07 AL-1789-8063A SR - VC04 and VC12 Compliance Matrix.pdf
PDF 641 KB Posted
- Attached to
- VC04 & VC12 Pumping Station
- Solicitation number
- JS-2025-001
- Issued by
-
Department of Energy
About this file
This document is a compliance matrix for the VC04 & VC12 Pumping Station project at Lawrence Berkeley National Laboratory (LBNL). The matrix details technical requirements and specifications that contractors must follow for manufacturing vacuum chambers, with "shall" statements indicating contractually binding requirements versus "may" or "should" statements indicating desired but non-binding specifications.
The document outlines specific requirements including documentation deliverables, manufacturing specifications, quality assurance protocols, and environmental standards. Key technical requirements include achieving a maximum thermal outgassing rate of 1.00e-11 Torr.l.s-1.cm-2, final pressure of 5.00e-10 Torr, and using CuCrZr material with hardness greater than HRB 70. Manufacturing processes must follow strict cleanliness protocols for ultra-high vacuum (UHV) environments, with specific standards for welding, cleaning, and testing procedures. The contractor must conduct visual inspections, CMM measurements, water pressure tests at 120 psi, bakeout procedures, and helium leak tests before final delivery. Special packaging and shipping requirements are specified to ensure proper protection during transport.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 02 SAMPLE Subcontract.pdf | ||
| 01 Request For Quotation (RFQ).docx | DOCX document | |
| 06 AL-1208-0209C Supplier Quality Evaluation Survey.pdf | ||
| 04 GP-Commercial Foreign (2).pdf | ||
| 05 Rep-CertForm.doc | DOC document | |
| 03 GP-Commercial Supplies and Services (10).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Will – is used to inform intent or declaration of purpose. This is not a specification. Example, the author will use the word ‘shall’ to indicate that a specification is contractually binding and must be implemented.
Specification definition
Shall, will, may, and should are used to define every specification listed in this document. The definitions of these terms are as follows :
May – is used to indicate a desire or goal of a specification. This can also be interpreted ‘as nice to have’ and are not contractually binding.
Shall –is a specification that is contractually binding and must be implemented.
Should – is used to indicate a desire or goal of a specification. This can also be interpreted ‘as nice to have’ and are not contractually binding
O ffi ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U 7Y
W
BE
G H
V
Downloaded by: Janet Schlock at December 13, 2024 10:58:07
A B C D E F G H I
Source Section Sub-Section Sub-Section
(2x) Sub-Section
(3x) Sub-Section
(4x) Description Compliance Comments - Please provide a narrative if not compliant
2 Deliverables / Scope
2.1 Deliverables
2.1.1 Documentation
The Subcontractor shall provide the entire list of documentation
2.1.3 Hardware
The Subcontractor shall provide the entire list of hardware
2.2 Scope of work
2.2.1 Management and Quality plan
The Subcontractor shall provide an initial schedule and a quality plan 7 day ARO
2.2.2 Final Design Review Requirements
The subcontractor shall be responsible for supplying a final design of the VC04 & VC12 (Pumping Station)
The subcontractor shall adhere to VC04 & VC12 (Pumping Station) engineering specification (AL-1779-4846)
The subcontractor shall participate in the Final Design Review
The subcontractor shall include at least the following documentation:
1. Manufacturing plan for the vacuum chamber
2. Final manufacturing drawings (required if design was modified)
3. Final CAD model (Required if Design was modified)
4. Test plan and associated procedures
5. Bill of material
The subcontractor shall wait for a written approval and resolution of all related FDR action items prior to fabrication
2.2.3 First article
The subcontractor shall produce the first article after approval of the FDR
The subcontractor shall produce the first article with the same testing and quality assurance as the production
2.2.4 First article delivery
The subcontractor shall be responsible for the delivery of the first article to LBNL
2.2.5 Complete production
The subcontractor shall wait the final approval of the first article for the commencement of fabrication of the production
The subcontractor shall include at least the following documentation prior shipment:
1. Complete vacuum chamber packed in an appropriate crate.
2. Completed FAT and associated reports
3. Final and completed ACL
4. Quality assurance receipts and certifications
5. Nonconformance or deviation documentation pertaining to each individual assembly
6. Final, approved shipping plan
7. Written authorization from LBNL to proceed with shipping
2.2.6 Delivery
The subcontractor shall be responsible for the delivery of the production to LBNL
2.3 Final documentation packages(s)
The subcontractor shall provide the final documentation package with at least the following:
1. A complete, as-built bill of materials identifying both fabricated and commercially available components
2. A complete, as built CAD model in an editable format
3. Complete, as built drawings in English, and in an editable format.
4. Any other documentation as requested
3 Management, reporting, documentation and reviews
3.1 Schedule
The subcontractor shall comply with the proposed schedule
3.2 Reporting requirements
The subcontractor shall use the portal (windchill) for data exchange
The subcontractor shall provide progress report before the fifth of each month(may include drawings, manufacturing plans, test plans, QA plans, schedule updated or other documents on request in any state.
The subcontractor shall authorize LBNL representative to visit factory where the units are being built
The subcontractor shall provide other report or data on LBNL request
3.3 Proposal documentation requirements
The subcontractor shall provide An electronic copy of all required documentation
3.4 Reviews
The subcontractor shall provide review drawings, documentation, and presentations 10 business days prior the scheduled FDR
3.5 Hold points
The subcontractor shall comply with the hold points
4 Fabrication
The subcontractor shall comply with the VC04 & VC12 (Pumping Station) engineering specification (AL-1779-4846)
5 Packaging and Shipping Specification
The subcontractor shall submit to LBNL a shipping plan and be approved before the first shipment
5.1 Container
The subcontractor shall use container or crates for the vacuum chamber shipment
The subcontractor shall use container or crates for the vacuum chamber storage
The subcontractor shall use a reusable crates with sides using standard attachments
The subcontractor shall submit design of crates to LBNL
The subcontractor shall wait for approval of crates design before fabrication
The subcontractor shall use ASTM D6199 for design and fabrication of crate
The subcontractor shall can ship multiple vacuum chambers per crate
The subcontractor shall secure crate during shipment
5.2 Marking
The subcontractor shall clearly identify tie-downs on crate
The subcontractor shall clearly identify lifting points on crate
The subcontractor shall clearly identify center of gravity on crate
The subcontractor shall labeled crate with all subcontract information including subcontract number, contact, and delivery information.
The subcontractor shall use self-adhesive shock indicators on crate
The subcontractor shall clearly indicate with clear and obvious labels indicating the presence of fragile contents
The subcontractor shall use originating native language and English on the crate
Storage Ring - VC4 & VC12 (Pumping Station) - Compliance Matrix
SOW - AL-1779-4845
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U 7Y
W
BE
G H
V
A B C D E F G H I
The subcontractor shall use up arrow to indicate the crate orientation
The subcontractor shall marked the serial number of each vacuum chamber contained therein.
5.3 Packaging
The subcontractor shall not use desiccant
The subcontractor shall have all vacuum chambers including cooling channels free of any liquid prior to shipping
The subcontractor shall use foam to prevent movement or overstress during transportation
The subcontractor shall use moisture barrier in containers to prevent condensation during air shipment
5.4 Handling and storage
In case of storage, the contractor shall have a temperature and moisture controlled storage facility
The contractor shall ensure that the temperature during storage is between 10 C and 40 C
6 Quality assurance
The contractor shall comply with the entire QA request by LBNL. If not please describe in column I your discrepancies
7 Final Design
The electron beam channel must be void on any abrupt geometry change through the chamber.
8 Environmental requirements
8.1 Codes and Standards
The following standards shall apply for the fabrication and test of the VC04 & VC12 (Pumping Station):
• EN ISO 13919 or EN ISO 5817
• EN ISO 17637
• ASTM E498.
• EN ISO 17640
• ASTM E2734/E2734 M − 10.
8.2 Cleanliness environment
The cleaning environment shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §7.2
8.3 Cleaning fluids
The cleaning fluids shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §7.3
8.4 Cutting fluids
The cutting fluids shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §7.4
8.5 Fasteners
The fasteners of the of vacuum chambers must comply with AL-1220-7841_Rev G, §7.6
8.6 Flange and Gaskets
The flanges and gaskets of the vacuum chambers must comply with AL-1220-7841_Rev G, §7.7
9 Technical requirement
9.1 Vacuum pressure
The maximum thermal outgassing rate shall be 1.00e-11 Torr.l.s-1.cm-2
Achievable final pressure shall be 5.00e-10 Torr
9.2 Manufacturing process
9.2.1 Material
All materials must be new.
All material must be free from surface cracks and fissures, forge and other tool marks, burns, delamination and other defects that would make it incompatible with a high vacuum environment.
Certification must be in accordance with EN ISO 10204 3.1.
The hardness of the raw material CuCrZr shall be greater than HRB 70
The temperature of the CuCrZr must not exceed 300C at any time during the fabrication process
Magnetic permeability for vacuum chamber base material must be 1.01 and for welds or braze joints 1.04
The tube of the vacuum chamber must be seamless
The material must be compatible with synchrotron radiation
9.2.2 Fabrication
9.2.2.1 Part fabrication
A water-soluble and non-halogenated cutting fluids shall be used for fabrication
All others requirements relative to the vacuum components fabrication shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §8.1, §8.2, §8.3
9.2.2.2 Cleaning after manufacturing
UHV surfaces shall be protected as per best practices during handling operations.
Parts shall be stored in a clean area from the workshop (See §7.2).
Parts shall be suspended in tanks by wire, hooks or in baskets
All others requirements relative to the vacuum components cleaning shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §9
9.2.2.3 Part joining
Step change in geometrical profile across weld shall be less than 0.2mm
All parts shall be cleaned prior to welding (See §8.3)
A WPS is not required
The weld quality shall be level D according to EN ISO 13919 or EN ISO 5817
All requirements relative to brazing shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §10.4
All welds shall be free from cracks and fissures or other defects that would make it incompatible with a high vacuum environment.
100% of the vacuum boundary welded joints shall be visually inspected
The visual inspection shall comply with EN ISO 17637
100% of the vacuum boundary welded joints shall be leak tested.
The leak test of the welded joint shall comply with ASTM E498
The criteria and parameter expected for the He leak check shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §14
9.3 Final cleaning
Once the final cleaning process has started, it shall not be stopped before the end.
After the final cleaning, all subsequent operations shall be performed in a cleanroom.
The cleaning agent used shall be identified and approved by LBNL prior to the Factory acceptance test.
All other requirements regarding the final cleaning and intermediate inspection shall comply with UHV Chamber and Component Production Requirements AL-1220
7841_Rev F, §11 and §12.
9.4 Final assembly
All requirement with final assembly shall comply UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §13
9.5 Final test
All test shall take place in a clean room
During pumping down of the part, all connection above the turbo pump shall be all-metal
The HPN2 port shall be all-metal
AL-1779-4846_SR -
VC04 & VC12
(Pumping Station) -
ESD
SOW - AL-1779-4845
ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U 7Y
W
BE
G H
V
A B C D E F G H I
The HPN2 port shall be a VCR to CF16 adapter that is replaced with a CF16 blank as the last connection to the chamber prior to shipping
LBNL shall have right to visit the contractor during these tests
9.5.1 Visual inspection
The selected vendor shall conduct a visual inspection on all vacuum chamber, with particular attention to the following points:
The visual inspection shall be documented in a report, including pictures of the detailed points mentioned above
9.5.2 CMM Measurement before bakeout
A CMM measurement must be performed, on all vacuum chamber
The dimensions to be controlled must be specified by the University technical representative.
9.5.3 Water pressure test
The cooling channel pressure test shall be conducted at 120 psi
The cooling channel pressure test shall last 10 mins
No leak shall appear at the completion of the pressure test
9.5.4 Bakeout
Bakeout shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §14.1
9.5.5 Residual Gas Analysis
Residual Gas Analysis shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §14.2
9.5.6 Final He leak test
Final He leak test shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §14.5
9.5.7 Final Pressure measurement
Final pressure measurement shall comply with AL-1220-7841, §14.5
9.5.8 HPN2 Back fill
HPN2 Back fill shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §14.6
9.6 Packing and shipping
Packing and shipping shall comply with UHV Chamber and Component Production Requirements AL-1220-7841_Rev G, §15
AL-1779-4846_SR -
VC04 & VC12
(Pumping Station) -
ESD
• Serialization applied to the chamber.
• Fittings present on all cooling channels.
• Ensure that all bolts within the device are securely tightened.
• Ensure that all welded joints are free from surface cracks and fissures.
• Presence of fiducial nest on the vacuum chamber
• Presence of Helicoils on the vacuum chamber ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U 7Y
W
BE
G H
V
Comply
Not comply
Partialy Comply ci al ly R el ea se d to th e
LB
N L
D oc um en t C on tr ol
C en te r
Re le as ed
: D ec em be r 1 3t h, D C
C A ut h
K ey
: U 7Y
W
BE
G H
V
File details come from the government source that posted it. Updated .