
5"
" NPS Sch. 40ƀHandrail ~ 1 continuous at landings between runs)
Handrail required for ramps (Handrail �…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .