JPP HVAC Replacement SOW.pdf

PDF 216 KB Posted

Attached to
JPP Regulatory Office - HVAC Units Replacement
Solicitation number
W912P526QA015
Issued by

About this file

Summary: Statement of Work – JPP Regulatory Office HVAC Units Replacement

This Statement of Work describes labor, materials, equipment, and services required to remove and replace three existing 4-ton packaged system HVAC units at 3701 Bell Road, Nashville, TN 37214. The work must be completed within 90 days of contract receipt, Monday through Friday, 0730-1600, except Federal Holidays. The Point of Contact is Joshua Frost (615-369-7515; joshua.w.frost@usace.army.mil). Three new high-efficiency 4-ton heat pump units must be installed with minimum 48,000 Btu/hr net cooling capacity, minimum SEER/SEER2 of 14.2, R-454B refrigerant, direct drive fans, standard 2" air filters with hinged access panels, and 7-day programmable digital thermostats with holiday scheduling and multi-stage capability. All work must conform to manufacturer recommendations, ASHRAE Guidelines (1992 HVAC Systems and Equipment Handbook), and EM-385-1 safety requirements. The contractor must provide all tools, labor, materials, supervision, and equipment; recover refrigerant in compliance with regulations; and maintain a neat work environment with daily cleanup. Outdoor units located on concrete pads in a chain-link fenced area; fence on west side may be removed for access but must be restored daily.

The contractor shall furnish operating and maintenance instruction manuals, system test reports in booklet form, and establish a quality control system with accessible records. HVAC mechanics must have minimum five years' experience with certified credentials provided before work begins; helpers may have less than two years' experience under direct supervision. System plans and drawings with catalog cuts demonstrating specification compliance must be submitted within 30 days of contract award. Upon completion and testing, the contractor must provide a one-year Extended Warranty covering full parts and labor with no out-of-pocket government expenses. An Activity Hazard Analysis must be prepared and approved by the Contracting Officer's Representative before work begins. Contractor personnel will be escorted in restricted areas; no background investigation or special training is required since this is classified as a supply contract with incidental labor. The removed equipment and refrigerant become contractor property for proper disposal in accordance with applicable regulations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JPP Regulatory Office – HVAC Units Replacement

Statement of Work

Description:

This Scope of Work outlines the labor, materials, equipment, and services required to remove and replace three existing packaged system 4-ton HVAC units at the designated facility.

Place of Delivery:

3701 Bell Road Nashville, TN 37214

Contractor shall coordinate with the POC for all site visits.

POC:

Joshua Frost 615-369-7515 joshua.w.frost@usace.army.mil

Working days and hours: Mon.-Fri., 0730-1600, except Federal Holidays.

Scope of Work:

1. Equipment to be furnished and installed will be in accordance with the following specifications. The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items to perform the work.

1.1. Perform all work in accordance with safety requirements in EM-385-1.

1.2. Removed equipment and refrigerants become the property of the Contractor to be disposed of in accordance with all applicable local, state, and Federal regulations.

1.3. Perform all work in a manner to prevent accidental damage to other property. In the event of accidental damage, the Contractor shall repair/replace as needed to restore that item(s) condition to pre-damaged state.

1.4. Selection and installation of all connections, controls, accessories, and other appurtenances must conform with the manufacturer’s recommendations. Connections of all three units to existing ductwork are to be made at full size in accordance with standard industry practices.

1.5. Replace all thermostats with digital thermostats.

1.6. Startup, testing and balancing, including adjusting existing ductwork dampers.

mailto:joshua.w.frost@usace.army.mil

2. Under the contract, the contractor shall furnish the following:

2.1. Remove and replace the existing three (3) packaged system units on ground level next to the

Regulatory building at 3701 Bell Road, Nashville 37214. The three (3) new high efficiency 4-ton packaged systems installed must conform to the following requirements:

2.1.1. Nominal 4-tons of cooling, with a minimum of 48,000 Btu/hr net cool capacity, minimum SEER/SEER2 of 14.2.

2.1.2. Heat pump with nominal 4-tons of heating capacity.

2.1.3. Use refrigerant R-454B

2.1.4. Direct drive fans

2.1.5. Standard 2” air filter with hinged access panels

2.1.6. Thermostat controls shall be 7-day time clock, holiday scheduling, multi-stage capability a large LCD (liquid crystal display) temperature display.

2.2. The three outdoor units are located on concrete pads adjacent to the building within a chain-link fenced area. The fence on the west side of the building can be removed to provide access and there is unrestricted access along the east side of the building to remove and replace units.

If the fence on the west side of the building near the Regulatory main entrance is removed, it must be restored at the end of each workday. The fence section is approximately 10 ft wide.

2.3. Provide and install all connections, controls, and accessories required for complete function of the three (3) newly installed 4-ton packaged system units with the existing mechanical system.

2.4. Follow manufacturer’s recommendations for refrigerant line sizing, do not allow or use refrigerant lines smaller than the manufacturer’s recommendations at any point. Any new refrigerant lines must be all ACR copper tubing or pipe, brazed, and installed in accordance with best industry practices.

3. In addition to the manufacturer’s standard warranty, the Contractor must provide a full one-year Extended Warranty starting from the date of turnover of the newly installed system. This one-year Extended Warranty must include full coverage (including but not limited to full parts and labor) for repairs which shall not incur an out-of-pocket expense to the Government in case of any defect or failure of the installed system during the timeframe of the Extended Warranty.

SAFETY:

An AHA (Activity Hazard Analysis - blank copy attached) will be prepared and turned into the COR prior to work starting. AHA’s will define the activities being performed and identify the sequences of work, the specific hazards anticipated, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk. Work will not begin until the AHA for the work activity has been accepted by the COR and discussed with all engaged in the activity, including the Contractor, subcontractor(s), and Government on-site representatives at preparatory and initial control phase meetings. The contractor shall inform any subcontractors of the safety requirements of the Corps of Engineers and supply a 385-1-1 for their review. The safety and health requirements manual can be found at http://www.usace.army.mil/SafetyandOccupationalHealth/EM38511,2008BeingRevised.aspx All work shall be performed in accordance with safety requirements as stated in the requirements contract. The Contractor will inform all workers of safety regulations and equipment necessary for this work order. Any equipment found not in conformance with the Corps of Engineers Safety Manual, EM http://www.usace.army.mil/SafetyandOccupationalHealth/EM38511,2008BeingRevised.aspx

385-1-1, will be removed from Government Property immediately. Work areas must be clearly marked to warn any visitors of any hazards. At the end of each day, the Contractor will assure that the work area is checked and clear of any safety hazards while the site is unattended. Additional precautions will be taken to eliminate safety hazards and to clearly mark the work area when it is to be left unattended during non-work days.

Pre-work Meeting and Final Inspection:

A pre-work meeting at the work site will be held to review the specifications, diagrams, photographs, etc. Inspections of this job shall be made periodically throughout the work. The COR’s representative will make a final inspection before the job is received and final payment made.

GENERAL:

The Contractor shall furnish all tools, labor and materials necessary to perform all work covered by these specifications. The work shall be in accordance with ASHRAE Guidelines in particular the 1992 ASHRAE HVAC Systems and Equipment Handbook.

Qualifications of HVAC Mechanics: HVAC mechanics employed to install, supervise and test the systems shall be certified to have not less than five years experience installing, supervising and testing systems of the type and rating specified. Helpers or apprentices with less than two years experience will be permitted to work under the direct supervision of a HVAC mechanic. Certificates of experience of mechanics shall be furnished to the Contracting Officers Representative prior to commencement of work.

One copy of system plans and/or drawings shall be submitted for approval. Plans/drawing shall include catalog cuts (with sizes, model numbers, etc.) with sufficient information to demonstrate conformance to the specifications. All plans and/or drawings shall be submitted to the Contracting Officer within 30 days after receipt of the Contact.

1. The Contractor shall furnish the Contracting Officer or the Contracting Officer's Representative 1 complete copy of operating instructions outlining the step-by-step procedures for system start up, operation and shutdown. The instructions shall include the manufacturer's name, model number, service manual parts list, and brief description of all equipment and their basic operating features.

2. The Contractor shall furnish the Contracting Officer or the Contracting Officer's Representative 1 complete copy of maintenance instructions listing routine maintenance procedures, possible breakdowns and repairs, and troubleshooting guides.

3. Upon completion and testing of the installed system, test reports shall be submitted in booklet form showing all field tests performed to adjust each component and all field tests performed to prove compliance with the specified performance criteria.

4. Quality Control: The Contractor shall establish and maintain a quality control system to assure compliance with the requirements stipulated in these specifications. The Contractor's work area shall be open and available to the Contracting Officer or the Contracting Officer's Representative for the purpose of inspection of work on this contract. Records shall be maintained on all materials used including brand names, sizes, model numbers and any other pertinent information. The quality control records shall be available at all times for inspection.

4.1 Commencement, Prosecution and Completion.

4.2 Upon receipt of the Contract the Contractor shall proceed immediately with the performance of the work.

4.3 The Contractor shall coordinate with the Contracting Officers Representative on work and storage areas at the RMO office.

4.4 All work shall be completed within 90 days after receipt of the Contract.

4.5 Demolition. Material removed not to be reinstalled shall, upon removal, become the property of the Contractor. Removed material, debris and trash generated by this work shall not be allowed to accumulate and it shall be removed by the Contractor, at intervals consistent with a neat and orderly work space. No sale of removed material shall take place on Government property. Recovery of existing Freon shall be the responsibility of the contractor.

4.6 The Contractor shall have on hand all material required to complete this contract before the HVAC systems can be taken out of service. This shall be coordinated with the Contracting Officer's authorized representative before the systems are taken out of service.

Cleanup:

Work areas will be kept neat and orderly during the work period. The contractor shall be responsible to repair any damage caused to existing areas/facilities that is within his control to prevent. Confine demolition and construction activities to work area limits directly around the existing site.

MATERIALS:

Materials shall be as specified herein. All materials shall be manufactured by firms which are regularly engaged in manufacturing materials of these types. Substitutions may be submitted for approval by the Contracting Officer or the Contracting Officer's Representative. All materials shall be new and unused.

Materials shall be stored before use as recommended by the manufacturer to prevent damage to the material.

Standard Products. Material and equipment shall be the standard products of manufacturers regularly engaged in the manufacture of HVAC systems and products. Equipment shall be supported by a service organization that is, in the opinion of the Contracting Officer or the Contracting Officer's Representative, reasonably convenient to the site.

Units shall be shipped as single packages only and shall be stored and handled according to unit manufacturer's recommendations.

Install work in such a manner and at such time that a minimum of cutting and patching of the building structure is required.

The system shall be designed and installed such that the Government or its agents are able to perform repair, replacement, upgrades, and expansions of the system without further dependence on the original Contractor.

Security:

1: General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures—this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

2: Background Investigation and Training Requirements: Since this is a supply contract with incidental labor for installation of the equipment, there are no background investigation or training requirements. However, the Contractor(s) will be escorted at all times inside any restricted area. Contact the point of contact provided in paragraph “Place of Delivery” for determination of the areas that are considered to be restricted.