About this file
Site Tour Notes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_L15PS00317_Amd_000003.pdf | ||
| Revised_Section_02640.pdf | ||
| Culvert_Spreadsheet.pdf | ||
| Sol_L15PS00317_Amd_000002.pdf | ||
| 2015-06-08_BENTONITE_ROAD_BID_SCHEDULE.pdf | ||
| 2015-06-08_BENTIONITE_ROAD_SPEC_REV_1.pdf | ||
| 2015-06-08_BENTONITE_RD_DWGS_REV_1.pdf | ||
| Sol_L15PS00317_Amd_000001.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Sol_L15PS00317.pdf | ||
| 2015-03-18_BENTIONITE_ROAD_SPEC.pdf | ||
| Fence_Proposal_Schedule.pdf | ||
| Drawings.pdf | ||
| Road_Proposal_Schedule.pdf | ||
| Davis_Bacon_Wage_Determination.txt | TXT text file |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICATION No. L15PS 00317 BENTONITE ROAD RECLAMATION SITE TOUR NOTES Page 1 of 2
BENTONITE ROAD RECLAMATION PRE-PROPOSAL NOTES
05/28/2015
IMPORTANT POINTS MENTIONED BEFORE THE CONTRACTORS WERE ALLOWED TO PROVIDE
QUESTIONS:
1. DAVIS/ BACON WAGE RATES APPLY TO THIS PROJECT.
2. THERE WILL BE ONE ADDITIONAL CATTLE GUARD AND ASSOCIATED FENCE WORK
ADDED TO THE PROJECT. LOOK TO SEE THE CHANGES ON AMENDMENT 1 TO THE
SOLICITATION.
3. 90 DAYS PERIOD OF PERFORMANCE
4. CONTRACTING OFFICE IS THE ONLY GOVERNMENT EMPLOYEE ALLOWED TO CHANGE
OR MODIFY THE CONTRACT.
5. WORK MUST NOT COMMENCE UNTIL AFTER JULY 15
TH
TO ADDRESS WILDLIFE
CONDITIONS ON THE ENVIRONMENTAL ASSESSMENT
THE REMAINING NARRATIVE WAS THE ANSWERS TO CONTRACTORS QUESTIONS:
1. BEDDING IS TO BE NATIVE MATERIAL MINUS ALL ROCKS, ORGANICS, OR OTHER
DEBRIS. THE CONTRACTION OFFICER WILL APPROVE IN FIELD. IF THE FOUNDATION
MATERIALS IS NOT SUITABLE FOR BEDDING THE CULVERT THE CONTRACTOR SHALL
BRING THAT INFORMATION TO THE ATTENTION OF THE CONTRACTING OFFICER
BEFORE CONTINUING TO INSTALL THE CULVERT. IF ADDITIONAL WORK IS REQUIRED
THE CONTRACTING OFFICER WILL MODIFY THE CONTRACT TO ACCOUNT FOR THE
WORK BEFORE THE CONTRACTOR STARTS WORK NOT EXPLICITY DETAILED IN THE
SPECIFICAITONS OR ON THE DRAWINGS.
2. THE QUANTITIES ON THE DRAWING FOR EMBANKMENT ARE CORRECT AND THE ON
THE BID SCHEDULE IS INCORECT. THE TOTAL SHOULD BE 3022+3022+755= ±6800 YDS
3. LIFTS ON THE ROAD WAY IN THE THREE IDENIFIED AREA ON THE DRAWING ARE TO BE
2’ THICK. BLEND IN THE ENDS TO MATCH EXISTING GRADES.
4. NOW STORMWATER PERMITS ARE REQUIRED
5. NO SEEDING IS REQUIRED BY THE CONTRACTOR
6. SECTION 02640 PART 4 SECTION 4.1 A i. THE CONTRACTOR COULD BE REQUIRED TO
MOVE AN ADDITIONAL 50 YDS
AT EACH SITE TO IMPROVE THE INLET OR OUTLET
CONDITIONS OF THE CULVERTS.
7. WEATHER SPECIFICALLY RAIN IS AN ALLOWABLE EXCUSE TO EXTEND THE CONTRACT.
8. THE CONTRACTOR MUST PROVIDE SAFE PASSAGE OVER THE ROAD SURFACE AT THE
END OF EACH WORKDAY. THE ROAD MUST BE OPEN AND BARRIERS INPLACE AS PER
THE SPECIFICATIONS. IT WOULD BE ACCEPTABLE FOR THE CONTRACTOR TO HOLD
UP TRAFFIC FOR SHORT PERIODS OF TIME DURING THE DAY TO ALLOW WORK TO
PROGRESS BUT THESE TIMES SHOULD BE LESS THAN 30 MIN.
9. PACIFIC STEEL AND BIG R ARE TWO VENDORS WHO’S CATTLE GUARDS COMPLY WITH
THE SPECIFICATONS. ANY COMMERICALLY AVAILABLE CATTLE GUARD THAT
COMPLIES WITH H-25 LOADING REQUIREMENTS AND ARE OF THE CORRECT
DIMENSIONS WILL BE ACCEPTABLE. THE CONTRACTOR SHALL SUBMITT FOR
APPROVAL ANY CATTLY GUARDS THAT DON’T MEET EVERY ASPECT OF THE
SPEICIFICATIONS.
10. ALL ANCHOR BOLTS MUST BE INSTALLED IN EACH CATTLE GUARD BASE
SOLICATION No. L15PS 00317 BENTONITE ROAD RECLAMATION SITE TOUR NOTES Page 2 of 2
11. ALL INVERTS WILL BE STAKED IN THE FIELD
12. BORROW LOCAITONS ARE ACCURATLY SHOWN ON THE PLANS, MAXIMUM HAUL
DISTANCE IS 5280 FEET
13. EXTRA MATERIAL AT EACH CULVERT SHALL BE DEPOSITED AT THE INLET AND OUTLET
OF THE CULVERTS AND BLEND THE GRADE TO MATCH THE EXISTING.
14. “ALL USED CULVERTS BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE
LEGALLY DISPOSED OF OFF THE GOVERNMENT PROPERTY. THERE WILL BE NO
BURYING OF DEBRIS ON GOVERNMENT OR STATE LAND.
15. SEE THE REVISED DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL CHANGES.