This is an Exhibit B Tenant Space Configuration document for the Illinois Department of Central Management Services (CMS) outlining detailed space requirements for the Illinois Department of Employment and Community Services (IDEC) in Chicago, Cook County. The document specifies that CMS seeks 23,803 square feet of general office space (RFI L6930) to accommodate IDEC operations. The space configuration requires 134 total personnel positions distributed across various office types, including 2 executive offices, 7 medium offices, 20 standard offices, 10 small offices, 30 medium cubicles, 25 standard cubicles, and 40 open bench workstations. Additionally, the tenant space must include 5,425 square feet of common office space encompassing conference rooms, break rooms, reception areas, and storage facilities; 3,091 square feet of specialty spaces including file rooms, wiring closets, copy/mail rooms, computer rooms, restrooms, and janitorial areas; and 3,967 square feet of flex space for mechanical, electrical, plumbing, data closets, and circulation. The document was prepared by Space Planner D. Hernandez on May 11, 2026, and establishes minimum standards for initial tenant build-out based on the Using Agency's operational needs.
All occupiable tenant space is preferably to be located within a contiguous area above grade level, though the State may consider multiple floors or non-contiguous spaces if they meet operational requirements. The space must comply with CMS Building Program Standards regarding exterior needs, performance standards, and material quality. Responses should include a minimum of 10 parking spaces contiguous with the building or in nearby lots, with at least 2 ADA-accessible spaces on an accessible route to the main entrance. All data wiring must meet Department of Innovation and Technology (DoIT) requirements with Category 6 or better cabling installed per IEEE and manufacturer specifications, with racks conforming to TIA-569 standards. The office percentage totals 29 percent, falling within the benchmark range of 20-32 percent. The document emphasizes that all work defined and reasonably implied by the programmatic information shall be incorporated into proposals for initial tenant build-out, and evaluation of responses will be made solely at the State's discretion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Lease Document Template V2.2026.05.docx | DOCX document | |
| L6930 Exhibit A - Boundary Map.pdf | ||
| L6930 Copy of RFI Template Response (FINAL).xlsx | XLSX spreadsheet | |
| L6930 rfi leasing template v 25 2 6 17 25 7~2.docx | DOCX document | |
| disclosure for leasing vendors v 26 1 5.docx | DOCX document | |
| ipg active registered disclosure for leasing vendors v.25.1 11.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Agency: IDEC
Location: CHICAGO
STATE OF ILLINOIS
EXHIBIT B - TENANT SPACE CONFIGURATION
L6930
Date: 05/11/2026
Space Planner: D.Hernandez
The following descriptions of programmed spaces define the initial minimum standards to fulfill the Using Agency's needs. The requested interior space categories includes the following:
1. Personnel Space - Business Units
1.a. Local Office
2. Common Office Space
3. Specialty Space Requests
4. Circulation/Support/Flex Space
5. Summary
All responses shall incorporate the standard defined below. Unless otherwise specifically noted herein, the [State and the] Using Agency prefers all occupiable tenant space be located within a contiguous space and above grade level, however [the State] the Using Agency may, in its sole discretion, may consider multiple floors or non-contiguous space(s) included in an offer if it is determined that the offer meets the client agency’s operational needs. Additionally, Building Program Standards (refer to link below) are defined to include exterior needs and provide a standard for performance and quality of materials required. All work defined and reasonably implied by programmatic information herein shall be incorporated into proposals for the initial tenant build-out.
Building Program Standards:
https://cms.illinois.gov/content/dam/soi/en/web/cms/agency/property/leasing/documents/buildingprogramstandards-after7-21.pdf
In the event a response is submitted for consideration of property where these Tenant Space Configurations may be reasonably met without complete demolition and re-construction of the space, but may require some interior upgrades and alterations, the Tenant Space Configurations shall represent performance and spatial guidelines. Evaluation of such response will require a review of the site and concurrence by the state on the extent to which the property reasonably meets the performance and spatial guidelines or will meet the guidelines based upon proposed improvements detailed in the response. Unless specific exceptions to the performance and spatial guidelines are acceptable to the state as may be offered, this Tenant Space Configuration document will serve as the definitive improvement exhibit to the lease without regard to the scope of work required to deliver the space in accordance with all standards and requests noted herein. Determinations of meeting the performance and spatial guidelines set forth herein shall be made solely at the state's discretion to favor the interest of the state.
All responses shall also provide a minimum of 10 parking spaces, contiguous with the building or a parking structure or surface lot(s) in close proximity to the proposed property, including 2 ADA-accessible spaces on an accessible route to the main building entrance. Except for reasonable accomodation, parking provided is for Using Agency clients and state-owned vehicles only.
The parking lot(s) designated for the proposed building must be completely paved by asphaltic cement, concrete or approved equal, and shall be lighted and striped. Paving is to be done in a manner that will provide efficient drainage. Lighting shall provide at least minimum illumination of the parking area, building access routes and entrances.
Data wiring and racks shall be installed in accordance with the Department of Innovation and Technology (DoIT) requirements. Rack placement shall confirm to TIA-569 standard. Rack clearances shall be 7" minimum from walls at sides, rear clearance shall be minimum of 24" from walls (36" clearance preferred), front clearance shall be 36" minimum (48" clearance preferred). All data wiring is to be of Category 6 or better cabling and installed within IEEE and manufacturer specifications. All connections are to be terminated in numerical sequence starting with "1". No gaps in numbering shall be allowed. For each wiring closet, all jacks shall be numbered consecutively with no breaks in numbering and labeled on. There shall never be more than one connection terminated in a wiring closet with the same number. Enough service loop shall be available to move panels anywhere within a rack.
Exhibit B Template - Revised 4/21/2022 Page 1 of 12 https://cms.illinois.gov/content/dam/soi/en/web/cms/agency/property/leasing/documents/buildingprogramstandards-after7-21.pdf
STATE OF ILLINOIS
EXHIBIT B - TENANT SPACE CONFIGURATION
L6930
Date: 05/11/2026
Space Planner: D.Hernandez
Total Personnel Space
11320
Total BU Square Feet
11320
1.a. Local OfficeType of Space SF - Each SF - Total Divider Electrical Outlets Voice/Data Outlets Other
2 Executive Office 250 500 Enclosed Walls 4 duplex wall outlets 2 wall outlets Keyed Lockset
7 Medium Office 150 1050 Enclosed Walls 4 duplex wall outlets 2 wall outlets Keyed Lockset
20 Standard Office 120 2400 Enclosed Walls 4 duplex wall outlets 2 wall outlets Keyed Lockset
10 Small Office 100 1000 Enclosed Walls 4 duplex wall outlets 2 wall outlets Keyed Lockset
30 Medium Cubicle 48 1440 60" High Panels 2 floor/partition/wall outlets
1 floor/partition/wall outlet
25 Standard Cubicle 36 900 60" High Panels 2 floor/partition/wall outlets
1 floor/partition/wall outlet
Bench (Open Interior
Workstation) 30 1200 60" High Panels
2 floor/partition/wall outlets
1 floor/partition/wall outlet
1.a. Local Office
1. Personnel Space - Business Units
Exhibit B Template - Revised 4/21/2022 Page 2 of 12
STATE OF ILLINOIS
EXHIBIT B - TENANT SPACE CONFIGURATION
L6930
Date: 05/11/2026
Space Planner: D.Hernandez
Exhibit B Template - Revised 4/21/2022 Page 3 of 12
STATE OF ILLINOIS
EXHIBIT B - TENANT SPACE CONFIGURATION
L6930
Date: 05/11/2026
Exhibit B Template - Revised 4/21/2022 Page 4 of 12
STATE OF ILLINOIS
EXHIBIT B - TENANT SPACE CONFIGURATION
L6930
Date: 05/11/2026
Exhibit B Template - Revised 4/21/2022 Page 5 of 12
STATE OF ILLINOIS
EXHIBIT B - TENANT SPACE CONFIGURATION
L6930
Date: 05/11/2026
Space Planner: D.Hernandez
Total Common
Space
# Type of Space SF - Each SF - Total Divider Lighting Electrical Outlets Voice/Data Outlets Other
1 Medium Huddle 100 100 Open Area 50 foot-candle minimum
4 duplex wall or floor outlets
2 Large Huddle 165 330 Open Area 50 foot-candle minimum
4 duplex wall or floor outlets
3 Small Conference 165 495 Enclosed Walls 50 foot-candle minimum 4 duplex wall outlets 4 wall outlets
On Video Conference wall, Data/Electrical wall outlet at
60" and Data/Electrical wall outlet at 18" AFF.
2 Medium Conference 273 546 Enclosed Walls 50 foot-candle minimum 6 duplex wall outlets 4 wall outlets
On Video Conference wall, Data/Electrical wall outlet at 60" and Data/Electrical wall outlet at
18" AFF., privacy locksets.
Large Conference
Alt. 2A/2B 750 750 Enclosed Walls
50 foot-candle minimum 8 duplex wall outlets 4 wall outlets
On Video Conference wall, Data/Electrical wall outlet at
60" and Data/Electrical wall outlet at 18" AFF.
1 Medium Break Room 250 250 Kitchenette 50 foot-candle minimum
2 duplex GFCI outlets above counter and 6 duplex wall outlets including dedicated wall outlet for refrigerator.
N/A
Include 10 LF of cabinets and counters with a stainless steel double compartment sink w/ hot & cold water; minimum clearance opening below sink of 30" width, 29" height & 19" depth for access by wheelchair users); Resilient floor finish;
gypsum wallboard ceiling; flush mounted ceiling fixtures.
2. Common Office Space
Exhibit B Template - Revised 4/21/2022 Page 6 of 12
STATE OF ILLINOIS
EXHIBIT B - TENANT SPACE CONFIGURATION
L6930
Date: 05/11/2026
Space Planner: D.Hernandez
1 Large Break Room 378 378 Kitchenette 50 foot-candle minimum
3 duplex GFCI outlets above counter and 8 duplex wall outlets including two dedicated wall outlets for refrigerators and two vending machines.
N/A
Central location for staff use.
Include 12 LF of cabinets and counters with a stainless steel double compartment sink w/ hot
& cold water; minimum clearance opening below sink of 30" width, 29" height & 19" depth for access by wheelchair users); Resilient floor finish; gypsum wallboard ceiling; flush mounted ceiling fixtures.
1 Small Reception 120 120 Open Area 50 foot-candle minimum 4 duplex wall outlets 4 wall outlets
Must be located at building entrance in non-secure area.
1 Medium Storage Room 250 250 Enclosed Walls 20 foot-candle minimum 4 duplex wall outlets
One (1) wall outlet located within five (5) feet and on same wall as entry door
Keyed Lockset
2 Large Storage Room 425 850 Enclosed Walls 20 foot-candle minimum 4 duplex wall outlets
One (1) wall outlet located within five (5) feet and on same wall as entry door
Keyed Lockset
1 Open Space 1356 1356 Per local building code and using agency requirements
Per using agency requirements. Refer to the "Other" column
Data for any additional eqipment
(ie. Printers/scanners/phones)
Exhibit B Template - Revised 4/21/2022 Page 7 of 12
STATE OF ILLINOIS
EXHIBIT B - TENANT SPACE CONFIGURATION
L6930
Date: 05/11/2026
Space Planner: D.Hernandez
Total Specialty Space
Type of
Space SF - Each SF - Total Divider Lighting Electrical Outlets Voice/Data Outlets Other
5 File Room 200 1000 Enclosed Walls 50 foot-candle minimum
Per local building code and using agency requirements
1 floor/partition/wall outlet Hirsch Access Control
Wiring Closet
(IDF)
150 150 Enclosed Walls
20 foot-candle minimum
4 - Dedicated 20A circuits with NEMA 5-
20r receptacles; 1 -dedicated 30A circuit with NEMA L5-30r locking receptacle for closets supporting more than 96 user devices. 2 - standard duplex outlets.
4 wall outlets
Minimum 1 per floor. Minimum
12 strands Single Mode or
Multimode Fiber between closets. Min. 8 ft ceiling ht. Hirsch keyless entry system.
Copy / Mail
Room 80 240 Enclosed Walls
50 foot-candle minimum
Per local building code and using agency requirements
Four (4) wall outlets. Two (2) data port for each copier
Sufficient grounded electrical outlets
(30amp and 20amp outlets) to supply tenant equipment needs. Built-in cabinetry with countertops. Verify equipment list with Tenant. Sufficient space thruout facility for seven (7) copiers.
Computer
Room 150 150 Enclosed Walls
50 foot-candle minimum 4 duplex wall outlets 2 wall outlets
Mother's
Room 80 80 Enclosed Walls
50 foot-candle minimum
Per using agency requirements N/A
To be located in non-secured area with locating door hardware indicating 'IN USE / VACANT'.
3. Specialty Space Requests
Exhibit B Template - Revised 4/21/2022 Page 8 of 12
STATE OF ILLINOIS
EXHIBIT B - TENANT SPACE CONFIGURATION
L6930
Date: 05/11/2026
Space Planner: D.Hernandez
1 Janitor Closet 50 50 Enclosed Walls 20 foot-candle minimum
Per using agency and local code
Requirements
N/A Minimum 1 per floor. Mop sink and shelving/storage for janitorial supplies
Drinking
Fountains N/A
Provide at least two (2) electric water coolers/bottle fillers (one public, one employee) as required by the Illinois
Plumbing Code complying with standards of the Illinois Accessibility
Code and the ADA. Provide adjacent finishes similar to toilet room finishes
Men's
Employee
Restroom
(Large)
224 224 Enclosed Walls 20 foot-candle minimum
Minimum (3) duplex wall outlets including
(2) GFI outlet.
N/A
Accommodate 56-80 employees.
Minimum (3) water closet, (1) urinal
& (4) lavatories; comply with ADA accesibility regulations; privacy door hardware; all necessary toilet room accessories (e.g. soap dispensers, mirrors, waste receptacles, mounted electric hand dryer, etc.). Per Local
Building Code, minimum one per floor
Women's
Employee
Restroom
(Large)
224 224 Enclosed Walls 20 foot-candle minimum
Minimum (3) duplex wall outlets including
(2) GFI outlet.
N/A
Accommodate 56-80 employees.
Minimum (4) water closets, & (4) lavatories; comply with ADA accesibility regulations; privacy door hardware; all necessary toilet room accessories (e.g. soap dispensers, mirrors, waste receptacles, mounted electric hand dryer, etc.). Per Local
Building Code, minimum one per floor
Exhibit B Template - Revised 4/21/2022 Page 9 of 12
STATE OF ILLINOIS
EXHIBIT B - TENANT SPACE CONFIGURATION
L6930
Date: 05/11/2026
Space Planner: D.Hernandez
Men's Public
Restroom 100 100 Enclosed Walls
50 foot-candle minimum
Minimum (2) duplex wall outlets including
(1) GFI outlet.
N/A
Minimum (1) water closet, (1) urinal
& (2) lavatories; comply with ADA accesibility regulations; privacy door hardware; all necessary toilet room accessories (e.g. soap dispensers, mirrors, waste receptacles, mounted electric hand dryer, etc.); provide (1) baby changing station and (1) child protection seat in stall to be fully retractable when not in use; signage indicating availability of unit at each location on access door or wall adjacent to access door.
Wome's Public
Restroom 100 100 Enclosed Walls
50 foot-candle minimum
Minimum (2) duplex wall outlets including
(1) GFI outlet.
N/A
Minimum (2) water closets, & (1) lavatories; comply with ADA accesibility regulations; privacy door hardware; all necessary toilet room accessories (e.g. soap dispensers, mirrors, waste receptacles, mounted electric hand dryer, etc.); provide (1) baby changing station and (1) child protection seat in stall to be fully retractable when not in use; signage indicating availability of unit at each location on access door or wall adjacent to access door.
1 Open Space 773 773 Open Area Per local building code and using agency requirements
Per using agency requirements.
Refer to the "Other" column
Data for any additional eqipment (ie.
Printers/scanners/phones)
Exhibit B Template - Revised 4/21/2022 Page 10 of 12
STATE OF ILLINOIS
EXHIBIT B - TENANT SPACE CONFIGURATION
L6930
Date: 05/11/2026
Space Planner: D.Hernandez
Total Flex Space
# Type of Space SF - Each SF - Total Electrical Outlets Voice/Data Outlets Other
Circulation/Support/
Flex Space 3967 3967
Per local building code and using agency requirements
Per using agency requirements.
Refer to the "Other" column
Space for Mechanical/Electrical/
Plumbing, Data closets, circulation and flexibility in layout
4. Circulation/Support/Flex Space
Exhibit B Template - Revised 4/21/2022 Page 11 of 12
STATE OF ILLINOIS
EXHIBIT B - TENANT SPACE CONFIGURATION
L6930
Date: 05/11/2026
Space Planner: D.Hernandez
Square Footage Totals:
Personnel Space 11,320
Common Space 5,425
Specialty Space 3,091
Flex Space 3,967
Total SF 23,803
Headcount Totals:
Executive Office 2
Medium Office 7
Standard Office 20
Small Office 10
Medium Cubicle 30
Standard Cubicle 25
Bench (Open Interior Workstation) 40
All responses shall incorporate the standard defined below. Unless otherwise specifically noted herein, the [State and the] Using Agency prefers all occupiable tenant space be located within a contiguous space and above grade level, however [the State] the Using Agency may, in its sole discretion, may consider multiple floors or non-contiguous space(s) included in an offer if it is determined that the offer meets the client agency’s operational needs. Additionally, Building Program Standards (refer to link below) are defined to include exterior needs and provide a standard for performance and quality of materials required. All work defined and reasonably implied by programmatic information herein shall be incorporated into proposals for the initial tenant build-out. 134
Percentage Offices: 29% Benchmark range 20%-32% offices