L3 - Standardized Proposal Breakdown v1.xls
XLS spreadsheet 69 KB Posted
- Solicitation number
- 697DCK-24-R-00382
About this file
This document appears to be a standardized proposal breakdown template related to a federal contract opportunity from the Federal Aviation Administration (FAA) for the Fire Life Safety at PHX Base Building and P50 TRACON project.
The key details are:
- Solicitation Number: 697DCK-24-R-00382
- Opportunity Type: Solicitation
- Description: The FAA has a requirement for fire suppression, fire life safety system, and leak repairs at the PHX Base Building and PH50 TRACON in Phoenix, AZ.
- Important Dates: Site visit on June 11, 2024 at 0900 MST, questions due by June 19, 2024 at 1500 EDT, proposals due by July 9, 2024 at 1500 EDT.
- Registration Requirement: Offerors must have a valid SAM.gov registration to be eligible for award.
- Proposal Instructions: Offerors must submit proposals in accordance with the Solicitation Instructions and Requirements (SIR).
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Modernization
| Standardized Proposal Breakdown | DATE PREPARED: MMM DD - YYYY | ||||
| PROJECT: P50 Fire Suppression Upgrade and FLS | |||||
| VENDOR: | |||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | ||||
| ITEM | EQUIPMENT COSTS - $ | MATERIAL COSTS - $ | LABOR COSTS - $ | OTHER COSTS - $ | TOTAL ITEM COST - $ |
| TOTAL | TOTAL | TOTAL | TOTAL | ||
| PRIME | |||||
| Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sprinkler System Installantion | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sprinkler System Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Firestopping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Acoustical Ceilings | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fire Alarm Systems/ Controls | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fire Pumps | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Gypsum Ceiling | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Construction Facilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Dayshift Superintendent | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Nightshift Superindendent | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Nightshift Differential | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SUBCONTRACTOR | |||||
| Mobilization/Demobilization | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Removal/Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Installation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Permits | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Additional Items (please specify): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||
| Subtotal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Profit | $ - 0 | $ - 0 | |||
| Overhead | $ - 0 | $ - 0 | |||
| TOTAL | $ - 0 | ||||
| Instructions For Use: Enter the component cost in the white cells only. The pink cells have embedded formulas. Entering data directly into these cells will overwrite the embedded formulas. Include a narrative description of the modernization effort along with your technical proposal and standardized proposal breakdown. |
Labor Rates
| PROJECT: P50 Fire Suppression Upgrade and FLS | |||||||||||||
| VENDOR: | |||||||||||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | ||||||||||||
| Prime Contractor Work | |||||||||||||
| Item No. | Labor Category/Description | Qty | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Mat. Cost | Bare Mat. | Unit Labor Cost | Bare Labor | Unit Equip. Cost | Bare Equip. Cost | Total |
| hr | 1 | 2 | 40 | $ - 0 | $ - 0 | $ - 0 | |||||||
| hr | 1 | 1 | 80 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Totals | 120 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General Notes: |
Subcontractor(s)
| PROJECT: P50 Fire Suppression Upgrade and FLS | |||||||||||||
| VENDOR: | |||||||||||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | ||||||||||||
| Subcontractor Work | |||||||||||||
| Item No. | Labor Category/Description | Qty | Unit | Means Crew | Man Hours/Unit | Man Hours | Unit Mat. Cost | Bare Mat. | Unit Labor Cost | Bare Labor | Unit Equip. Cost | Bare Equip. Cost | Total |
| hr | 1 | 2 | 40 | $ - 0 | $ - 0 | $ - 0 | |||||||
| hr | 1 | 1 | 80 | $ - 0 | $ - 0 | $ - 0 | |||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| $ - 0 | $ - 0 | $ - 0 | |||||||||||
| Totals | 120 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||
| General Notes: |
Materials
| PROJECT: P50 Fire Suppression Upgrade and FLS | ||||||||
| VENDOR: | ||||||||
| PREPARER: | PREPARER'S CONTACT INFORMATION: | |||||||
| Prime Contractor Work | ||||||||
| Item No. | Description | Quantity | Unit Mat. Cost | Bare Mat. | Quantity | Unit Equip. Cost | Bare Equip. Cost | Total |
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | ||||||
| $ - 0 | ||||||||
| Totals | $ - 0 | $ - 0 | $ - 0 | |||||
| General Notes: |
- Any materials provided in the Cost Breakdown tab in the lumpsum amount of $10K or more must be brokendown on this tab.