This document is Addendum 2 for KEYS Bid 01-25, a solicitation for Substation Battery Replacement by the Keys Energy Services in Florida. The addendum provides clarifications to two specific questions from potential bidders regarding battery strap specifications. The first question confirms that the straps are battery-to-battery connector straps, and the second question clarifies that the bid requires 100 total straps across 10 substation battery banks (10 straps per substation).

The addendum does not provide additional details about pricing, contract terms, or specific technical requirements beyond the strap clarification. It serves as a supplemental communication to ensure bidders have accurate information about the battery replacement project's component requirements. No other substantive information about funding, timeline, or award criteria is included in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KEYS BID 01-25 SPECIFICATIONS FOR SUBSTATION BATTERY REPLACEMENT

Addendum 2

Questions and Answers:

1. Can you please help me understand if the strap is battery to battery connectors or a hold down strap?

a. These are battery-to-battery strap connections.

2. The bid states that "Ten (10) completely new substation battery banks, including straps, are required." Please confirm if this means 10 straps per substation (for a total of 100 straps across all 10 substations) or if only 10 straps are required in total?

a. 100 total straps in total