L3 Standardized Proposal Breakdown.xlsx
XLSX spreadsheet 33 KB Posted
- Solicitation number
- 0048
About this file
The document is a standardized cost proposal breakdown template for the P50 Fire Suppression Upgrade and FLS project for the Federal Aviation Administration (FAA). The Excel spreadsheet provides a detailed cost structure with sections for equipment, material, labor, and other costs across multiple construction categories including general requirements, electrical, HVAC, plumbing, and utilities. The template includes spaces for prime contractor and subcontractor labor rates, materials, and various cost markups such as mobilization, general conditions, nighttime/off-hour work premiums, and Buy America Act premiums.
The related federal contract opportunity is a solicitation (Number 0048) for the PHX Base Building and P50 TRACON Fire Life Safety Upgrade. The project is being managed by the FAA Southwestern Region, with proposals due by September 26, 2025 at 1500 ET. A mandatory site visit is scheduled for September 16, 2025 at 0900 MST, and potential bidders must submit written interest by September 9, 2025 at 1500 ET. Offerors must have a current SAM registration and submit proposals in strict accordance with the Solicitation Information Request (SIR) guidelines. All questions about the solicitation must be submitted in writing to rodgers.l.cox@faa.gov by September 17, 2025.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Breakdown
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY |
| PROJECT: P50 Fire Suppression Upgrade and FLS |
| VENDOR: | |||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | ||||
| ITEM | EQUIPMENT COSTS - $ | MATERIAL COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | TOTAL |
| 01-00-00.00 General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 02-00-00.00 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 02-80-00.00 HazMat Remediation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 03-00-00.00 Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 05-00-00.00 Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 07-00-00.00 Thermal and Moisture Protection | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 08-00-00.00 Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 09-00-00.00 Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10-00-00.00 Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11-00-00.00 Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12-00-00.00 Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13-00-00.00 Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 22-00-00.00 Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 23-00-00.00 HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 26-00-00.00 Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 28-00-00.00 Electronic Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 31-00-00.00 Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 32-00-00.00 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 33-00-00.00 Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Markups | |||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Difficulty | |||||
| Nighttiime/Offhour Work Premium | |||||
| Buy America Act Premium | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Phasing Premium | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Bonding/Insurance | |||||
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| TOTAL | $ - 0 | |||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |
Labor Rates PROJECT: P50 Fire Suppression Upgrade and FLS
| VENDOR: | |
| PREPARER: | PREPARER'S CONTACT INFORMATION: |
| Prime Contractor Work | |||||||||||||
| Item No. | Labor Category/Description | Qty | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Mat. Cost | Bare Mat. | Unit Labor Cost | Bare Labor | Unit Equip. Cost | Bare Equip. Cost | Total |
| hr | 1 | 2 | 40 | $ - 0 | $ - 0 | $ - 0 | |||||||
| hr | 1 | 1 | 80 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Totals | 120 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
General Notes:
Subcontractor(s) PROJECT: P50 Fire Suppression Upgrade and FLS
| VENDOR: | |
| PREPARER: | PREPARER'S CONTACT INFORMATION: |
| Subcontractor Work | |||||||||||||
| Item No. | Labor Category/Description | Qty | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Mat. Cost | Bare Mat. | Unit Labor Cost | Bare Labor | Unit Equip. Cost | Bare Equip. Cost | Total |
| hr | 1 | 2 | 40 | $ - 0 | $ - 0 | $ - 0 | |||||||
| hr | 1 | 1 | 80 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Totals | 120 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
General Notes:
Materials PROJECT: P50 Fire Suppression Upgrade and FLS
| VENDOR: | |
| PREPARER: | PREPARER'S CONTACT INFORMATION: |
| Prime Contractor Work | |||||||||||
| Item No. | Labor Category/Description | Qty | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Mat. Cost | Bare Mat. | Unit Equip. Cost | Bare Equip. Cost | Total |
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| Totals | 0 | $ - 0 | $ - 0 | $ - 0 |
General Notes:
- Any materials provided in the Cost Breakdown tab in the lumpsum amount of $10K or more must be brokendown on this tab.
File details come from the government source that posted it. Updated .