L3 Standardized Proposal Breakdown.xlsx
XLSX spreadsheet 33 KB Posted
- Solicitation number
- 697DCK-24-R-00382
About this file
This document is a Request for Proposal (RFP) issued by the Federal Aviation Administration (FAA) for fire suppression, fire life safety system, and leak repairs at the Phoenix Base Building and P50 TRACON facilities in Phoenix, Arizona. The solicitation number is 697DCK-24-R-00382 and the requirement is for BIL-funded upgrades.
The key details are:
- Proposals are due by July 9, 2024 at 1500 EDT
- A site visit is scheduled for June 11, 2024 at 0900 MST with registration required by June 6, 2024
- All questions must be submitted in writing by June 19, 2024 at 1500 EDT
- To be eligible, offerors must have a valid SAM registration
- The government is not liable for proposal preparation costs and does not guarantee award
This RFP provides a standardized cost breakdown template for vendors to submit their pricing. It does not contain a Statement of Work or other technical requirements.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Breakdown
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY |
| PROJECT: P50 Fire Suppression Upgrade and FLS |
| VENDOR: | |||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | ||||
| ITEM | EQUIPMENT COSTS - $ | MATERIAL COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | TOTAL |
| 01-00-00.00 General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 02-00-00.00 Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 02-80-00.00 HazMat Remediation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 03-00-00.00 Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 05-00-00.00 Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 07-00-00.00 Thermal and Moisture Protection | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 08-00-00.00 Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 09-00-00.00 Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10-00-00.00 Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11-00-00.00 Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12-00-00.00 Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13-00-00.00 Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 22-00-00.00 Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 23-00-00.00 HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 26-00-00.00 Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 28-00-00.00 Electronic Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 31-00-00.00 Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 32-00-00.00 Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 33-00-00.00 Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| Markups | |||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| General Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Difficulty | |||||
| Nighttiime/Offhour Work Premium | |||||
| Buy America Act Premium | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Phasing Premium | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Bonding/Insurance | |||||
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - 0 $ - 0 $ - 0 $ - 0
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Profit | $ - 0 | $ - 0 | ||
| Overhead | $ - 0 | $ - 0 | ||
| TOTAL | $ - 0 | |||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |
Labor Rates PROJECT: P50 Fire Suppression Upgrade and FLS
| VENDOR: | |
| PREPARER: | PREPARER'S CONTACT INFORMATION: |
| Prime Contractor Work | |||||||||||||
| Item No. | Labor Category/Description | Qty | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Mat. Cost | Bare Mat. | Unit Labor Cost | Bare Labor | Unit Equip. Cost | Bare Equip. Cost | Total |
| hr | 1 | 2 | 40 | $ - 0 | $ - 0 | $ - 0 | |||||||
| hr | 1 | 1 | 80 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Totals | 120 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
General Notes:
Subcontractor(s) PROJECT: P50 Fire Suppression Upgrade and FLS
| VENDOR: | |
| PREPARER: | PREPARER'S CONTACT INFORMATION: |
| Subcontractor Work | |||||||||||||
| Item No. | Labor Category/Description | Qty | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Mat. Cost | Bare Mat. | Unit Labor Cost | Bare Labor | Unit Equip. Cost | Bare Equip. Cost | Total |
| hr | 1 | 2 | 40 | $ - 0 | $ - 0 | $ - 0 | |||||||
| hr | 1 | 1 | 80 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Totals | 120 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
General Notes:
Materials PROJECT: P50 Fire Suppression Upgrade and FLS
| VENDOR: | |
| PREPARER: | PREPARER'S CONTACT INFORMATION: |
| Prime Contractor Work | |||||||||||
| Item No. | Labor Category/Description | Qty | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Mat. Cost | Bare Mat. | Unit Equip. Cost | Bare Equip. Cost | Total |
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| $ - 0 | |||||||||||
| Totals | 0 | $ - 0 | $ - 0 | $ - 0 |
General Notes:
- Any materials provided in the Cost Breakdown tab in the lumpsum amount of $10K or more must be brokendown on this tab.
File details come from the government source that posted it. Updated .