This federal contract opportunity solicitation is for the rehabilitation of roads, construction of a trail and pedestrian bridge, and rehabilitation of a parking lot at the Marais des Cygnes National Wildlife Refuge in Linn County, Kansas. Work includes roadway excavation, aggregate base, asphalt and concrete pavement, minor concrete work, signing, striping and other miscellaneous construction. The solicitation was issued by the Federal Highway Administration within the Department of Transportation, with the solicitation number 6982AF21B000031 for the project titled "KS FTFW MACY 10(2) HQ Road, Parking, Refuge Intro Trail." The description provides details on improvements to entrance roads, parking lots and a proposed orientation trail, including a new pedestrian bridge.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
08/30/2021 WENDY M LONGLEY Digitally signed by WENDY M LONGLEY
Date: 2021.09.01 06:19:28 -06'00'
Sheet 1 of 2
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
A2
ABBREVIATIONS DRAINAGE SYMBOLS
GEOLOGIC SYMBOLS
DI
FENCE & CATTLEGUARD SYMBOLS
Cattleguard (Existing, Proposed)
Fence w/ Gate (Existing, Proposed)
Fence (Existing, Proposed)
Material Source
Boring Location (Existing, Proposed)
Riprap Apron (Proposed)
Underdrain (Existing, Proposed)
With Drop Inlet (Existing, Proposed)
With Headwalls (Existing, Proposed)
With End Sections (Existing, Proposed)
Pipe Culvert (Existing, Proposed)
Box Culvert (Existing, Proposed)
Bridge (Existing, Proposed)
Spring
River
Wetland
Large Creek
Lake, Pond or Reservoir
Drainage or Small Creek
Flow Arrow
Ditch (Existing, Proposed)
SPRING
D jt.J int.
incr.
incl.
IDI
hwy.
HW
horiz.
hex.
HES
hdwl.H gdr.
galv.
ga.G ftg.
fin.
FES
Fed.
f.f.F ext.
exp. jt.
exc.
EW
et ux et al
ER
EQ or eq.
EOP
engr(s).
emb.
elev.
El. 94.066 e
EE
dwg(s).
DLC
Dist.
dist.
diaph.
diag.
dia. or D
DI
DHV
decr.D culv.
CTSM
ctrs.
CS
cr.
corr.
cont.
constr. jt.
constr.
conc.
col.
Co.
CMP
clr.
c-c
CBCC
brg.
br.
BP
BM
BK
beg.
b.f.B asph.
appr.
alt.
AH
aggr.
ADT
abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall
Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve
WW
VPI
vph vert.
VV
typ.
TS
transv.
TCE
TBM
tan.
T.
TT
sym.
struc.
str.
stiff.
std.
sta.
ST
st.
spec.
spa.
shldr.
sec.
SC
SADT
SS
rte.
Rt. or RT
RH
ret. wall
Res.
res.
reqd.
reinf.
reconst.
rdwy.
rd.
R/W
R.
RR
quant., QtyQ pvmt.
PT
psi proj.
POT
POS
POC
pl.
PI
perf.
PCC
PCP
OD
o.f.
o.c.O
no. or # neg.
NC
NN
mtn(s).
mon.
min.
max.
matl.
maint.
mag.M
LW
Lt. or LT
LPSM
long.
lat.
lam.
LL
EROSION & SEDIMENT CONTROL SYMBOLS
joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement
Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline
Ø
Riprap
Rolled Erosion Control Product
Diversion Berm
Check Dam
Bonded Fiber Matrix Mulching
Fiber Roll (Slope Protection)
Temporary Inlet Protection
Silt Fence
Fiber Roll (Ditch and/or Cut Slope)
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
Y M
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2)
SYMBOLS AND ABBREVIATIONS
CONVENTIONAL PLAN
Sheet 2 of 2
A3
S/W sidewalk
PROJECT SPECIFIC SYMBOLS
PROJECT SPECIFIC ABBREVIATIONS
ABA Architectural Barriers Act
36 31
36 31
6 1
ˆ
Treeline
Tree
MAPPING SYMBOLS
LANDSCAPING & VEGETATION SYMBOLS
RIGHT-OF-WAY SYMBOLS
ROADWAY SYMBOLS
SIGN SYMBOLS
UTILITY SYMBOLS
Retaining Wall (Existing, Proposed)
Median & Side Barrier (Existing, Proposed)
Guardwall (Existing, Proposed)
Guardrail (Existing, Proposed)
GUARDRAIL, BARRIER & WALL SYMBOLS
Post Mounted (Existing, Proposed)
Portable (Proposed)
Delineator (Existing, Proposed)
Commercial (Existing, Proposed)
Signs
Telephone
Power
Fiber Optic
CATV
Overhead Utility Line (Existing, Proposed)
Water
Telephone
Sanitary Sewer
Power
Oil
Gas
Fiber Optic
CATV
Underground Utility (Existing, Proposed)
Telephone Pedestal (Existing, Proposed)
Telephone Booth (Existing, Proposed)
Street Light (Existing, Proposed)
Support Pole Anchor (Existing, Proposed)
Support Pole (Existing, Proposed)
Surface (Existing, Proposed)
Underground (Existing, Proposed)
Irrigation Ditch
999.9
Roadway Obliteration
Roadway Centerline (With Station ticks)
Proposed
Existing
Edge of Roadway
Toe of Fill
Transition
Top of Cut
Slope Stake Limits
Clearing/Construction Limits
Survey Control Point
Trail
Spot Elevation
Double Track
Single Track
Railroad
North Arrow
Coordinate Grid Tick
Building (Existing, Proposed)
Section Corner (Found)
Section Corner (Found, Projected)
Section Corner (Found, Projected)
Right-of-Way Line (Proposed)
Right-of-Way Line (Existing)
Property Line
Parcel Number
Monument (As described)
Temporary (Proposed)
Permanent (Proposed)
Permanent (Existing)
Easements
National Wildlife Refuge
National Park
National Forest
Bureau of Land Management
Bureau of Indian Affairs
Section
Section
Section
Township or Range Line
City
County
State
National
Boundaries
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
Y M
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
SURVEY CONTROL
A4
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d C
T L
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
2IN ALUM CAP
803.2
6IN CMP
803.7
804.9
PIPE DIRECTION
VENT
805.1
6IN PVC/UNABLE TO FIND OPPOSITE SIDE
805.5
6IN CMP
805.9
6IN CMP
WATER
WATER
VENT
VENT
WATER
VENT
WATER
FLAG POLE
VENT
VENT
WATER METER
10+00
400+00
110+00
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d S
T E
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2)
Existing R/W
Kansas State Highway 52
400'200'0
Scale in Feet
SITE MAP
Refuge Orientation Trail 3
Refuge Orientation Trail 2
Refuge Orientation Trail 1
Shop Access Road (RTE 300)
E: 2415559.12
N: 1914286.39
Entrance Road
KS FTFW MACY 10(2)
End Project
16+90.02
E: 2415538.36
N: 1914462.79
Entrance Road
KS FTFW MACY 10(2)
Begin Project
10+28.00
A5
(RTE 010)
Entrance Road
Shop Parking (RTE 800)
Potential Staging Area
End Refuge Orientation Trail 3
306+80.89
Orientation Trail 2
Begin Refuge
200+00.00
C re e k
Mud dy
Construction Access
Construction Access
Headquarters
Visitor Center/
Orientation Trail 1
Refuge
Parking (RTE 901)
Hwy 52 Visitor Kiosk
Floodplain Boundary
FEMA Zone A
Floodplain Boundary
FEMA Zone A
End Refuge Orientation Trail 2
203+10.00
Orientation Trail 3
Begin Refuge
300+00.00
Pedestrian Bridge to 111+62.06
111+02.06
Construction Access
NOTE:
1. See Subsection 156.07 for construction access requirements.
E: 2415643.15
N: 1914106.42
Refuge Orientation Trail
KS FTFW MACY 10(2)
Begin Project
100+00.00
E: 2416995.55
N: 1913865.37
Refuge Orientation Trail
KS FTFW MACY 10(2)
End Project
119+29.50
401+40.00 Begin Shop Access Road (RTE 300)
402+85.00 End Shop Access Road (RTE 300)
Visitor Center ABA Parking (RTE 909)
Visitor Center Parking (RTE 900)
TYPICAL SECTIONS
A6
2.2. 2%
Placed in two lifts
3" Asphalt Concrete Pavement
2%
DETAIL A
NOTE:
9" Excavation
6" Roadway Aggregate, Method 2
Applies to both sides
Traveled Way
11'
Traveled Way
11'
5' 5'
Clearing and Construction Limits
Limit
Stake
Slope
Limit
Stake
Slope
Tack coat (applied between asphalt lifts)
Fog seal (applied to top asphalt lift)
Prime coat (applied to top of aggregate)
Existing aggregate surfacing depth varies from 4" to 8"
Average 16 ft from 12 ft to 20 ft
10+28.00 TO 12+05.62
ENTRANCE ROAD (RTE 010)
TYPICAL SECTION
10+28.00 TO 12+60.00
ENTRANCE ROAD (RTE 010)
EXISTING TYPICAL SECTION
2.
See Detail A
Limit
Stake
Slope
Traveled Way
11' to 31.6' max.
1:3 max.
1:3 max.
1:3
5'
Road
Access
C ShopL
6'
C Entrance RoadL
C Entrance RoadL
Road
C EntranceL
5' to 25.6'
30°
5.2"
11+40.00 TO 12+88.16 RT
ENTRANCE ROAD (RTE 010)
TYPICAL SECTION
2.
Placed in two lifts
3" Asphalt Concrete Pavement
9" Excavation
6" Roadway Aggregate, Method 2
See Detail A
5'
Clearing and Construction Limits
Limit
Stake
Slope max.
1:3
C Entrance RoadL
1:20 max.
1%
Placed in two lifts
3" Asphalt Concrete Pavement
9" Excavation
5'
Clearing and Construction Limits
Limit
Stake
Slope
Tack coat (applied between asphalt lifts)
Fog seal (applied to top asphalt lift)
Prime coat (applied to top of aggregate) max.
1:4
1%
Tack coat (applied between asphalt lifts)
Fog seal (applied to top asphalt lift)
Prime coat (applied to top of aggregate)
4" Bedding Material
S/W
5'
Parking Area
11' to 16'
1.5% 1:20 max.
C Entrance RoadL
Traveled Way
16' to 38.4'
Traveled Way
11' to 16'3.
3.
3.
3.3.
1%
Parking Area
0' to 22'
1% seeding limits
Topsoil and seeding limits
Topsoil and seeding limits
Topsoil and seeding limits
Topsoil and seeding limits
Topsoil and ground
Existing ground
Existing ground
Existing
Clearing and Construction Limits
Placed in two lifts
3" Asphalt Concrete Pavement
9" Excavation
6" Roadway Aggregate, Method 2
2%
Tack coat (applied between asphalt lifts)
Fog seal (applied to top asphalt lift)
Prime coat (applied to top of aggregate) seeding limits
Topsoil and
(top of pavement)
Profile grade
(top of pavement)
Profile grade
(top of pavement)
Profile grade
(top of pavement)
Profile grade
See Detail A
Asphalt concrete pavement
15+96.13 TO 16+90.02
12+88.16 TO 13+37.37
VISITOR CENTER PARKING (RTE 900)
ENTRANCE ROAD (RTE 010)
TYPICAL SECTION
13+37.37 TO 15+96.13
VISITOR CENTER PARKING (RTE 900)
ENTRANCE ROAD (RTE 010)
TYPICAL SECTION
Aggregate seeding limits
Topsoil and ground
Existing sides of roadway)
(Detail applies to both right and left
Shoulder up with roadway aggregate, method 2
Construct 30° pavement edge (safety edge)
Place Geogrid
Place Geogrid
Place Geogrid
Place Geogrid
Place Geogrid
4" Sidewalk, Colored Concrete
Sidewalk, Colored Concrete.
Bedding material is included in the cost of pay item 61501-0200 incidental and not paid separately.
foreslope and back of sidewalk during final grading. This work is surfacing; grade the windrowed material onto the final roadway completion of final asphalt paving, concrete work, and aggregate outside the existing aggregate roadway and concrete edge. After
During clearing and grubbing, windrow existing topsoil material
See the cross sections for cut and fill slope ratios.
See Plans and cross sections for dimensions.
on the existing bench.
Steepen the foreslope as necessary, but not steeper than 1:3, to stay
Construct a 1:4 foreslope unless otherwise directed by the CO.
adequate drainage and stability.
embankment slope ratios may be adjusted by the CO to assure
The gradient and width of roadway ditches and the excavation and
Method 2
Aggregate, 6" Roadway
6.
6.
5.
4.
3.
2.
1.
NO SCALE
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
A7
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2)
Station to Station
LENGTH OF PROJECT
Description
Entrance Road (RTE 010)
Roadway (ft.) Trail (ft.)
0.71
TOTALS (ft.)
TOTALS (mi.)
Refuge Orientation Trail 1
Refuge Orientation Trail 2
Refuge Orientation Trail 3
10+28.00 to 16+90.02
100+00.00 to 111+02.06
200+00.00 to 203+10.00
300+00.00 to 306+80.89
662.02
1102.06
310.00
680.89
2860.39807.02
2%
12" Excavation
6" Roadway Aggregate, Method 2
4" Bedding Material
1.5%
3.
S/W
Varies
6" Minor Concrete Pavement, Plain
VISITOR CENTER ABA PARKING (RTE 909)
TYPICAL SECTION
3.
3.
4.
or Parking Area
Traveled Way
ABA Parking
Varies
NOTE:
Shop Access Road (RTE 300) 401+40.00 to 402+85.00 145.00
2.
2. 2%
Placed in two lifts
3" Asphalt Concrete Pavement
9" Excavation
6" Roadway Aggregate, Method 2
Traveled Way
12'
5' 5'
Clearing and Construction Limits
Limit
Stake
Slope
Limit
Stake
Slope
Existing aggregate surfacing depth varies from 4" to 8"
Average 16 ft from 12 ft to 16 ft max.
1:3 max.
1:3 seeding limits
Topsoil and seeding limits
Topsoil and ground
Existing
(top of pavement)
Profile grade
Road
Access
C ShopL
401+40.00 TO 403+85.00
SHOP ACCESS ROAD (RTE 300)
EXISTING TYPICAL SECTION
Road
Access
C ShopL
401+40.00 TO 402+85.00
SHOP ACCESS ROAD (RTE 300)
TYPICAL SECTION
Tack coat (applied between asphalt lifts)
Fog seal (applied to top asphalt lift)
Prime coat (applied to top of aggregate)
See Detail A for structural section details
See mainline typical section
DETAIL A
30°
5.2"
Asphalt concrete pavement
DETAIL B
1:3 max
Aggregate
Applies to all sides
Aggregate Edge
Match Existing
Existing Aggregate
Aggregate Parking Area
Varies 3.
See Detail B
HWY 52 VISITOR KIOSK PARKING (RTE 901)
TYPICAL SECTION
111+02.06 to 111+62.06
Refuge Orientation Trail 1 111+62.06 to 119+29.50
Pedestrian Bridge
Bridge (ft.)
60.00
767.44
60.00
4" Roadway Aggregate, Method 2
Aggregate Reconditioning
Match Existing
5'
Limit
Stake
Slope max.
1:4 seeding limits
Topsoil and ground
Existing
Aggregate
NO SCALE
sides of roadway)
(Detail applies to both right and left aggregate, method 2
Shoulder up with roadway
(safety edge)
Construct 30° pavement edge
Place GeogridPlace Geogrid
Place Geogrid
4" Sidewalk, Colored Concrete
7.
6.
5.
4.
3.
2.
1.
7.
Sidewalk, Colored Concrete.
Bedding material is included in the cost of pay item 61501-0200 incidental and not paid separately.
foreslope and back of sidewalk during final grading. This work is surfacing; grade the windrowed material onto the final roadway completion of final asphalt paving, concrete work, and aggregate outside the existing aggregate roadway and concrete edge. After
During clearing and grubbing, windrow existing topsoil material
See the cross sections for cut and fill slope ratios.
Maximum slope in any direction.
See Plans and cross sections for dimensions.
on the existing bench.
Steepen the foreslope as necessary, but not steeper than 1:3, to stay
Construct a 1:4 foreslope unless otherwise directed by the CO.
adequate drainage and stability.
embankment slope ratios may be adjusted by the CO to assure
The gradient and width of roadway ditches and the excavation and
A8
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
Y P
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2)
4" Bedding Material
S/W
5'
1.5% ground
Existing
Clearing and Construction Limits
4" Bedding Material
S/W
5'
1.5% seeding limits
Topsoil and ground
Existing
C TrailL seeding limits
Topsoil and
1:4 m ax .1:
m ax.
1:2
Embankment Construction
1.5% 1:4
4" Bedding Material
S/W
5' seeding limits
Topsoil and seeding limits
Topsoil and
Slope Stake LimitSlope Stake Limit
2' 2'
2'
Slope Stake LimitSlope Stake Limit
2'
2'
C TrailL
2'
Construction Limits
Clearing and
Slope Stake Limit
Slope Stake Limit
Construction Limits
Clearing and seeding limits
Topsoil and seeding limits
Topsoil and
Embankment Construction
1:2 m ax
1:2 m ax
C TrailL C TrailL ground
Existing
Existing native soil Existing native soil
LEVEL GROUND
REFUGE ORIENTATION TRAIL
EXISTING TYPICAL SECTION
EMBANKMENT
REFUGE ORIENTATION TRAIL
TYPICAL SECTION
LEVEL GROUND
REFUGE ORIENTATION TRAIL
TYPICAL SECTION
EXISTING BERM
REFUGE ORIENTATION TRAIL
TYPICAL SECTION
NOTE:
300+00.00 TO 306+80.89
REFUGE ORIENTATION TRAIL 3
200+00.00 TO 202+90.00
REFUGE ORIENTATION TRAIL 2
111+62.06 TO 119+29.50
100+00.00 TO 111+02.06
REFUGE ORIENTATION TRAIL 1
TYPICAL SECTIONS
4" Bedding Material ground
Existing
2'
Slope Stake LimitSlope Stake Limit
2'
Construction Limits
Clearing and seeding limits
Topsoil and seeding limits
Topsoil and
Profile grade (top of sidewalk) Profile grade (top of sidewalk)
Profile grade (top of sidewalk)
Place Geogrid
Place Geogrid
Conc.
Varies
Pad
4.
Place Bench
CONCRETE PAD FOR BENCHES
REFUGE ORIENTATION TRAIL
TYPICAL SECTION
EXISTING BERM
REFUGE ORIENTATION TRAIL
EXISTING TYPICAL SECTION
4.
1.5%
Conc.
Varies
Construction Limits
Clearing and
Place Geogrid
4" Sidewalk, Concrete
4" Bedding Material
Place Bench
Place Geogrid
Pad
1.5%
C TrailL
4.
2'
2'
1:4
2'
NO SCALE
Place Geogrid
Sidewalk, Colored Concrete.
Bedding material is included in the cost of pay item 61501-0200 onto the final grading. Incidental, not paid separately.
After completion of trail construction; grade the windrowed material
During clearing and grubbing, windrow existing topsoil material.
See Plans for location, side, and dimensions.
See the cross sections for cut and fill slope ratios.
Construct a 1:4 foreslope unless otherwise directed by the CO.
adequate drainage and stability.
embankment slope ratios may be adjusted by the CO to assure
The gradient and width of roadway ditches and the excavation and
6.
5.
4.
3.
2.
1.
6.
6. 6.
6.
4" Sidewalk, Colored Concrete 4" Sidewalk, Colored Concrete4" Sidewalk, Colored Concrete
4" Sidewalk, Colored Concrete
6.
Sheet and Description
B3 B3 B3 B4 B5 B5 B6 S2
Survey Summary
Removal Summary
Grading Summary
Surfacing Summary
Permanent Signing
Summary
Permanent Pavement Marking
Summary
Miscellaneous Summary
Pedestrian Bridge
Summary Allowance Bid
Schedule
A0010 15101-0000 MOBILIZATION LPSM ALL
A0020 15215-2000 SURVEY AND STAKING, BRIDGE EACH 1 1
A0030 15215-7000 SURVEY AND STAKING, PARKING AREA EACH 6 6
A0040 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL MILE 1.390 1.390
A0050 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 1.390 1.390
A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0070 15401-0000 CONTRACTOR TESTING LPSM ALL
A0080 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0090 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 4,439 261 4,700
A0100 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0110 20101-0000 CLEARING AND GRUBBING ACRE 1.48 0.12 1.60
A0120 20301-2400 REMOVAL OF SIGN EACH 1 1
A0130 20302-2100 REMOVAL OF PIPE CULVERT LNFT 25 25
A0140 20303-0300 REMOVAL OF CONCRETE SQYD 152 18 170
A0150 20401-0000 ROADWAY EXCAVATION CUYD 948 52 1,000
A0160 20441-0000 WASTE CUYD 680 20 700
A0170 20703-2000 GEOGRID, STABILIZATION SQYD 4,709 241 4,950
A0180 20801-0000 STRUCTURE EXCAVATION Contract
CUYD 5 5 Quantity
A0190 20803-0000 STRUCTURAL BACKFILL Contract
CUYD 10 10 Quantity
A0200 25125-0000 BOULDER EACH 29 29
A0210 25126-0000 REMOVE AND RESET BOULDER EACH 7 7
A0220 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 827 43 870
A0230 30303-2000 AGGREGATE SURFACE RECONDITIONING SQYD 333 17 350
A0240 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 398 22 420
A0250 40601-0000 FOG SEAL TON 1.04 0.06 1.10
A0260 41102-1000 PRIME COAT, METHOD 1 SQYD 2,425 125 2,550
A0270 41201-0000 TACK COAT TON 1.04 0.06 1.10
A0280 50101-2600 MINOR CONCRETE PAVEMENT, PLAIN, 6-INCH DEPTH SQYD 69 11 80
A0290 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) Contract
CUYD 7 7 Quantity
A0300 55301-3500 PRECAST, PRESTRESSED CONCRETE SLAB Contract
EACH 1 1 Quantity
A0310 55401-1000 REINFORCING STEEL Contract
LB 800 800 Quantity
A0320 55601-0900 BRIDGE RAILING, STEEL Contract
LNFT 135 135 Quantity
A0330 56701-0000 MICROPILE (5.5" DIAMETER) Contract
LNFT 90 90 Quantity MileStone: For AD Date Completed: 08/26/21 Report Date: 08/26/21
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A
-A ug
-2
:1
A M
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities c:
\p w w or ki ng \c en tr al
\d
1\ [K
S F
TF
W
M
AC
Y
(2
FI
N
A L
S O
Q .x ls m
]S he et
STATE PROJECT
B1FTFW MACY 10(2)KS
SHEET
NUMBER
Sheet and Description
B3 B3 B3 B4 B5 B5 B6 S2
Survey Summary
Removal Summary
Grading Summary
Surfacing Summary
Permanent Signing
Summary
Permanent Pavement Marking
Summary
Miscellaneous Summary
Pedestrian Bridge
Summary Allowance Bid
Schedule
A0340 56706-0000 MICROPILE PROOF LOAD TEST Contract
EACH 2 2 Quantity
A0350 60915-1000 WHEELSTOP, CONCRETE EACH 13 13
A0360 61501-0200 SIDEWALK, COLORED CONCRETE SQYD 1,885 115 2,000
A0370 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 40
A0380 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 40
A0390 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 40
A0400 62301-0000 GENERAL LABOR HOUR 60
A0410 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 20
A0420 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 20
A0430 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 0.65 0.05 0.70
A0440 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 0.65 0.05 0.70
A0450 62901-1200 ROLLED EROSION CONTROL PRODUCT, TYPE 5.A SQYD 106 9 115
A0460 63301-0000 SIGN SYSTEM EACH 8 8
A0470 63301-1000 SIGN SYSTEM, GOVERNMENT FURNISHED SIGN
(INTERPRETATIVE PANELS) EACH 5 5
A0480 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 4,178 4,400
A0490 63405-0850 PAVEMENT MARKINGS, TYPE B, ACCESSIBILITY SYMBOL EACH 1 1
A0500 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL
A0510 63701-0000 FIELD OFFICE EACH 1
A0520 64603-0300 FIXTURE, BENCH EACH 5 5
A0530 64620-0400 REMOVE AND RESET MAILBOX EACH 1 1
-A ug -2
:1
A M
MileStone: For AD Date Completed: 08/26/21 Report Date: 08/26/21 c:
\p w w or ki ng \c en tr al
\d
1\ [K
S F
TF
W
M
AC
Y
(2
FI
N
A L
S O
Q .x ls m
]S he et
2) SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of
Estimated Quantity
STATE PROJECT
B2FTFW MACY 10(2)KS
SHEET
NUMBER
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d T
A B
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2) B3
GRADING SUMMARIES
SURVEY, REMOVAL, AND
P
M c p w w o r k in g c e n tr a l0 d T
A B
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2) B4
SUMMARY
SURFACING
P
M c p w w o r k in g c e n tr a l0 d T
A B
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2) B5
SUMMARIES
AND PAVEMENT MARKING
PERMANENT SIGNING
P
M c p w w o r k in g c e n tr a l0 d T
A B
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2) B6
SUMMARY
MISCELLANEOUS
V E
N T
W A
T E
R W
A T
E R
V E
N T
V E
N T
W A
T E
R
V E
N T
W A
T E
R
F L
A G P
O L E V E
N T
V E
N T
PT
.7
401+00
400+00
13+00
16+00
14+
15+00
P T
.0
P C
.4
P T
.2
PCC 14+47.80
P C
.3
P T
.6
P C
.0
P C
.0
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P
M A
C Y .d g n
NUMBER
SHEET
KS KS FTFW MACY 10(2)
.9
V P I
E L
.3
-2.000% -0.500%
60' VC
K = 40
V P I
E L
.0
-0.500% +0.000%
50' VC
K = 100
V P I
E L
.0
+0.000% +0.500%
50' VC
K = 100
.5
.9
V P I
E L
.1
-0.650% -3.600%
50' VC
K = 17
SSD = 391'
.2
100'50'0
Scale in Feet
C1
11+00 12+0010+00 13+00 14+00 15+00 16+00
Curve Data
Existing ground
Existing R/W
Existing R/W
(Do not disturb)
Existing kiosk mailbox and boulder
Remove and reset
Refuge Orientation Trail
Visitor Center/Headquarters
(RTE 010)
C Entrance RoadL
See Sheet D1 for details
Visitor Center Parking (RTE 900)
17+00
Curve = P_ENT-1
PI 12+30.09
D
R = 125.00'
T = 23.08'
L = 45.65'
Curve = P_ENT-2
PI 14+27.61
D
R = 38.00'
T = 49.23'
L = 69.42'
Curve = P_ENT-3
PI 14+97.03
D
R = 38.00'
T = 49.23'
L = 69.42'
Curve = P_ENT-4
PI 16+53.31
D
R = 500.00'
T = 36.84'
L = 73.54'
Curve = P_SAR-1
PI 401+29.36
D
R = 250.00'
T = 129.36'
L = 238.75'
401+00 402+00400+00 403+00
40' R
(RTE 010)
Entrance Road
Profile grade
(RTE 300)
Shop Access Road
Profile grade
Existing ground
Curve P_ENT-1
Curve P_ENT-3
Curve P_ENT-2
Curve P_SAR-1
Curve P_ENT-4
(R
TE
S ho p A cc es s
R oa d
LC Shop Access Road (RTE 300)
E: 2415419.95
N: 1914094.97
403+00
Shop Access Road
E: 2415546.48
N: 1914350.98
Shop Access Road 400+00
Entrance Road 11+40, 5' RT =
61.00' LT
11+20.00
61.00' LT
10+60.00 (Do not disturb)
Existing flagpole
See Sheet D1 for details
Visitor Center ABA Parking (RTE 909)
25' R
STOP
R1-1
24" White Stopbar
Shop Access Road (RTE 300)
End Construction
402+85.00
E: 2415538.36
N: 1914462.79
10+28.00
Entrance Road (RTE 010)
KS FTFW MACY 10(2)
Begin Project
E: 2415559.12
N: 1914286.39
16+90.02
Entrance Road (RTE 010)
KS FTFW MACY 10(2)
End Project
K a n s a s S ta te H ig h w a y
Road (RTE 300)
Begin Shop Access
401+40.00
Road (RTE 300)
End Shop Access
402+85.00
Road (RTE 010)
Begin Entrance
10+28.00
Road (RTE 010)
End Entrance
16+90.02
Parking (RTE 901)
Hwy 52 Visitor Kiosk
(Remove)
Existing Culvert
Solid Yellow Stripe
Begin Double
10+35.00
Solid Yellow Stripe
15+93 End
Solid Yellow Stripe
13+02 End
Limits of Construction
Limits of Construction
Limits of Construction
PLAN AND PROFILE - ENTRANCE ROAD (RTE 010) AND SHOP ACCESS ROAD (RTE 300)
2IN ALUM CAP
FLAG POLE
P R
C
.6
PRC
.4
105+00
PRC 105+
31.53
P T
.2
P C
.6
1+
PRC 101+09.66
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P T r a il
M A
C Y .d g n
NUMBER
SHEET
KS KS FTFW MACY 10(2)
V P I
E L
.5
-1.500% -2.600%
.6
V P I
E L
.9
-2.600% -0.700%
20' VC
K = 11
V P I
E L
.0
-0.700% -1.500%
100'25'0
Scale in Feet
101+00 102+00100+00 103+00 104+00 105+00 106+00
Existing ground
Profile grade
Curve Data
See Sheet D1 for details
Parking (RTE 900)
Visitor Center
(RTE 010)Entrance Road
Headquarters
Visitor Center/
PLAN AND PROFILE - REFUGE ORIENTATION TRAIL 1
C Refuge Orientation Trail 1L
Curve P_TR_01-1
Curve P_TR_01-2
Curve P_TR_01-3
Curve P_TR_01-4
Curve P_TR_01-5
Curve = P_TR_01-1
PI 100+78.79
D
R = 100.00'
T = 33.15'
L = 64.02'
Curve = P_TR_01-2
PI 101+52.54
D
R = 100.00'
T = 42.88'
L = 81.01'
Curve = P_TR_01-3
PI 102+24.78
D
R = 100.00'
T = 34.11'
L = 65.74'
Curve = P_TR_01-4
PI 123+81.65
D
R = 90.00'
T = 2,125.24'
L = 275.13'
Curve = P_TR_01-5
PI 105+74.29
D
R = 50.00'
T = 42.75'
L = 70.74'
(R
TE
Sh op A cc es s
Ro ad
Place Bench (One-sided)
Concrete pad 10'x5'
100+85 RT
Orientation Trail 1
Begin Refuge
100+00.00
C2
Limits of Construction
Limits of Construction furnished sign (interpretative panels)
Place Sign system, government
101+20 RT
E: 2415643.15
N: 1914106.42
Refuge Orientation Trail
KS FTFW MACY 10(2)
Begin Project
100+00.00
0 P T
.2
P C
.3
9+
PRC 109+82.24
+00
P T
.5
P C
.1
PRC 112+28.75
P T
.9
P C
.0
P C
.0
+00
PT 301+12.80
200+00
PC 200+16.62
P T
.4
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P T r a il
M A
C Y .d g n
NUMBER
SHEET
KS KS FTFW MACY 10(2)
Cross Slope Diagram
V P I
E L
.3
-1.500% -3.800%
50' VC
K = 22
V P I
E L
.2
-3.800% -1.200%
50' VC
K = 19
V P I
E L
.3
50' VC
K = 10
V P I
E L
.3
+3.80
0% -1.000%
40' VC
K = 8
V P I
E L
.7
20' VC
K = 3
V P I
E L
.7
+4.80 0%
-1.000%
V P I
E L
.9
-5.000%
V P I
E L
.9
30' VC
K = 3
V P I
E L
.0
+5.00 0%
20' VC
K = 4
100'50'0
Scale in Feet
108+00 109+00107+00 110+00 112+00 113+00
Curve Data
Existing ground
Profile grade
(Do not disturb)
Wetland Area
PLAN AND PROFILE - REFUGE ORIENTATION TRAIL 1
Curve = P_TR_01-6
PI 109+36.54
D
R = 100.00'
T = 152.19'
L = 197.89'
Curve = P_TR_01-7
PI 110+45.67
D
R = 50.00'
T = 63.43'
L = 90.32'
Curve = P_TR_01-8
PI 112+04.84
D
R = 50.00'
T = 29.72'
L = 53.63'
Curve = P_TR_01-9
PI 112+56.87
D
R = 50.00'
T = 28.12'
L = 51.24'
Refuge Orientation Trail 2 200+00.00
Refuge Orientation Trail 1 110+00.00 =
C Refuge Orientation Trail 1L
C Refuge Orientation Trail 3L
C Refuge Orientation Trail 2L
300+00.00
Refuge Orientation Trail 3
113+56.04 =
Refuge Orientation Trail 1
Place Bench (Two-sided)
Concrete pad 10'x8'
112+70 LT
Place Bench (Two-sided)
Concrete pad 10'x8'
109+20 LT
Curve P_TR_01-6
Curve P_TR_01-7
Curve P_TR_01-8
Curve P_TR_01-9
111+00
C3M uddy Creek
Bridge
Pedestrian
Begin
111+02.06
Bridge
Pedestrian
End
111+62.06
Begin Pedestrian Bridge
111+02.06
End Pedestrian Bridge
111+62.06
-1.5%
-10%
10%
0%
-10%
10%
0%
Profile grade and axis of rotation
106+50
106+50
1.5%
LT EOP
RT EOP
0%
LT EOP
RT EOP
-1.5%
1.5%
113+50
113+50110+92
111+02
110+92
111+72
111+62
111+72
LT & RT EOP
LT & RT EOP
Limits of Construction
Limits of Construction
Limits of Construction
Construction
Limits of furnished sign (interpretative panels)
Place Sign system, government
109+50 RT
furnished sign (interpretative panels)
Place Sign system, government
112+60 LT
C Refuge Orientation Trail 1L
P T
.9
P C
.0
P R
C
.2
P T
.4
P C
.0
P T
.8
P C
.5
P R
C
.1
P T
.1
P C
.2
2 PRC 30
5+28.0
P T
.8
119+00
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P T r a il
M A
C Y .d g n
NUMBER
SHEET
KS KS FTFW MACY 10(2)
-0.600%
V P I
E L
.1
-0.600% +1.600%
50' VC
K = 23
V P I
E L
.6
50' VC
K = 16
V P I
E L
.7
+4.80 0%
+2.800%
50' VC
K = 25
V P I
E L
.7
+2.800% +0.870%
100' VC
K = 52
.4
V
P I
E L
.4
100'50'0
Scale in Feet
115+00 116+00114+00 117+00 118+00 119+00
Curve Data
Existing ground
Profile grade
(Do not disturb)
Wetland Area
820820
Refuge Orientation Trail 3 306+90.23
Refuge Orientation Trail 1 119+38.84 =
PLAN AND PROFILE - REFUGE ORIENTATION TRAIL 1
C Refuge Orientation Trail 3L
Curve = P_TR_01-10
PI 115+13.09
D
R = 300.00'
T = 201.01'
L = 354.19'
Curve = P_TR_01-11
PI 117+35.99
D
R = 200.00'
T = 69.71'
L = 134.15'
C Refuge Orientation Trail 1L
Curve P_TR_01-10
Curve P_TR_01-11
300+00.00
Refuge Orientation Trail 3
113+56.04 =
Refuge Orientation Trail 1
End Refuge Orientation Trail 1
119+29.50
C4
Limits of Construction
E: 2416995.55
N: 1913865.37
Refuge Orientation Trail
KS FTFW MACY 10(2)
End Project
119+29.50
C Refuge Orientation Trail 3L
PC
7+ .3
9+
P R
C
.2
PT 110+72.56
111+00
P C
.6
PT 200+74.49
1+
PC 201+02.72
PT
.5
PC
.2
PT
+69 .0
3+
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P T r a il
M A
C Y .d g n
NUMBER
SHEET
KS KS FTFW MACY 10(2)
.2
V P I
E L
.9
-2.600%
30' VC
K = 5
V P I
E L
.8
+3.000 % -2.000%
30' VC
K = 6
V P I
E L
.5
50' VC
K = 8
V P I
E L
.9
+4.00 0%
V P I
E L
.9
V P I
E L
.9
+4.50 0%
.9
0.0%
0.0%
100'50'0
Scale in Feet
200+00 201+00 202+00 203+00
Existing ground
(Do not disturb)
Wetland Area
820820
PLAN AND PROFILE - REFUGE ORIENTATION TRAIL 2
Curve Data
(Do not disturb)
Wetland Area
Refuge Orientation Trail 2 200+00.00
Refuge Orientation Trail 1 29+50.00 =
Place Bench (One-sided)
Concrete pad 20'x8'
203+00
C Refuge Orientation Trail 1L
C Refuge Orientation Trail 2L
Curve P_TR_02-1
Curve = P_TR_02-1
PI 200+49.29
D
R = 50.00'
T = 32.67'
L = 57.87'
Curve = P_TR_02-2
PI 201+35.36
D
R = 20.00'
T = 32.64'
L = 40.84'
Curve = P_TR_02-3
PI 202+86.31
D
R = 3.00'
T = 26.05'
L = 8.74'
Curve P_TR_02-3
Curve P_TR_02-2
Profile grade
Begin Refuge Orientation Trail 2
200+00.00
End Refuge Orientation Trail 2
203+10.00
End Refuge Orientation Trail 2
203+10.00
Orientation Trail 2
Begin Refuge
200+00.00
C5
M u d d y C r e e k
Limits of Construction
Limits of Construction furnished sign (interpretative panels)
Place Sign system, government
202+92 RT
landing area
5' min.
P
.9
P C
.0
P R
C
.2
P T
.4
P C
.0
P T
.8
P C
.5
P R
C
.1
PRC 303+35.99
P T
.1
P C
.2
PRC 30
5+28.0
P T
.8
119+00
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d P
N P T r a il
M A
C Y .d g n
NUMBER
SHEET
KS KS FTFW MACY 10(2)
V P I
E L
.4
-0.600% +1.000%
.0
V P I
E L
.9
V P I
E L
.5
-1.000% +1.300%
V P I
E L
.4
V P I
E L
.1
+4.60 0%
-1.000%
40' VC
K = 7
V P I
E L
.5
40' VC
K = 7
V P I
E L
.1
+4.80 0%
-0.230%
V P I
E L
.0
-4.000%
.4
V
P I
E L
.4
100'50'0
Scale in Feet
301+00 302+00300+00 303+00 304+00 305+00
Profile grade
(Do not disturb)
Wetland Area
820820
PLAN AND PROFILE - REFUGE ORIENTATION TRAIL 3
Curve Data
306+00 307+00
Curve = P_TR_03-1
PI 300+63.25
D
R = 100.00'
T = 63.25'
L = 112.80'
Curve = P_TR_03-2
PI 302+53.18
D
R = 100.00'
T = 29.64'
L = 57.62'
Curve = P_TR_03-3
PI 303+11.70
D
R = 50.00'
T = 30.54'
L = 54.83'
Curve = P_TR_03-4
PI 303+94.30
D
R = 75.00'
T = 58.31'
L = 99.13'
Curve = P_TR_03-5
PI 305+03.14
D
R = 50.00'
T = 31.92'
L = 56.82'
Curve = P_TR_03-6
PI 305+78.99
D
R = 125.00'
T = 50.95'
L = 96.77'
Curve P_TR_03-1
Curve P_TR_03-2
Curve P_TR_03-3
Curve P_TR_03-4
Curve P_TR_03-5
Curve P_TR_03-6
Place Bench (One-sided)
Concrete pad 10'x5'
306+35 LT300+00.00
Refuge Orientation Trail 3
113+56.04 =
Refuge Orientation Trail 1
Existing ground
Refuge Orientation Trail 3 306+90.23
Refuge Orientation Trail 1 119+38.84 =
End Refuge Orientation Trail 3
306+80.89
Orientation Trail 3
End Refuge
306+80.89
Orientation Trail 3
Begin Refuge
300+00.00
Orientation Trail 3
Begin Refuge
300+00.00
C6
Limits of Construction
Limits of Construction furnished sign (interpretative panels)
Place Sign system, government
306+42 LT
C Refuge Orientation Trail 1L
P
M c p w w o r k in g c e n tr a l0 d P
L A
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2)
W A
T E
R
W A
T E
R
F L
A G P
O L E
V E
N T
V E
N T
12+00
13+00
14+00
15+00
401+
16+00
Sidewalk, Concrete
White (typ.)
Type B, Solid
40'20'0
Scale in Feet
Shop Access Road (RTE 300)
40' (typ.)
(ty p
.7
16'
R5-1
R4-7
R6-1L
M6-3
RS-034
M6-2R
R5-11
R
(Do not disturb)
Existing Flagpole
Parking (RTE 900)
End Visitor Center
16+90.02
Parking (RTE 900)
Begin Visitor Center
12+07.01
DO NOT
ENTER
ONE WAY
AUTHORIZED
VEHICLES
ONLY
16 feet width
Gate, metal, 401+60.00
R
2'R
R
R
2' R
R
2'R
R
R
R
5'R
VAN
ACCESSIBLE
R7-8P
R7-8
Parking Spaces
2 Oversized Vehicle
Concrete Wheelstop (typ.)
Type B, Solid White (typ.)
(typ
31.
1'
(t y p .)3
.1
35'R
5'
11'
2'R
2' R
3 Angled Parking Spaces
Place 3 Boulders
Place 4 Boulders
Place 13 Boulders
(RTE 909)
ABA Parking
Visitor Center
7 Angled Parking Spaces
Place 6 Boulders
5'
5'
20 21 ty p
(ty p
Concrete Wheelstop (typ.)
3 Angled Parking Spaces
5'
(t y p
NOTE:
PARKING (RTE 900)
VISITOR CENTER
D1
(t y p .)9
Sidewalk (Remove)
Existing Concrete
(Remove)
Concrete Pad
Existing ABA
RESERVED
PARKING
44'R
Place 10 Boulders
W12-1
See Special 634-A for pavement marking details.
See Special 633-A for sign installation details.
See Special 619-A for gate details.
See Special 609-A for wheelstop details.
See Sheet D2 for point control table.
5.
4.
3.
2.
1.
Sidewalk, Color Concrete
Sidewalk, Colored Concrete
Visitor Center/Headquaters
16+00
P
M c p w w o r k in g c e n tr a l0 d P
L A
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2) D2
PARKING (RTE 900)
VISITOR CENTER
V E
N T
W A
T E
R W
A T
E R
V E
N T
V E
N T
W A
T E
R
V E
N T
W A
T E
R
F L
A G P
O L E V E
N T
V E
N T
401+00
400+00
13+00
16+00
14+
15+00
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d E
C P
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2)
100'50'0
Scale in Feet
Existing R/W
Refuge Orientation Trail
Visitor Center/Headquarters
(RTE 010)
C Entrance RoadL
(R
TE
S ho p A cc es s
R oa d
LC Shop Access Road (RTE 300)
E: 2415538.36
N: 1914462.79
10+28.00
Entrance Road (RTE 010)
KS FTFW MACY 10(2)
Begin Project
E: 2415559.12
N: 1914286.39
16+90.02
Entrance Road (RTE 010)
KS FTFW MACY 10(2)
End Project
K a n s a s S ta te H ig h w a y
(Remove)
Existing Culvert
E1
Fiber Roll (typ.)
Fiber Roll (typ.)
Fiber Roll (typ.)
Fiber Roll (typ.)
Fiber Roll (typ.)
Fiber Roll (typ.)
Fiber Roll (typ.)
Fiber Roll (typ.)
Fiber Roll (typ.)
10+28.00 TO 16+90.02
ENTRANCE ROAD (RTE 010)
EROSION CONTROL
NOTE:
2.
1.
sheet for erosion control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion control devices not to scale.
Existing R/W
Hwy 52 Visitor Kiosk Parking (RTE 901)
Fiber Roll (typ.)
Visitor Center Parking (RTE 900)
Visitor Center ABA Parking (RTE 909)
2IN ALUM CAP
FLAG POLE
105+00
1+
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d E
C P T r a il
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2)
0 1
9+
+00
+00
200+00
100'50'0
Scale in Feet
(RTE 010)Entrance Road
Headquarters
Visitor Center/
C Refuge Orientation Trail 1L
(R
TE
Sh op A cc es s
Ro ad
E2
Fiber Roll (typ.)
Fiber Roll (typ.)
Fiber Roll (typ.)
Fiber Roll (typ.)
100+00 TO 115+00
REFUGE ORIENTATION TRAIL 1
EROSION CONTROL
Fiber Roll (typ.) Fiber Roll (typ.)
Fiber Roll (typ.)
NOTE:
2.
1.
sheet for erosion control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion control devices not to scale.
Fiber Roll (typ.)
Fiber Roll (typ.)
100'50'0
Scale in Feet
Fiber Roll (typ.)
Fiber Roll (typ.)
Fiber Roll (typ.)
NOTE:
2.
1.
sheet for erosion control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion control devices not to scale.
300+00.00
Refuge Orientation Trail 3
113+56.04 =
Refuge Orientation Trail 1
Erosion Control Details
See Sheet E1 for
Parking (RTE 900)
Visitor Center
Fiber Roll (typ.)
E: 2415643.15
N: 1914106.42
Refuge Orientation Trail
KS FTFW MACY 10(2)
Begin Project
100+00.00
C Refuge Orientation Trail 1L
C Refuge Orientation Trail 1L
C Refuge Orientation Trail 3L
C Refuge Orientation Trail 2L
119+00
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d E
C P T r a il
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2)
9+
111+00
1+
3+
E3
Fiber Roll (typ.)
E: 2416995.55
N: 1913865.37
Refuge Orientation Trail 1
KS FTFW MACY 10(2)
End Project
119+29.50
Refuge Orientation Trail 3 306+90.23
Refuge Orientation Trail 1 119+38.84 =
C Refuge Orientation Trail 1L
C Refuge Orientation Trail 3L
300+00.00
Refuge Orientation Trail 3
113+56.04 =
Refuge Orientation Trail 1
(Do not disturb)
Wetland Area
200+00 TO 203+10
REFUGE ORIENTATION TRAIL 2
115+00 TO 119+29.50
REFUGE ORIENTATION TRAIL 1
EROSION CONTROL
C Refuge Orientation Trail 1L
Refuge Orientation Trail 2 200+00.00
Refuge Orientation Trail 1 29+50.00 =
Begin Refuge Orientation Trail 2
200+00.00
M u d d y C r e e k
(Do not disturb)
Wetland Area
End Refuge Orientation Trail 2
203+10.00
(Do not disturb)
Wetland Area
Fiber Roll (typ.)
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion control devices not to scale.
2.
1.
NOTE:
sheet for erosion and sediment control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
Erosion control devices not to scale.
2.
1.
100'50'0
Scale in Feet
100'50'0
Scale in Feet
C Refuge Orientation Trail 2L
C Refuge Orientation Trail 3L
C Refuge Orientation Trail 1L
119+00
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d E
C P T r a il
M A
C Y .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
NUMBER
SHEET
KS KS FTFW MACY 10(2)
100'50'0
Scale in Feet
(Do not disturb)
Wetland Area
300+00.00
Refuge Orientation Trail 3
113+56.04 =
Refuge Orientation Trail 1
Refuge Orientation Trail 3 306+90.23
Refuge Orientation Trail 1 119+38.84 =
End Refuge Orientation Trail 3
306+80.89
Orientation Trail 3
Begin Refuge
300+00.00
E4
Fiber Roll (typ.)
Fiber Roll (typ.)
Fiber Roll (typ.)
NOTE:
2.
1. Erosion control devices are not to scale.
sheet for erosion control symbols.
Refer to the Conventional Plan Symbols and Abbreviations
300+00 TO 300+80.89
REFUGE ORIENTATION TRAIL 3
EROSION CONTROL
C Refuge Orientation Trail 1L
NOTE:
12" min.
FIBER ROLL
Maximum spacing (ft)
9" Ø Fiber Roll
Flow
12" min.
C le a r in g
L im it
S lo p e
S ta k e
INSTALLATION DETAIL
FIBER ROLL AS PERIMETER CONTROL
uphill side of fiber roll
Place excavated material on
AT CULVERT OUTLET
FIBER ROLL
flared end section
Culvert inlet with
AT CULVERT INLET
FIBER ROLL
flared end section
Culvert outlet with Flow
D ire c tio n o f ru n o ff
Flow
FIBER ROLL LAPPING DETAIL
Stagger joints (typ.)
FIBER ROLL JOINT DETAIL
FIBER ROLL SLOPE LAYOUT
spacing table See Fiber Roll
Install fiber rolls along contours Wood stakes
Fiber Roll
Slope
Fiber Roll
Pay Limits
Pay Limits overlap 12" (min.)
Fill slope
C157-55 side of fiber roll material on uphill
Place excavated
Flow Flow
54" or larger
Culvert Size
24" or smaller
30" to 48"
9" Ø Fiber Roll length (ft)
FIBER ROLLS AT CULVERTS*
needed due to project-specific conditions.
top of the culvert inlet only. Adjust length as
*Approximate length shown for rolls across the
See note 6 control runoff culvert as needed to
Install fiber rolls below
6.
5.
4.
3.
2.
1.
disturbance.
and all water entering the culvert is crossing the disturbance is on both the road and around the culvert
Place fiber rolls all the way around the inlet when the under it.
water is forced to flow through fiber roll rather than against upstream side of fiber roll to ensure storm with trench bottom and sides. Tamp soil backfill to the contour. Place fiber rolls in continuous contact
For fiber rolls on bare soil, construct trenches parallel
Expose stakes 2" above top of fiber roll.
Drive stakes into undisturbed soil at least 12" deep.
from each end.
2' o.c. max. culverts. Stake fiber rolls 6-inches stakes. Space stakes 4' o.c. max. on slopes and
Stake fiber rolls in place with 1" x 1" or 1" Ø wood vary more than 5% from level.
section of fiber roll, do not allow the fiber roll to
Install fiber rolls along slope contours. For any 20' to installation.
Repair all rills or gullies and properly compact prior
A A
Trench 2" min.
See no te 3
See no te 3
2" min.
Trench table for length requirements
See Fiber Rolls at Culverts culvert inlet
Install fiber rolls around table for length requirements
See Fiber Rolls at Culverts culvert outlet
Install fiber rolls around
Flow
Fiber roll roll 2" min.
Trench fiber
SECTION A-A
REVISED: 12/2017
DETAIL APPROVED FOR USE 01/2011
E5
Flow
NO SCALE
1V:4H or flatter
Slope Gradient
1V:2H or steeper
STAKE DETAIL
uphill side of fiber roll
Place excavated material on
Fill or cut slope
FIBER ROLL SPACING TABLE*
project-specific conditions.
*Approximate spacing shown. Adjust spacing as needed due to
Between 1V:4H and 1V:3H
Between 1V:3H and 1V:2H
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
NUMBER
SHEET
Boulder (typ.)
m in
0.5 to 1' Finish grade
BOULDER PLACEMENT
BOULDER PLACEMENT
ground (typ.).
and blend with to surcharge surface material with salvaged Fill up to boulder toe
BOULDERS - SECTION
6' Spacing (typ.)
C le a r
PLAN
3'
1'
251-A
NO SCALE
G1
2.
1.
NOTE:
Edge of pavement
E d g e o f p a v e m e n t
2' min.
dimension to be 5'.
Minimum boulder dimension to be 3' and maximum boulder layout and spacing as directed by the CO.
Place boulders in locations as shown on plans, final
3' min. to 5' max m in to m a x
STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d s p A .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
SPECIAL
U.S. CUSTOMARY SPECIAL
NUMBER
SHEET
NO SCALE
P
M c p w w o r k in g c e n tr a l0 d S td
.d g n
FEDERAL LANDS HIGHWAY OFFICE
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
STANDARD
U.S. CUSTOMARY STANDARD
NUMBER
SHEET
KS KS FTFW MACY 10(2)
501-1
STANDARD APPROVED FOR USE --/----
REVISED: 9/2016
MINOR CONCRETE PAVEMENT
R1
NOTE:
3.
2.
1.
PLAN PLAN
PROFILE PROFILE
REINFORCED MINOR CONCRETE PAVEMENTPLAIN MINOR CONCRETE PAVEMENT
Traffic Traffic
Transverse contraction joint
THICKNESS
PAVEMENT
JOINT SPACING
TRANSVERSE
See Note 2See Note 2
Lap longitudinal and transverse reinforcement not as shown for joints in reinforced pavement.
for joints in plain portland cement concrete pavement
Provide the same type of dowel assemblies and tie bars
Transverse joint
Longitudinal joint
Tie bar
Dowel bar Dowel bar less than 15 inches.
(in) (ft)
6 = T <12
T < 6
(typ.)
24" ty p typ.
2" clear ty p c le a r ty p c le a r typ.
2" clear welded wire reinforcement or No. 4 bars
Slab reinforcement 4" x 4" - W6 x W6 reinforcement or No. 4 bars
W6 x W6 welded wire
Slab reinforcement 4" x 4" -
See Detail C501-50 for joint and joint sealing details.
#6
#5
#5
(inches) (inches)
10 < T = 12
8 < T = 10
T = 8
" typ.8 3" - 8
" typ.8 3" - 8
" typ.8 3" - 8
" typ.8 3" - 8
" typ.8 3" - 8
" typ.8 3" - 8
9"9"
9"9"
18"18"
" - 1" typ.2
9"9"
" - 1" typ.2
18"18"
Smooth dowel @ 12" c-c
Smooth dowel @ 12" c-c
Deformed tie bar @ 30" c-c
" (typ.)8 3" - 8
" (typ.)8 3" - 8
Do not place tie bars within 15" of transverse joints.
" - 1" typ.2
Deformed tie bar @ 30" c-c
Smooth dowel @ 12" c-c
07/2013
REVISED: 08/2014
DETAIL APPROVED FOR USE
C501-50
PAVEMENT JOINTS
MINOR CONCRETE
R2
T
T
T/2
T
T/2
T
T/2
T
T/2
T
NOTE:
T/3
T/3
Tie Bar Diameter
Dowel Bar
NO SCALE
T
Thickness (T)
Pavement
T/3
T/2
T/3
CONTRACTION JOINT
DOWELED - TRANSVERSE
CONTRACTION JOINT
TIED - LONGITUDINAL
CONTRACTION JOINT
DOWEL BUTT - TRANSVERSE
CONSTRUCTION JOINT
TIED BUTT - LONGITUDINAL
CONSTRUCTION JOINT
DOWELED - TRANSVERSE
ISOLATION JOINT
UNDOWELED - LONGITUDINAL
ISOLATION JOINT
UNTIED - LONGITUDINAL
UNDOWELED - TRANSVERSE and
ISOLATION JOINT
Pavement surface
See Note 7 Joint Sealant
See Note 7 Joint Sealant
2 x joint width) (Diameter = Backer rod
2 x joint width)
(Diameter =
Backer rod Fixture or structure
Expansion cap
See Note 7 Joint Sealant joint material
Expansion
SAWED OR FORMED JOINT
JOINT SEALING DETAILS
CONSTRUCTION JOINT
CONSTRUCTION JOINT
PLAIN - TRANSVERSE or LONGITUDINAL
7.
6.
5.
4.
3.
2.
1.
is 2:1 or as recommended by sealant manufacturer.
silicone sealant is used, the width to depth shape factor
Maintain joint sealant shape factor of 1:1 except when construction with epoxy resin.
the tie bars and dowels into the existing concrete set into concrete during placement, drill and anchor
For construction joints, if tie bars and dowels are not approval.
planned construction joint locations to the CO for and longitudinal construction joints sparingly. Submit not included in the joint layout plan. Use transverse
Transverse and longitudinal construction joints are and length of the concrete surface.
Use expansion joint material extending the full depth
Install isolation joints when abutting a fixed structure.
Use deformed reinforcing bars for tie bars.
pavement.
and other steel used in the construction of concrete
Use epoxy-coated material for all tie bars, dowels, STATE PROJECT
P
M c p w w o r k in g c e n tr a l0 d C .d g n
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
DETAIL
U.S. CUSTOMARY DETAIL
NUMBER
FEDERAL HIGHWAY ADMINISTRATION
CENTRAL FEDERAL LANDS HIGHWAY DIVISION
DRAWING NO.
DATEBRIDGE DRAWING
of
PROJECT TEAM LEADERSCALE
CHECKED BYDRAWN BYDESIGNED BYREVISIONS
BY
DATENO.
REVISIONS
LINN COUNTY, KS
9R. THOMPSON J. ROBERTS MARCH 2020
KS KS FTFW MACY 10(2)
U.S. FISH AND WILDLIFE SERVICE
NO.
PROJECTSTATE
MUDDY CREEK PEDESTRIAN BRIDGE
MARAIS DES CYGNES NATIONAL WILDLIFE REFUGE
REFUGE ORIENTATION TRAIL 1
S56°47'28"E
HYDRAULIC NOTES:
Q
Q
Q
2220 4.22
3120 4.39
4640 4.03
HYDRAULIC DATA
793.9
794.6
795.4 ft /sec.
Q ft/sec.
V
Elev.
WS
1" = 10'-0"
KATHRINEBERG
GENERAL PLAN & ELEVATION
M u d d y C re e k
C Refuge Orientation Trail 1L
PLAN
L
Orientation Trail 1
C Refuge
Proposed grade at
L
ELEVATION
20'10'0
Scale in Feet
3:1
Q 1600 4.13 793.35
Freeboard for the Q is 0.5 feet.3.
Scour design event is Q .2.
bridge.
Water surface elevations are at upstream face of 1.
FOUNDATION LAYOUT
SHEET
INDEX TO SHEETS
DESCRIPTION
GENERAL PLAN AND ELEVATION
SUMMARY OF BORING LOGS
DECK SLAB PLAN AND TYPICAL SECTION
ABUTMENT DETAILS
BRIDGE RAILING DETAILS
MISCELLANEOUS DETAILS
PROFILE GRADE DIAGRAM
Elevations are at profile grade C Refuge Orientation Trail 1L
1'-6" 1'-6" grading (typ.)
Proposed
Bridge Location
3:1
90° (Typ.)
RG3181-A
RG3181-B
RG3181-C
RG3181-D
RG3181-E
RG3181-F
RG3181-G
RG3181-H
RG3181-I
MICROPILE DETAILS
FIX FIX
line at C Trail
Existing ground
El. 793.3
Design High Water
El. 793.86
Min. low chord
(Fill face Abut. 1)
Begin Bridge (Fill face Abut. 2)
End Bridge
E l.
.7
.6
E l.
.9
.0
+4.80% -1.00% -5.00%
P r o p o s e d
T r a il
58'-0"
P C
.1
Micropile (typ.)
No To Scale
GENERAL NOTES AND ESTIMATE
1'-0" 1'-0"
57'-0"
C BearingL C BearingL
S1
El. 795.69
Sta. 111+02.06
(Fill face Abut. 1)
Begin Bridge
C MicropilesL C MicropilesL handrail. (typ.)
steel cable pedestrian
Pedestrian Bridge Railing, Modified Oregon DOT
Length of Bridge = 60'-0"
Bridge Rail Post Spacing: 16 Spa. @ 4'-0" = 64'-0"
(Typ.)
"2 13'-4
(Typ.)
"2 15'-4
E n d o f
W in g w a ll
E n d o f
W in g w a ll
El. 795.09
Sta. 111+62.06
(Fill face Abut. 2)
End Bridge type 5.A (typ.)
control product
Rolled erosion
Bridge Rail Length = 67'-6"
Length of Bridge = 60'-0"
Prefabricated Prestressed Concrete Slab Length = 58'-0"
Railing, steel cable pedestrian handrail.
Modified Oregon DOT Pedestrian Bridge
-1.00%
Elev. 768.5
Estimated Tip Elev. 770.6
Estimated Tip
Abut. 1
Elev. 791.32
Abut. 2
Elev. 790.62
Prestressed Concrete Slab
RG3181-A
CMM
GENERAL NOTES
CALL 811
CALL BEFORE YOU DIG:
2 NO SCALE
GENERAL NOTES AND ESTIMATE
S2
RG3181-B
Construction Access: Construction access limits shall be approved by CO.
Geotechnical report: A geotechnical report is available from the CO.
Construction stability: Contractor is responsible for the stability of the structure throughout the duration of construction.
Section 717.10(a) with the durometer (shore "A") hardness of 50.
Elastomeric Bearing Pad: Bearing pads are unlaminated. They shall be cut or molded from AASHTO elastomer Grade 4 or 5 as described in
Prestressed Concrete Slab: Refer to sheet S7.
paid for.
Reinforcing steel lap splices: Minimum lap splices shall be as shown on the plans. Bar splices other than those shown on the plans will not be concrete covering to the face of any bar shall be 2 inches, unless otherwise noted on the plans.
Reinforcing steel: Reinforcing steel shall be black bars and shall conform to AASHTO M31 or M322, (ASTM A615) Grade 60. The minimum expansion joint filler that meets the requirements of AASHTO M213.
cement. All exposed edges shall have a 3/4" chamfer. Exposed surfaces shall be given a class 2 finish, unless noted otherwise. Provide
4500 psi. On -site soils exhibit a negligible degree of sulfate attack on concrete (exposure class S0) so all concrete shall be made with Type II
Concrete: Cast-in-place concrete for the abutments and wingwalls shall be class A (AE) and shall have a 28 day compressive strength of
Federal Highway Projects (FP-14 U.S. Customary Units).
Construction Specifications: The work shall be in accordance with the Standard Specifications for Construction of Roads and Bridges on
Site Class = D. Seismic Zone = 1.
long period spectrum acceleration, SD1 = 0.091g.
Long period acceleration at 1.0 seconds (S1 = 0.038 g) modified by the site coefficient (Fv = 2.4) to give the short period spectrum acceleration, SDS = 0.124 g.
Short period acceleration at 0.2 seconds (Ss = 0.077 g) modified by the site coefficient (Fa = 1.6) to give the acceleration, As = 0.053 g.
Peak ground acceleration (PGA = 0.033 g), if modified by the site coefficient (FPGA = 1.6) to give a spectrum
Seismic:
20 lbs. per square foot applied to the deck area as uplift.
Wind Load:
Micropiles: Refer to sheet S5.
Live Load Surcharge: Equivalent to a height of soil. For abutments and wingwalls h = 2 feet.
At Rest Pressure: Equivalent to a fluid unit weight of soil = 60 lbs. per cubic foot.
Lateral Earth Pressure:
No Allowance for future wearing surface.
Soil: 135 lbs. per cubic foot.
Structural Steel: 490 lbs. per cubic foot.
Concrete: 150 lbs. per cubic foot.
Dead Load:
Vehicle Live Load: Not Required
Pedestrian Live Load = 90 psfLoading:
and AASHTO LRFD Guide Specifications for Design of Pedestrian Bridges, 2009 with current iterims.
Design in accordance with the 8th edition of the AASHTO LRFD Bridge Design Specifications, 2017 Design:
DESIGN DATA
ESTIMATE
ITEM NO. DESCRIPTION UNIT
PAY
QTY.
EST.
NOTES
15215-2000 SURVEY AND STAKING, BRIDGE EACH 1
20801-0000 STRUCTURE EXCAVATION CUYD 5 (1)
20803-0000 STRUCTURAL BACKFILL CUYD 10 (1)(2)
55201-0200 STRUCTURAL CONCRETE CLASS A (AE) CUYD 7 (1)
55301-3500 PRECAST PRESTRESSED CONCRETE SLAB EACH 1
55401-1000 REINFORCING STEEL LB 800 (1)
55601-0900 BRIDGE RAILING STEEL LNFT
56701-0000 MICROPILE (5.5" DIAMETER) LNFT 90
56706-0000 MICROPILE PROOF LOAD TEST EACH 2
62901-1200 ROLLED EROSION CONTROL PRODUCT TYPE 5.A SQYD 106
NOTES:
(1) Contract Quantity
(2) Includes cost of…