L3 Standardized Proposal Breakdown.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
PHX Base Building and P50 TRACON Fire Life Safety
Solicitation number
0048
Issued by

About this file

The document is a standardized cost proposal breakdown template for the P50 Fire Suppression Upgrade and FLS project for the Federal Aviation Administration (FAA). The Excel spreadsheet provides a detailed cost structure with sections for equipment, material, labor, and other costs across multiple construction categories including general requirements, electrical, HVAC, plumbing, and utilities. The template includes spaces for prime contractor and subcontractor labor rates, materials, and various cost markups such as mobilization, general conditions, nighttime/off-hour work premiums, and Buy America Act premiums.

The related federal contract opportunity is a solicitation (Number 0048) for the PHX Base Building and P50 TRACON Fire Life Safety Upgrade. The project is being managed by the FAA Southwestern Region, with proposals due by September 26, 2025 at 1500 ET. A mandatory site visit is scheduled for September 16, 2025 at 0900 MST, and potential bidders must submit written interest by September 9, 2025 at 1500 ET. Offerors must have a current SAM registration and submit proposals in strict accordance with the Solicitation Information Request (SIR) guidelines. All questions about the solicitation must be submitted in writing to rodgers.l.cox@faa.gov by September 17, 2025.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Breakdown

Standardized Proposal BreakdownDATE PREPARED: MMM DD - YYYY
PROJECT: P50 Fire Suppression Upgrade and FLS
VENDOR:
PREPARER:PREPARER'S CONTACT INFORMATION:
ITEMEQUIPMENT COSTS - $MATERIAL COSTS - $LABOR COSTS - $OTHER COSTS - $TOTAL ITEM COST - $
TOTALTOTALTOTALTOTAL
01-00-00.00 General Requirements$ - 0$ - 0$ - 0$ - 0$ - 0
02-00-00.00 Existing Conditions$ - 0$ - 0$ - 0$ - 0$ - 0
02-80-00.00 HazMat Remediation$ - 0$ - 0$ - 0$ - 0$ - 0
03-00-00.00 Concrete$ - 0$ - 0$ - 0$ - 0$ - 0
05-00-00.00 Metals$ - 0$ - 0$ - 0$ - 0$ - 0
07-00-00.00 Thermal and Moisture Protection$ - 0$ - 0$ - 0$ - 0$ - 0
08-00-00.00 Openings$ - 0$ - 0$ - 0$ - 0$ - 0
09-00-00.00 Finishes$ - 0$ - 0$ - 0$ - 0$ - 0
10-00-00.00 Specialties$ - 0$ - 0$ - 0$ - 0$ - 0
11-00-00.00 Equipment$ - 0$ - 0$ - 0$ - 0$ - 0
12-00-00.00 Furnishings$ - 0$ - 0$ - 0$ - 0$ - 0
13-00-00.00 Special Construction$ - 0$ - 0$ - 0$ - 0$ - 0
22-00-00.00 Plumbing$ - 0$ - 0$ - 0$ - 0$ - 0
23-00-00.00 HVAC$ - 0$ - 0$ - 0$ - 0$ - 0
26-00-00.00 Electrical$ - 0$ - 0$ - 0$ - 0$ - 0
28-00-00.00 Electronic Safety and Security$ - 0$ - 0$ - 0$ - 0$ - 0
31-00-00.00 Earthwork$ - 0$ - 0$ - 0$ - 0$ - 0
32-00-00.00 Exterior Improvements$ - 0$ - 0$ - 0$ - 0$ - 0
33-00-00.00 Utilities$ - 0$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0$ - 0
Additional Items (please specify):$ - 0$ - 0$ - 0$ - 0$ - 0

Subtotal $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Markups
Mobilization/Demobilization$ - 0$ - 0$ - 0$ - 0$ - 0
General Conditions$ - 0$ - 0$ - 0$ - 0$ - 0
Difficulty
Nighttiime/Offhour Work Premium
Buy America Act Premium$ - 0$ - 0$ - 0$ - 0$ - 0
Phasing Premium$ - 0$ - 0$ - 0$ - 0$ - 0
Bonding/Insurance
Additional Items (please specify):$ - 0$ - 0$ - 0$ - 0$ - 0

Subtotal $ - 0 $ - 0 $ - 0 $ - 0

$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Subtotal$ - 0$ - 0$ - 0$ - 0
Profit$ - 0$ - 0
Overhead$ - 0$ - 0
TOTAL$ - 0
Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown.

Labor Rates PROJECT: P50 Fire Suppression Upgrade and FLS

VENDOR:
PREPARER:PREPARER'S CONTACT INFORMATION:
Prime Contractor Work
Item No.Labor Category/DescriptionQtyUnitMeans CrewMan Hours/UnitMan HoursUnit Mat. CostBare Mat.Unit Labor CostBare LaborUnit Equip. CostBare Equip. CostTotal
hr1240$ - 0$ - 0$ - 0
hr1180$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Totals120$ - 0$ - 0$ - 0$ - 0

General Notes:

Subcontractor(s) PROJECT: P50 Fire Suppression Upgrade and FLS

VENDOR:
PREPARER:PREPARER'S CONTACT INFORMATION:
Subcontractor Work
Item No.Labor Category/DescriptionQtyUnitMeans CrewMan Hours/UnitMan HoursUnit Mat. CostBare Mat.Unit Labor CostBare LaborUnit Equip. CostBare Equip. CostTotal
hr1240$ - 0$ - 0$ - 0
hr1180$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Totals120$ - 0$ - 0$ - 0$ - 0

General Notes:

Materials PROJECT: P50 Fire Suppression Upgrade and FLS

VENDOR:
PREPARER:PREPARER'S CONTACT INFORMATION:
Prime Contractor Work
Item No.Labor Category/DescriptionQtyUnitMeans CrewMan Hours/UnitMan HoursUnit Mat. CostBare Mat.Unit Equip. CostBare Equip. CostTotal
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
Totals0$ - 0$ - 0$ - 0

General Notes:

- Any materials provided in the Cost Breakdown tab in the lumpsum amount of $10K or more must be brokendown on this tab.

File details come from the government source that posted it. Updated .